Cased Hole – When When • Multizone wells • Deeper wells • Full zonal isolation • Wellbore stability
Limitations/Risks • Perforations are choke for high rate wells (especially gas) • Interval length limited to < +/400ft (TVD), unless stacked
Benefits • Reliable
BG
Productivity Driver for Open Holes
Oilfield Review Summer 2001
Transmissibility, 1000 md-ft/cp BG
Welling Criteria – SPE 39475 Based on modeling • For oil wells: Fracpack if Kres < 900 mD OHGP if Kres > 900 mD • For gas wells: Q < 200 Mscf/d Fracpack if Kres < 300 mD HRWP if Kres > 300 mD Q > 200 Mscf/d F&P if Kres < 200 mD HRWP if Kres > 200 mD Q > 500 Mscf/d F&P if Kres < 150 mD HRWP if Kres > 150 mD OHGP if Kres > 600 mD BG
Horizontal Open Hole • • • • • • •
Increase reservoir contact Avoid coning Reduce flux rates for thin pays Minimize compaction issues Improve sweep Stitch compartmentalized reservoirs Reduce risk of sand production
* Open hole completions increase operational complexity and pose more completion risk BG
Open Hole Completion Type Selection - Key Parameters • • • • • • • • •
Rock strength properties – UCS, in-situ stresses Formation Particle Size Distribution (PSD) Drilling mud environment Is the formation homogenous or heterogeneous Are there reactive shales Reservoir – fracture pressure window Zonal isolation Sand production at the onset of depletion Is it a high risk environment – subsea BG
Particle Size Distribution (PSD) Cumulative Log Diagram Sample B Well Sorted
Water Packing or Shunt Packing (SPE 85504) High Risk Environments Deepwater Low Net to Gross w/Reactive Shales Wells drilled with S/OB-RDFs – thin filtercake Out of gauge hole sections Subsea wells (rathole size and length below last casing point) Low or unknown Frac gradient Inflatable packers required for compartmentalisation/zonal isolation Simultaneous GP and Cleanup preferred (particularly Injectors) OH Fracing (injectors)
BG
Based On Field Experience (Bennett et al., BP)
BG
Fracpack vs HRWP HRWP when • Marginal economics • Pressure limitations in the near wellbore area – Probability of parting casing/liner top
• Close proximity to water • HHP limitations
BG
Gravelpack
CH FP w/screens
OH FP w/screens
CH Frac no screens
OH Frac no screens
Best Completions Based On Production
Perforations
Completion Options
Sand Control Borehole Stability
Poor 1
Sustained Production
Fair 2
Zonal Isolation
Good 3
Rig Time Savings Execution Logistics 10
BG
9
11
11
13
12
Sand Control Geographic Distribution - Completion Type Sand Prone Reservoirs
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.