OM Quiz Merged
Short Description
Download OM Quiz Merged...
Description
11/10/2013
OM2 Quiz 1.html
Test: Operations Management2 Quiz1 DivB User: Mayank Ashok Kumar Garg Garg [Taken On: 10/18/2010] Section 2: Operations Management2 Quiz1 DivB Q. 1 Lead-time is currently one week. The average demand during the week is 100 units with a standard deviation of 20 units. If the supplier increases lead-time to 9 weeks, what will be the standard deviation of lead-time demand? Actual
Correct
Result
Selected Choices display ed
Correct
60
Correct
44.72
Correct
40
Correct
17.89 Correct
Q. 2 The safety stock for fixed order quantity system with no more than a 2 percent chance of running out of inventory between orders (Z=2.05), daily demand 20units, 3 day lead time, and a 2.83 daily standard deviation of demand. Actual
Correct
Result
Selected Choices display ed
Correct
70
Correct
20
Correct
None of the options
Correct
10 Correct
Q. 3 The demand of calendars has been approximated by a normal distribution with Mean =350 and standard deviation 50. The calendars cost Rs. 35 each, and it can be sold for Rs.70 each. If the salvage value is nil, the optimum order quantity will be: Actual
Correct
Result
Selected Choices display ed
Correct
350
Correct
575
Correct
None of the options
Correct
500 Correct
Q. 4 The basis of ABC classification of materials Actual
Correct
Result
Selected Choices display ed
Correct
Annual consumption value
Correct
Unit cost of inventory
Correct
Annual cost of inventory
Correct
Annual rate of consumption Correct
Q. 5 News boy problem is an example of: Actual
Correct
Result
Selected Choices display ed
InCorrect
Dynamic inventory problem
InCorrect
Multi-period inventory
InCorrect
Static inventory problem
InCorrect
P- system Incorrect
Q. 6 A company has a product with a daily demand of 20 items, and a daily standard deviation file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 1.html
1/2
11/10/2013
OM2 Quiz 1.html
of 2.43 items. The lead-time for this item is 4 days. If this company is willing to accept a stockout one cycle out of twenty, what is the reorder point (P(stock out)=0.05, Z=1.645). Actual
Correct
Result
Selected Choices display ed
Correct
96 items
Correct
88 items
Correct
84 items
Correct
80 items Correct
Q. 7 Which of the following is an advantage of perpetual inventory system? Actual
Correct
Result
Selected Choices display ed
Correct
Low cost of record keeping
Correct
Fixed order quantity
Correct
Periodic review of inventory
Correct
Economies in shipping orders Correct
Q. 8 The safety stock for a fixed period system with no more than a 2 percent chance of running out of inventory (Z=2.05), daily demand 20units, order interval 13 days, 3 day lead time, and a 2.83 daily standard deviation of demand. Actual
Correct
Result
Selected Choices display ed
InCorrect
10
InCorrect
70
InCorrect
20
InCorrect
none of the options Incorrect
Q. 9 ________ is the result of dividing the annual demand by the quantity ordered (Q) each time. Actual
Correct
Result
Selected Choices display ed
Correct
Average inventory
Correct
Annual number of orders placed
Correct
Maximum inventory
Correct
The time between successive orders Correct
Q. 10 Which is not an advantage of the periodic review system? Actual
Correct
Result
Selected Choices display ed
Correct
C onsolidated shipments lower freight costs
Correct
Useful when a large number of items is ordered from the same supplier
Correct
Helps to control "A" type items
Correct
Inventory need not be monitored continually Correct
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 1.html
2/2
11/10/2013
OM2 Quiz 2.html
Test: OM2 Quiz2 DivB User: Mayank Ashok Kumar Garg Garg [Taken On: 10/26/2010] Section 2: OM2 Quiz2 Div B Q. 1 If the highest priority is to minimize the average job-lateness, then the jobs sequence should begin with those jobs requiring Actual
Correct
Result
Selected Choices display ed
InCorrect
The longest processing time
InCorrect
The least remaining operations
InCorrect
The smallest critical ratio
InCorrect
The shortest processing time Incorrect
Q. 2 When backward scheduling is used to determine to which time slots jobs are assigned within work centers, which of the following does NOT apply: Actual
Correct
Result
Selected Choices display ed
Correct
accurate lead times are required
Correct
jobs are assigned to the latest possible time slots in work centers
Correct
the starting point for planning is the promised delivery date to the customer
Correct
jobs are assigned to the earliest unassigned time slots in work centers Correct
Q. 3 Which aggregate planning strategy generally would result in the least amount of inventory? Actual
Correct
Result
Selected Choices display ed
InCorrect
Level
InCorrect
C hase
InCorrect
Lot-for-Lot (LFL)
InCorrect
Mixed Incorrect
Q. 4 A _____________ is a statement of how many finished items are to be produced and when they are to be produced. Actual
Correct
Result
Selected Choices display ed
Correct
Master Production Schedule
Correct
Material Requirements Planning
Correct
Aggregate Plan
Correct
Shop Floor C ontrol Correct
Q. 5 Manufacturing Resource Planning (MRP II) Actual
Correct
Result
Selected Choices display ed
Correct
Handles materials but not capacity
Correct
Is a major input to aggregate planning
Correct
Integrates accounting and financial data
Correct
Directly schedules vendors Correct
Q. 6 Lot-for-Lot (LFL) Actual
Result
Selected Choices display ed
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 2.html
1/2
11/10/2013
OM2 Quiz 2.html
Correct
Correct
Is best applied when inventory carrying costs are high and setup/order costs are low
Correct
Is best used for low inventory carrying costs and high purchase order costs
Correct
Minimizes purchase or setup costs
Correct
Masks the true nature of dependent demand Correct
Q. 7 Which of the following is NOT an input into the MRP: Actual
Correct
Result
Selected Choices display ed
Correct
inventory status file
Correct
bills of material file
Correct
master production schedule
Correct
planned order schedule Correct
Q. 8 Which of the following is not an aggregate planning decision option? Actual
Correct
Result
Selected Choices display ed
InCorrect
Promotion and advertising
InCorrect
Subcontracting
InCorrect
Building a new plant
InCorrect
Layoffs Incorrect
Q. 9 Dependent-demand inventory means: Actual
Correct
Result
Selected Choices display ed
InCorrect
materials that have already been assigned to specific orders
InCorrect
materials that are on order, but not yet arrived
InCorrect
None of the alternatives is correct.
InCorrect
materials that are service parts Incorrect
Q. 10 Scheduled receipts are: Actual
Correct
Result
Selected Choices display ed
Correct
materials that are on order and scheduled to be received in a specific period
Correct
also called planned order receipts
Correct
used to meet unforeseen demand during lead times
Correct
materials reserved for spare parts demand Correct
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 2.html
2/2
11/10/2013
OM2 Quiz 3.html
Test: OM2 Quiz3 Div B User: Mayank Ashok Kumar Garg Garg [Taken On: 11/23/2010] Section 2: OM2 Quiz3 DivB Q. 1 For variables data, the sample means are assumed to be Actual
Correct
Result
Selected Choices display ed
Correct
densely distributed
Correct
correlated
Correct
poisson distributed
Correct
normally distributed Correct
Q. 2 If a process is neither capable nor in control, the desired first step is to Actual
Correct
Result
Selected Choices display ed
Correct
redesign the equipment.
Correct
remove common causes.
Correct
remove sources of assignable causes of variation.
Correct
determine the process capability index. Correct
Q. 3 Which of the following is a likely cause of the control chart pattern known as a "trend" ? Actual
Correct
Result
Selected Choices display ed
InCorrect
a mixture of two materials
InCorrect
change in setup method
InCorrect
new operator
InCorrect
aging equipment Incorrect
Q. 4 The output of a process is stable and normally distributed. If the process mean equals 23.5, what percent of output will be smaller than the mean? Actual
Correct
Result
Selected Choices display ed
Correct
10%
Correct
50%
Correct
30%
Correct
C annot be determined without the standard deviation Correct
Q. 5 A p-chart is also called a Actual
Correct
Result
Selected Choices display ed
Correct
fraction defective chart.
Correct
fraction conforming chart.
Correct
process capability chart.
Correct
probability chart. Correct
Q. 6 If the lower limit for a p-chart computes to a number less that zero, this indicates Actual
Correct
Result
Selected Choices display ed
Correct
an incorrect use of an attribute measure.
Correct
None of the options.
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 3.html
1/2
11/10/2013
OM2 Quiz 3.html
Correct
a calculation error has been made.
Correct
an out of control process. Correct
Q. 7 Which of the following charts is used to monitor the average number of defects per unit when subgroup sizes are variable? Actual
Correct
Result
Selected Choices display ed
Correct
c-chart
Correct
p-chart
Correct
u-chart
Correct
s-chart Correct
Q. 8 Twenty-five samples, of size 30 were collected and a total of 48 nonconforming items were found. The three sigma upper control limit for a p-chart would be Actual
Correct
Result
Selected Choices display ed
Correct
0.833.
Correct
0.091.
Correct
0.211.
Correct
0.198. Correct
Q. 9 The Cp equals 2.00 and the process standard deviation equals 1.00. Determine the tolerance spread. Actual
Correct
Result
Selected Choices display ed
Correct
6.0
Correct
12.0
Correct
1.0
Correct
2.0 Correct
Q. 10 Which is a major advantage of np-charts? Actual
Correct
Result
Selected Choices display ed
InCorrect
simplicity of understanding relative to a p-charts.
InCorrect
can be used for variable sample sizes unlike the p-chart.
InCorrect
more accurate than p-charts.
InCorrect
requires a smaller sample size than p-charts. Incorrect
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 3.html
2/2
11/10/2013
OM2 Quiz 4.html
Test: OM2 Quiz4 DivB User: Mayank Ashok Kumar Garg Garg [Taken On: 11/29/2010] Section 2: OM2 Quiz4 DivB Q. 1 Which term refers to inventory oscillations in a supply chain? Actual
Correct
Result
Selected Choices display ed
Correct
C ross docking
Correct
Fill rate
Correct
Bullwhip effect
Correct
Delayed differentiation Correct
Q. 2 Configuration activities of the supply chain include all of the following except: Actual
Correct
Result
Selected Choices display ed
InCorrect
What the product-service bundle will include
InCorrect
Where facilitates will be located
InCorrect
How communication between customers and suppliers will be handled
InCorrect
C ommunicating demand, performance expectations and performance results with suppliers and customers Incorrect
Q. 3 Which of the following is not one of the seven principles of improving supply chains? Actual
Correct
Result
Selected Choices display ed
InCorrect
Global sourcing
InCorrect
Product postponement
InCorrect
Listen to the signals of the marketplace and plan accordingly
InCorrect
Segment customers based upon service needs Incorrect
Q. 4 The causes of bull whip effect include except: Actual
Correct
Result
Selected Choices display ed
InCorrect
Demand forecast updating
InCorrect
Product postponement
InCorrect
Order batching
InCorrect
Price fluctuations Incorrect
Q. 5 Which of the following is NOT a waste as determined by Shigeo Shingo: Actual
Correct
Result
Selected Choices display ed
Correct
motion and effort
Correct
work in process inventories
Correct
transportation
Correct
communication Correct
Q. 6 Very small production lots in JIT manufacturing result in: Actual
Correct
Result
Selected Choices display ed
Correct
reduced work in process inventory levels
Correct
increased set up time
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 4.html
1/2
11/10/2013
OM2 Quiz 4.html
Correct
lost capacity because of idle machines
Correct
increased production costs Correct
Q. 7 In a Kanban system, cards serve this purpose: Actual
Correct
Result
Selected Choices display ed
Correct
punched Kanban cards are used to program machines
Correct
None of the alternatives is correct.
Correct
product quality is recorded on Kanban cards
Correct
workers record maintenance information on Kanban cards Correct
Q. 8 In a pull system like JIT, what do we look at to determine what to produce next? Actual
Correct
Result
Selected Choices display ed
Correct
the next stage of production
Correct
schedules
Correct
the previous stage of production
Correct
the forecasted demand Correct
Q. 9 For Daily demand 1,500 units, Production lead-time 1 day, Safety stock 1 day and Kanban size 250 units: The number of Kanbans would be Actual
Correct
Result
Selected Choices display ed
Correct
10
Correct
14
Correct
None of the options
Correct
12 Correct
Q. 10 Machine reliability is best defined by which of the following: Actual
Correct
Result
Selected Choices display ed
Correct
the likelihood that the machine can be kept operational under normal conditions of use
Correct
the likelihood that a particular number of machines will fail in a given time period or number of hours of use
Correct
the likelihood that a group of machines will not fail
Correct
the likelihood of a machine not breaking down or needing repairs in a given time period or number of hours of use Correct
file:///C:/Users/Rahul/Desktop/New folder/SP - Academic Stuff/Cluster-1/Quizzes and QP/Quiz Papers/OM2 Quiz 4.html
2/2
11/10/2013
Banking Exams
QuizMantra: Operations Management Quiz - 2
MBA / Management
UPSC / Civil Services
Information Technology
Miscellaneous
DAILY QUIZ Current Affairs
FRIDA Y , JA NUA RY 2 0 , 2 0 1 2
General Knowledge
Operations Management Quiz - 2
Vocabulary Logo Quiz
1. The Process Mapping technique is used in which of the following
GK SECTION
stages of ERP implementation?
2013 Daily GK 2012 Daily GK GK Quiz CURRENT AFFAIRS May 2013
[A]Identification of the needs for implementing an ERP package [B]Evaluating the "as-is" situation of the business [C]Reengineering of the business processes to achieve the desired results [D]Evaluation of various ERP packages Show Answer
April 2013 Find us on Facebook
March 2013 February 2013
2. Which of the following is a function of the Supply Chain Management
January 2013
(SCM) component of Operational Planning?
2012 Current Affairs
[A]Order release
December 2012
[B]Incoming inspection
November 2012 October 2012 September 2012
[C]Definition of measurements for supporting the system
QuizMantra Like 3,055 people like QuizMantra.
[D]Accounts payable Definition of measurements for supporting the system
August 2012 July 2012 June 2012 May 2012 April 2012
3. Which of the following is not true with respect to Gantt Charts? [A]They are simple bar charts used to schedule operations [B]Their purpose is to provide ease and clarity in communicating the important job shop information to managers
Facebook social plugin
SUBSCRIBE UPDATE ON NEW QUIZZES
March 2012
[C]They are basically of two types: Workload charts and Scheduling
February 2012
charts
January 2012
[D]They also help managers to identify hurdles like production breakdown
Trade & Industry
and human performance
ENGLISH
They also help managers to identify hurdles like production breakdown and human performance
Subscribe in a reader
Vocabulary
4. The Municipal Corporation of Hyderabad used the JIT approach to cut the time to record a deed transfer by 50 percent. This application of JIT approach is an example of [A]Organizing problem-solving [B]Clarifying process flows [C]Upgrading housekeeping [D]Upgrading quality Clarifying process flows
5. Three Sigma Level puts the defects count at __________ in a million.
Email address...
[A]65807
FRIENDS
Submit
[B]65907 [C]66807 [D]66907 66807
6. While servicing a car, the mechanics change the lubricant, rotate the tyres, tune up the engine, replace the key components or overhaul certain systems (if necessary), clean the windows and apply a sticker on the front windscreen that indicates the date of next service. All these activities are aimed at avoiding failure or unsafe operation of the automobile, and hence come under the scope of
www.quizmantra.com/2012/01/operations-management-quiz-2.html
1/4
11/10/2013
QuizMantra: Operations Management Quiz - 2 [A]Preventive Maintenance [B]Remedial Maintenance [C]Centralized Maintenance [D]Decentralized Maintenance
Join this site w ith Google Friend Connect
Members (251) More »
Preventive Maintenance
7. Which of the following is not true with respect to Project Crashing? [A]The process of reducing the time of the project by reducing some of the activity times is called crashing [B]Subcontracting, using the services of overtime labour and adding an extra shift are some of the general approaches for crashing the project
Already a member? Sign in
time [C]As the Project Crashing approaches are expensive, managers need to make an analysis of timecost tradeoffs that reduce the project duration with a minimum increase in cost
Follow @QuizMantra
[D]We select the critical activity that has the minimum completion time We select the critical activity that has the minimum completion time
8. The difficulties involved in transporting products and accessing established distribution channels impede the process of globalization. This is an example of [A]Economic Impediment [B]Managerial Impediment [C]Institutional Impediment [D]Cultural Impediment Economic Impediment
LINKS
9. Roshni Ltd., a bulb manufacturing company, has earned reputation in the market because of long life of its bulb filaments. This is an appropriate
About Us
example of which of the following quality dimensions?
Contact Us
[A]Features
scdl papers
[B]Conformance [C]Serviceability [D]Durability Durability
10. Variable-sequence robots are most useful for which of the following production systems? [A]Product focused [B]Process focussed [C]Flow-shop [D]Assembly line Process focussed
11. Which of the following is not a feature of JIT Purchasing? [A]There is usually a single source of supply for a given part in nearby geographical area with a longterm contract [B]Purchasing is carried out in small lots, with frequent deliveries [C]Suppliers have less freedom in design specifications [D]There is less formal paperwork Suppliers have less freedom in design specifications
12. The purchase department wants to procure a specific quantity of inventory items required for use in a specific period. For this purpose, the shop-floor manager has to prepare which of the following documents? [A]Change Report [B]Control Report [C]Planning Report [D]Authorized order releases Authorized order releases
www.quizmantra.com/2012/01/operations-management-quiz-2.html
2/4
11/10/2013
QuizMantra: Operations Management Quiz - 2
13. Which of the following is false in relation to Demand Chain? [A]Instead of building and operating their supply chain from manufacturer to market, Demand Chain leaders are creating alliances with those channel partners best able to fulfill consumers’ needs and wants [B]The players in today’s emerging Demand Chains are different from those in traditional supply chains [C]Responsibilities are assumed by the Demand Chain as a whole [D]In a Demand Chain, products don’t necessarily originate from manufacturers The players in today’s emerging Demand Chains are different from those in traditional supply chains
14. Forward scheduling is used in which of the following situations? [A]Organizations that produce customized products whose demand is not known until the customer releases an order [B]Manufacturing organizations that use MRP systems [C]Service organizations that can anticipate the demand for their services ahead of time [D]Event-management organizations that make arrangements for special events such as trade fairs, corporate get-togethers etc. Organizations that produce customized products whose demand is not known until the customer releases an order
15. Which of the following is not true regarding Acceptance Plans used in quality control? [A]They help to decide whether lots of raw materials, purchased parts and finished goods meet prescribed quality standards [B]On the basis of Acceptance Plans, operations managers can either accept or reject a lot [C]Acceptance Plans have large sample sizes [D]Acceptance Plans protect an organization by limiting the percentage of defective products that are shipped to customers Acceptance Plans have large sample sizes
Labels: MBA, Operations, Operations Management, PGDBA, Production and Operation Management
0 COMMENTS: Post a Comment
Newer Post
Home
Older Post
Subscribe to: Post Comments (Atom)
IBPS CWE NEWS
UPSC, IBPS AND OTHER EXAMS' NEWS
CURRENT AFFAIRS
IBPS CWE PO/MT-III 2013 Admit Cards available now: Download admit cards Newstrack India
UPSC IBPS SSC
Current Affairs in India Latest News
Banking Exams in India
India News Business World
III 2013 Admit Cards to be held in the
Protests against changes in UPSC syllabus Zee News
Current affairs leitmotif of colliery's puja Times of India
month of October and November for
"In Bihar over 1,000 financially
DHANBAD: Bhuli, claimed to be one of the
Probationary Officer/ Management
backward students appear for the civil
biggest colonies of coal workers in Asia
Trainee posts in various banks. The admit
services exam choosing Arabic and
boasts of seven big pandals this puja.
cards for IBPS CWE PO ...
Persian as optional papers who will be
Each pandal has been set up at a cost
excluded by the UPSC," said Imran, a
between Rs 5 - Rs 7 lakh. Even the
student from Patna University. Terming
programme to burn the effigy of demon
the recent changes as ...
king Raavan on ...
Institute of Banking Personnel Selection (IBPS) has issued the IBPS CWE PO/MT-
expected cutoff score in ibps SpeakingTree (blog) In our opinion, good coaching classes can
www.quizmantra.com/2012/01/operations-management-quiz-2.html
3/4
11/10/2013
QuizMantra: Operations Management Quiz - 2
be really beneficial to get good Score in IBPS and also helps for time Management For Different Sections. IBPS PO question papers contains five sections : 1.Computer Knowledge : Computer
Related Articles » Meeting against removal of Arabic, Persian Pali UPSC exams Times ofand India SH Akhtar, general secretary of All India Associations of Arabic teachers and
Knowledge is highly ...
scholars, while condemning this decision
आईबीपीएस वारा बको म आरआरबी अ धकार -( तरI,II III ... Jagran Josh
of UPSC, termed it very unfortunate as by
ब कं ग का मक चयन संथान (IBPS)
weaker section of minority community
ेीय ामीण बक
म अ धकार पद ( ण ेी- I,II,III) और कायालय सहायक
(बहु उ े शीय) केलए उपयुत उ मीदवार क नयु ि त के लए सावज नक ल खत ...
removing these languages from UPSC, will be deprived ... State government to send names of 11 DG to UPSC Therank Newofficers Indian Express
Current Affairs Power Pack Supplement 2013 Josh Jagran
The State government is all set to send
... Rajasthan Administrative Services
police officers to the Union Public Service
2013,Uttar Pradesh Combined Lower
Commission (UPSC), which will in turn
Subordinate Services 2013, Jharkhand
shortlist three names, one of whom would
PCS 2013, as well as IBPS CWE RRBs
be appointed Director General of Police of
Officer Scale I and Officer Assistant
Andhra ...
2013, IBPS CWE PO/MT 2013 Exam, IBPS CWE Clerks exam 2013, ...
the names of 11 Director General rank
UPSC lifts ban on direct recruitment of engineers Hindustan Times As per norms, 57% recruitment is to be done direct through the UPSC, while 43% of seats are reserved for promotes. The last direct recruitment was done in 2003 when three engineers were hired on the
Current Affairs 7th October, 2013: Putin Nominated AEG India for Nobel Peace Prize 8.10.2013: Vighneshwaran is sworn in as the Sri Lanka north region Chief Minister. He was sworn in by Rajpaksa, President of Sri Lanka. Liberation Tigers of Tamil Eelam was strong in this region before the death of Prabhakaran. Elections were held here ... India against intervention in internal affairs of others Business Standard "India is a strong supporter of respect for sovereignty, integrity and political independence of states. We believe in avoiding any unauthorised intervention in a state's internal affairs or use of force in any conflict or post-conflict situation ... Current affairs 2nd October 2013 | Russian President Putin has been AEG India Nominated ... 02.10.2013: Russian President Vladimir Putin has been nominated for 2014 Nobel Peace Prize. He nominated for this award for plying a key role in preventing US missile on Syria and for taking initiative to dismantle chemical weapons. International ...
post of assistant engineer (AE). Prior to that ...
www.quizmantra.com/2012/01/operations-management-quiz-2.html
4/4
View more...
Comments