Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report MiCOM P922 81H/L
P922
Bay Ref: Substation: REVISION PAGES 0 1
SUMMARY 1
PURPOSE OF TESTS
2
X
2
REFERENCE DOCUMENT
2
X
3
SCOPE
2
X
4
RELAY TERMINLOGY
3
X
5
TEST EQUIPMENT
3
X
6
PRE-REQUISTES
3
X
7
PROCEDURES
4
X
8
RECORD TEST SHEET
6
X
8.1 RELAY INFORMATION 8.2 VT DATA: 8.3 PRODUCT CHECKS 8.4 MEASURMENT VALUE TEST: 8.5 OVER FREQUENCY PROTECTION 8.6 UNDER FREQUENCY PROTECTION 8.7 BINARY INPUT TEST : 8.8 BINARY OUTPUT TEST: 8.9 FIXED LED INDICATIONS TEST: 8.10
LED INDICATIONS TEST:
8.11
FINAL CHECK
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV-1
Page 1 of 9
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
P922 1
TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report MiCOM P922 81H/L
Bay Ref: Substation:
PURPOSE OF TESTS
The purpose of the tests is to check the full functionality of the protection relay. This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures. This procedure does not intend to check all tripping matrix and PSL logic tests, this, when applicable, is described into a separate document, dedicated to the specific substation and feeder type. 2
REFERENCE DOCUMENTS DOCUMENT REFERENCE
DOCUMENT
VERSION/ DATE
REMARKS
Protection Line Diagram Schematic Drawing Service Manual Operation Manual Protection Relay Coordination Principles Relay setting Calculation LED Display Configuration
3
SCOPE
Substation Name :Diameter: Bay : Panel Number : Relay Denomination in Scheme Scheme to be Checked
Relay Functionality Test.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV-1
Page 2 of 9
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
P922 4
Bay Ref: Substation:
TERMINOLOGY
Code ( ANSI) 81H/L
5
TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report MiCOM P922 81H/L
Terminology Over/Under Frequency Relay
TEST EQUIPMENT USED
Sl No 1.
Description
Make
Equipment Sl No.
Calibration date
2.
Secondary Injection Kit Multimeter
3.
Laptop
NA
Setting software
Type : MICOM S1 Studio Version : 2.14
6
Calibration due date
PRE - REQUISITES PRE-REQUISITES
REMARKS
All Safety Condition Are Ok All Competent Personnel Available For The Test Ac & Dc Supply Availability And Security PPE Safety Available. All Other Relevant Safety Instructions Been Followed Coordination With Other Parties ( GIS, Transformer, Etc..)
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV-1
Page 3 of 9
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
P922 7
TRANSMISSION & DISTRIBUTION
Site Acceptance Test Report MiCOM P922 81H/L
Bay Ref: Substation:
TEST PROCEDURES The following procedures are written for demonstrating the main protection functions of the P922 relay using an Omicron test set or similar. The tests do not test the boundaries of all available function characteristics. They do test that the function is operating at a point on one chosen characteristic. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.
NOTE : All the Test are performed in the Test Switch. Omicron CMC156 Test Equipment or Any Equivalent To Be Used ..
7.1 Testing Over/Under Frequency function Note : stage (f1>) or (f1) (overfrequency), then configure it at (81) or (f1) or (tf1) check: 1. If time delay (tf1>) is short, gradually increase the frequency from the nominal frequency fn to the value of the stage (f1>): tripping should occur for a frequency in the range [(f1>) – 10mHz, (f1>) + 10mHz]. 2. If time delay (tf1>) is long, adjust the frequency to [(f1>) – 50mHz] and check that tripping does not occur. Increase the frequency to 1.2x(f1>) and check that tripping occurs. 3. Gradually reduce the frequency and measure the value of the drop-off stage (f1>): the function must reset for a frequency less than or equal to [(f1>) – 50mHz]. Stage (f1