REPORT OF DRAFT SURVEY

Applicant Vessel / Barge Port of loading / discharging Description of Cargo Date & Time of Reading

BP3IP JAKARTA Mv.Sunter Lake Tanjung Priok - Jakarta SBM in Bulk

ARR : L/S : Constant : 00/00/00 00.00 ( M / Ft )

1.Foreward Draft

2.Afterward Draft

Port Stb'side Mean Correction Corrected Port Stb'side Mean Correction Corrected

3.Fore and After mean Draft 4.Mid Ship Draft Port Stb'side Mean Correction Corrected 5.Mean of Means 6.Quarter Mean of Mean 7.Displacements 8.Trim Correction INITIAL Trim 1.20 TPI / TPC 8.825 LCF 0.1585 MTC 7.050 LBP 75.0 Density 1.020 9.Displacement Corrected for trim 10.Density Correction 11.Displacement Corrected for Density 12.Total Deductable weight Ballast 180.0 Fresh Water 70.0 Fuel Oil 120.0 Diesel Oil 30.0 Others 50.0 13. Net Displacement 14. Total Cargo Loading / Discharging

Acknowledged by.

00/00/00 00.00

INITIAL

FINAL

4.21000 4.19000 4.20000 0.00000 4.20000 5.42000 5.38000 5.40000 0.00000 5.40000 4.80000 4.91000 4.89000 4.90000 0.00000 4.90000 4.85000 4.875000 3,732.500

5.30000 5.34000 5.32000 0.00000 5.32000 5.80000 5.84000 5.82000 0.00000 5.82000 5.57000 5.66000 5.68000 5.67000 0.00000 5.67000 5.62000 5.645000 4,427.500

2.238 6.768

6.812 1.017

3,741.51 (18.251) 3,723.25 450.000

4,435.33 (21.636) 4,413.69 343.000

3,273.25 797.438

4,070.69

FINAL 0.5 9.205 1.110 6.1 75.0 1.020

1st 2nd

0.0 80.0 185.0 28.0 50.0

Marine Surveyor,

________________