CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18 CT-EPC/011/SH-EPM/EP-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) FORMAT No.: P-0200/152/PAINT-01
South West Gas Fields Development Project, Algeria
REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND
Report No : HBH-ENC-FWT- PAI -0001 Date : 19/09/2022 Steel Temp (OC) : 40°
Primer
PPG
Intermidate Final
/ /
S.No
Drawing No. / Iso No.
Spool No
Abrasive Blasting
1
ROOF PLATE
SUB CONTRACTOR
Sign
Name Date
Relative Humidity (%) : 2
Brand Name SIGMAZINC 102 HS
Sa 2,5
Surface Profile (Microns)
70
Batch No. P121165496
/ / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg 72
60
LTHE
62
66
61
64 64.2
/ / Date & Time: Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
/
/
/
/
/
Holiday check Acc/Not Acc
Avg /
CLIENT
Remarks
CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18 CT-EPC/011/SH-EPM/EP-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) FORMAT No.: P-0200/152/PAINT-01
South West Gas Fields Development Development Project, Algeria
REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND
Report No : HBH-ENC-FWT- PAI -0002 Date : 0 05 5/10/2022 Steel Temp (OC) : 32°
Primer
/
Intermidate Final
BELGIUM /POLAND /
S.No
Drawing No. / Iso No.
Spool No
Abrasive Blasting
1
ROOF PLATE
SUB CONTRACTOR
Sign
Name Date
Relative Humidity (%) : 2
Brand Name /
Sa 2,5
Surface Profile (Microns)
Batch No. /
SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg /
/
LTHE
/
/
/
/
21241179154 / Date & Time: Primer+Intermediate+Final (DFT- microns)
1 190
Required Range: 2 3 4 5 1 17 78
18 182
18 184
Holiday check Acc/Not Acc
Avg
20 208 188.4
CLIENT
Remarks
CONTRACT No.: CT-EPC/011/SH-EPM/E CT-EPC/011/SH-EPM/EP-G/18 P-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND
Report No : HBH-ENC-FWT- PAI -0001 Date : 1 19 9/09/2022 Steel Temp (OC) : 38°
Primer
PPG
Intermidate Final
/ /
S.No
Drawing No. / Iso No.
Relative Humidity (%) : 3
Brand Name SIGMAZINC 102 HS /105 BAS
Spool No
Abrasive Blasting
Surface Profile (Microns)
/ / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Av A vg
Batch No. P121165496 / P132209891 / / Date & Time: Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Holiday check Acc/Not Acc
Avg
1
OUTERSHELL 01
Sa 2,5
70
75
78
80
88
79
80
/
/
/
/
/
/
2
OUTERSHELL 02
Sa 2,5
71
77
84
82
74
86
80 8 0.6
/
/
/
/
/
/
3
OUTERSHELL 03
Sa 2,5
72
80
82
78
86
76
80 8 0.4
/
/
/
/
/
/
4
OUTERSHELL 04
Sa 2,5
73
78
85
88
82
74
81 8 1.4
/
/
/
/
/
/
5
OUTERSHELL 05
Sa 2,5
74
102
92
88
86
88
91.2
/
/
/
/
/
/
SUB CONTRACTOR
Sign
Name Date
LTHE
CLIENT
Remarks
CONTRACT No.: CT-EPC/011/SH-EPM/E CT-EPC/011/SH-EPM/EP-G/18 P-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND
SURFACE PREPARATION AND PAINTING INSPECTION REPORT Report No : HBH-ENC-FWT- PAI -0004
Date : 2 20 0/10/2022 Steel Temp (OC) : 32°
Primer
/
Intermidate Final
PPG /
S.No
Drawing No. / Iso No.
Relative Humidity (%) : 2
Brand Name /
Spool No
Abrasive Blasting
Surface Profile (Microns)
Batch No. /
SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Av A vg
21241179154 / Date & Time: Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Avg
1
OUTERSHELL -01
Sa 2,5
/
/
/
/
/
/
202
196
192
208
210 201.6
2
OUTERSHELL -02
Sa 2,5
/
/
/
/
/
/
204
218
220
204
198 208.8
3
OUTERSHELL -03
Sa 2,5
/
/
/
/
/
/
198
212
210
208
204 206.4
4
OUTERSHELL -04
Sa 2,5
/
/
/
/
/
/
188
200
220
196
207 202.2
5
OUTERSHELL -05
Sa 2,5
/
/
/
/
/
/
222
214
216
192
190 206.8
SUB CONTRACTOR
Sign
Name Date
LTHE
Holiday check Acc/Not Acc
CLIENT
Remarks
CONTRACT No.: CT-EPC/011/SH-EPM CT-EPC/011/SH-EPM/EP-G/18 /EP-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Developmen Developmentt Project, Algeria
FORMAT No.: P-0200/152 PAINT REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
CUSTOMER : SONATRACH CONTRACTOR : L&T Hydrocarbon Engineering Limited Visual Check : ACC Abrasive Used : SAND
Report No : HBH-ENC-FWT- PAI -0006 Date : 1 12 2/12/2022 Steel Temp (OC) : 32°
Primer
/
Intermidate Final
/ INTERNATIONAL
S.No
Drawing No. / Iso No.
Relative Humidity (%) : 6
Brand Name /
Spool No
Abrasive Blasting
Surface Profile (Microns)
Batch No. /
/ INTHERTANE 990 Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg
/ 2331281040 Date & Time: Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Avg
1
OUTERSHELL -01
Sa 2,5
/
/
/
/
/
/
280
275
312
325
295 297.4
2
OUTERSHELL -02
Sa 2,5
/
/
/
/
/
/
290
31 3 10
30 3 05
40 4 00
26 2 65
3
OUTERSHELL -03
Sa 2,5
/
/
/
/
/
/
310
300
258
274
269 282.2
4
OUTERSHELL -04
Sa 2,5
/
/
/
/
/
/
250
228
305
320
270 274.6
5
OUTERSHELL -05
Sa 2,5
/
/
/
/
/
/
315
29 2 95
30 3 00
27 2 70
22 2 20
27 2 74
ROOF PLATE
Sa 2,5
/
/
/
/
/
/
320
27 2 75
25 2 50
35 3 55
26 2 65
29 2 93
SUB CONTRACTOR
Sign
Name Date
LTHE
Holiday check Acc/Not Acc
31 3 14
CLIENT
Remarks