Node B Integration Guide

August 24, 2018 | Author: Javier Zaragosi | Category: Microsoft Excel, Xml, Computer Hardware, System Software, Computer Networking
Share Embed Donate


Short Description

Download Node B Integration Guide...

Description

Node B integration process 1 UMTS Architecture................................................................................................................................. 2 1.1 Design Team: 2 1.2 Radio Planning Team: 2 1.3 Onsite Commissioning Team 3 1.4 Node B Integration Team: 3 1.4.1 OAM & Hardware Scripts:.....................................................................................................3 1.4.2 ARW Script: 3 1.4.3 Add Cell Network Scripts:....................................................................................................3 2.2 CCR Tool - Workflow 11 2.3 CCR Tool - Create CCR-Form Template...........................................................................................11 2.4 Loading Add_Cell Network Scripts:...................................................................................................14 3. IUB Script: 24 4. Loading License................................................................................................................................. 27 5. Adjust License.................................................................................................................................... 29 6. Update Parameters 31 7. Create back CV and set as startable on NodeB:.................................................................................32 8. Software Upgrade using SMO 34 9. Conclusion 39

INTRODUCTION: This document will describe the NodeB integration process flow which will be used when integrating a new node B, as well as demonstrating the CCR process from the delivery of data fill to the production and loading of XML and MO script.

1

1.1

UMTS Architecture

Design Team:

The integration team should be provided and updated with the LLD (Low Level Design) for the 3G Node B integration from the design team

LLD.xls

1.2

Radio Planning Team:

Has to generate the two CCR forms (excel sheet) one for Hardware Scripts and other for Cell Network.

The names of two CCR sheets are:AddCellNetworkP7.xls AddCellNetworkP7_V 5_0.xls

Onsite P7.xls ( for hardware script)

1.3

Onsite Commissioning Team

Responsible for the installation and commissioning the NodeB, Loading OAM and External Hardware scripts

1.4

Node B Integration Team:

After loading OAM and Hardware script. The integration team can start the integration To generate the XML files required for the WDCMA RAN integration, a CCR web based tool is used.

1.4.1

OAM & Hardware Scripts:

Both scripts are generated by referring to the LLD .Those two scripts will be emailed to the onsite commissioning team to load it on to NodeB.

1.4.2

ARW Script:

Integration team will generate and load the ARW script on to the OSS Common Explorer by using the ARW (Add RBS Wizard) tool.

1.4.3

Add Cell Network Scripts:

From the AddCellNetworkP7.xls CCR form, Cell scripts are generated and loaded on to the OSS Common Explorer by creating Planned Area and importing the.xml files to the planned areas.

2. Add RBS Wizard • • • • • •

Open OSS Go to WCDMA RAN Explorer Use your favourite FTP client to transfer files to OSS Upload the ARW script to : /var/opt/ericsson/nms_umts_arw_reg/dat/xml/import Open new planned configuration Enter the name of the planned configuration then click ok

Go to: tools ARW

Select ARW file for import file then click NEXT

Change the RNC SUBRACK related to your site, then click next until you reach the end of the wizard

Verify that the RBS status was successfully complete

Go to your created planned configuration: right click  activate

.12

CCR TOOL

CCR Tool is the official internal tool that is used in producing .xml scripts.

2.2

CCR Tool - Workflow  Create CCR-Form Template  Populate CCR form  Create project/import CCR form  Execute/generate scripts

2.3 CCR Tool - Create CCR-Form Template  Click on Create CCR-form Template:

• Make appropriate selections and click Create:

• CCR Tool - Create project/import CCR form CCR form is an excel spreadsheet and it will be emailed to you if you choose that option when creating a template. After CCR template is populated, you can create a project in the tool and import your spreadsheet. Select Create Project:

 Make appropriate selections and click Create:

 Your project will now appear under Projects Tab.  To generate scripts, click on the Icon in the Configuration column:

- Uncheck “Test Load” and click Generate. - XML scripts will get generated. - Scripts will be emailed to you or you can extract them from Configuration column. - Once the scripts are generated the icon will be changed from

to

2.4 Loading Add_Cell Network Scripts: • Upload the cells scripts to : /var/opt/ericsson/nms_umts_wran_bcg/files/import

Three planned areas are created as below: 1. Create Planned Configuration for Cell :_Cell

Right click  import

Import the following Scripts in following order • ar e a s. x m l • ad d _ c el • • • •

l.xml add_hsdsch.xml add_eul.xml coveragerelation.xml cell update

After loading all the scripts, activate the Planned Configuration

Go to moshell and check if the cells and the channels are created

2. Create Planned Configuration for GSM Relation :_GSM Import the following Scripts in following order: • •

add_gsmcell.xml gsmcell_relations.xml

Activate Planned Configuration.

Go to moshell and check if the GSM relations are created

3. Create Planned Configuration for Utran Relation: _UtranRelation

Import the following Scripts in following order: • • •

cell_relations.xml add_extcell.xml extcell_relations.xml

Activate Planned Configuration.

Go to moshell and check if the utranrelations are created

3. IUB Script: •

Upload the iub script to : /var/opt/ericsson/integration/xml_scripts/iub_scripts

Open element manager

Tools  run command file

Choose your IUB script

Check halt on errors, verbose logging Then start

4. Loading License •

Upload the license to : /var/opt/ericsson/integration/xml_scripts/lkf

In rbs element manager go to licensingMO propertiesAction(2)Update licensekeyfile

User ID: xxxxxx

Password: xxxxxxxx Ip Address: IP address of the master server sFile: /var/opt/ericsson/integration/xml_scripts/lkf/licensename.xml (license directory in the node)

Then execute

5. Adjust License Go to configuration  Manage HW and SW inventory  software management organizer

Choose your RBS name, right click  adjust

6. Update Parameters Open element manager  tools  run command file

Choose your parameters script

Parameter_Setting_2_Carriers.mo

Also check the RBS parameter IubDataStreams, maxHsRate must be modified depending on the number of E1s Change the following parameter using Moshell •

numHsCodeResources



numEulResources



maxTotalOutputPower

7. Create back CV and set as startable on NodeB: Go to Moshell : CVMS CVLS

After creating the CV we unlock the IUB and the site name

8. Software Upgrade using SMO Locate the desired node and start the wizard using the upgrade function in SMO

Choose the upgrade package then click next

Choose the appropriate ftp server area

Check the upgrade steps to be executed

Then click finish

9. Conclusion Once the upgrade is completed we list the iub status for the node ( lst . site name), we print the traffic status (get radiol), we check the license status (license lkf), we print the list of the active alarm (alt)