CHECK LIST FOR FIRE PUMP- NFPA 20 SYSTEMSGENERAL SUBMITTAL REQUIREMENTS:
(i)
This checklist must be completed/answered by consultant(s) by ticking [ √] appropriate boxes (ii) Submit a separate sheet containing explanatory notes against all negated answers (iii) It is axiomatic that the submission has been made by the consultants only upon having read and clearly understood all the relevant provisions of the current Fire Protection, Fire Prevention and Fire/Emergency Control(FP, FP&FF) Regulations
FIRE PUMP INFORMATION [ horizontal or vertical]
1 Manufacturer details provided
YES
NO
2 Model number details provided
YES
NO
3 Manufacturer specification sheet(s) provided
YES
NO
4 Proof that all equipment components are listed
YES
NO
5 GPM rating provided on the plans
YES
NO
6 Head rating provided on the plans
YES
NO
7 RPM's provided on the plans
YES
NO
8 Piping size and type is detailed
YES
NO
OS & Y valve in suction pipe is correctly detailed in the YES plans
NO
10 Size of suction pipe and type is detailed
YES
NO
11 Check valve in pump discharge assembly
YES
NO
YES
NO
13 Vortex plate is provided when stored water is used
YES
NO
14 Indicating valve on the system side of the check valve
YES
NO
Pressure relief valve located between pump and pump discharge
YES
NO
9
12
15
Eccentric taper reducer for suction is detailed (taper at bottom)
FIRE PUMP INFORMATION [horizontal or vertical]
1 Emergency lighting provided in pump room
YES
NO
Automatic sprinkler protection provided in the pump room
YES
NO
YES
NO
Pump room wiring in rigid or liquid tight flexible metal YES conduit
NO
YES
NO
1 Submergence level of pump impellers
YES
NO
2 Well screen and suction and strainer details
YES
NO
3 Dimensions of well
YES
NO
Air relief valves, water level detectors, pressure gauges, YES etc DRIVER INFORMATION
NO
YES
NO
3 Rated horsepower provided
YES
NO
4 RPM's provided
YES
NO
5 Electric or diesel information provided
YES
NO
6 Hours of fuel supply given
YES
NO
YES
NO
2
3 Pump room floor drain provided
4 5
Double backflow preventer valve is detailed
ADDITIONAL INFORMATION VERTICAL PUMPS
4
1 Manufacturer and specification information provided 2 Model number provided
ELECTRIC DRIVERS 1 Electrical circuit schematic provided 2
Schematic for secondary power circuit and transfer equipment
YES
NO
3
Controller near motors(more than 12" above floor and 3 YES ½' clearance to the rear)
NO
YES
NO
4 Controller listed for electric motor drivers
5 Alarm signal provided to an attended location
YES
NO
6 Transfer switch specification and listing provided
YES
NO
7 One transfer switch provided for each individual pump
YES
NO
YES
NO
Closed circuit and liquid cooling details provided in the YES plans
NO
YES
NO
YES
NO
5 Two batteries provided for each engine- rack supported YES
NO
YES
NO
7 Pump room & engine has adequate ventilation provided YES
NO
DIESEL DRIVERS 1 Listed fire pump used 2
3 Equipped with over speed shutdown device 4
Instrument panel with tachometer, oil pressure, and temperature gauges
6 Batteries have two means for recharging shown
Fuel tank is at least 1 gallon per horsepower plus a 5% cushion
YES
NO
YES
NO
YES
NO
1 Jockey pump location and piping is detailed
YES
NO
Jockey pump specification sheet(s) provided with the plans Jockey pump check valve is detailed on the discharge 3 pipe
YES
NO
YES
NO
1 Minimum supply provided
YES
NO
2 Connection to water supply
YES
NO
YES
NO
8
9 The controller is listed for diesel pump use 10
Controller near motors(more than 12" above floor and 3 ½' clearance to the rear)
11 Alarm signal provided to an attended location JOCKEY PUMP INFORMATION
2
WATER SUPPLY INFORMATION
3
FDC location is acceptable (within 50' of a public fire hydrant)
OTHER DETAILS Dedicated ATS for individual Fire pumps sets provided 1 YES for electric driven pumps Dedicated and direct Power supply for the fire pumps 2 sets provided from the main distributin board of the source (DEWA Transformer)
NO
YES
NO
Minimum 1m from all sides provided for easy 3 access/maintenance of fire protection system maintained YES inside the room
NO
Controllers are placed inside the pump room with easy accessiblity
YES
NO
5 Control logic/pressure switch setting details provided
YES
NO
6 Adequate and appropriate ventilations for pump
YES
NO
7 Factory test curve & related test documents provided