Republic of the Philippines

Polytechnic University of the Philippines COLLEGE OF ENGINEERING ELECTRONICS ENGINEERING DEPARTMENT 3rd Flr., CEA Bldg., NDC Compound, Sta. Mesa, Manila

DAILY REPORT OF ACTIVITIES

Name: Course: Student Number: Company: Division/Plant Assigned:

CHRISTINE JESSA P. LUCENA BS Electronics Engineering 2012-03129-MN-0 Globe Telecom Core & VAS Network Technology Strategy and Planning Technical Services Design | Network Technical Group

The trainee should give a brief and concise report of the task performed during the training and how it was accomplished. This report should indicate the machineries, equipment, facilities, tools and materials used if any.

Day 1

Date: APRIL 19, 2016 Time In: 8AM Time Out: 6 PM Hours Accumulated: 9 HR

-

2

Date: APRIL 20, 2016 Time In: 11:00 AM Time Out: 7:10 PM Hours Accumulated: 7 HR

-

3

Date: APRIL 21, 2016 Time In: 7:54 AM Time Out: 6:10 PM Hours Accumulated: 9 HR

-

4

Date: APRIL 22, 2016 Time In: 8:20 AM Time Out: 7:30 PM Hours Accumulated: 10 HR

-

5

Date: APRIL 25, 2016 Time In: 7:58 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

6

Date: APRIL 26, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

7

Date: APRIL 27, 2016 Time In: 8:00 AM Time Out: 8:00 PM Hours Accumulated: 11 HR

-

-

Accomplishment Orientation about the works that the interns will do during their OJT in Globe. Ideation of the research study Discussion about the different wired and wireless technologies such as 2G, 3G, LTE and new access technologies By Sir Bonin and Sir Jonjon Discussion on how calls and texts take place. Meeting the Core and VAS Planning Group Thorough Discussion of GSM Network Architechture with Sir Lyber Research for Sir Tan Discussion of Evolution of 2G with Sir Lyber Research for Sir Tan Site Surveying in Marikina with Huawei pips Research for Sir Tan Studied about NFV Researched and studied about Network Function Virtualization (NFV) and made a presentation Researched and studied about Network Function Virtualization (NFV) and made a presentation and made a summary

8

Date: APRIL 28, 2016 Time In: 8:00 AM Time Out: 8:00 PM Hours Accumulated: 11 HR

-

Revised the summary of NFV as advised by Sir Lyber and Sir Kiel

9

Date: APRIL 29, 2016 Time In: 8:30 AM Time Out: 7:30 AM Hours Accumulated: 10 HR

-

Revised the summary of NFV as advised by Sir Lyber and Sir Kiel Help Pierre with his Presentation about VDSL2 Attended a presentation about VDSL2

-

10

Date: MAY 3, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

11

Date: MAY 4, 2016 Time In: 8:30 AM Time Out: 7:30 AM Hours Accumulated: 10 HR

-

12

Date: MAY 5, 2016 Time In: 7:30 AM Time Out: 5:30 PM Hours Accumulated: 9 HR

-

13

Date: MAY 6, 2016 Time In: 8:00 AM Time Out: 8:00 PM Hours Accumulated: 11 HR

-

14

Date: MAY 10, 2016 Time In: 8:00 AM Time Out: 6:30 PM Hours Accumulated: 9 HR 30 MIN

-

Date: MAY 11, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

16

Date: MAY 12, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

17

Date: MAY 13, 2016 Time In: 8:00 AM Time Out: 8:00 PM Hours Accumulated: 11 HR

-

18

Date: MAY 16, 2016 Time In: 8:00 AM Time Out: 7:00 PM Hours Accumulated: 10 HR

19

Date: MAY 17, 2016 Time In: 8:30 AM Time Out: 7:30 PM Hours Accumulated: 10 HR

-

Started the second part of the research about VMware.

20

Date: MAY 18, 2016 Time In: 8:00 AM Time Out: 7:00 PM Hours Accumulated: 10 HR

-

Continue doing the research about VMWare, doing a step by step user guide on how to create a Virtual Machine using VMware Attended a seminar about Enterprise Risk Intelligence. This seminar is for the celebration of Risk Management Week 2016. Continue doing the research about

15

-

-

-

-

21

Date: MAY 19, 2016 Time In: 8:00 AM

-

Consult Sir Lyber about the summary and revised it again as advised by Sir Lyber Help Pierre in making Presentation about DSL and ADSL Technologies. Presented my Summary to Maam Yen. Help Ralph in testing their Excel tool. Sir Lyber introduced a new research series for me, about Virtualization, VMWare and Cloud Computing. Started the research Sir Lyber gave, about Virtualization. Continue Doing the research about Virtualization Discussion about Packet Core 101 by Maam Lara and NFV SDN 101 by Sir Lyber Continue Doing the research about Virtualization Discussion about NAS/Circuit Switching 101 by Sir Arjay Revised the summary about Virtualization and started PowerPoint. Finished and presented the summary and presentation about Virtualization Discussion about RFI Copper BB by RJ Discussion of Globe Employee life with Sir Ardens

Time Out: 6:00 PM Hours Accumulated: 9 HR

-

-

VMware Introduction and discussion about Sir Jonjon's new project Synergized Access Design. Participated on different activities and games as celebration to Risk Management Week 2016" Continue doing the research about VMware.

22

Date: MAY 20, 2016 Time In: 8:30 AM Time Out: 7:30 PM Hours Accumulated: 10 HR

-

23

Date: MAY 23, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

Continue doing the research about VMware.

24

Date: MAY 24, 2016 Time In: 8:30 AM Time Out: 5:30 PM Hours Accumulated: 8 HR

-

25

Date: MAY 25, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

Showed the research to Sir Lyber and talk about the revisions Help Pierre in creating a diagram about Access Synergy Downloaded and installed VMware Workstation 8 to my laptop

26

Date: MAY 26, 2016 Time In: 8:00 AM Time Out: 6:00 PM Hours Accumulated: 9 HR

-

27

Date: MAY 27, 2016 Time In: 8:30 AM Time Out: 5:30 PM Hours Accumulated: 8 HR

-

28

Date: MAY 31, 2016 Time In: 8:00 AM Time Out: 5:00 PM Hours Accumulated: 8 HR

-

Testing of VMware workstation 8 on my laptop

29

Date: JUNE 1, 2016 Time In: 8:30 AM Time Out: 6:30 PM Hours Accumulated: 9 HR

-

Testing of VMware workstation 8 on my laptop Sir Lyber checked the software and the virtual machine Did some recreational activities on 19th floor with co-OJTs Passed the Configuration files of the Virtual Machine to Sir Lyber Research for Sir Tan Research for Sir Tan

-

-

-

Successfully installed a Virtual Machine on my Laptop Look for Vendor Response in the Reishi SOC Evaluation as instructed by Maam Marie Finished the Vendor Response searching and passed it to Maam Marie

30

Date: JUNE 2, 2016 Time In: 8:00 AM Time Out: 7:00 PM Hours Accumulated: 10 HR

31

Date: JUNE 3, 2016 Time In: 9:00 PM Time Out: 6:00 PM Hours Accumulated: 8 HR

32

Date: JUNE 6, 2016 Time In: 9:00 PM Time Out: 6:00 PM Hours Accumulated: 8 HR

-

Attended a meeting about Synergy guidelines conducted by Sir Jonjon

33

Date: JUNE 7, 2016 Time In: 9:00 AM Time Out: 7:00 PM Hours Accumulated: 9 HR

-

34

Date: JUNE 8, 2016 Time In: 8:00 AM Time Out: 7:00 PM Hours Accumulated:

Troubleshoot Laptop because of hardisk malfunction Helped Pierre with his task for Sir Bonin Research for Sir Tan

-

-

Certified True and Correct:

ENGR. GERHARD P. TAN, PECE INTERMEDIATE SUPERVISOR PROGRAM DIRECTOR, SUMMER INTERNSHIP PROGRAM