CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18 CT-EPC/011/SH-EPM/EP-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) FORMAT No.: P-0200/152/PAINT-01

South West Gas Fields Development Project, Algeria

REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND

Report No : HBH-ENC-FWT- PAI -0001 Date : 19/09/2022 Steel Temp (OC) : 40°

 

Primer

PPG

Intermidate Final

/ /

S.No

Drawing No. / Iso No.

Spool No

Abrasive Blasting

1

ROOF PLATE

SUB CONTRACTOR

Sign

 Name Date

Relative Humidity (%) : 2

Brand Name SIGMAZINC 102 HS

Sa 2,5

Surface Profile (Microns)

70

Batch No. P121165496

/ / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg 72

60

LTHE

62

66

61

64 64.2

/ / Date & Time: Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

/

/

/

/

/

Holiday check Acc/Not Acc

Avg /

CLIENT

Remarks

 

CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18 CT-EPC/011/SH-EPM/EP-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) FORMAT No.: P-0200/152/PAINT-01

South West Gas Fields Development Development Project, Algeria

REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND

Report No : HBH-ENC-FWT- PAI -0002 Date : 0 05 5/10/2022 Steel Temp (OC) : 32°

 

Primer

/

Intermidate Final

BELGIUM /POLAND /

S.No

Drawing No. / Iso No.

Spool No

Abrasive Blasting

1

ROOF PLATE

SUB CONTRACTOR

Sign

 Name Date

Relative Humidity (%) : 2

Brand Name /

Sa 2,5

Surface Profile (Microns)

Batch No. /

SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg /

/

LTHE

/

/

/

/

21241179154 / Date & Time: Primer+Intermediate+Final (DFT- microns)

1 190

Required Range: 2 3 4 5 1 17 78

18 182

18 184

Holiday check Acc/Not Acc

Avg

20 208 188.4

CLIENT

Remarks

 

CONTRACT No.: CT-EPC/011/SH-EPM/E CT-EPC/011/SH-EPM/EP-G/18 P-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND

Report No : HBH-ENC-FWT- PAI -0001 Date : 1 19 9/09/2022 Steel Temp (OC) : 38°

 

Primer

PPG

Intermidate Final

/ /

S.No

Drawing No. / Iso No.

Relative Humidity (%) : 3

Brand Name SIGMAZINC 102 HS /105 BAS

Spool No

Abrasive Blasting

Surface Profile (Microns)

/ / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Av A vg

Batch No. P121165496 / P132209891 / / Date & Time: Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Holiday check Acc/Not Acc

Avg

1

OUTERSHELL 01

Sa 2,5

70

75

78

80

88

79

80

/

/

/

/

/

/

2

OUTERSHELL 02

Sa 2,5

71

77

84

82

74

86

80 8 0.6

/

/

/

/

/

/

3

OUTERSHELL 03

Sa 2,5

72

80

82

78

86

76

80 8 0.4

/

/

/

/

/

/

4

OUTERSHELL 04

Sa 2,5

73

78

85

88

82

74

81 8 1.4

/

/

/

/

/

/

5

OUTERSHELL 05

Sa 2,5

74

102

92

88

86

88

91.2

/

/

/

/

/

/

SUB CONTRACTOR

Sign

 Name Date

LTHE

CLIENT

Remarks

 

CONTRACT No.: CT-EPC/011/SH-EPM/E CT-EPC/011/SH-EPM/EP-G/18 P-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND

SURFACE PREPARATION AND PAINTING INSPECTION REPORT Report No : HBH-ENC-FWT- PAI -0004

Date : 2 20 0/10/2022 Steel Temp (OC) : 32°

 

Primer

/

Intermidate Final

PPG /

S.No

Drawing No. / Iso No.

Relative Humidity (%) : 2

Brand Name /

Spool No

Abrasive Blasting

Surface Profile (Microns)

Batch No. /

SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Av A vg

21241179154 / Date & Time: Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Avg

1

OUTERSHELL -01

Sa 2,5

/

/

/

/

/

/

202

196

192

208

210 201.6

2

OUTERSHELL -02

Sa 2,5

/

/

/

/

/

/

204

218

220

204

198 208.8

3

OUTERSHELL -03

Sa 2,5

/

/

/

/

/

/

198

212

210

208

204 206.4

4

OUTERSHELL -04

Sa 2,5

/

/

/

/

/

/

188

200

220

196

207 202.2

5

OUTERSHELL -05

Sa 2,5

/

/

/

/

/

/

222

214

216

192

190 206.8

SUB CONTRACTOR

Sign

 Name Date

LTHE

Holiday check Acc/Not Acc

CLIENT

Remarks

 

CONTRACT No.: CT-EPC/011/SH-EPM CT-EPC/011/SH-EPM/EP-G/18 /EP-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Developmen Developmentt Project, Algeria

FORMAT No.: P-0200/152 PAINT REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND

Report No : HBH-ENC-FWT- PAI -0006 Date : 1 12 2/12/2022 Steel Temp (OC) : 32°

 

Primer

/

Intermidate Final

/ INTERNATIONAL

S.No

Drawing No. / Iso No.

Relative Humidity (%) : 6

Brand Name /

Spool No

Abrasive Blasting

Surface Profile (Microns)

Batch No. /

/ INTHERTANE 990 Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg

/ 2331281040 Date & Time: Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Avg

1

OUTERSHELL -01

Sa 2,5

/

/

/

/

/

/

280

275

312

325

295 297.4

2

OUTERSHELL -02

Sa 2,5

/

/

/

/

/

/

290

31 3 10

30 3 05

40 4 00

26 2 65

3

OUTERSHELL -03

Sa 2,5

/

/

/

/

/

/

310

300

258

274

269 282.2

4

OUTERSHELL -04

Sa 2,5

/

/

/

/

/

/

250

228

305

320

270 274.6

5

OUTERSHELL -05

Sa 2,5

/

/

/

/

/

/

315

29 2 95

30 3 00

27 2 70

22 2 20

27 2 74

ROOF PLATE

Sa 2,5

/

/

/

/

/

/

320

27 2 75

25 2 50

35 3 55

26 2 65

29 2 93

SUB CONTRACTOR

Sign

 Name Date

LTHE

Holiday check Acc/Not Acc

31 3 14

CLIENT

Remarks