OPERATION MANAGEMENT (CASE: MRP AT A-CAT CORP.)
Short Description
Tugas Kelompok Analisis Kasus Mata Kuliah Manajemen Operasi MM UI Tahun 2015....
Description
18th of May 2015 Operations Management For Competitive Advantage Group 4 Azis Rizky Prawira Camelia Indah Murniwati Jejen Nugraha Muhammad Yuriansyah Putra Nasrul Nabil Sangadji
1406513344 1406513376 1406589114 1406514100 1406589303
OUTLINE Company Background of A-CAT Corp. Problem Identification Theory of MRP Analysis Conclusion & Lesson Learned
Company Background: A-CAT Corp.
Mid-sized manufacturer and distributor of domestic electrical appliances. Operated two medium-sized facilities in Vidarbha region of Maharashtra states of India. Focus on the rural segment (low-income customers). A-CAT’s manufacturing units had been in operation since 1986. Annual sales of Rs6,000,000 US$120,000. Had about 35 employees. Manufactured electrical appliances for household use: television signal boosters, transformers, FM radio kits, electronic ballasts, battery chargers, voltage regulators, etc.
Problem Identification
Sunita Menon was assigned the task of preparing the operation plan for the next eight weeks for the product P0110. The basic problem Menon Faced was deciding how to produce economically. After collecting the data (Bill of Materials, Product Structure Diagram, Master Schedule, On Hand Inventory, Costs Associated), Menon reached a different answer for every lot-sizing technique that she applied.
Theory of MRP
MRP is a planning approach to material / material that ignoring the past, but look to the demands or needs of future production. MRP can be applied for planning materials / parts / components or sub-assemblies that depend on the product or inventory. MRP is a computerized information system is built specifically to help manufacturers manage inventory and schedule of reservations / reception material / materials.
MRP Input
Authorized master production schedule
Inventory transactions
Inventory records
MRP explosion
Material requirements plan
Other sources of demand
Bills of materials
Engineering and process designs
Information for MRP Bill of Materials (BOM) of all products for certain that consists of several levels (level). Number parts / components are unique and permanent. The existence of Master Production Schedule (MPS) of production. The final result contains the time and amount. The amount of material requirements / Notes Inventory (Inventory Record) for each part / component products. Stock code number. Lead time for each part / component in an exact figure. The required amount equal to that of the production schedule.
BOM Sample
Master Production Scheduling
Master production schedule (MPS): Total aggregate production for all types of "family" seats
Inventory Record
Supply Notes : A record that shows an item’s lot-size policy, lead time, and various time-phased data. Gross requirements : The total demand derived from all parent production plans. Scheduled receipts are orders that have been placed but not yet completed. projected on-hand inventory: An estimate of the amount of inventory available each week after gross requirements have been satisfied. planned receipts : Orders that are not yet released to the shop or supplier. planned order releases : An indication of when an order for a specified quantity of an item is to be issued.
Lot Sizing in MRP Systems Lot sizes – the part quantities issued in the planned order receipt and planned order release sections of an MRP schedule.
Analysis
Based on the data (Bill of Materials, Product Structure Diagram, Master Schedule, On Hand Inventory, Costs Associated), Lot Sizes will be determined by using Lot Sizing Strategies below: 1. 2. 3. 4.
Lot for Lot (L4L) Economic Order Quantity (EOQ) Least Total Cost (LTC) Least Unit Cost (LUC)
Bill of Material (BOM)
Level 0
(Quantity)
Independent Demand
(1)
(2)
(2)
1
Dependent Demand
2
(4)
(3)
Master Production Schedule The End Item: P0110
On Hand Inventory
Cost
1. Lot for Lot (L4L)
Lot-for-Lot (L4L) is the most commont technique. It Sets planned orders to exactly match the net requirements Produces exactly what is needed each week with no inventory carroed over into future periods. Minimizes carrying cost. Does not take into account setup costs or capacity limitations.
Step 1: MRP Explosion Calculations MRP Explosion Calculations Item P0110 Q L4L LT 2 OH 240 SS 0
Week Gross requirement Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order release
MRP Explosion Calculations Item POX Q LT OH SS
L4L 1 500 0
-4
-3
-2
-1
1 400
2 350
3 300
4 450
5 300
6 450
7 225
8 525
240
240
240
240
0 300 300 300
0 450 450 450
0 300 300 225
0 450 450 525
0 525 525
350
0 350 350 450
0 225 225
160
0 160 160 300
-2
-1
1
2
3
4
5
6
7
8
320
700
600
900
600
900
450
1050
180 0 0 520
0 520 520 600
0 600 600 900
0 900 900 600
0 600 600 900
0 900 900 450
0 450 450 1050
0 1050 1050
Week -4 Gross requirement Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order release
500
-3
500
0
MRP Explosion Calculations Item POY Q LT OH SS
L4L 1 340 0
Week -4 Gross requirement Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order release
MRP Explosion Calculations Item P1X1 Q LT OH SS
L4L 1 500 0
L4L 1 600 0
340
0
-2
-1
1
2
3
4
5
6
7
8
320
700
600
900
600
900
450
1050
20 0 0 680
0 680 680 600
0 600 600 900
0 900 900 600
0 600 600 900
0 900 900 450
0 450 450 1050
0 1050 1050
6
7
8
6
7
8
Week -4 Gross requirement Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order release
MRP Explosion Calculations Item P1X2 Q LT OH SS
340
-3
500
-3
500
1580
-2
-1
1
2
3
4
5
2080
2400
3600
2400
3600
1800
4200
0 1580 1580 2400
0 2400 2400 3600
0 3600 3600 2400
0 2400 2400 3600
0 3600 3600 1800
0 1800 1800 4200
0 4200 4200
Week -4 Gross requirement Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order release
600
-3
600
960
-2
-1
1
2
3
4
5
1560
1800
2700
1800
2700
1350
3150
0 960 960 1800
0 1800 1800 2700
0 2700 2700 1800
0 1800 1800 2700
0 2700 2700 1350
0 1350 1350 3150
0 3150 3150
Step 2: Lot-for-Lot Run Size for an MRP Schedule P0110 Week
P0X Week
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost 1 160 160 0 0 500 500 2 350 350 0 0 500 1000 3 300 300 0 0 500 1500 4 450 450 0 0 500 2000 5 300 300 0 0 500 2500 6 450 450 0 0 500 3000 7 225 225 0 0 500 3500 8 525 525 0 0 500 4000
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -1 520 520 0 0 400 400 1 600 600 0 0 400 800 2 900 900 0 0 400 1200 3 600 600 0 0 400 1600 4 900 900 0 0 400 2000 5 450 450 0 0 400 2400 6 1050 1050 0 0 400 2800
POY Week -1 1 2 3 4 5 6
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost 680 680 0 0 350 350 600 600 0 0 350 700 900 900 0 0 350 1050 600 600 0 0 350 1400 900 900 0 0 350 1750 450 450 0 0 350 2100 1050 1050 0 0 350 2450
P1X1 Week
P1X2 Week
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -2 1580 1580 0 0 430 430 -1 2400 2400 0 0 430 860 1 3600 3600 0 0 430 1290 2 2400 2400 0 0 430 1720 3 3600 3600 0 0 430 2150 4 1800 1800 0 0 430 2580 5 4200 4200 0 0 430 3010
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -2 960 960 0 0 400 400 -1 1800 1800 0 0 400 800 1 2700 2700 0 0 400 1200 2 1800 1800 0 0 400 1600 3 2700 2700 0 0 400 2000 4 1350 1350 0 0 400 2400 5 3150 3150 0 0 400 2800
Step 3: Total Cost Calculation for L4L Item P0110 P0X P0Y P1X1 P1X2 Total Cost L4L
Cost 4,000 2,800 2,450 3,010 2,800 15,060
2. Economic Order Quantity (EOQ)
Economic order quantity (EOQ) is the order quantity that minimizes total inventory holding costs and ordering costs. It is one of the oldest classical production scheduling models. Step 1: EOQ Calculations
D = Annual Demand H = Annual Holding Cost S = Setup Cost
Step 2: MRP Explosion Calculations Lv 0 (P0110) EOQ = 588 LT :2 Gross requirement schedule receipts projected on hand net requirements Planned order receipts Planned Ending Inventory Planned order releases Lv 1 (POX) EOQ = 1287 LT :1 -3 Gross requirement schedule receipts projected on hand net requirements Planned order receipts Planned Ending Inventory Planned order releases 1287
Lv 1 (POY) LT :1 Gross requirement schedule receipts projected on hand net requirements Planned order receipts Planned Ending Inventory Planned order releases
EOQ = 1665 -3
-2
588
-2 1176 500 676 1287 611
-2 1176 340 836 1665 829
1665
-1
1 2 3 400 350 300
4 450
5 6 7 8 300 450 225 525
240 160 350 300 588 588 428 78 366 588 588
450 588 504 588
300 450 225 525 588 588 204 342 117 180 588
-1 1 2 0 1176 1176
3 4 0 1176
5 6 0 1176
7
3 4 0 1176
5 6 0 1176
0 1176 1176 0 1176 0 1176 1665 1665 1665 1318 142 631 1120 1665 1665 1665
Total Cost :
D= H= S= 2DS/H = EOQ = Total Cost :
7
17940 52 500 345000 588 4719
8
1176 1176 1176 1176 1287 1287 1287 1287 722 833 944 1055 1287 1287 1287 1287
-1 1 2 0 1176 1176
D= H= S= 2DS/H = EOQ =
34970 16.9 400 1655385 1287 3354
8 D= H= S= 2DS/H = EOQ = Total Cost :
36010 9.1 350 2770000 1665 2107
Lv 2 (P1X1) EOQ = 10418 LT :1 -4 -3 Gross requirement 5148 schedule receipts projected on hand 500 net requirements 4648 Planned order receipts 10418 Planned Ending Inventory 5770 Planned order releases 10418
-2 -1 1 0 5148 5148
2 3 0 5148
0 5148 5148 10418 622 5892 10418
0 5148
Lv 2 (P1X2) EOQ = 4994 LT :1 -4 -3 -2 Gross requirement 3861 0 schedule receipts projected on hand 600 net requirements 3261 0 Planned order receipts 4994 Planned Ending Inventory 1733 Planned order releases 4994 4994
4 5 0 5148
6
7
8 D= H= S= 2DS/H = EOQ =
0 5148 10418 744 6014 10418
-1 1 3861 3861
2 3 0 3861
3861 3861 4994 4994 2866 3999 4994
0 3861
4 5 0 3861
0 3861 4994 138 1271 4994
Total Cost :
6
7
164060 1.3 430 108532000 10418 1766
8 D= H= S= 2DS/H = EOQ = Total Cost :
121582.5 3.9 400 24940000 4994 2351
Step 3: EOQ Run Size for an MRP Schedule P0110 Week
P0X Week
POY Week
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost 1 160 588 428 428 500 928 2 350 0 78 78 0 1006 3 300 588 366 366 500 1872 4 450 588 504 504 500 2876 5 300 0 204 204 0 3080 6 450 588 342 342 500 3922 7 225 0 117 117 0 4039 8 525 588 180 180 500 4719
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -2 676 1287 611 199 400 599 -1 0 0 0 0 0 599 1 1176 1287 722 235 400 1233 2 1176 1287 833 271 400 1904 3 0 0 0 0 0 1904 4 1176 1287 944 307 400 2611 5 0 0 0 0 0 2611 6 1176 1287 1055 343 400 3354 Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -2 836 1665 829 145 350 495 -1 0 0 0 0 0 495 1 1176 1665 1318 231 350 1076 2 1176 0 142 25 0 1101 3 0 0 0 0 0 1101 4 1176 1665 631 110 350 1561 5 0 0 0 0 0 1561 6 1176 1665 1120 196 350 2107
P1X1 Week
P1X2 Week
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -3 4648 10418 5770 144 430 574 -2 0 0 0 0 0 574 -1 5148 0 622 16 0 590 1 5148 10418 5892 147 430 1167 2 0 0 0 0 0 1167 3 5148 0 744 19 0 1186 4 0 0 0 0 0 1186 5 3861 10418 6014 150 430 1766
Net Requirements Production Quantity Ending Inventory Holding Cost Setup Cost Total Cost -3 3261 4994 1733 130 400 530 -2 0 0 0 0 0 530 -1 3861 4994 2866 215 400 1145 1 3861 4994 3999 300 400 1845 2 0 0 0 0 0 1845 3 3861 0 138 10 0 1855 4 0 0 0 0 0 1855 5 3861 4994 1271 95 400 2351
Step 4: Total Cost Calculation for EOQ Total EOQ Cost ITEM COST (In Rs) P0110 4719 POX 3354 POY 2107 P1X1 1766 P1X2 2351 TOTAL 14296
3. Least Total Cost (LTC)
Least Total Cost (LTC) is a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup (or ordering) cost for various lot sizes and then selects the lot in which these are most nearly equal.
Step 1
Step 2
Week Quantity Ordered 1 160 1-2 510 1-3 810 1-4 1260 1-5 1560 1-6 2010 1-7 2235 1-8 2760
Carrying Cost Setup Cost Total Cost Different 0 500 500 500 350 500 850 150 950 500 1450 450 2300 500 2800 1800 3500 500 4000 3000 5750 500 6250 5250 7100 500 7600 6600 10775 500 11275 10275
Week Quantity Ordered 3 300 3-4 750 3-5 1050 3-6 1500 3-7 1725 3-8 2250
Carrying Cost Setup Cost Total Cost Different 0 500 500 500 450 500 950 50 1050 500 1550 550 2400 500 2900 1900 3300 500 3800 2800 5925 500 6425 5425
Week Quantity Ordered 5 300 5-6 750 5-7 975 5-8 1500
Carrying Cost Setup Cost Total Cost Different 0 500 500 500 450 500 950 50 900 500 1400 400 2475 500 2975 1975
Week Quantity Ordered 7 225 7-8 750
Carrying Cost Setup Cost Total Cost Different 0 500 500 500 525 500 1025 25
Week 1 2 3 4 5 6 7 8
Net Requirement Prod. Qty Ending Inv. 160 510 350 350 0 0 300 750 450 450 0 0 300 750 450 450 0 0 225 750 525 525 0 0
Holding Cost 350 0 450 0 450 0 525 0
Setup Cost Total Cost 500 850 0 850 500 1800 0 1800 500 2750 0 2750 500 3775 0 3775
LTC Level 0 P0110 Item P0110 POX POY P1X1 P1X2 Week 1 2 3 4 5 6 7 8
Item P0110 POX POY P1X1 PIX2
Inventory 240 500 340 500 600
Net Requirement 400 350 300 450 300 450 225 525
Cost/Unit Set Up Cost 200 500 65 400 35 350 5 430 15 400
Step 1
Step 2
Week Quantity Ordered 1 520 1-2 520 1-3 2020 1-4 2020 1-5 3520 1-6 3520 1-7 5020 1-8 5020
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400 975 400 1375 575 975 400 1375 575 2925 400 3325 2525 2925 400 3325 2525 5850 400 6250 5450 5850 400 6250 5450
Week Quantity Ordered 3 1500 3-4 1500 3-5 3000 3-6 3000 3-7 4500 3-8 4500
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400 975 400 1375 575 975 400 1375 575 2925 400 3325 2525 2925 400 3325 2525
Week Quantity Ordered 5 1500 5-6 1500 5-7 3000 5-8 3000
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400 975 400 1375 575 975 400 1375 575
Week Quantity Ordered 7 1500 7-8 1500
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400
Week 1 2 3 4 5 6 7 8
Net Requirement Prod. Qty Ending Inv. 520 520 0 0 0 0 1500 1500 0 0 0 0 1500 1500 0 0 0 0 1500 1500 0 0 0 0
Holding Cost 0 0 0 0 0 0 0 0
Setup Cost Total Cost 400 400 0 400 400 800 0 800 400 1200 0 1200 400 1600 0 1600
LTC Level 1 P0X Item P0110 POX POY P1X1 P1X2 Week 1 2 3 4 5 6 7 8
Item P0110 POX POY P1X1 PIX2
Inventory 240 500 340 500 600
Qty 1 2 2 4 3
Net Requirement 510 0 750 0 750 0 750 0
Tot. Req 1020 0 1500 0 1500 0 1500 0
Cost/Unit Set Up Cost 200 500 65 400 35 350 5 430 15 400
Step 1
Step 2
Week Quantity Ordered 1 680 1-2 680 1-3 2180 1-4 2180 1-5 3680 1-6 3680 1-7 5180 1-8 5180
Carrying Cost Setup Cost Total Cost Different 0 350 350 350 0 350 350 350 525 350 875 175 525 350 875 175 1575 350 1925 1225 1575 350 1925 1225 3150 350 3500 2800 3150 350 3500 2800
Week Quantity Ordered 5 1500 5-6 1500 5-7 3000 5-8 3000
Carrying Cost Setup Cost Total Cost Different 0 350 350 350 0 350 350 350 525 350 875 175 525 350 875 175
Week 1 2 3 4 5 6 7 8
Net Requirement Prod. Qty Ending Inv. 680 2180 1500 0 0 1500 1500 0 0 0 0 0 1500 3000 1500 0 0 1500 1500 0 0 0 0 0
Holding Cost 263 263 0 0 263 263 0 0
Setup Cost Total Cost 350 613 0 875 0 875 0 875 350 1487.5 0 1750 0 1750 0 1750
LTC Level 1 P0Y Item P0110 POX POY P1X1 P1X2 Week 1 2 3 4 5 6 7 8
Item P0110 POX POY P1X1 PIX2
Inventory 240 500 340 500 600 Net Requirement 510 0 750 0 750 0 750 0
Qty 1 2 2 4 3 Tot. Req 1020 0 1500 0 1500 0 1500 0
Cost/Unit Set Up Cost 200 500 65 400 35 350 5 430 15 400
Step 1
Step 2
Week Quantity Ordered 1 1580 1-2 1580 1-3 7580 1-4 7580 1-5 13580 1-6 13580 1-7 19580 1-8 19580
Carrying Cost Setup Cost Total Cost Different 0 430 430 430 0 430 430 430 300 430 730 130 300 430 730 130 900 430 1330 470 900 430 1330 470 1800 430 2230 1370 1800 430 2230 1370
Week Quantity Ordered 5 6000 5-6 6000 5-7 12000 5-8 12000
Carrying Cost Setup Cost Total Cost Different 0 430 430 430 0 430 430 430 300 430 730 130 300 430 730 130
Week 1 2 3 4 5 6 7 8
Net Requirement Prod. Qty Ending Inv. 1580 7580 6000 0 0 6000 6000 0 0 0 0 0 6000 12000 6000 0 0 6000 6000 0 0 0 0 0
Holding Cost 150 150 0 0 150 150 0 0
Setup Cost Total Cost 430 580 0 730 0 730 0 730 430 1310 0 1460 0 1460 0 1460
LTC Level 2 P1X1 Item P0110 POX POY P1X1 P1X2 Week 1 2 3 4 5 6 7 8
Item P0110 POX POY P1X1 PIX2
Inventory 240 500 340 500 600 Net Requirement 520 0 1500 0 1500 0 1500 0
Qty 1 2 2 4 3 Tot. Req 2080 0 6000 0 6000 0 6000 0
Cost/Unit Set Up Cost 200 500 65 400 35 350 5 430 15 400
Step 1
Step 2
Week Quantity Ordered 1 960 1-2 960 1-3 5460 1-4 5460 1-5 9960 1-6 9960 1-7 14460 1-8 14460
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400 675 400 1075 275 675 400 1075 275 2025 400 2425 1625 2025 400 2425 1625 4050 400 4450 3650 4050 400 4450 3650
Week Quantity Ordered 5 4500 5-6 4500 5-7 9000 5-8 9000
Carrying Cost Setup Cost Total Cost Different 0 400 400 400 0 400 400 400 675 400 1075 275 675 400 1075 275
Week 1 2 3 4 5 6 7 8
Net Requirement Prod. Qty Ending Inv. 960 5460 4500 0 0 4500 4500 0 0 0 0 0 4500 9000 4500 0 0 4500 4500 0 0 0 0 0
Holding Cost 338 338 0 0 338 338 0 0
Setup Cost Total Cost 400 738 0 1075 0 1075 0 1075 400 1813 0 2150 0 2150 0 2150
LTC Level 2 P1X2 Item P0110 POX POY P1X1 P1X2 Week 1 2 3 4 5 6 7 8
Inventory 240 500 340 500 600
Net Requirement 520 0 1500 0 1500 0 1500 0
Item P0110 POX POY P1X1 PIX2
Qty 1 2 2 4 3 Tot. Req 1560 0 4500 0 4500 0 4500 0
Cost/Unit Set Up Cost 200 500 65 400 35 350 5 430 15 400
Step 3: Total Cost Calculation for LTC
Item P0110 P0X P0Y P1X1 P1X2 Total Cost
Cost 3,775 1,600 1,750 1,460 2,150 10,735
4. Least Unit Cost (LUC)
Least unit cost method – a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
LUC
Step 1 Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
1
160
0
500
500
1-2
510
350
500
850
1-3
810
950
500
1450
1-4
1260
2300
500
2800
1-5
1560
3500
500
4000
1-6
1200
5750
500
6250
1-7
2235
7100
500
7600
1-8
2760
10775
500
11275
3.13 1.67 1.79 2.22 2.56 5.21 3.40 4.09
Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
3
300
0
500
500
3-4
750
450
500
950
3-5
1050
1050
500
1550
3-6
1500
2400
500
2900
3-7
1725
3300
500
3800
3-8
2250
5925
500
6425
1.7 1.3 1.5 1.9 2.2 2.9
Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
5
300
0
500
500
5-6
750
450
500
950
5-7
975
900
500
1400
5-8
1500
2475
500
2975
1.7 1.3 1.4 2.0
Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
7
225
0
500
500
7-8
750
525
500
1025
2.2 1.4
Step 2
Level 0 P0110
Week
Net Requirement
Prod. Qty
Ending Inv.
Holding Cost
Setup Cost
Total Cost
1
160
510
350
350
500
850
2
350
0
0
0
0
850
3
300
750
450
450
500
1800
4
450
0
0
0
0
1800
5
300
750
450
450
500
2750
6
450
0
0
0
0
2750
7
225
750
525
525
500
3775
8
525
0
0
0
0
3775
LUC
Step 1 Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
-1
0
0
0
0
-1-0
520
0
400
400
-1-1
1120
195
400
595
-1-2
2020
780
400
1180
-1-3
2620
1365
400
1765
-1-4
3520
2535
400
2935
-1-5
3970
3266.25
400
3666.25
-1-6
5020
5313.75
400
5713.75
0 0.77 0.53 0.58 0.67 0.83 0.92 1.14
Week 2
Quantity Ordered 900
Carrying Cost 0
Setup Cost 400
Total Cost 400
2-3
1500
195
400
595
2-4
2400
780
400
1180
2-5
2850
1218.75
400
1618.75
2-6
3900
2583.75
400
2983.75
Week 4
Quantity Ordered 900
Carrying Cost 0
Setup Cost 400
Total Cost 400
4-5
1350
146.25
400
546.25
4-6
2400
828.75
400
1228.75
Week 6
Quantity Ordered 1050
Carrying Cost 0
Setup Cost 400
Total Cost 400
Step 2
Level 1 P0X
Unit Cost
0.44 0.40 0.49 0.57 0.77
Unit Cost
0.44 0.40 0.51
Unit Cost
0.38
Week
Net Requirement
Prod. Qty
Ending Inv.
Holding Cost
Setup Cost
Total Cost
-1
0
0
180
58.5
0
58.5
0
520
1120
600
195
400
653.5
1
600
0
0
0
0
653.5
2
900
1500
600
195
400
1248.5
3
600
0
0
0
0
1248.5
4
900
1350
450
146.25
400
1794.75
5
450
0
0
0
0
1794.75
6
1050
1050
0
0
400
2194.75
Step 1
Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
-1
0
0
0
0
-1-0
680
0
350
350
-1-1
1280
105
350
455
-1-2
2180
420
350
770
-1-3
2780
735
350
1085
-1-4
3680
1365
350
1715
-1-5
4130
1758.75
350
2108.75
-1-6
5180
2861.25
350
3211.25
0 0.51 0.36 0.35 0.39 0.47 0.51 0.62
Week 3
Quantity Ordered 600
Carrying Cost 0
Setup Cost 350
Total Cost 350
3-4
1500
157.5
350
507.5
3-5
1950
315
350
665
3-6
3000
866.25
350
1216.25
Week 5
Quantity Ordered 450
Carrying Cost 0
Setup Cost 350
Total Cost 350
5-6
1500
183.75
350
533.75
Step 2
LUC Level 1 P0Y
Unit Cost
0.58 0.338 0.341 0.41 Unit Cost
0.78 0.36
Week
Net Requirement
Prod. Qty
Ending Inv.
Holding Cost
Setup Cost
Total Cost
-1
0
0
20
3.5
0
3.5
0
680
2180
1500
262.5
350
616
1
600
0
900
157.5
0
773.5
2
900
0
0
0
0
773.5
3
600
1500
900
157.5
350
1281
4
900
0
0
0
0
1281
5
450
1500
1050
183.75
350
1814.75
6
1050
0
0
0
0
1814.75
LUC Step 1 Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
-1
780
0
430
430
-1-0
3580
70
430
500
-1-1
5980
190
430
620
-1-2
9580
460
430
890
-1-3
11980
700
430
1130
-1-4
15580
1150
430
1580
-1-5
17380
1420
430
1850
-1-6
21580
2155
430
2585
0.55 0.14 0.10 0.093 0.094 0.10 0.11 0.12
Week 3
Quantity Ordered 2400
Carrying Cost 0
Setup Cost 430
Total Cost 430
3-4
3600
90
430
520
3-5
7800
180
430
610
3-6
11400
495
430
925
Week 6
Quantity Ordered 4200
Carrying Cost 0
Setup Cost 430
Total Cost 430
Step 2
Level 2 P1X1
Unit Cost
0.18 0.14 0.078 0.081 Unit Cost
0.10
Week
Net Requirement
Prod. Qty
Ending Inv.
Holding Cost
Setup Cost
Total Cost
-1
780
9580
8800
220
430
220
0
2800
0
6000
150
0
370
1
2400
0
3600
90
0
460
2
3600
0
0
0
0
460
3
2400
7800
5400
135
430
1025
4
3600
0
1800
45
0
1070
5
1800
0
0
0
0
1070
6
4200
4200
0
0
430
1500
LUC Step 1 Week
Quantity Ordered
Carrying Cost
Setup Cost
Total Cost
Unit Cost
-1
360
0
400
400
-1-0
2460
157.5
400
557.5
-1-1
4260
427.5
400
827.5
-1-2
6960
1035
400
1435
-1-3
8760
1575
400
1975
-1-4
11460
2587.5
400
2987.5
-1-5
12810
3195
400
3595
-1-6
15960
4848.75
400
5248.75
1.11 0.23 0.19 0.21 0.23 0.26 0.28 0.33
Week 2
Quantity Ordered 2700
Carrying Cost 0
Setup Cost 400
Total Cost 400
2-3
4500
135
400
535
2-4
7200
540
400
940
2-5
8550
843.75
400
1243.75
2-6
11700
1788.75
400
2188.75
Week 4
Quantity Ordered 2700
Carrying Cost 0
Setup Cost 400
Total Cost 400
4-5
4050
101.25
400
501.25
4-6
7200
573.75
400
973.75
Week 6
Quantity Ordered 3150
Carrying Cost 0
Setup Cost 400
Total Cost 400
Step 2
Level 2 P1X2
Unit Cost
0.15 0.12 0.13 0.15 0.19 Unit Cost
0.15 0.12 0.14 Unit Cost
0.13
Week
Net Requirement
Prod. Qty
Ending Inv.
Holding Cost
Setup Cost
Total Cost
-1
360
4260
3900
97.5
400
97.5
0
2100
0
1800
45
0
142.5
1
1800
0
0
0
0
142.5
2
2700
4500
1800
45
400
587.5
3
1800
0
0
0
0
587.5
4
2700
4050
1350
33.75
400
1021.25
5
1350
0
0
0
0
1021.25
6
3150
3150
0
0
400
1421.25
Step 3: Total Cost Calculation for LUC
Item P0110 P0X P0Y P1X1 P1X2 TOTAL
Cost (Rs) 3,775 2,195 1,815 1,500 1,421 10,706
Conclusion
Based on calculations, Total Cost for every lot-sizing Method as follows Lot-Sizing Method
Total Cost (Rs)
Lot-for-Lot (L4L)
15,060
Economic Order Quantity (EOQ)
14,296
Least Total Cost (LTC)
10,735
Least Unit Cost (LUC)
10,706
The lowest cost was obtained using the Least Unit Cost Method of Rs10,706. Sunita Menon should choose the Least Unit Cost Method as Lot Sizing Strategy at A-Cat Corp.
Lesson Learned
MRP system determines detailed schedules that show exactly what is needed over time. MRP is most useful in industries where standard products are made in batches from common components and parts. The system’s effectiveness depended on the inventory position and policies, the bill of materials and the demand requirements for finished goods and components. Lot sizes are the production (or purchasing quantities) that are used by the MRP system. The simplest case is when the system schedules exactly what is needed each period (known as lot-forlot), but when there are significant cost (set up cost & carrying cost) lot-for-lot might not be the least costly method. The advantage of the least unit cost method is that it is more complete analysis and would take into account ordering or setup costs that might change as the order sizes increases. The lowest cost from the alternatives method of Lot Sizing can be a consideration for Lot Sizing.
References
Jacobs, F. Robert, and Richard B. Chase. Operations and Supply Chain Management. 14th. Global Ed. New York: McGraw-Hill Companies Inc. 2014. Material Requirements Planning at A-Cat Corp. 2012. Richard Ivey School of Business Foundation.