Description

N68-22 Cabinet Installation Guide Issue

01

Date

2013-01-30

HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2013. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd. Address:

Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China

Website:

http://www.huawei.com

Email:

[email protected]

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

i

N68-22 Cabinet Installation Guide

About This Document

About This Document

Overview This document contains information related to the installation of the N68E-22 cabinet. The information consists of how to install the cabinet, accessories, external power cables, and PGND cables, how to attach engineering labels to the power cables and PGND cables, and other reference information.

Product Version This document applies to all the versions of the following products: eCoordinator, BSC6910, and BSC6900.

Intended Audience This document is intended for installation personnel.

Organization 1 Changes in the N68E-22 Cabinet Installation Guide This chapter describes the changes in the N68E-22 Cabinet Installation Guide. 2 Overview of the N68E-22 Cabinet The N68E-22 cabinet features a modular design. It provides sufficient space for installing devices such as subracks to facilitate capacity expansion and maintenance. Among the main parts of a cabinet, load-bearing parts include front and rear columns of the racks, middle columns, and door frames. Other parts cannot bear load, including mounting bars, front and rear doors, wooden plates on both sides of the cabinet, front and rear wire bushings, and guide rails. 3 Preparing for the N68E-22 Cabinet Installation Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in the cases. Ensure that all the tools required for the installation are available. 4 Installing the N68E-22 Cabinet Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

ii

N68-22 Cabinet Installation Guide

About This Document

Installing the N68E-22 cabinet involves installing the cabinet and the accessories. It also involves attaching engineering labels to the cabinet. 5 Installing the N68E-22 Cabinet on the Concrete Floor This chapter describes how to install the N68E-22 cabinet on the concrete floor. 6 Installing the N68E-22 Cabinet on the ESD Floor This chapter describes how to install the N68E-22 cabinet on the ESD floor by using the N6X series support assembly. 7 Installing the Accessories for the N68E-22 Cabinet This chapter describes how to install the front and back doors as well as side panels for the N68E-22 cabinet. This chapter also describes how to install the PGND cables for the doors and side panels. 8 Attaching the Engineering Labels to the Cabinets This chapter describes how to attach the engineering labels, including row and column labels, to the cabinets. 9 Cabinet Installation Record The hardware installation record is used to record the hardware installation information. 10 Checklist for the Cabinet Installation This chapter describes the items and specifications for checking the cabinet installation. 11 Exploded View of the N68E-22 Cabinet This section describes the components of the N68E-22 cabinet and the cabinet details, which are indicated in the exploded view.

Conventions Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol

Description Indicates a hazard with a high level or medium level of risk which, if not avoided, could result in death or serious injury. Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Indicates a potentially hazardous situation that, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. Indicates a tip that may help you solve a problem or save time.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

iii

N68-22 Cabinet Installation Guide

About This Document

Symbol

Description Provides additional information to emphasize or supplement important points of the main text.

General Conventions The general conventions that may be found in this document are defined as follows. Convention

Description

Times New Roman

Normal paragraphs are in Times New Roman.

Boldface

Names of files, directories, folders, and users are in boldface. For example, log in as user root.

Italic

Book titles are in italics.

Courier New

Examples of information displayed on the screen are in Courier New.

Command Conventions The command conventions that may be found in this document are defined as follows. Convention

Description

Boldface

The keywords of a command line are in boldface.

Italic

Command arguments are in italics.

[]

Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... }

Optional items are grouped in braces and separated by vertical bars. One item is selected.

[ x | y | ... ]

Optional items are grouped in brackets and separated by vertical bars. One item is selected or no item is selected.

{ x | y | ... }*

Optional items are grouped in braces and separated by vertical bars. A minimum of one item or a maximum of all items can be selected.

[ x | y | ... ]*

Optional items are grouped in brackets and separated by vertical bars. Several items or no item can be selected.

GUI Conventions The GUI conventions that may be found in this document are defined as follows.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

iv

N68-22 Cabinet Installation Guide

About This Document

Convention

Description

Boldface

Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK.

>

Multi-level menus are in boldface and separated by the ">" signs. For example, choose File > Create > Folder.

Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Format

Description

Key

Press the key. For example, press Enter and press Tab.

Key 1+Key 2

Press the keys concurrently. For example, pressing Ctrl+Alt +A means the three keys should be pressed concurrently.

Key 1, Key 2

Press the keys in turn. For example, pressing Alt, A means the two keys should be pressed in turn.

Mouse Operations The mouse operations that may be found in this document are defined as follows.

Issue 01 (2013-01-30)

Action

Description

Click

Select and release the primary mouse button without moving the pointer.

Double-click

Press the primary mouse button twice continuously and quickly without moving the pointer.

Drag

Press and hold the primary mouse button and move the pointer to a certain position.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

v

N68-22 Cabinet Installation Guide

Contents

Contents About This Document.....................................................................................................................ii 1 Changes in the N68E-22 Cabinet Installation Guide..............................................................1 2 Overview of the N68E-22 Cabinet..............................................................................................2 3 Preparing for the N68E-22 Cabinet Installation......................................................................6 3.1 Unpacking the Cases and Checking the Items....................................................................................................7 3.2 Tools Required for Installing the N68E-22 Cabinet.........................................................................................13

4 Installing the N68E-22 Cabinet.................................................................................................14 5 Installing the N68E-22 Cabinet on the Concrete Floor.........................................................15 5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor..............................................................16 5.2 Template Files for Installing the N68E-22 Cabinet..........................................................................................16 5.3 Positioning the N68E-22 Cabinet on the Concrete Floor.................................................................................18 5.4 Securing the N68E-22 Cabinet on the Concrete Floor.....................................................................................23 5.5 Testing the Insulation of the N68E-22 Cabinet................................................................................................26 5.6 Combining the N68E-22 Cabinets....................................................................................................................27

6 Installing the N68E-22 Cabinet on the ESD Floor.................................................................33 6.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor.....................................................................35 6.2 Template Files for Installing the N68E-22 Cabinet..........................................................................................35 6.3 N6X Series Support Assembly.........................................................................................................................37 6.4 Positioning the N68E-22 Cabinet on the ESD Floor........................................................................................39 6.5 Installing the N6X Series Support and the Guide Rails...................................................................................44 6.6 Securing the N68E-22 Cabinet on the ESD Floor............................................................................................48 6.7 Testing the Insulation of the N68E-22 Cabinet................................................................................................51 6.8 Combining the N68E-22 Cabinets....................................................................................................................52 6.9 Placing the ESD Floor in the Original Position................................................................................................57

7 Installing the Accessories for the N68E-22 Cabinet..............................................................60 7.1 Accessories to Be Installed for the N68E-22 Cabinet......................................................................................62 7.2 Installing the Side Panels for the N68E-22 Cabinet.........................................................................................62 7.3 Installing the Front and Rear doors for the N68E-22 Cabinet..........................................................................64 7.4 Installing the PGND Cables for the Doors of the N68E-22 Cabinet................................................................65

8 Attaching the Engineering Labels to the Cabinets...............................................................67 Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

vi

N68-22 Cabinet Installation Guide

Contents

9 Cabinet Installation Record.......................................................................................................69 10 Checklist for the Cabinet Installation...................................................................................71 11 Exploded View of the N68E-22 Cabinet................................................................................73

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

vii

N68-22 Cabinet Installation Guide

1

1 Changes in the N68E-22 Cabinet Installation Guide

Changes in the N68E-22 Cabinet Installation Guide This chapter describes the changes in the N68E-22 Cabinet Installation Guide.

01 (2013-01-30) Compared with Draft A (2012-07-23), this issue includes the new topic: l

Hardware Installation Record

l

Exploded View of the N68E-22 Cabinet

Compared with Draft A (2012-07-23), this issue does not incorporate any changes. Compared with Draft A (2012-07-23), this issue does not exclude any topics. Since N68E-22 cabinets remain the same despite different versions and modes, the names of different versions and modes are changed into N68E-22 Cabinet Installation Guide, and the documentation version is upgraded to 01. This document applies to all the versions of the following products: eCoordinator, BSC6910 and BSC6900 .

Draft A (2012-07-23) This is the Draft A release of V100R014C00.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

1

N68-22 Cabinet Installation Guide

2

2 Overview of the N68E-22 Cabinet

Overview of the N68E-22 Cabinet

The N68E-22 cabinet features a modular design. It provides sufficient space for installing devices such as subracks to facilitate capacity expansion and maintenance. Among the main parts of a cabinet, load-bearing parts include front and rear columns of the racks, middle columns, and door frames. Other parts cannot bear load, including mounting bars, front and rear doors, wooden plates on both sides of the cabinet, front and rear wire bushings, and guide rails.

Appearance of the N68E-22 Cabinet The color of the N68E-22 cabinet surface is purple and gray. N68E-22 cabinets are classified into single-door cabinets and double-door cabinets. Figure 2-1 shows the appearance of a singledoor N68E-22 cabinet. Figure 2-2 shows the appearance of a double-door N68E-22 cabinet. NOTE

BSC6910 series cabinets support only the double-door mode and BSC6900 series cabinets support both the single-door and double-door modes.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

2

N68-22 Cabinet Installation Guide

2 Overview of the N68E-22 Cabinet

Figure 2-1 Appearance of the single-door N68E-22 cabinet

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

3

N68-22 Cabinet Installation Guide

2 Overview of the N68E-22 Cabinet

Figure 2-2 Appearance of the double-door N68E-22 cabinet

Technical Specifications of the N68E-22 Cabinet Table 2-1 describes the technical specifications of the N68E-22 cabinet. Table 2-1 Technical specifications of the N68E-22 cabinet Item

Value

Dimension (H x W x D)

2,200 mm (height) x 600 mm (width) x 800 mm (depth)

Height of the available space

46 U

Weight

l Rack: ≤ 59 kg; l Empty cabinet: ≤ 100 kg; l The weight of a BSC6900 cabinet in full configuration is less than or equal to 320 kg. The weight of a BSC6910 cabinet in full configuration is less than or equal to 400 kg.

Power supply

Issue 01 (2013-01-30)

Per subrack four routes of -48 V DC power supply Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

4

N68-22 Cabinet Installation Guide

2 Overview of the N68E-22 Cabinet

Item

Value

EMC

l Meets the requirements of ETSI EN300 386 l Meets the requirements of Council directive 89/336/EEC

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

5

N68-22 Cabinet Installation Guide

3

3 Preparing for the N68E-22 Cabinet Installation

Preparing for the N68E-22 Cabinet Installation

About This Chapter Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in the cases. Ensure that all the tools required for the installation are available. 3.1 Unpacking the Cases and Checking the Items This section describes how to unpack the cases and check the items in the cases to facilitate subsequent cabinet installation. 3.2 Tools Required for Installing the N68E-22 Cabinet The tools required for installing the N68E-22 cabinet are tools for measuring, marking, drilling, and fastening, small tools, auxiliary tools, meters, and some special tools.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

6

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

3.1 Unpacking the Cases and Checking the Items This section describes how to unpack the cases and check the items in the cases to facilitate subsequent cabinet installation.

Prerequisites l

Site preparation for the installation is complete.

l

The cases that contain the cabinets and components are delivered to the site.

l

When carrying or placing the equipment, you should ensure that it does not collide with doors, walls, shelves, or other objects.

l

When transporting or installing the equipment, components, or parts, you should avoid touching their uncoated metal surfaces with sweaty or dirty gloves.

Context

Procedure Step 1 Unload the cases.

CAUTION When unloading the cases, you should place the cases in sequence. Ensure that the labels on the cases face the same direction. Step 2 Check whether the number of cases on site matches the Packing List and whether the place of delivery is the same as the actual installation place. If...

Then...

The number of cases on site matches that in the Packing List

Go to Step 3.

The number of cases on site does not match that in the Packing List

Go to Step 4.

Step 3 Check the shockwatch labels on both sides of each case to determine whether each case has been hit. If...

Then...

Both labels on a case are transparent, as shown by part 1 in Figure 3-1

The case has not been hit. Go to Step 5.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

7

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

If...

Then...

Any label on a case becomes red, as shown The case has been hit by a force greater than by part 2 in Figure 3-1 50g (g is the standard gravity) during transportation. Such hit damages the cabinet or boards in the case. To handle this problem, go to Step 4.

Figure 3-1 Shockwatch label

Step 4 Stop unpacking the cases. Ask the project supervisor to send the Cargo Problems Report that is signed by the customer to the local Huawei office within three days. Step 5 Check whether the cases are intact. If...

Then...

Any case is seriously damaged or soaked

Go to Step 6.

The cases are intact

Go to Step 7.

Step 6 Stop unpacking the cases, find out the causes, and contact the local Huawei office to further handle the problem.

CAUTION To protect the equipment and find out the causes, perform the following actions: Move the unpacked equipment indoors for proper storage, take photos of the storage environment, the rusted or corroded equipment, packing cases, and packing materials. Keep these photos for future verification. Store the packing cases and materials properly.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

8

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

Step 7 Unpack the wooden cases.

CAUTION l Before unpacking, move the wooden cases into or close to the equipment room if enough space is available. This prevents damage to the cabinets during the transportation. l When you unpack the wooden cases, unpack the one containing the packing list first. Then, you can find items rapidly according to the names, codes, positions, and quantities in the Packing List. l The following description takes the wooden case that contains the cabinet as an example. The methods of unpacking other types of wooden cases are similar. 1.

Place the wooden case on the ground. Ensure that the side with the wooden frame faces the bottom.

2.

Use a wrench, a flat-head screwdriver, or a claw hammer to straighten the tongues on the four sides of the cover, as shown in Figure 3-2. Figure 3-2 Straightening the tongue

3.

Issue 01 (2013-01-30)

Remove the cover. If the wooden case contains a carton, take out the carton and then open it according to Step 8. If the wooden case contains a cabinet, go to the next step. See Figure 3-3.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

9

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

Figure 3-3 Removing the cover

4.

Use the same method to remove the side boards from the wooden case, as shown in Figure 3-4. Figure 3-4 Removing side boards

5.

Issue 01 (2013-01-30)

Erect the cabinet with the BOTTOM side down.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

10

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

CAUTION This operation needs three to five installers. Prevent the cabinet from falling during the erection to avoid personnel injury. 6.

Remove the bottom of the case, that is, the side with the wooden frame.

7.

Remove the packing foam from the corners and edges of the cabinet.

8.

Remove the vacuum plastic bag.

Step 8 Unpack the carton, as shown in Figure 3-5. Figure 3-5 Unpacking a carton

1 Carton label

2 Strap

3 Pressure-sensitive tape

4 Foam plate

5 Board label

6 Board

1.

Check the types and quantities of the items in the carton according to the carton label.

2.

Use diagonal pliers to cut the straps.

3.

Rip the tape along the joint seams by using the paper knife. Do not insert the knife too deep, or else the items may be damaged.

4.

Unpack the carton and take out the items.

Step 9 Unpack boards.

CAUTION l Electronic components are extremely sensitive to static electricity. When unpacking the boards, wear an ESD wrist strap or a pair of ESD gloves properly. l The ESD bag contains desiccant to keep the bag dry. When taking the board from a cold dry place to a hot damp place, wait at least 30 minutes before unpacking. Otherwise, moisture condensed on the board surface may damage the board. 1.

Check that no evident damage is on the board packages.

2.

Open the packages and ensure that the boards are in good condition. For any board problem, contact the order management engineer at the local Huawei office.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

11

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

Step 10 Check whether the unpacked boards need to be installed immediately, and then proceed accordingly. If...

Then...

The unpacked boards need to be installed Place the boards on an ESD surface and immediately discharge the static electricity. The unpacked boards need not be installed Pack the boards with the original materials and immediately place them in a cool dry place away from direct sunlight or strong electromagnetic radiation. Step 11 Check the items. Check the items one by one according to the names, types, and quantities described in the Packing List. The acceptance of items covers the following aspects: l Appearance: Check whether there is any visible defect, looseness, distortion, or damage; check whether the labels are legible and whether the nameplates and decorating plates are available and meet the requirements. l Integrity: Ensure that all the parts and accessories required for the installation of cabinets are available. l Computer: Check whether the monitor, keyboard, and mouse are intact and in good condition. l Board: Ensure that the type and quantity of the boards are consistent with those in the Packing List. Ensure that no printed circuit board is broken and no component is detached from the board. NOTE

The project supervisor should take the major role in the inspection of equipment and components whose electric characteristics are likely to have been affected.

If...

Then...

The packing list indicates "shortage of articles"

Inform the order management engineer at the local office. Then, sign the Packing List together with the customer.

There are any short, wrong, extra, or damaged items

Representatives of Huawei and the customer must sign the Unpacking Inspection Memo and Packing List. The installation supervisor must fill in the Cargo Problems Report and inform the order management engineer at the local office in three days. The installation supervisor must keep the problematic items intact and the inner and outer packing intact for future investigation and verification.

The shipment is intact

Place the inspected items by type. Then, representatives of Huawei and the customer sign the Packing List.

----End Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

12

N68-22 Cabinet Installation Guide

3 Preparing for the N68E-22 Cabinet Installation

3.2 Tools Required for Installing the N68E-22 Cabinet The tools required for installing the N68E-22 cabinet are tools for measuring, marking, drilling, and fastening, small tools, auxiliary tools, meters, and some special tools.

Common Tools Table 3-1 lists the common tools required for installing the N68E-22 cabinet. Table 3-1 Common tools required for installing the N68E-22 cabinet Type

Tool

Measuring tools

Long tape, 50 m ribbon tape, 5 m tape measure, 400 mm level bar, and level instrument

Marking tools

Marking pen and pencil

Drilling tools

Percussion drill with matching bits of Ф6, Ф8, Ф10, Ф12, Ф14, and Ф16, and vacuum cleaner

Fastening tools

Flat-head screwdrivers (M3 to M6) Phillips screwdrivers (M3 to M6) Adjustable wrench Socket wrenches (M6, M8, M10, M12, M14, M17, M19) Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19) Combination wrenches (M17 and M19) Long-arm wrench

Small tools

Sharp-nose pliers, diagonal pliers, pliers, hand-held electric drill, file, handsaw, crowbar, rubber hammer, and claw hammer

Auxiliary tools

Paper knife, bellows, plumb, fork, ladder, heat gun, and PVC insulation tape

Special Tools The special tools required for installing the N68E-22 cabinet are the earth resistance meter, ESD wrist strap, ESD gloves, cable peeler, safety knife, and multi-purpose crimping pliers.

Meters The meters required for installing the N68E-22 cabinet are the multimeter and 500 V megohmmeter (for testing insulation resistance). NOTE

The meters must be checked and certified.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

13

N68-22 Cabinet Installation Guide

4 Installing the N68E-22 Cabinet

4

Installing the N68E-22 Cabinet

Installing the N68E-22 cabinet involves installing the cabinet and the accessories. It also involves attaching engineering labels to the cabinet.

Prerequisites l

The equipment is unpacked and accepted.

l

The cabinet is delivered to the site.

l

The tools required for the installation are available.

Procedure Step 1 Install the N68E-22 cabinet. If...

Then...

You install the N68E-22 cabinet on an ESD See Installing the N68E-22 Cabinet on the floor, ESD Floor. You install the N68E-22 cabinet on a concrete floor,

See Installing the N68E-22 Cabinet on the Concrete Floor.

You install the N68E-22 cabinet on other types of floors,

Contact Huawei for technical support.

Step 2 Install the accessories for the N68E-22 cabinet by referring to 7 Installing the Accessories for the N68E-22 Cabinet. Step 3 Attach the engineering labels to the cabinet by referring to Attaching the Engineering Labels to the Cabinets. ----End

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

14

N68-22 Cabinet Installation Guide

5

5 Installing the N68E-22 Cabinet on the Concrete Floor

Installing the N68E-22 Cabinet on the Concrete Floor

About This Chapter This chapter describes how to install the N68E-22 cabinet on the concrete floor. 5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor The N68E-22 cabinet can be directly installed on the concrete floor, so other types of materials are not required. Ensure that you have arranged sufficient N68E-22 cabinets as required. 5.2 Template Files for Installing the N68E-22 Cabinet The template files for installing the N68E-22 cabinet consist of the equipment room floor plan and the marking template. The equipment room floor plan is used to determine the installation position of the N68E-22 cabinet in the equipment room. The marking template is used to determine the drilling positions. The installation of the N68E-22 cabinet on a concrete floor and that of the N68E-22 cabinet on an ESD floor use the same equipment room floor plan but different marking templates. Combining the adjacent N68E-22 Cabinets is recommended, and the SFP+ High-Speed Cables can be installed when the length of the cables is not long enough. 5.3 Positioning the N68E-22 Cabinet on the Concrete Floor Positioning the N68E-22 cabinet on the concrete floor involves the following steps: determining cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies. 5.4 Securing the N68E-22 Cabinet on the Concrete Floor This section describes how to secure the N68E-22 cabinet on the concrete floor. 5.5 Testing the Insulation of the N68E-22 Cabinet This section describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the ground. 5.6 Combining the N68E-22 Cabinets This section describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet with another cabinet, you should use connecting pieces to secure them. The combining of N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and combining of N68E-22 and N68-22 cabinets.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

15

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

5.1 Materials for Installing the N68E-22 Cabinet on the Concrete Floor The N68E-22 cabinet can be directly installed on the concrete floor, so other types of materials are not required. Ensure that you have arranged sufficient N68E-22 cabinets as required.

5.2 Template Files for Installing the N68E-22 Cabinet The template files for installing the N68E-22 cabinet consist of the equipment room floor plan and the marking template. The equipment room floor plan is used to determine the installation position of the N68E-22 cabinet in the equipment room. The marking template is used to determine the drilling positions. The installation of the N68E-22 cabinet on a concrete floor and that of the N68E-22 cabinet on an ESD floor use the same equipment room floor plan but different marking templates. Combining the adjacent N68E-22 Cabinets is recommended, and the SFP+ High-Speed Cables can be installed when the length of the cables is not long enough.

Equipment Room Floor Plan The Equipment Room Floor Plan is provided by the customer or the site survey personnel. Figure 5-1 shows an example of the Equipment Room Floor Plan.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

16

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-1 Equipment room floor plan (unit: mm)

NOTE

See Figure 5-1. The requirements for the installation position of the N68E-22 cabinet are as follows: l

The distance between two rows of cabinets should be at least 1,000 mm.

l

The distance between the wall and the cabinet side that is the closest to the wall should be at least 800 mm.

l

The distance between the wall and the row that is the closest to the wall should be at least 800 mm (for double-door cabinets) and 1,000 mm (for single-door cabinets).

l

The width of the aisles in the equipment room should be at least 1,000 mm.

Marking Template The marking template is delivered with the cabinet. The marking template for installing the N68E-22 cabinet on the concrete floor is different from the marking template for installing the N68E-22 cabinet on the ESD floor. See Figure 5-2 and Figure 5-3.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

17

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

Figure 5-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

5.3 Positioning the N68E-22 Cabinet on the Concrete Floor Positioning the N68E-22 cabinet on the concrete floor involves the following steps: determining cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

Prerequisites l

The components required for the positioning are available. The required component is the M12x60 expansion bolt assembly.

l

The materials required for the positioning are available. The required materials are the marking template and Equipment Room Floor Plan.

l

The tools required for the positioning are available. The required tools are the tape measure, marker, hammer drill with Ф16 drill bit, vacuum cleaner, and hammer (for example, claw hammer).

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

18

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Context l

Line drawing and hole drilling are the primary tasks for cabinet installation as imprecise drawing or drilling may hamper the installation. Therefore, it is important to ensure their quality.

l

Before marking cabinet positions and drilling holes, check the installation position of the equipment, such as cable racks, in the equipment room for easy cabling.

l

The Equipment Room Floor Plan is provided by the customer or the site survey personnel.

Procedure Step 1 Ensure that the Equipment Room Floor Plan is in accordance with the requirements for installing the N68E-22 cabinet by referring to Template Files for Installing the N68E-22 Cabinet. Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in the Equipment Room Floor Plan. Step 3 Determine the positions of the holes for the expansion bolt assemblies on the concrete floor based on the installation position of the cabinet. You can use the marking template or tape measure to determine the positions of the holes for the expansion bolt assemblies on the concrete floor. The marking template is made of paper and is prone to deformation. Before using the marking template, check whether it is deformed based on the dimensions of marking template specified in Template Files for Installing the N68E-22 Cabinet. If...

Then...

The marking template is one of the accessories delivered on site and is not Go to Step 4. deformed, The marking template is not one of the accessories delivered on site or is deformed,

Go to Step 5.

Step 4 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies. 1.

As shown in Figure 5-4 or Figure 5-5, use measuring and marking instruments to measure and mark the start points for the front of a row of cabinets. From each start point, mark the benchmark lines in the cabinet arrangement direction.

2.

Place the marking template on the floor. Ensure that the semicircle notch of the template indicates the front of the cabinet and the edges of the template align with the benchmark lines.

3.

Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floor by using the template.

4.

After all the hole positions are marked, ensure that the distance between the holes is accurate.

5.

Go to Step 6.

Step 5 If the marking template cannot be used on site, use the tape measure to determine the positions of the holes for the expansion bolt assemblies. 1.

Issue 01 (2013-01-30)

As shown in Figure 5-4 or Figure 5-5, use measuring and marking instruments to measure and mark two straight lines with 687 mm wide spacing, and ensure that the lines are parallel with the front of the cabinet. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

19

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-4 Installation holes for one cabinet (unit: mm)

Figure 5-5 Installation holes for a row of cabinets (unit: mm)

2.

As shown in Figure 5-4 or Figure 5-5, determine the position of hole for the first expansion bolt assembly on each of the straight lines. Taking the hole as the benchmark point, mark the installation holes for other expansion bolt assemblies in succession.

3.

After all the hole positions are marked, ensure that the distance between the holes is accurate.

Step 6 Drill the holes.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

20

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

CAUTION l The concrete floor should not be penetrated. Therefore, you should confirm the thickness of the concrete floor before drilling holes. For some types of concrete floors on which the drilling is not suitable, you should consult the architectural engineers and get their permission before drilling holes. l Before drilling holes, you should take dustproof measures on the electronic equipment in the equipment room. You should use a vacuum cleaner to remove the dust during the drilling. Before removing the dustproof cover from the electronic equipment, you should clean up the pieces of concrete that have accumulated during the drilling. l You must wear safety goggles during the drilling to protect your eyes from the dust. l While drilling holes, you must hold the drill stock firmly. You must keep the drill bit vertical to the floor to protect the floor from being damaged or the holes from being slanted. 1.

Dig a pit by using a chisel to help hold the drill bit to the floor, as shown in Figure 5-6. Figure 5-6 Digging a pit

2.

Use a hammer drill to drill holes at the marked places on the concrete floor. The depth of each hole must range from 52 mm to 60 mm. All the holes must have the same depth. Select a Ф16 drill bit in appropriate length. See Figure 5-7. Figure 5-7 Drilling a hole

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

21

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

3.

Ensure that the depth of each hole ranges from 52 mm to 60 mm and that the holes are not slanting. If the depth of the hole is not appropriate or if the hole is slanting, re-drill the hole. If the slanting hole cannot be corrected, stop using the hole.

4.

Remove the dust inside and outside the holes by using a vacuum cleaner.

Step 7 Install the expansion bolt assemblies. Figure 5-8 shows an expansion bolt assembly. Figure 5-8 Expansion bolt assembly

1 Bolt

2 Spring washer

3 Flat washer

5 Nut

6 Guiding slot

7 Guiding rib

4 Expansion tube

1.

Measure the distance between the holes. If the distance does not meet the specifications, reposition and drill new holes.

2.

Insert the guiding rib on the nut into the guiding slot on the expansion tube, and then screw the bolt slightly to ensure that the guiding rib does not move out from the guiding slot. See part 1 of Figure 5-9.

3.

Insert the expansion tube and the nut into the hole vertically, and then use a rubber hammer to strike the expansion tube until it is completely buried in the hole, as shown in part 2 of Figure 5-9. Figure 5-9 Installing the expansion bolt assembly (1)

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

22

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

4.

Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not get loose easily. See part 1 of Figure 5-10.

5.

Unscrew the expansion bolt counterclockwise and then remove the spring washer and flat washer. Keep them for future use. See part 2 of Figure 5-10. Figure 5-10 Installing the expansion bolt assembly (2)

----End

5.4 Securing the N68E-22 Cabinet on the Concrete Floor This section describes how to secure the N68E-22 cabinet on the concrete floor.

Prerequisites l

The components required for the installation are available. The required component is the N68E-22 cabinet.

l

The materials required for the installation are available. The required materials are the insulating pads, flat washers 12, spring washers 12, adjusting pads (optional), and M12x60 expansion bolt assemblies.

l

The tools required for the installation are available. The required tools are the pallet truck, level bar, torque wrench, socket wrench, and Phillips screwdriver.

Context

CAUTION The gravity center of the cabinet is high. Therefore, do not lift or push the cabinet alone. Moving a cabinet requires at least two persons and a pallet truck, so as to ensure personnel safety and equipment safety.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

23

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Procedure Step 1 Remove the wooden protection boards from the front and back of the cabinet. Step 2 Remove the four wooden protection boards from both the left and right parts of the rack. Pull down the hook pin at the upper part of both the front and back doors of the cabinet, and then remove both doors. Store the doors for future use. See Figure 5-11. Figure 5-11 Removing the wooden protection boards

NOTE

When storing the doors, you should ensure that they are unlocked. Therefore, the lock rod at the lower part of each door does not protrude, thus preventing the lock rod from deformation. See Figure 5-12.

Figure 5-12 State of the lock of each door

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

24

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Step 3 Remove the reinforced plate from both sides of the cabinet. Step 4 Place the cabinet in the specified position. Align the installation holes in the cabinet with the holes on the floor. Step 5 Add the spring washer, flat washer, and insulating tube to each of the four expansion bolts. Then, insert each expansion bolt into the expansion tube and pretighten the expansion tube and the nut. See Figure 5-13. Step 6 Below the cabinet, push two insulating spacers from both the front and back sides. Ensure that the notch faces the inner side and is wedged in the expansion bolt. Align the installation holes of each insulating spacer with the corresponding expansion bolt holes. See Figure 5-13. Figure 5-13 Securing the cabinet

1 M12x60 bolt

2 Spring washer 12

4 Insulating tube

5 Insulating spacer

3 Flat washer

Step 7 Using M12 socket wrench to level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level, use a socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet and ensure that the cabinet is level. See Figure 5-14.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

25

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-14 Leveling the cabinet

1 Anchor bolt

2 Fixing bolt

Step 8 Use the torque wrench to secure the four fixing bolts and tighten them to 45 N•m. ----End

5.5 Testing the Insulation of the N68E-22 Cabinet This section describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the ground.

Prerequisites The tool required for the insulation test is available. The required tool is the multimeter.

Procedure Step 1 Set the multimeter to the megohm scale. Step 2 Measure the resistance between the M12x60 expansion bolt and the cabinet. If...

Then...

The resistance is greater than or equal to five megohms,

Test completes.

The resistance is smaller than five megohms,

The cabinet is not insulated from the ground. Go to Step 3.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

26

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-15 Insulation test

Step 3 Remove all the installation parts between the N68E-22 cabinet and the ground. Step 4 Ensure that the insulation parts are not missing or damaged. Step 5 Secure the cabinet again. Step 6 Repeat Step 1 to test the insulation again. ----End

5.6 Combining the N68E-22 Cabinets This section describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet with another cabinet, you should use connecting pieces to secure them. The combining Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

27

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

of N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and combining of N68E-22 and N68-22 cabinets.

Prerequisites The tools required for the installation are available. The required tools are the wrench and climbing ladder.

Context If two N68E-22 cabinets are to be combined, the connecting pieces are already installed on top of the cabinets and are delivered with the cabinets. If N68E-22 and N68-22 cabinets are to be combined, special connecting pieces for combining cabinets are required. Figure 5-16 shows the special connecting pieces for combining cabinets. Figure 5-16 Special connecting pieces for combining cabinets

Procedure l

Combining Two N68E-22 Cabinets 1.

Issue 01 (2013-01-30)

Remove the connecting pieces from the column inside the N68E-22 cabinet, rotate each of them by 180 degrees, and then reinstall them, as shown in Figure 5-17.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

28

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-17 Reinstalling the connecting piece between N68E-22 cabinets

2.

Issue 01 (2013-01-30)

Use M8x30 bolts to connect the connecting pieces of the adjacent cabinets together. See part 1 of Figure 5-18.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

29

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-18 Combining two N68E-22 cabinets

Issue 01 (2013-01-30)

3.

Remove the two connecting pieces from the front and back doorheads of the adjacent cabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 5-18 .

4.

At the bottom of the combined cabinets and in front of the column, use a level bar to check whether the horizontal and vertical deviations of the row of cabinets meet the specifications, as shown in Figure 5-19. If the cabinet is not level, use a socket wrench to adjust the leveling foot.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

30

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-19 Using a level bar to check the horizontal and vertical deviations

l

Issue 01 (2013-01-30)

Combining N68E-22 and N68-22 Cabinets 1.

Remove the connecting pieces from the column inside the N68E-22 cabinet, rotate each of them by 180 degrees, and then reinstall them, as shown in Figure 5-17.

2.

Remove the connecting piece from the middle top of the N68-22 cabinet, as shown in part 1 of Figure 5-20. Keep the removed M6x16 screws for future use.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

31

N68-22 Cabinet Installation Guide

5 Installing the N68E-22 Cabinet on the Concrete Floor

Figure 5-20 Combining N68E-22 and N68-22 cabinets

3.

Fix the special connecting pieces to the N68-22 cabinet, as shown in part 1 of Figure 5-20 .

4.

Use M8x30 bolts to fix the special connecting pieces of the N68-22 cabinet and the connecting pieces at the column in the N68E-22 cabinet, as shown in part 1 of Figure 5-20 .

5.

Remove the two connecting pieces from the front and back doorheads of the adjacent cabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 5-20 .

6.

At the bottom of the combined cabinets and in front of the column, use a level bar to check whether the horizontal and vertical deviations of the row of cabinets meet the specifications. If the cabinet is not level, use a socket wrench to adjust the leveling foot of the N68E-22 cabinet.

----End

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

32

N68-22 Cabinet Installation Guide

6

6 Installing the N68E-22 Cabinet on the ESD Floor

Installing the N68E-22 Cabinet on the ESD Floor

About This Chapter This chapter describes how to install the N68E-22 cabinet on the ESD floor by using the N6X series support assembly. 6.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor The materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinet and N6X series support assembly. 6.2 Template Files for Installing the N68E-22 Cabinet The template files for installing the N68E-22 cabinet consist of the equipment room floor plan and the marking template. The equipment room floor plan is used to determine the installation position of the N68E-22 cabinet in the equipment room. The marking template is used to determine the drilling positions. The installation of the N68E-22 cabinet on a concrete floor and that of the N68E-22 cabinet on an ESD floor use the same equipment room floor plan but different marking templates. Combining the adjacent N68E-22 Cabinets is recommended, and the SFP+ High-Speed Cables can be installed when the length of the cables is not long enough. 6.3 N6X Series Support Assembly The N6X series support assembly consists of N6X series support, guide rail, and front pallet. To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinet together and use the front pallet to support the ESD floor before and after the cabinet. 6.4 Positioning the N68E-22 Cabinet on the ESD Floor Positioning the N68E-22 cabinet on the ESD floor involves the following steps: determining cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies. 6.5 Installing the N6X Series Support and the Guide Rails This section describes how to install the N6X series support and the guide rails. 6.6 Securing the N68E-22 Cabinet on the ESD Floor Upon delivery, the N68E-22 cabinet is equipped with the front and back doors. Therefore, you should remove the doors first and then secure the cabinet on the N6X series support. 6.7 Testing the Insulation of the N68E-22 Cabinet This section describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the ground. Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

33

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

6.8 Combining the N68E-22 Cabinets This section describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet with another cabinet, you should use connecting pieces to secure them. The combining of N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and combining of N68E-22 and N68-22 cabinets. 6.9 Placing the ESD Floor in the Original Position After securing the N68E-22 cabinet on the ESD floor, you need to install the front pallet to support the ESD floor around the cabinet and place the ESD floor around the cabinet in the original position.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

34

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

6.1 Materials for Installing the N68E-22 Cabinet on the ESD Floor The materials for installing the N68E-22 cabinet on the ESD floor consist of the N68E-22 cabinet and N6X series support assembly. Table 6-1 lists the materials required for installing the N68E-22 cabinet on the ESD floor. Table 6-1 Materials required for installing the N68E-22 cabinet on the ESD floor Name

Sub-Item

Quantity

N68E-22 cabinet

-

Depends on the site requirements

N6X series support assembly

Support

Twice the number of cabinets

Guide rail

Twice the number of cabinets

Front pallet

Twice the number of cabinets

6.2 Template Files for Installing the N68E-22 Cabinet The template files for installing the N68E-22 cabinet consist of the equipment room floor plan and the marking template. The equipment room floor plan is used to determine the installation position of the N68E-22 cabinet in the equipment room. The marking template is used to determine the drilling positions. The installation of the N68E-22 cabinet on a concrete floor and that of the N68E-22 cabinet on an ESD floor use the same equipment room floor plan but different marking templates. Combining the adjacent N68E-22 Cabinets is recommended, and the SFP+ High-Speed Cables can be installed when the length of the cables is not long enough.

Equipment Room Floor Plan The Equipment Room Floor Plan is provided by the customer or the site survey personnel. Figure 6-1 shows an example of the Equipment Room Floor Plan.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

35

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-1 Equipment room floor plan (unit: mm)

NOTE

See Figure 6-1. The requirements for the installation position of the N68E-22 cabinet are as follows: l

The distance between two rows of cabinets should be at least 1,000 mm.

l

The distance between the wall and the cabinet side that is the closest to the wall should be at least 800 mm.

l

The distance between the wall and the row that is the closest to the wall should be at least 800 mm (for double-door cabinets).

l

The width of the aisles in the equipment room should be at least 1,000 mm.

Marking Template The marking template is delivered with the cabinet. The marking template for installing the N68E-22 cabinet on the concrete floor is different from the marking template for installing the N68E-22 cabinet on the ESD floor. See Figure 6-2 and Figure 6-3. Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

36

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-2 Marking template for installing the N68E-22 cabinet on the concrete floor (unit: mm)

Figure 6-3 Marking template for installing the N68E-22 cabinet on the ESD floor (unit: mm)

6.3 N6X Series Support Assembly The N6X series support assembly consists of N6X series support, guide rail, and front pallet. To support and secure the cabinet, you need to use bolts to fix the guide rail, support, and cabinet together and use the front pallet to support the ESD floor before and after the cabinet.

N6X Series Support The support is used to raise the cabinets so that the installation personnel can easily lay the floor and route the cables in the equipment room. Figure 6-4 shows the N6X series support.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

37

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-4 N6X series support

1 Half support

2 Expansion lever

3 M8 screw assembly connecting the half support and the expansion lever

4 Holes for connecting the support 5 Holes for connecting the support 6 Height scale of the ESD floor and the guide rail and the front pallet 7 Height locking bolt

8 Hole for connecting the support and the ground

The length of the N6X series support can be adjusted by adjusting the length of the expansion lever. There are two types of N6X series support: height-adjustable and height-fixed. For details, see Table 6-2. Table 6-2 Two types of N6X series support Type

ESD Floor Height

Remarks

I Heightadjustable

210-296 mm,296-465 mm, 465-756mm

l Stepless regulation of height can be performed within the range. l The height of the ESD floor refers to the distance between the concrete floor and the upper surface of the ESD floor.

II Height-fixed

Customized according to the height of the ESD floor

Mainly applicable to the scenario where the floor is very high or very low, with the minimum floor height of 150 mm

Guide Rail The guide rail is used to connect the cabinet and the support. Figure 6-5 shows the guide rail.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

38

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-5 Guide rail

1 Holes for connecting the cabinet

2 Holes for connecting the support

Front Pallet The front pallet is used to support the floor around the cabinet. Figure 6-6 shows the front pallet. Figure 6-6 Front pallet

1 Holes for connecting the support

6.4 Positioning the N68E-22 Cabinet on the ESD Floor Positioning the N68E-22 cabinet on the ESD floor involves the following steps: determining cabinet positions, marking the positions, drilling holes, and installing expansion bolt assemblies.

Prerequisites l

The components required for the positioning are available. The required components are the M12x60 expansion bolt assemblies.

l

The materials required for the positioning are available. The required materials are the marking template and Equipment Room Floor Plan.

l

The tools required for the positioning are available. The required tools are the tape measure, panel lifter, electric saw, marker, hammer drill with φ16 drill bit, vacuum cleaner, safety goggles, dustproof cover for electronic equipment, and rubber hammer.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

39

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Procedure Step 1 Ensure that the Equipment Room Floor Plan is in accordance with the requirements for installing the N68E-22 cabinet by referring to Template Files for Installing the N68E-22 Cabinet. Step 2 Use a tape measure to determine the cabinet positions based on the dimensions specified in the Equipment Room Floor Plan. Step 3 Use the panel lifter to remove the ESD floor in the installation area. Step 4 Remove the supporting pieces of the ESD floor. Step 5 Clean the installation area. Step 6 Choose a method of determining the positions of the holes for the expansion bolt assemblies on the concrete floor. You can use the marking template or tape measure to determine the positions of the holes for the expansion bolt assemblies on the concrete floor. The marking template is made of paper and is prone to deformation. Before using the marking template, check whether it is deformed based on the dimensions of marking template specified in Template Files for Installing the N68E-22 Cabinet. If...

Then...

The marking template is one of the accessories delivered on site and is not Go to Step 7. deformed, The marking template is not one of the accessories delivered on site or is deformed,

Go to Step 8.

Step 7 Use the marking plate to determine the positions of the holes for the expansion bolt assemblies. 1.

As shown in Figure 6-7 or Figure 6-8, use measuring and marking instruments to measure and mark the start points for the front of a row of cabinets. From each start point, mark the benchmark lines in the cabinet arrangement direction.

2.

Place the marking template on the floor. Ensure that the semicircle notch of the template indicates the front of the cabinet and the edges of the template align with the benchmark lines.

3.

Mark the positions of the holes (four holes for each cabinet) for expansion bolts on the floor by using the template.

4.

After all the hole positions are marked, ensure that the distance between the holes is accurate.

5.

Go to Step 9.

Step 8 Use the tape measure to determine the positions of the holes for the expansion bolt assemblies. 1.

Issue 01 (2013-01-30)

As shown in Figure 6-7 or Figure 6-8, use measuring and marking instruments to measure and mark two straight lines with 704 mm wide spacing, and ensure that the lines are parallel with the front of the cabinet.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

40

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-7 Installation holes for one cabinet (unit: mm)

Figure 6-8 Installation holes for a row of cabinets (unit: mm)

2.

As shown in Figure 6-7 or Figure 6-8, determine the position of hole for the first expansion bolt assembly on each of the straight lines. Taking the hole as the benchmark point, mark the installation holes for other expansion bolt assemblies in succession.

3.

After all the hole positions are marked, ensure that the distance between the holes is accurate.

Step 9 Drill the holes.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

41

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

CAUTION l The concrete floor should not be penetrated. Therefore, you should confirm the thickness of the concrete floor before drilling holes. For some types of concrete floors on which the drilling is not suitable, you should consult the architectural engineers and get their permission before drilling holes. l Before drilling holes, you should take dustproof measures on the electronic equipment in the equipment room. You should use a vacuum cleaner to remove the dust during the drilling. Before removing the dustproof cover from the electronic equipment, you should clean up the pieces of concrete that have accumulated during the drilling. l You must wear safety goggles during the drilling to protect your eyes from the dust. l While drilling holes, you must hold the drill stock firmly. You must keep the drill bit vertical to the floor to protect the floor from being damaged or the holes from being slanted. 1.

Dig a pit by using a chisel to help hold the drill bit to the floor, as shown in Figure 6-9. Figure 6-9 Digging a pit

2.

Use a hammer drill to drill holes at the marked places on the concrete floor. The depth of each hole must range from 52 mm to 60 mm. All the holes must have the same depth. Select a φ16 drill bit. See Figure 6-10. Figure 6-10 Drilling a hole

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

42

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

3.

Ensure that the depth of each hole ranges from 52 mm to 60 mm and that the holes are not slanting. If the depth of the hole is not appropriate or if the hole is slanting, re-drill the hole. If the slanting hole cannot be corrected, stop using the hole.

4.

Remove the dust inside and outside the holes by using a vacuum cleaner.

Step 10 Install the expansion bolt assemblies. Figure 6-11 shows an expansion bolt assembly. Figure 6-11 Expansion bolt assembly

1 Bolt

2 Spring washer

3 Flat washer

5 Nut

6 Guiding slot

7 Guiding rib

4 Expansion tube

1.

Measure the distance between the holes. If the position of a hole is not correct, re-position and drill a new hole.

2.

Insert the guiding rib on the nut into the guiding slot on the expansion tube, and then screw the bolt slightly to ensure that the guiding rib does not move out from the guiding slot. See part 1 of Figure 6-12.

3.

Insert the expansion tube and the nut into the hole vertically, and then use a rubber hammer to strike the expansion tube until it is completely buried in the hole, as shown in part 2 of Figure 6-12. Figure 6-12 Installing the expansion bolt assembly (1)

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

43

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

4.

Pre-tighten the expansion bolt clockwise so that the nut and the expansion tube do not get loose easily. See part 1 of Figure 6-13.

5.

Unscrew the expansion bolt counterclockwise and then remove the spring washer and flat washer. Keep them for future use. See part 2 of Figure 6-13. Figure 6-13 Installing the expansion bolt assembly (2)

----End

6.5 Installing the N6X Series Support and the Guide Rails This section describes how to install the N6X series support and the guide rails.

Prerequisites l

The components required for the installation are available. The required components are guide rails, M12x35 assembling bolt, and M12x60 assembling bolt.

l

The materials required for the installation are available. The required materials are flat washer 12, spring washer 12, and large flat washer.

l

The tools required for the installation are available. The required tools are torque wrench and ruler.

Procedure Step 1 Adjust the depth of the support. Move the two half supports so that the tail end of each half support is flush with the 800 silkscreen on the expansion lever. Then, fasten the six M8x20 screw assemblies on the expansion lever. See Figure 6-14.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

44

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-14 Adjusting the depth of the support

1 Half support

2 M8 assembling bolt connecting the half support and the expansion lever

3 Expansion lever

4 Height locking bolt

Step 2 Adjust the height of the support. 1.

Loosen the height locking bolts. Figure 6-14 shows the positions of the height locking bolts.

2.

Adjust the height of the support until it is equal to the measured height of the ESD floor.

CAUTION l The height of the ESD floor shall be in accordance with the site survey report. l The value read on the height scale of each support must be the same as the measured height of the ESD floor. Otherwise, the heights of the cabinets in the same row may be different after capacity expansion. 3.

Tighten the height locking bolts to 45 N•m by using a torque wrench. Note that the two bolts in the middle should be tightened before the four bolts on the two sides.

Step 3 Install the guide rails. See Figure 6-15.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

45

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-15 Installing the guide rails

1 Support

2 Guide rail

4 Spring washer

5 Flat washer

3 M12x35 bolt

1.

Place the guide rail on the support and align the installation holes for the guide rail with those for the support.

2.

Assemble the support and the guide rail by using the M12x35 assembling bolts, spring washers, and flat washers.

3.

Adjust the position of the support so that the diagonals of the four-sided shape formed by the two guide rails have nearly the same length, with a deviation of not more than 2 mm.

4.

Use a wrench to tighten the assembling bolts diagonally.

Step 4 Level and secure the support. 1.

Align the installation holes for the support with those for the expansion bolt assemblies in the ground, and then place the support assembled with the guide rail on the floor.

2.

Install the spring washers and flat washers on the M12x60 bolts. Through the installation holes for the support, vertically insert the bolts into the holes for the expansion bolt assemblies. See Figure 6-16.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

46

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-16 Securing the support

1 Support

2 Guide rail

3 M12x60 bolt

4 Spring washer

5 Large flat washer

6 Adjusting pad

7 Expansion tube

8 Nut

9 Level bar

3.

Place the level bar on the support to check whether the support is level. If it is not level, add adjusting pads under the support.

4.

Tighten the four bolts to 45 N•m one diagonal pair after another.

Step 5 Connect the supports if the N68E-22 cabinets are to be combined. To ensure that you can combine cabinets smoothly, use the insulating spacers to help locate adjacent two supports. Figure 6-17 shows an insulating spacer. Figure 6-17 Insulating spacer

1 Hole for locating adjacent supports

1.

Issue 01 (2013-01-30)

2 Hole for fixing the cabinet

Place the insulating spacer on the guide rails of the adjacent two supports. Align the halfcircle gaps of the insulating spacer with the installation holes for the two guide rails, and then insert the M12x35 assembling bolts into the holes. See Figure 6-18. Use the insulating spacers to connect all the supports. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

47

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-18 Connecting the supports

1 Insulating spacer

2 M12x35 bolt

2.

Use the level bar to check the levelness of the supports. If the supports are not level, use the adjusting pads to level them. See Figure 6-18.

3.

Use the wrench to tighten the height locking bolts to secure the supports.

4.

Remove the M12x35 assembling bolts and the insulating spacers. Keep them for future use.

----End

6.6 Securing the N68E-22 Cabinet on the ESD Floor Upon delivery, the N68E-22 cabinet is equipped with the front and back doors. Therefore, you should remove the doors first and then secure the cabinet on the N6X series support.

Prerequisites l

The components required for the installation are available. The required components are cabinet and M12x35 bolts.

l

The materials required for the installation are available. The required materials are insulating spacer, flat washer 12, and spring washer 12.

l

The tools required for the installation are available. The required tools are level bar, torque wrench, socket wrench, and Phillips screwdriver.

Context

CAUTION The gravity center of the cabinet is high. Therefore, do not lift or push the cabinet alone. Moving a cabinet requires at least two persons and a pallet truck, so as to ensure personnel safety and equipment safety.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

48

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Procedure Step 1 Remove the wooden protection boards from the front and back of the cabinet. Step 2 Remove the four wooden protection boards from both the left and right parts of the rack. Pull down the hook pin at the upper part of both the front and back doors of the cabinet, and then remove both doors. Store the doors for future use. See Figure 6-19. Figure 6-19 Removing the wooden protection boards

NOTE

When storing the doors, you should ensure that they are unlocked. Therefore, the lock rod at the lower part of each door does not protrude, thus preventing the lock rod from deformation. See Figure 6-20.

Figure 6-20 State of the lock of each door

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

49

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Step 3 Remove the reinforced plate from both sides of the cabinet. Step 4 Determine the position of the cabinet front. Then, lift the cabinet onto the guide rail. Align the installation holes at the bottom of the cabinet with the four holes on the guide rail. Step 5 Add the spring washer, flat washer, and insulating tube to each of the four expansion bolts. Then, insert each expansion bolt into the expansion tube and pretighten the expansion tube and the nut. See Figure 6-21. Step 6 Below the cabinet, push two insulating spacers from both the front and back sides. Ensure that the notch faces the inner side and is wedged in the expansion bolt. Align the installation holes of each insulating spacer with the corresponding expansion bolt holes. See Figure 6-21. Figure 6-21 Installing the cabinet

1 N68E-22 cabinet

2 Guide rail

3 Support

4 Insulating spacer

5 Insulating tube

6 Flat washer

7 Spring washer

8 Bolt

Step 7 Using M12 socket wrench to level the cabinet. Use a level bar to check the levelness of the cabinet. If the cabinet is not level, use a socket wrench to adjust the anchor bolt (adjustable range: 0-10 mm) of the cabinet and ensure that the cabinet is level. See Figure 6-22.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

50

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-22 Leveling the cabinet

1 Anchor bolt

2 Fixing bolt

Step 8 Use the torque wrench to fix the four fixing bolts and tighten them to 45 N•m. ----End

6.7 Testing the Insulation of the N68E-22 Cabinet This section describes how to test the insulation of the N68E-22 cabinet and how to insulate it from the ground.

Prerequisites The tool required for the insulation test is available. The required tool is the multimeter.

Procedure Step 1 Set the multimeter to the megohm scale. Step 2 Measure the resistance between the M12x60 expansion bolt and the cabinet. If...

Then...

The resistance is greater than or equal to five megohms,

Test completes.

The resistance is smaller than five megohms,

The cabinet is not insulated from the ground. Go to Step 3.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

51

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-23 Insulation test

Step 3 Remove all the installation parts between the N68E-22 cabinet and the ground. Step 4 Ensure that the insulation parts are not missing or damaged. Step 5 Secure the cabinet again. Step 6 Repeat Step 1 to test the insulation again. ----End

6.8 Combining the N68E-22 Cabinets This section describes how to combine the N68E-22 cabinets. When combining an N68E-22 cabinet with another cabinet, you should use connecting pieces to secure them. The combining Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

52

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

of N68E-22 cabinets can be classified into the following: combining of two N68E-22 cabinets and combining of N68E-22 and N68-22 cabinets.

Prerequisites The tools required for the installation are available. The required tools are the wrench and climbing ladder.

Context If two N68E-22 cabinets are to be combined, the connecting pieces are already installed on top of the cabinets and are delivered with the cabinets. If N68E-22 and N68-22 cabinets are to be combined, special connecting pieces for combining cabinets are required. Figure 6-24 shows the special connecting pieces for combining cabinets. Figure 6-24 Special connecting pieces for combining cabinets

Procedure l

Combining Two N68E-22 Cabinets 1.

Issue 01 (2013-01-30)

Remove the connecting pieces from the column inside the N68E-22 cabinet, rotate each of them by 180 degrees, and then reinstall them, as shown in Figure 6-25.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

53

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-25 Reinstalling the connecting piece between N68E-22 cabinets

2.

Issue 01 (2013-01-30)

Use M8x30 bolts to connect the connecting pieces of the adjacent cabinets together. See part 1 of Figure 6-26.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

54

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-26 Combining two N68E-22 cabinets

Issue 01 (2013-01-30)

3.

Remove the two connecting pieces from the front and back doorheads of the adjacent cabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 6-26 .

4.

At the bottom of the combined cabinets and in front of the column, use a level bar to check whether the horizontal and vertical deviations of the row of cabinets meet the specifications, as shown in Figure 6-27. If the cabinet is not level, use a socket wrench to adjust the leveling foot.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

55

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-27 Using a level bar to check the horizontal and vertical deviations

l

Issue 01 (2013-01-30)

Combining N68E-22 and N68-22 Cabinets 1.

Remove the connecting pieces from the column inside the N68E-22 cabinet, rotate each of them by 180 degrees, and then reinstall them, as shown in Figure 6-25.

2.

Remove the connecting piece from the middle top of the N68-22 cabinet, as shown in part 1 of Figure 6-28. Keep the removed M6x16 screws for future use.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

56

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-28 Combining N68E-22 and N68-22 cabinets

3.

Fix the special connecting pieces to the N68-22 cabinet, as shown in part 1 of Figure 6-28 .

4.

Use M8x30 bolts to fix the special connecting pieces of the N68-22 cabinet and the connecting pieces at the column in the N68E-22 cabinet, as shown in part 1 of Figure 6-28 .

5.

Remove the two connecting pieces from the front and back doorheads of the adjacent cabinets. Then, reinstall the connecting pieces, as shown in part 2 of Figure 6-28 .

6.

At the bottom of the combined cabinets and in front of the column, use a level bar to check whether the horizontal and vertical deviations of the row of cabinets meet the specifications. If the cabinet is not level, use a socket wrench to adjust the leveling foot of the N68E-22 cabinet.

----End

6.9 Placing the ESD Floor in the Original Position After securing the N68E-22 cabinet on the ESD floor, you need to install the front pallet to support the ESD floor around the cabinet and place the ESD floor around the cabinet in the original position.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

57

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Prerequisites l

The components required for the installation are available. The required components are the front pallet and M12x30 assembling bolt.

l

The materials required for the installation are available. The required materials are the spring washer 12 and flat washer 12.

l

The tools required for the installation are available. The required tools are the wrench and handsaw.

Procedure Step 1 Use the M12x30 assembling bolt, spring washer, and flat washer to secure the front pallet to the support, as shown in Figure 6-29. Figure 6-29 Installing the front pallet

Step 2 Adjust the height of the front pallet to ensure that the upper surface of the front pallet is flush with the lower surface of the ESD floor. Step 3 Cut the ESD floor according to the actual conditions and then place the ESD floor in the original position, as shown in Figure 6-30.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

58

N68-22 Cabinet Installation Guide

6 Installing the N68E-22 Cabinet on the ESD Floor

Figure 6-30 Placing the ESD floor in the original position

----End

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

59

N68-22 Cabinet Installation Guide

7

7 Installing the Accessories for the N68E-22 Cabinet

Installing the Accessories for the N68E-22 Cabinet

About This Chapter This chapter describes how to install the front and back doors as well as side panels for the N68E-22 cabinet. This chapter also describes how to install the PGND cables for the doors and side panels.

Prerequisites l

The cabinet is installed.

l

The accessories for the cabinet are delivered to the site.

Procedure Step 1 Install the side panels for the N68E-22 cabinet by referring to 7.2 Installing the Side Panels for the N68E-22 Cabinet. Step 2 Install the front and back doors for the N68E-22 cabinet by referring to 7.3 Installing the Front and Rear doors for the N68E-22 Cabinet. Step 3 Install the PGND cables for the doors and side panels of the N68E-22 cabinet by referring to 7.4 Installing the PGND Cables for the Doors of the N68E-22 Cabinet. ----End 7.1 Accessories to Be Installed for the N68E-22 Cabinet The accessories to be installed for the N68E-22 cabinet are front and back doors, side panels, and the corresponding PGND cables. 7.2 Installing the Side Panels for the N68E-22 Cabinet A single N68E-22 cabinet has four side panels, with two side panels on both the left and right sides. When multiple N68E-22 cabinets are combined in a row, a total of four side panels need to be installed at the two ends of the cabinet row. When the N68E-22 cabinet is combined with other types of cabinets, you need to install the side panels where the cabinets are combined. 7.3 Installing the Front and Rear doors for the N68E-22 Cabinet Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

60

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

This takes the double-door cabinet as an example to describe how to install the front and rear doors. 7.4 Installing the PGND Cables for the Doors of the N68E-22 Cabinet This section describes how to install the PGND cables for the doors of the N68E-22 cabinet. Each front door, rear door, and side panel of the cabinet must be installed with a PGND cable.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

61

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

7.1 Accessories to Be Installed for the N68E-22 Cabinet The accessories to be installed for the N68E-22 cabinet are front and back doors, side panels, and the corresponding PGND cables. Table 7-1 lists the accessories to be installed for the N68E-22 cabinet. Table 7-1 Accessories to be installed for the N68E-22 cabinet Accesso ry

Installation Position

Remarks

Side panel

See Exploded View of the N68E-22 Cabinet.

Side panels need to be installed at both ends of a row of combined cabinets. The side panels are classified into left panels and right panels.

Front and back doors

There are two types of structures for the front and back doors: single-door structure and doubledoor structure. The installation methods are the same.

PGND cables for the doors and side panels

The PGND cables connect the front and back doors as well as side panels to the base of the cabinet.

7.2 Installing the Side Panels for the N68E-22 Cabinet A single N68E-22 cabinet has four side panels, with two side panels on both the left and right sides. When multiple N68E-22 cabinets are combined in a row, a total of four side panels need to be installed at the two ends of the cabinet row. When the N68E-22 cabinet is combined with other types of cabinets, you need to install the side panels where the cabinets are combined.

Prerequisites l

The components required for the installation are available. The required components are the side panels and M6x12 countersunk screws.

l

The tools required for the installation are available. The required tool is a Phillips screwdriver with a long handle.

Context Figure 7-1 shows how to install the side panels for the N68E-22 cabinet.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

62

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

Figure 7-1 Installing the side panels for the N68E-22 cabinet

Procedure Step 1 Remove the connecting plate from the middle top of the cabinet, as shown in part 1 of Figure 7-1. Step 2 Connect the ground cable on the rack to the ground screw on the side panel, as shown in part 2 of Figure 7-1. Step 3 Place the side panel in the appropriate position, align the eight M6x12 screws with the installation holes, and then fasten the screws, as shown in part 3 of Figure 7-1. ----End

Follow-up Procedure Record the installation result in the corresponding table provided in Hardware Installation Record.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

63

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

7.3 Installing the Front and Rear doors for the N68E-22 Cabinet This takes the double-door cabinet as an example to describe how to install the front and rear doors.

Prerequisites l

To facilitate the operation, the front and rear doors should be installed after the installation of other hardware is complete.

l

The components required for the installation are available. The required components are the front and rear doors.

Context Figure 7-2 shows how to install the front and rear doors for the cabinet. Figure 7-2 Installing the front and rear doors for the N68E-22 cabinet

Procedure Step 1 Insert the pivot of the door into the hole in the lower enclosure of the cabinet, as shown in part 1 of Figure 7-2. Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

64

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

Step 2 Pull down the hook pin, align it with the pivot hole in the upper enclosure of the cabinet, and then release the hook pin so as to fix the door onto the cabinet, as shown in part 2 of Figure 7-2. ----End

Follow-up Procedure Record the installation result in the corresponding table provided in Hardware Installation Record.

7.4 Installing the PGND Cables for the Doors of the N68E-22 Cabinet This section describes how to install the PGND cables for the doors of the N68E-22 cabinet. Each front door, rear door, and side panel of the cabinet must be installed with a PGND cable.

Prerequisites l

The components required for the installation are available. The required components are PGND cables of cabinet doors.

l

The tools required for the installation are available. The tools are the Phillips screwdriver and the wrench.

Context NOTE

PGND cables for the front door and rear door are required for the single-door cabinet. PGND cables for the front doors and rear doors are required for the double-door cabinet.

Figure 7-3 shows how to install the PGND cables for the doors of the N68E-22 cabinet.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

65

N68-22 Cabinet Installation Guide

7 Installing the Accessories for the N68E-22 Cabinet

Figure 7-3 Installing the PGND cables for the doors of the N68E-22 cabinet

Procedure Step 1 Connect the PGND cables for the side panels, as shown in part 1 of Figure 7-3. NOTE

For a row of combined cabinets, only the side panels at the left and right ends of the cabinet row need to be installed with PGND cables.

Step 2 Connect the PGND cables for the front and rear doors, as shown in part 2 of Figure 7-3. ----End

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

66

N68-22 Cabinet Installation Guide

8

8 Attaching the Engineering Labels to the Cabinets

Attaching the Engineering Labels to the Cabinets This chapter describes how to attach the engineering labels, including row and column labels, to the cabinets.

Context Figure 8-1 shows the row label. Figure 8-1 Row label

Figure 8-2 shows the column label. Figure 8-2 Column label

Procedure Step 1 Attach the row labels to the cabinets. Attach the row labels to the side panels of the cabinets that stand near the aisle at the two ends of each cabinet row. Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

67

N68-22 Cabinet Installation Guide

8 Attaching the Engineering Labels to the Cabinets

If there is more than one row of cabinets, attach label A to the side panels at the two ends of the first cabinet row that is the closest to the door of the equipment room, label B to the second row, label C to the third row, and so on. Step 2 Attach the column labels to the cabinets. Attach the column labels to the door head of the cabinet front, with label 00 to the first cabinet near the main aisle, 01 to the second one, 02 to the third one, and so on. ----End

Follow-up Procedure Record the operation result in the corresponding table provided in Hardware Installation RecordHardware Installation Record.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

68

N68-22 Cabinet Installation Guide

9 Cabinet Installation Record

9

Cabinet Installation Record

The hardware installation record is used to record the hardware installation information. Table 9-1 Checklist for the installation of cable tray Item

Yes or No

Record/Remarks

The bolts for all the cable ladders are installed. The cable troughs and all their bolts are installed. All the accessories for the cable tray are installed.

Table 9-2 Checklist for the cabinet installation Item

Yes or No

Record/Remarks

The installation positions of the cabinets are determined. The positions of all the cabinets are marked. The installation holes for all the expansion bolt assemblies are drilled.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

69

N68-22 Cabinet Installation Guide

9 Cabinet Installation Record

Item

Yes or No

Record/Remarks

All the expansion bolt assemblies are installed. All the supports are installed if the ESD floor is used. All the cabinets are installed and secured. All the cabinets are insulated. All the cabinets are combined. The ESD floor is placed in the original position if the ESD floor is used.

Table 9-3 Checklist for the installation of other accessories Item

Yes or No

Record/Remarks

The side panels of all the cabinets are installed. The front and back doors of all the cabinets are installed. All the PGND cables for the doors are installed. All the engineering labels are attached to the cabinet.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

70

N68-22 Cabinet Installation Guide

10

10 Checklist for the Cabinet Installation

Checklist for the Cabinet Installation

This chapter describes the items and specifications for checking the cabinet installation. Table 10-1 lists the items and specifications for checking the cabinet installation. Table 10-1 Checklist for the cabinet installation

Issue 01 (2013-01-30)

SN

Item

1

The cabinet layout complies with the engineering design.

2

The supports are positioned and spaced according to the schematic drawing of installation holes if the equipment room has an ESD floor.

3

All supports are properly fixed to the floor if the equipment room has an ESD floor.

4

The support assembly is properly installed if the equipment room has an ESD floor.

5

All the front pallets for the ESD floor are installed at the same height if the equipment room has an ESD floor that needs to be supported by front pallets.

6

The cabinet is well insulated from the support or ground.

7

The cover plates are properly installed at the top and bottom of the cabinet.

8

The accessories such as the side panel, front door, and rear door are properly installed.

9

The row labels, column labels, and product labels are properly attached.

10

The ESD wrist strap is inserted into the ESD installation hole of the cabinet.

11

The connecting plates of the combined cabinets are properly installed.

12

The shockproof parts between multiple rows of cabinets are insulated.

13

All the screws are fastened. The flat washers and spring washers are mounted. The spring washers are placed between the flat washers and the screws.

14

The cabinets are stable and orderly placed.

15

The adjacent cabinets are close to each other and are in alignment.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

71

N68-22 Cabinet Installation Guide

Issue 01 (2013-01-30)

10 Checklist for the Cabinet Installation

SN

Item

16

The vertical deviation of the cabinet is less than 3 mm.

17

All the cabinet side panels facing the aisle are properly aligned, with the maximum deviation of 5 mm.

18

The surfaces of the cabinets are clean without any fingerprint or smudge. The paint on the surfaces of the cabinets is intact. There is no dust, excessive cable tie ends, or other sundries in the cabinets (even at dead corners).

19

All the labels, tags, and nameplates are complete, legible, and correct.

20

The front and rear doors of the cabinet open and close easily.

21

The modules in one cabinet are aligned from the top down.

22

All the filler panels are installed.

23

All the boards are installed in proper positions, and the DIP switches of the boards are properly set.

24

The components and the connecting wires or cables of the cabinets are not detached or damaged.

25

The paint on the components of the cabinets is in overall good condition.

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

72

N68-22 Cabinet Installation Guide

11

11 Exploded View of the N68E-22 Cabinet

Exploded View of the N68E-22 Cabinet This section describes the components of the N68E-22 cabinet and the cabinet details, which are indicated in the exploded view. Figure 11-1 shows the structure of the N68E-22 cabinet.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

73

N68-22 Cabinet Installation Guide

11 Exploded View of the N68E-22 Cabinet

Figure 11-1 Structure of the N68E-22 cabinet

1 Front and rear columns

2 Door frames

4 Front and back doors

5 Middle columns

3 Side panels

Table 11-1 describes the parts marked with letters in Figure 11-1.

Issue 01 (2013-01-30)

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

74

N68-22 Cabinet Installation Guide

11 Exploded View of the N68E-22 Cabinet

Table 11-1 Details of the installation of a cabinet No.

Description

a

No. b

(1) Product label c

(1) Huawei Logo d

(1) Connecting plate used to connect combined cabinets e

(1) Middle column f

(1) Plastic cover plate

(1) General grounding point of the cabinet

(2) Plastic cover plate g

h

(1) Wire bushing

(1) Movable hook pin i

j

(1) Grounding screw

Issue 01 (2013-01-30)

Description

(1) Leveling foot

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

75

N68-22 Cabinet Installation Guide

No.

11 Exploded View of the N68E-22 Cabinet

Description

k

Description

l

(1) Pin hole

Issue 01 (2013-01-30)

No.

(1) Lower movable pivot on front door

Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.

76