NORSK OFFSHOREDAG 2005 ”Konvertering av eksisterende skip til produksjonskip”
NORSK OFFSHOREDAG 2005 26. mai 2005 Arne Hygen Tørnkvist Bergesen Offshore
AGENDA
• Bergesen Worldwide
• The FPSO lease market - where is it heading ?
• Oil FPSOs - concept strategy
• Gas FPSOs - concept strategy
2
The Owner & Operator
Bergesen BergesenWorldwide Worldwide
Bergesen Bergesend.y. d.y.ASA ASA Dry Drybulk bulk transportation transportation Gas Gas transportation transportation Offshore Offshore solutions solutions
Crude Crude transportation transportation
AGENDA
• Bergesen Worldwide
• The FPSO lease market - where is it heading ?
• Oil FPSOs - concept strategy
• Gas FPSOs - concept strategy
4
Mobile Offshore Units – as per April 2005
180 Spar
Number of Installed Units
Past 10 Years + 190%
TLP Semi
120
FPSO
60
0 19
75
104/36 +79FSO
19
77
19
79
19
On order 22/7
81
19
83
19
85
19
87
19
89
19
91
19
93
Bid/planning 87/ WA 26/ MG 16/ Bz 13
95 19
97 19
19
99
20
01
20
03
20
05
5
Mobile Offshore Units – as per April 2005 19 12 6 2 P MI O O TL SE PS FS F
14
1 1
I
P M O O TL SE PS FS F
14
5
5 18
P MI O O TL SE PS FS F
13
P MI O O TL SE PS FS 27 F
15 1
25
3
P MI O R O TL SE FPS PA FS S
15
2
P MI O O TL SE PS FS F
1
1
P MI O O TL SE PS FS F
1
P MI O O TL SE PS FS F
19
9 3 P MI O O TL SE PS FS F
13 2 P MI O O TL SE PS FS F
104/36 +79FSO
1
Not shown are 3 FPSOs that are off-field and stacked. Units in the GOM include 2 FSOs off Mexico and 1 FSO off Colombia
Mobile Offshore Units – installed after 1996 19
7 3 1 P MI O O TL SE PS FS F
1 13LP T
11
I M SO SO E F S FP
4
17 11
P MI O O TL SE PS FS F
23 1
P MI O O TL SE PS FS F
1
1
P MI O O TL SE PS FS F
6
P MI O R O TL SE PS PA FS F S
8 15
2
1
P MI O O TL SE PS FS F
6 3 P MI O O TL SE PS FS F
P MI O O TL SE PS FS F
5
3
P MI O O TL SE PS FS F The FSO in the GOM is off Mexico
7
Mobile Offshore Units – on order 2005
1
1
P O MI O TL PS SE FS F
1 P TL
S
I EM
FP
SO
1 FS
O
P MI O RG O TL SE PS B FS F D O PR
4
1
P MI O O TL SE PS FS F
1 I R O P M A TL SE FPS SP
3 1
1
7
P MI O O TL SE PS FS F
2 P MI O O TL SE PS FS F
6 2 P MI O O TL SE PS FS F
1 P MI O O TL SE PS FS F
Not shown is the speculative FPSO (Aoka Mizu) hull that has been completed but topsides have not been fabricated, and 2 speculative FPSO hulls under construction for Modec.
8
FPSOs – Projected orders next 5 years Deepwater Megafield FPSOs Harsh Environment (turret) FPSOs 80 70 60 50 40
4 8 29
Deepwater (spread/ turret) FPSOs 2 6 23
Shallow and benign water (spread) FPSOs
30 20 10
31
28
0
st st a a ec ec r r Fo Fo w gh o i L H 9
Global oil production and future demand
Demand with 1,5% per annum global growth
25 vs. 2/ 90% whr.t fnd. Nw oil
10
Nordsjøen versus Vest Afrika
11
Exploration vs. discoveries
Newfield Wildcat
Oil Reserves Added (MMbbl)
12
Lifting Cost
13
FPSOs – Bergesen Market Focus (5 years)
80 70 60 50 40
4 8 29
Deepwater (spread/ turret) FPSOs 2 6 23
Shallow and benign water (spread) FPSOs
30 20 10
31
28
0
st st a a ec ec r r Fo Fo w gh o i L H 14
FPSO lease contractors
15
AGENDA
• Bergesen Worldwide
• The FPSO lease market - where is it heading ?
• Oil FPSOs - concept strategy
• Gas FPSOs - concept strategy
16
BERGESEN Offshore - Fleet
Okoluba toru17
Big is Beautiful
Year Yearbuilt built Length Lengthover overall all Breadth Breadth Depth Depthmoulded moulded Total TotalOil Oilcargo: cargo:
• Modularisation • Standardisation • Flexibility by design • Selecting the right subsuppliers
20
The Generic Core & Upgrade Potential
21
Fabrication Facilities The Topside Fabrication Yard (Thailand)
22
Fabrication Facilities Hook-up and conversion at Jurong Shipyard
23
Designed for expansion
Generic
Generic + expansion
Early Production
Production
Applications
Swap/Upgrade
Production
Time
Life of Field
Production
Time
Time
25
Early Production
Production
Applications (swap or upgrade)
Swap/Upgrade
Production
Time
Time
26
Why choosing a generic approach Contract Period (Years)
5
10
FPSO
27
AGENDA
• Bergesen Worldwide
• The FPSO lease market - where is it heading ?
• Oil FPSOs - concept strategy
• Gas FPSOs - concept strategy
28
The growing importance of natural gas
29
Bergesen
World’s largest independent owner and operator of gas carriers LPG & LNG
30
From the Well to the Market
LNG
Dry gas Wet gas
LPG
Subsea
Offshore LPG Production Focus Areas
1992 2002
GAS FLARING
BERGESEN OFFSHORE LPG Extraction FPSO
LPG FPSO - Design Basis
Available 2007 to the oil industry • Gas Capacity:
70 - 250 MMscfd
• Storage capacity:
75,000 cm
• Design Life:
20 years
• Recovery rate:
up to 99% of the available Propane
• H2S and CO2:
Can manage sour gas and 10% CO2
• Water depth:
From 30 to 2000 m
• Delivery Process Plant:
12 months
• FPSO delivery from Yard:
15 months 36
The Generic LPG/Condensate FPSO
37
Generic LPG/Condensate FPSO
38
Flexibility by Design
Import compression
Stabilisation
LPG Product Splitter
Export compression
39
Flexibility by design
LPG Extraction & Gas Injection
41
Well Control/ LPG Extraction/ Gas Injection
42
Commercial sample case
USD per day 500.000 400.000
Net contribution:
300.000
USD 350.000 per day
200.000 100.000 0
st ue o l C Va n t c tio u c u od d r o P Pr
• Average associated gas, pressure above 70 bar • The residue gas is flared • Existing pipeline to LPG FPSO • 10 year contract 43
LPG FPSO - Concluding remarks
• LPG FPSO - a quick and beneficial step in the direction towards non flaring (35% of the heating value of the gas is monetised) • LPG FPSO - available on shorter contracts where an intermediate solution is needed • LPG FPSO - a vehicle for residue gas compression and injection
44
NORSK OFFSHOREDAG 2005 ”Konvertering av eksisterende skip til produksjonskip”
NORSK OFFSHOREDAG 2005 26. mai 2005 Arne Hygen Tørnkvist Bergesen Offshore
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.