FONTANA TOWERS - JUFFAIR S.NO. NCR-001 NCR-002 NCR-003 NCR-004 NCR-005 NCR-006 NCR-007 NCR - 008 NCR-009 NCR-011 NCR-012 NCR-013 NCR-014 NCR-015 NCR-016 NCR-017 NCR-018 NCR-019 NCR-020 NCR-021 NCR-022 NCR-023 NCR-024 NCR-023(A) NCR-024(A) NCR-025 NCR-026 NCR-027 NCR-028 NCR-029 NCR-030 NCR-030 (A) NCR-031 NCR-032 NCR-033

DESCRITION Plaster & Paint Works Quality Tiles Work at 10th Floor Tiles Installation Using unapproved materials Shaft Block Flexible Duct Connection for Diffuser House Keeping and Safety Violation Duct Wooden Sleeves Inspection Request Quality of the Block wall Tiles Work without Bonding work Tiles Protection Lack of Supervision Using the Mixer Machine Hoist Lift Shaking Lack of Coordination Balcony Water Proofing Safety Violation Filling the Blocks Balcony Upstand Ceiling Framing Using unapproved water proofing material Water Proofing Safety Violation on Site Wasting Material Plaster Quality Balcony Upstand Work Inspection Quality of work Stoppage of Work Kithen Ceiling Safety Violation on Site Site House Keeping Lack of Work Coordination Water Proofing Quality Closing the Gypsum Board

Date 27.06.2010 28.06.2010 04.07.2010 07.07.2010 05.07.2010 07.07.2010 12.07.2010 17.07.2010 19.07.2010 26.07.2010 26.07.2010 26.07.2010 29.07.2010 29.07.2010 29.07.2010 29.07.2010 29.07.2010 29.07.2010 02.08.2010 05.08.2010 17.08.2010 11.08.2010 25.10.2010 02.11.2010 02.11.2010 31.10.2010 31.10.2010 31.10.2010 31.10.2010 31.10.2010 03.11.2010 07.11.2010 08.11.2010 08.11.2010 21.11.2010

STATUS Rejected Rejected Accepted Accepted Accepted Rejected Accepted Accepted Rejected Accepted Accepted Rejected Accepted Rejected Rejected Rejected Rejected Rejected Accepted Accepted

Date

Referenc Rev e no.

Submittal Description & Location

DIS.

from SBIC

to SBIC Status

01.11.10

WIR 139-10

0

Wall Tile layout @ toilet type D, flat C, 11th floor tower B part 3

WL TL

01.11.10

03.11.10

A

01.11.10

WIR 140-10

0

Wall Tile layout @ toilet type D, flat N, 11th floor tower A part 2

WL TL

01.11.10

02.11.10

A

01.11.10

WIR 141-10

0

Wall Tile layout @ toilet type j g & e, flat A, 10th floor tower A part 1

WL TL

01.11.10

01.11.10

WIR 142-10

0

Wall Tile layout @ toilet type j & g, flat P, 11th floor tower B part 4

WL TL

01.11.10

02.11.10

A

01.11.10

WIR 138-10

0

Wall tile layout @ toilet type a b g j and d, flat o, 11th floor tower b part 4

WL TL

01.11.10

02.11.10

c

01.11.10

WIR 147-10

0

Wall tile layout @ toilet type J, 11th floor tower b part 3, flat c

WL TL

01.11.10

02.11.10

A

01.11.10

WIR 144-10

0

Wall tile layout @ toilet type F & c, flat f and e, 7th floor tower A part 1

WL TL

01.11.10

02.11.10

A

01.11.10

WIR 146-10

0

Wall tile layout @ Toilet Type J, flat A & B, 7th floor tower A part 1

WL TL

01.11.10

02.11.10

A

01.11.10

WIR 145-10

0

Wall Tile Layout @ toilet type j, flat I & J, 7th floor tower A part 2

WL TL

01.11.10

02.11.10

C

02.11.10

WIR 121-10

0

All work above ceiling excluding toilet and main door area prior to closegypsum sheet flat C D G and H, 7th floorgyp tower B part 02.11.10 3

02.11.10

C

02.11.10

WIR 121-10

0

Rush and level point prior to start plaster, ground floor tower A part 1 & 2

02.11.10

WIR 119-10

0

All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat A B E and F

02.11.10

WIR 120-10

02.11.10

WIR 122-10

02.11.10

Pl

02.11.10

03.11.10

A

gyp

02.11.10

02.11.10

C

0

All work above ceiling excluding toilet and main doorarea prior to close gypsum sheet flat I j m & n, 7th floor towrgyp A part 2 02.11.10

04.11.10

C

0

All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat k l o & P

gyp

02.11.10

02.11.10

C

WIR 143-10

0

Floor Tyle layout, flat F, 8th floor tower A part 1

fl tl

02.11.10

04.11.10

C

02.11.10

WIR 145-10

0

alum

02.11.10

08.11.10

C

02.11.10

WIR 149-10

0

Wall tile layout @ toilet type C & F, Flat I and J, 7th floor tower Apart 2

WL TL

02.11.10

03.11.10

B

03.11.10

WIR 136-10

0

Floor tile Layout, flat O, 8th floor tower B part 4

Fl TL

03.11.10

04.11.10

B

03.11.10

WIR 108-10

0

Floor Tile Layout, Flat L, 11th Floor Tower B part 4

Fl TL

03.11.10

04.11.10

B

03.11.10

WIR 155-10

0

GI Lintel Plaster Works, 20th Floor Tower B Part 3 & 4

PL

03.11.10

06.11.10

A

03.11.10

WIR 156-10

0

GI Lintel Plaster Works, 21st Floor Tower B Part 3 & 4

PL

03.11.10

04.11.10

A

03.11.10

WIR 152-10

0

Wall Tile layout @ Toilet type A B G & J, Flat P, 17th floor towr B Part 4

WL TL

03.11.10

04.11.10

A

03.11.10

WIR 153-10

0

Wall tile Grouting @ Toilet Type A B G & J, Flat A, 16th Floor, Tower A part # 1

TL GRT

03.11.10

04.11.10

B

03.11.10

WIR 157-10

0

Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3

LNTL

03.11.10

04.11.10

B

03.11.10

WIR 113-10

0

All works above ceiling excluding toilet & main door area prior to close gypsum sheet flat C,D,G, & H, 6th floor Towr gyp B part 03.11.10 #3

04.11.10

C

03.11.10

WIR 114-10

0

All work above ceiling excluding toilet and main door area prior to close gypsum sheet flat K,L, O & P, 6th floor tower B part03.11.10 4

04.11.10

C

03.11.10

WIR 154-10

0

Wall tile grouting @ toilet type A B G &J, Flat O & P, 16th Floor tower B Part 4

04.11.10

B

TL GRT

03.11.10

03.11.10

WIR 14

1

5-29th Floor motion sensor installation complete with conduiting and wiring modification (Motion sensor supplied MEP by Client-wiring 03.11.10 and relation modification by EMCO)

04.11.10

wir 158-10

0

Wall tile layout @ toilet type A B G & J, Flat N, 16th Floor Tower A part # 2

04.11.10

WIR 159-10

0

GI Lintel plaster works, 22nd floor tower A, part # 1 & 2

04.11.10

wir 160-10

0

G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AREA LNTL AND LIFT LOBBY, 04.11.10 FLAT A06.11.10 B E F I J M AND CN, 10TH FLOOR TOWER A PAR

04.11.10

wir 161-10

0

G I LINTEL WORKS AND BLOCK INSTALLATION PRIOR FOR PLASTERING INCLUDING PASSAGE AREA LNTL AND LIFT LOBBY, 04.11.10 FLAT CDGHKLO&P, 06.11.10 09TH C FLOOR TOWER B PART 3&4

06.11.10

WIR 106-10

0

Floor Tile Layout, Flat P, 9th floor tower B part 4

Fl TL

06.11.10

06.11.10

B

06.11.10

WIR 151-10

0

Floor Tile Layout, Flat N, 7th floor tower A part 2

Fl TL

06.11.10

06.11.10

B

06.11.10

WIR 150-10

0

Floor Tile Layout, Flat J, 11th floor tower A part 2

Fl TL

06.11.10

06.11.10

B

06.11.10

WIR 133-10

0

All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat c d g and h

gyp

06.11.10

06.11.10

C

06.11.10

WIR 132-10

0

All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat I j m & n, 8th floor, gyp tower A part06.11.10 2

06.11.10

C

06.11.10

WIR 131-10

0

All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat AB E & F 8th floor, gyp tower A part 06.11.10 1

06.11.10

C

06.11.10

WIR 134-10

0

All work above ceiling excluding toilet and Fire dumper area prior to close gypsum sheet flat K L O & P 8th floor,gyp tower B part 06.11.10 4

06.11.10

C

06.11.10

WIR 16 Rev. 0

0

5th floor db to flatwise megger value/insulation resistance teast(Megger value report attached in the DB elecb &DB MCB will fixed 06.11.10 after installed 08.11.10 the doors

B

06.11.10

WIR 168-10

0

Floor Tile Layout, flat C, 11th floor tower B, part 3

fl tl

06.11.10

06.11.10

B

06.11.10

WIR 167-10

0

Floor Tile Layout, flat D, 11th floor tower B, part 3

fl tl

06.11.10

06.11.10

B

06.11.10

WIR 171-10

0

Water proofing water rest @ wet area, 6th floor Tower A& B part 1 2 3 & 4

WP

06.11.10

06.11.10

WIR 164-10

0

Wall tile layout @ Toilet type A B & E, flat P, 9th floor tower B part 4

WL TL

06.11.10

07.11.10

C

06.11.10

WIR 162-10

0

Wall tile layout @ toilet type K, lat E, 11th floor tower A part 1

WL TL

06.11.10

08.11.10

B

06.11.10

WIR 166-10

0

Wall tile layout @ toilet type E, flat P, 5th floor towr B part 4

WL TL

06.11.10

07.11.10

A

06.11.10

Wir 169-10

0

Floor Tile Layout, flat O, 11th floor towr B part 4

fl tl

06.11.10

06.11.10

B

06.11.10

Wir 170-10

0

Floor Tile Layout, flat P, 11th floor towr B part 4

fl tl

06.11.10

06.11.10

B

06.11.10

WIR 172-10

0

Rebars & Shuttering for lintel works @ GF, GF tower A&B Part 1& 3

LNTL

06.11.10

08.11.10

A

06.11.10

WIR 165-10

0

Wall tile layout @ toilet type F, flat F, 9th floor tower A part 1

WL TL

06.11.10

06.11.10

B

06.11.10

WIR 163-10

0

Rebars & Shuttering for con. Seat on swimming pool 4th floor swimming pool part 5

Shuttering rebars 06.11.10

08.11.10

B

07.11.10

WIR 174-10

0

Prepertaion for balcony upstand concreting works flat F & G, 16-23 flor, tower A part 1 & 2

Civil

07.11.10

08.11.10

B

07.11.10

WIR 178-10

0

Wall Tile layout @ toilet type J, flat D, 9th floor tower B, part # 3

WL TL

07.11.10

08.11.10

B

07.11.10

Wir 177-10

0

Wall Tile layout @ toilet type C, flat E, 11th floor tower A, part # 1

WL TL

07.11.10

08.11.10

B

07.11.10

WIR 176-10

0

Wall tile layout @ toilet type C, flat L, 11th floor tower B part 4

WL TL

07.11.10

08.11.10

B

07.11.10

WIR 175-10

0

Wall Tile layout @ toilet type C, Flat E & I, 10th floor tower A part 1

WL TL

07.11.10

08.11.10

B

07.11.10

WIR 173-10

0

Floor tile layout, Flat P, 16th floor tower B, part 4

fl tl

07.11.10

08.11.10

WIR 17

0

5th floor db to flatwise megger value/insulation resistance test(Megger value report attached in the DB elecb & MCB DB will fixed 08.11.10 after installed 08.11.10 the doors, 5th floor B tower B

08.11.10

WIR 105-10

0

Floor tile layout, flat O, 9th floor tower B part 4

fl tl

08.11.10

08.11.10

WIR 179-10

0

Floor tile layout, Flat A, 16th Floor Tower A part 1

fl tl

08.11.10

08.11.10

WIR 179-10

1

Floor tile layout, Flat A, 16th Floor Tower A part 1

fl tl

08.11.10

08.11.10

WIR 197-10

0

Wall tiles prior for grouting @ toilet type A & B, 10th floor tower A part 1

WL TL

08.11.10

WL TL

04.11.10

04.11.10

A

Pl

04.11.10

04.11.10

B

08.11.10

B

08.11.10

C

08.11.10

WIR 196-10

0

Wall tiles prior for grouting @ toielt type A B E J & E, flat A, 10th floor tower A part 1

WL TL

08.11.10

10.11.10

WIR 126-10

0

10.11.10

WIR 107-10

0

Floor Tile Layout, Flat H, 11th floor Tower B part # 3

fl tl

10.11.10

10.11.10

B

Floor Tile Layout, Flat G, 11th floor Tower B part # 3

fl tl

10.11.10

10.11.10

10.11.10

WIR 18 rev. 0

0

6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith for your reference db )in10.11.10 the DB elCB&MCB's 11.11.10will be fixed B after installed the doors 6TH F

B

10.11.10

WIR 19 rev. 0

0

6th floor DB to flatwise Megger value/Insulation resistance test (Megger value report attached herwith for your reference db )in10.11.10 the DB elCB&MCB's 11.11.10will be fixed B after installed the doors 6TH F

10.11.10

wir 213-10

0

G I LINTEL PLASTER WORKS, 23RD FLOOR TOWER A&B PART 1 2 3 & 4

LNTL

10.11.10

11.11.10

B

10.11.10

wir 215-10

0

WALL TILES LAYOUT @ TOILET TYPE D& F, FLAT F, 16TH FLOOR TOWER A PART 1

WL TL

10.11.10

10.11.10

A

10.11.10

wir 208-10

0

Wall tiles layout @ toilet type F, flat G, 09th floor tower B part 3

WL TL

10.11.10

10.11.10

B

10.11.10

WIR 207-10

0

Wall tiles layout@ toilet type f, flat f, 10th floor tower A part 1

WL TL

10.11.10

10.11.10

A

10.11.10

WIR 206-10

0

Wall tiles layout @ toilet type K, flat I, 10th floor tower A part 2

WL TL

10.11.10

10.11.10

A

10.11.10

WIR 209-10

0

Wall tiles layout @ toilet type g, flat pI, 07th floor tower b part 4

WL TL

10.11.10

13.11.10

A

10.11.10

WIR 205-10

0

Floor tiles layout , Flat K, 11th floor tower B part 4

Fl TL

10.11.10

10.11.10

a

10.11.10

WIR 203-10

0

GI Lintel and blockwork installation prior for plastering flat C D G & H, 11th floor tower B part 3

LNTL

10.11.10

11.11.10

A

10.11.10

WIR 202-10

0

G I LINTEL AND BLOCKWORK INSTALLATION PRIOR FOR PLASTERING FLAT K L O & P 10TH FLOR TOWER BL WRK B PART10.11.10 4

11.11.10

A

10.11.10

wir 199-10

0

Bathroom water proofing preperation flat a& b, 16th floor tower A part 1

10.11.10

WIR 204-10

0

11.11.10

WIR 222-10

11.11.10

WP

10.11.10

11.11.10

B

Gi Lintel and blockwork installation prior for plastering Flat K.L o & P, 11th floor tower B part 4

LNTL

10.11.10

11.11.10

B

0

Wall tile layout flat L, Type K, 11th floor tower B part 4

WL TL

11.11.10

11.11.10

A

WIR 221-10

0

Bathtub installation at master bathroom flat O type A, 5th floor tower B part 4

WL TL

11.11.10

13.11.10

B

11.11.10

WIR 220-10

0

Wall tile layout flat L, Type K, 11th floor tower B part 4

WL TL

11.11.10

11.11.10

A

11.11.10

WIR 219-10

0

Wall tile layout flat J, Type F, 10th floor tower A part 2

WL TL

11.11.10

11.11.10

A

11.11.10

WIR 218-10

0

Wall tile layout flat H, Type C, 11th floor tower B part 3

WL TL

11.11.10

13.11.10

B

11.11.10

WIR 217-10

0

Wall tile layout flat A, Type J & G, 12th floor tower A part 1

WL TL

11.11.10

11.11.10

A

11.11.10

WIR 216-10

0

Balcony upstand rebar work prior for concreting Flat B C N & o

Rebar

11.11.10

13.11.10

B

11.11.10

WIR 214-10

0

Floor tiles layout works, flat B, 16th floor tower A part # 1

fl tl

11.11.10

13.11.10

B

10.11.10

WIR 223-10

0

Wall tile prior for grouting Flat E Type K, 11th floor tower A part 1

WL TL

11.11.10

11.11.10

B

13.11.10

WIR 217-10

0

Wall tiles layout @ toilet type F & D

WL TL

13.11.10

13.11.10

WIR 216-10

0

Block work layout @ 3rd floor, 3rd floor parking area part # 5(SNT BACK)

BL WRK

returned

13.11.10

B

13.11.10

WIR 200-10

0

rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5

Rebar

returned

13.11.10

WIR 198-10

0

Rust coat and point level, GF tower B part 4

Civil

13.11.10

13.11.10

A

13.11.10

WIR 21

0

7th floor DB to flatwise megger value /insulation resistane test, 7th floor tower b

db

13.11.10

15.11.10

b

13.11.10

WIR 218-10

0

GI lintel and block work installation prior for plastering, 11th floor tower A part 1 & 2

LNTL

13.11.10

13.11.10

B

13.11.10

WIR 222-10

0

Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2

WL TL

returned

13.11.10

WIR 221-10

0

Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2

WL TL

returned

13.11.10

B

13.11.10

WIR 220-10

0

Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1

WL TL

returned

13.11.10

WIR 219-10

0

Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1

WL TL

returned

14.11.10

WIR PI-64

0

PPR pressure testing @ 10 bar pressure, 26th floor tower A & B

PL

14.11.10

15.11.10

A

14.11.10

WIR 236-10

0

Block work layout @ 3rd floor, 3rd floor parking area part # 5

14.11.10

WIR 200-10

0

rebar an shuttering for con. Seat @ swimming pool area, 4th floor swimming pool part 5

BL WRK

14.11.10

14.11.10

A

Rebar

14.11.10

14.11.10

14.11.10

WIR 232-10

0

B

Wall tiles layout @ toilet type J& B, flat n, 9th floor tower A part 2

WL TL

14.11.10

14.11.10

C

14.11.10

WIR 233-10

14.11.10

WIR 234-10

0

Wall tiles layout @ toilet type J& B, flat n, 10th floor tower A part 2

WL TL

14.11.10

14.11.10

A

0

Wall tiles layout @ toilet type A B J& G, flat B, 12th floor tower A part 1

WL TL

14.11.10

14.11.10

14.11.10

A

WIR 235-10

0

Wall tiles layout @ toilet type E & B, flat A, 12th floor tower A part 1

WL TL

14.11.10

14.11.10

A

14.11.10

WIR 240-10

0

Wall tiles layout @ toilet type J, flat P, 10th floor tower B part 4

WL TL

14.11.10

15.11.10

a

14.11.10

WIR 171-10

0

Water proofing water test @ wet Area, 6th floor tower A & B part 1 2 3 4

WP

14.11.10

14.11.10

c

14.11.10

WIR 237-10

0

Wall tiles layout @ toilet type C & K, flat I, 12th floor tower A, part 2

WL TL

14.11.10

15.11.10

A

14.11.10

WIR 239-10

0

Wall Tiles layput @ toilet type J, Flat O, 10th floor tower B part 4

WL TL

14.11.10

15.11.10

A

14.11.10

WIR 238-10

0

Wall tiles layout @ toilet type A & B, Flat D, 12th floor tower B part 3

WL TL

14.11.10

15.11.10

A

14.11.10

WIR 20

0

7th Floor DB to flatwise Megger value/Insulation resistance test in the db -elcb&mcbs will be fixed after installedDB the doors, 14.11.10 7th floor Tower 15.11.10 A

b

14.11.10

wir 241-10

0

WATER PROOFINGWATER TEST @ WET AREA, 7TH FLOOR TOWER A AND B PART 1 2 3 & 4

14.11.10

WIR 244-10

0

WATER PROOFINGWATER PG LEAK TEST, 5TH FLOR TOWER A &b, PART 1 3 & 4

15.11.10

WIR 249-10

0

Blockwork layout @ 4th floor, 4th floor panorama area

15.11.10

WIR 245-10

0

15.11.10

WIR 246-10

15.11.10 15.11.10

WP

14.11.10

15.11.10

C

WP

14.11.10

14.11.10

A

BL WRK

15.11.10

15.11.10

A

Wall tiles layout @ toilet type D, flat B, 12th floor Tower A part 1

WL TL

15.11.10

15.11.10

A

0

Wall tile layout @ toilet type A & D, Flat N, 10th floor Tower A part 2

WL TL

15.11.10

15.11.10

A

WIR 248-10

0

Wall tiles layout @ toilet type J, flat D, 12th floor Tower B part # 3

WL TL

15.11.10

15.11.10

A

WIR 247-10

0

Wall tiles layout @ toile type A & J, flat C, 12th floor tower B part 3

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 258-10

0

STEEL WORK @ SLOPE OF SWIMMING POOL TO START CONCRETING AREA, 4TH FLOOR SP PART #Sw 5 pool

15.11.10

21.11.10

A

15.11.10

WIR 242-10

0

Floor tiles layout works, flat o, 16th floor tower B part 4

Fl TL

15.11.10

15.11.10

B

15.11.10

WIR 250-10

0

Wall tiles layout @ toilet type G, Flat D, 12th floor tower B part 3

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 251-10

0

Wall tiles layout @ toilet type B & G, Flat C, 12th floor tower B part 3

WL TL

15.11.10

15.11.10

C

15.11.10

WIR 252-10

0

Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1

WL TL

15.11.10

20.11.10

a

15.11.10

WIR 253-10

0

Wall tiles layout @ toilet type D, flat B, 10th floor tower A part 1

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 255-10

0

Wall tiles layout @ toilet type K, Flat L, 12th floor Tower B part # 4

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 256-10

0

Wall tiles layout @ toilet type G, flat N, 10th floor tower a, part 2

WL TL

15.11.10

15.11.10

A

15.11.10

wir 257-10

0

Wall tiles layout @ toilet type j, flat P, 09th floor tower b, part 4

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 254-10

0

Wall tiles laout @ toilet type k & Gm flat e, 12th floor tower A, part 1

WL TL

15.11.10

15.11.10

A

15.11.10

WIR 171-10

2

WATER PROOFING WATER TEST @ WETAREA, 6TH FLOOR TOWER a & b PART 1 2 3 & 4

WP

15.11.10

20.11.10

c

15.11.10

WIR 22

0

8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, 8TH FLOOR TWR A

DB

15.11.10

21.11.10

B

15.11.10

WIR 146-10

1

Inspection for rusting bolts cleaning and rust removing in tower B 14 floor east elev and north elevation SG7B/l/l & R, sg08/l/l 15.11.10 & r, SG07a/l20.11.10 & sg05/f/l, 14-16, 02-04, 12-1404-06, 06-11 Q-V alum

15.11.10

WIR 147-10

1

Inspection for rusting bolts application of wash primer in Tower B 14th floor east elev and north elev SG7b/L/Lalum & r, sg08/L/L15.11.10 & R sg07a/l &21.11.10 sg05/f/l, 14-16, 02-04,12-14, A 04-06, 06-11, q-v

16.11.10

WIR 148

stage inspection for alum structural framing tower A SG08/r/r & L West Elev 27-29flr, 12-14& 04-06 on Grid C-d alum

16.11.10

22.11.10

B

20.11.10

ME-32

0

installation of ceiling mounted exhaust fan in laundry room, 16th floor part 3 tower b

civil

20.11.10

23.11.10

B

20.11.10

WIR 259-10

0

GI lintel and block work installation prior for plastering, flat A B E F I J M & N, 12th floor tower A part 1 & 2

LNTL

20.11.10

21.11.10

A

20.11.10

WIR 263-10

0

Wall tiles layout @ toilet type A B G & J, flat M, 10th floor tower A, part

WL TL

20.11.10

21.11.10

B

20.11.10

WIR 267-10

0

All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4

20.11.10

WIR 266-10

0

All worksabove ceiling prior closing gypsum sheet ceiling flat k l o p 5th floor tower B part 4

20.11.10

WIR 262-10

0

Wall tiles layout @ toilet type A B G j flat A 17th floor tower A part # 1

WL TL

20.11.10

21.11.10

C

20.11.10

WIR 261-10

0

Wall tiles layout @ toilrt type F & D flat j, 16th floor tower A par t2

WL TL

20.11.10

21.11.10

C

20.11.10

WIR 260-10

0

Wall tiles layout @ toilrt type C E K flat I, 16th floor tower A par t2

WL TL

20.11.10

20.11.10

WIR 171-10

0

Water proofing water rest @ we area @ toilet type G D J flat C N & M, 6th floor tower A & B part 2 & 3

WP

20.11.10

21.11.10

C

20.11.10

WIR 149-10

0

Stage inspection for aluminium structural framing in tower B SG07 /c/l/l west elev 15-17 02-04 on grid Q

alum

20.11.10

22.11.10

B

20.11.10

WIR 150-10

0

Stage inspection for aluminium structural framing in tower B SG07B/c/R/R east elev 14-24 02-04 on grid J

alum

20.11.10

WIR 151-10

0

Stage inspection for aluminium structural framing in tower B SG07B/c/R/l east elev 15-27 14-16 on grid J

alum

20.11.10

22.11.10

B

20.11.10

WIR 225-10

0

Floor tiles layout works, flat C, 12th floor tower B part 3

Fl TL

20.11.10

21.11.10

B

20.11.10

wir 265-10

0

All worksabove ceiling prior closing gypsum sheet ceiling flat I em & n 5th floor tower A part 2

gyp

20.11.10

25.11.10

c

20.11.10

WIR 264-10

All worksabove ceiling prior closing gypsum sheet ceiling flat AB E & F 5th floor tower A part 1

gyp

20.11.10

25.11.10

c

21.11.10

WIR 243-10

0

Dry area gypsum ceiling closing works, flat a b e f I j m& N, 16th floor tower A part 1 & 2

gyp

21.11.10

23.11.10

C

21.11.10

WIR 38

0

16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) in theDB DB ELCB&21.11.10 MCB will be fixed 22.11.10 after installedBthe doors

22.11.10

WIR 276-10

0

Wall tiles layout @ toilet type A, flat P, 12th floor Tower B par 4

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 275-10

0

Wall Tiles layout @ toilet type K, Flat H, 12th floor Tower B, part 3

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 268-10

0

Wall Tiles layout @ toilet type A, Flat A, 12th floor TowerA, part 1

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 271-10

0

Wall Tiles layout @ toilet type A b j e & D, Flat O, 12th floor TowerB, part 4

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 272-10

0

Wall Tiles Layout @ Toilet Type F, Flat K, 9th floor tower B part 4

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 270-10

0

Wall Tiles Layout @ Toilet Type C, Flat L, 12th floor tower B part 4

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 269-10

0

Wall Tiles Layout @ Toilet Type E, Flat M, 10th floor tower A part 2

WL TL

22.11.10

22.11.10

A

22.11.10

WIR 281-10

0

Wall Tiles Layout @ Toilet Type A B G & J, Flat A, 17th floor tower A part 2

WL TL

22.11.10

23.11.10

A

22.11.10

WIR 153-10

1

Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 06-11 on alum grid C

22.11.10

23.11.10

B

22.11.10

WIR 152-10

1

Stage inspection for Aluminium structural framing SG07A/R Tower A west elevation from 27-29 floor, 02-04 on alum grid D

22.11.10

23.11.10

B

22.11.10

WIR 154-10

1

Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 14-16 on alum grid Q

22.11.10

23.11.10

B

22.11.10

WIR 155-10

1

Stage inspection for Aluminium structural framing SG07A/R Tower b west elevation from 25-29 floor, 02-04 on alum grid Q

22.11.10

23.11.10

B

22.11.10

wir PI-65

0

fire fightng riser testing, 15 bar pressure

22.11.10

23.11.10

B

22.11.10

wir 23

0

8TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, elcb & mcb's will be fixed after megger installed the 22.11.10 doors 8TH FLOOR TWR A

22.11.10

WIR 24

0

9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will bemegger fixed after installed 22.11.10 the doors 8TH FLOOR TWR A

gyp gyp

FF

C

22.11.10

wir 277-10

0

water proofing & leak test @ toilet type a b cd cd, e, f, g & k, flat a b e f I j m& N, 8th floor tower a, part 1&2

WP

22.11.10

22.11.10

wir 284-10

0

GI LINTEL PLASTER WORKS, 24TH FLOOR TOWER a & b PART 1 & 2

22.11.10

wir 288-10

0

Fire sealent application @ passages & inside the flat, excluding fire dumper area flat a b m n c d o & p, 7th floor fire damper Tower A &22.11.10 B part 1 2 3 &25.11.10 4

LNTL

22.11.10

B

22.11.10

wir 279-10

0

Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & O,P, 6th firefloor damper tower A22.11.10 & B part 1 2 323.11.10 &4

C

22.11.10

WIR 280-10

0

Fire sealent application @ passages inside the flat, excluding fire dumper area, flat A B M N C D O & P, 8thfire floor damper tower A &22.11.10 B part 1 2 3 &25.11.10 4

B

22.11.10

WIR 278-10

0

Fire sealent application @ passages inside the flat excluding fire damper area flat a b m n c d O & o, P, 5th fire floordamper tower A & 22.11.10 B part 1 2 3 &24.11.10 4

C

22.11.10

WIR PI-65

0

Fire fighting riser testing 15 bar pressure

23.11.10

WIR 282-10

0

23.11.10

WIR 283-10

0

23.10.10

WIR 156

0

INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum EAST ELEV 23.11.10 & NORTH ELEV 23.11.10 SG7B/L/L& R, B SG08/L/L& R, sg07a/L & sg05

23.10.10

wir 25

0

9TH FLOOR DB TO FLATWISEMEGGER NALUE /INSULATION RESISTANCE, in the db elcb & mcb's will be fixed DB after installed 23.11.10 the doors 9TH FLOOR TWR A

23.10.10

wir 291-10

0

Wall tiling installation @ kitchens flat c d g j k l o & P, 5th floor towr B

23.10.10

WIR 289-10

0

GI lintel block work installation prior for plastering flat c d g h k l o & P, 12th floor tower B part 3& 4

23.10.10

WIR 273-10

0

Floor tiles layout, flat F, 12th floor tower A Part 1

23.10.10

WIR 293-10

0

23.10.10

WIR 292-10

23.10.10

WIR 290-10

23.10.10

23.11.10

A

FF

22.11.10

Floor Tiles Layout, Flat N, 16th Floor Tower A, part 2

Fl TL

23.11.10

23.11.10

B

Floor Tiles Layout, Flat K, 16th Floor Tower B, part 4

Fl TL

23.11.10

23.11.10

B

WL TL

23.11.10

25.11.10

C

BL WRK

23.11.10

24.11.10

A

Fl TL

23.11.10

24.11.10

B

Wall tiling installation @ kitchens Flat C D G H k L O P, 6th floor tower B part 3 & 4

WL TL

23.11.10

25.11.10

C

0

Wall tiling installation @ kitchens, flat A B E F I J M & N, 6th floor tower A part 1& 2

WL TL

23.11.10

25.11.10

C

0

Wall tiling installation @ Kitchens Flat A, B E,F I, J M & N, 5th floor tower A part 1 & 2

WL TL

23.11.10

25.11.10

C

WIR 230-10

0

Floor Tiles Layout, Flat G & H, 12 floor tower B Part 3

Fl TL

23.11.10

24.11.10

B

23.10.10

wir 231-10

0

Floor Tiles Layout, Flat k& L, 12 floor tower B Part 3

Fl TL

23.11.10

24.11.10

B

23.10.10

WIR 228-10

0

Floor Tiles Layout, Flat A & b, 12 floor tower A Part 1

Fl TL

23.11.10

24.11.10

B

23.10.10

Wir 226-10

0

Floor Tiles Layout, Flat D, 12 floor tower B Part 3

Fl TL

23.11.10

25.11.10

B

23.10.10

WIR 302-10

0

Block work layout @ 3 rd floor, 3rd floor tower A & B, Part 6

BL WRK

23.11.10

25.11.10

B

23.10.10

WIR 301-10

0

Block work layout @ 2nd floor, 2rd floor tower A , Part 1& 2

BL WRK

23.11.10

24.11.10

B

24.11.10

WIR 305-10

0

Wall Tiles Layout @ Toilet type D, Flat C, 12th Floor Tower B, Part 3

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 306-10

0

Wall Tiles layout @ Toilet Type F, Flat G, 12th Floor Tower B Part # 3,

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 307-10

0

Wall Tiles layout @ Toilet Type A B E J & G, Flat M, 09th Floor Tower A Part # 2

WL TL

24.11.10

25.11.10

C

24.11.10

WIR 308-10

0

Wall Tiles layout @ Toilet Type G, Flat N, 09th Floor Tower A Part # 1

WL TL

24.11.10

25.11.10

C

24.11.10

WIR 309-10

0

Wall Tiles Layout @ Toilet Type A B & J, Flat B, 17th Floor Tower A Part 1

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 310-10

0

Wall Tiles Layout @ Toilet Type D & F, Flat J, 16th Floor Tower A Part 2

WL TL

24.11.10

25.11.10

B

24.11.10

WIR 39

0

16th floor DB to flatwise Megger value /Insulation resistance test (megger value report attached herewith) in theDB DB ELCB&24.11.10 MCB will be fixed after installed the doors

24.11.10

WIR 298-10

0

Wall Tiles Layout @ Toilet Type F, Flat J, 6th Floor Tower A, Part # 2

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 297-10

0

Wall Tiles Layout @ Toilet Type F, Flat F, 6th Floor Tower A, Part 1

WL TL

24.11.10

25.11.10

C

24.11.10

WIR 300-10

0

Wall Tiles Layout @ Toilet Type J, Flat M, 6th Floor Tower A, Part 2

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 299-10

0

Wall Tiles Layout @ Toilet Type J, Flat M & N, 7th Floor Tower A Part # 2

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 294-10

0

Wall Tiles Layout @ Toilet Type F, Flat F, 12th Floor Tower A Part 1

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 295-10

0

Wall Tiles Layout @ Toilet Type E, Flat P, 11th Floor Tower B part 4

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 304-10

0

Wall Tiles Layout @ Toilet Type C E & K, Flat I, 16th Floor Tower A part # 2

WL TL

24.11.10

25.11.10

B

24.11.10

WIR 303-10

0

Wall Tiles Layout @ Toilet Type C E & K, Flat E, 16th Floor Tower A part # 1

WL TL

24.11.10

25.11.10

A

24.11.10

WIR 312-10

0

Rush coat & point level @ Ground Floor, Ground Floor Tower B part 3 & 4, GF Tower B Part 3& 4

alum

24.11.10

25.11.10

B

24.11.10

WIR 296-10

0

Floor Tiles Layout, Passage Area, 5th Floor Tower A part 1 & 2

Fl TL

24.11.10

25.11.10

B

25.11.10

WIR 297-10

0

wall TILES LAYOUT @ TOILET TYPE F, FLAT F, 6TH FLOOR TOWER A PART 1

WL TL

25.11.10

25.11.10

WIR 314-10

0

wall TILES LAYOUT @ TOILET TYPE C, FLAT H, 12TH FLOOR TOWER B PART 3

WL TL

25.11.10

25.11.10

WIR 313-10

0

wall TILES LAYOUT @ TOILET TYPE G, FLAT M&n, 09TH FLOOR TOWER A PART 2

WL TL

25.11.10

25.11.10

WIR 157

0

INSPECTION FOR RUSTING BOLTS APPLICATION OF EPOXY PRIMER IN TOWER B 14TH & 15TH FLOORalum EAST ELEV 25.11.10 & NORTH ELEV SG7B/L/L& R, SG08/L/L& R, sg07a/L & sg05

25.11.10

wir 311-10

0

FLOOR TILES LAYOUT, FLAT I, 16TH FLOOR, TOWER a PART # 2

Fl TL

25.11.10

FONTANA Project (MAR) MATERIAL APPROVAL REQUEST # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Date

Referenc Rev. e

Submittal Description & Location

from

to Status consult

08.09.10 A-16-10 08.09.10 D-0015 14.09.10 A-14-10 11.10.10 A-17-10 12.10.10 MAC-001-10

0 0 0 0 0

Hilti Fire Stop System CP 606 Hilti Fire Stop System CP 606 (with sample material) Panoramic Glass panaromic glazing steel structure, hilti sweitzerland Wall & Ceiling Paint (Jutton), colour cahrt and data sheet

18.10.10 20.10.10 23.10.10 25.10.10 28.10.10 31.10.10 31.10.10 31.10.10 04.11.10 08.11.10 23.11.10 23.11.10 23.11.10 24.11.10 24.11.10 25.11.10

0 0 1

water proofing for bathrooms and balconies Dev-const Dev-const b Rockwool for installation back of the aluminium cladding water proofing for bathrooms and balconies Dev-const Dev-const b Aluminium welding on aluminium pipe handrailing for l shape balcony deep sea Fire Damper (ModelAFD3), air master catalogue enclosed water proofing for bathrooms and balconies, golden care construction caluse A, letter forDev-const details and Dev-const photograph forb sample Fiber mesh for use with toilets water proofing (alyaf ts163+), bathrooms & toilets, alyaf industrial Dev-constcoDev-const ltd, golden careaconstruction clause pa Fire damper (moel AFD3). As per drawings, air master, uae, clause e, catalogue 50% (2nd Dev-const week ofDev-const nov) and balance b (last week of nov) GI profiles for gypsum ceiling Dev-const Dev-const a Sigma acrylic primer sealer, walls floors in the typical floors and car parking floors,sigma ksa skyline trading corporation, silk finish paint for b Drawing & Document, window cleaning system, elevations of the towers Submittalfor fire stop application, al mahroos bsc dev-cons dev-cons b Fire Damper (Model -AFD3) dev-cons dev-cons b Submission of structural calculations for typical panels Sanitary services products, axis-arepro dev-cons dev-cons a Drwing INTERNal doors details@ tyical floors, frm 5th to 29th typical floors

MAC-002-10 MAC-003-10 MAC-002-10 MAC-004-10 AC-30 MAC-002-10 MAC-005-10 MAC-006-10 MAC-007-10 MAC-008-10 DAC-005-10 MAC-010-10 MAC-011-10 DAC/s-28-10 MAC-012-10 dac-006-10

0

0 0 0 0 0 0 0 0

DSE SBIC DSE dse Dev-const Dev-const

b

return date

14.10.10 18.10.10 23.10.10

31.10.10 31.10.10 31.10.10 06.11.10 09.11.10 25.11.10 23.11.10 25.11.10

(DAR) DRAWING / DOCUMEN #

Date

Transmittal #

1 2 3

28.06.10 08.07.10 10.07.10

4

25.07.10

DEEP-1016 sbic-1086 sbic-1086 jana-1090 dse/sbic/320/2010

5

26.07.10

deep-1018

0

6 7 8 1 10 11

12.08.10 15.08.10

DEEP-1019 Gulf-1003

17.08.10 17.08.10 17.08.10

BUKA-0001

1 0 0 0 0 0

12

17.08.10

13

23.08.10

EMCO - 1103

EMCO/C-323/ELP-01

0

14

29.08.2010

DEEP-1021

DEEP-1021/ BR-01 BR--02

0

15 16 17

29.08.2010 01.09.2010 01.09.2010

DEEP-1022 SBIC-1099 -R SBIC-1101

DEEP-1022/ PE-01 & PE-02 AR-0025-10 AR-0026-10

0 3 0

18

07.09.2010

EMCO-1104

EMCO-1104

0

19

07.09.2010

BU-KA-001 r

BU-KA-001 r

1

20

07.09.2010

SBIC-1102

SBIC-1102

0

21 22 23 24 25 26 27

Drawing # emco/c-323/elp-01 emco/c-323/EM-01

Rev. 0 0

0

GLBO10-MP05 DEEP-1020 BUKAMAL

0

21.10.10 DAC/s-23-10 DAC/s-23-10 16.10.10 + DAC/S-24-10 27.10.10 DAC/S-24-10(Returned) DAC-002-10 DAC-002-10 04.11.10 DAC-003-10 DAC-003-10 09.11.10 DAC-004-10 DAC-004-10 20.11.10 24.11.10 DAC/s-28-10 DAC/s-28-10

0 0 0 0 0

FONTANA PROJECT

R) DRAWING / DOCUMENT APPROVAL CERTIFICATE Description & Location

from SBIC

to SBIC Status

STRUCTURAL CALCULATIONS FOR PANARAMIC GLAZING generator electrical room layout (GF) Modification flats ("6l, 7e&11H)electrical layout

28.06.10 08.07.10 10.07.10

sameer

structural calculations for steel support for cladding wings

25.07.10

socotec

struction calculationsfor typical curtain walls

26.07.10

STRUCTURAL CALCULATIONS FOR PANARAMA GLAZING Main Swimming Pool - Balance Tank Design and Structural Calculation for Mast. Garbage chute system Plans Block 1 & 2 Garbage chute system Section 1 & 2 Garbage chute system Details A

Disc

kumar

12.08.2010 15.08.10 15.08.10

Garbage chute system Details B generator electrical room layout (GF) Rev-E Balcony Railing Elev.Plan & Details

Panaromic Elev, Plan & Details Tiles Layout of ApartmentS @ Typical Floors. 01.09.10 Emco/C-324/AC-07 HVAC ducting layout (5th to 15th floor ) Internal Stair case details on Penthouse Floors 01.09.2010 Rev-4 07.09.10 GC-001Garbage chute system planlayout Block(116th & 2 toRev-1 Emco/C-324/AC-06 HVAC ducting 29th floor) GC-002 Garbage Chute system section block 1 & 2 Rev-2 07..09.10 GC-003 Garbage chute system Details Rev-1 Tile Details AR-0027-10 to AR-0037-10 Typical floorAToilets GC-004 Garbage chute System details B 07.09.10 (Typ.A,B,C,E, D,H,F ,J & k) drawing and details FIN preliminary 21.10.10 PH low level lighting layout,PH upper level lighting layout, PH low level small power 24.10.10 b layout, PH upper small power layout, PH lo Curtain wall/ Cladding wings elevations and sectional details(Returned) PENTHOUSE SWIMMING POOL DETAILS (HARD AND SOFT COPY) 06.11.10 C electrical layout flat 7e, modification ladies pool fittings and pipe work layout dev-const Submission of structural calculations for typical panels