SX1722

COMPANY COMMENTS

A

A B C D

APPROVED WITHOUT COMMENT - WORK MAY PROCEED APPROVED WITH MINOR COMMENTS– WORK MAY PROCEED -REVISE AND RESUBMIT REVISE AND RESUBMIT – WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED APPROVAL NOT REQUIRED. INFORMATION ONLY. WORK MAY PROCEED

F

AS-BUILT / ACCEPTED AS FINAL

R

REJECTED - REVISE AND RESUBMIT. WORK NOT TO PROCEED.

V

VOID (DOCUMENT HAS BEEN CANCELLED / DELETED)

W thout pre ud ce to Contractor's rght under the Sub-Contract,

Code 2 - Comments as noted. Re-submission required 40965 2

MT

 

Const   28-9-16

A B C D

APPROVED WITHOUT COMMENT - WORK MAY PROCEED APPROVED WITH MINOR COMMENTS– WORK MAY PROCEED -REVISE AND RESUBMIT REVISE AND RESUBMIT – WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED APPROVAL NOT REQUIRED. INFORMATION ONLY. WORK MAY PROCEED

40965

F

AS-BUILT / ACCEPTED AS FINAL

R

REJECTED - REVISE AND RESUBMIT. WORK NOT TO PROCEED.

V

VOID (DOCUMENT HAS BEEN CANCELLED / DELETED)

W thout pre ud ce to Contractor's rght under the Sub-Contract, Contractor's review of this document does not relieve SubContractor of the responsibility for correctness under the sub contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or material developed or selected by the Sub-Contractor and does not relieve the SubContractor from full compliance with its obligations under the SubContract. Name/Signature  ______________________________________ For Petrofac-Samsung-CB&I Joint Venture

Code 2 - Comments as noted. Re-submission required

Date ______________

2

MT

 

Const   28-9-16

30.48.40.31 -TSA, PV 30.48.00.31- Gen. Protective coatings for onshore facilities, PV

Clearly Describe equipment and pipe insulation

# Binding wire. # Sealant / Flashing component. # Expansion spring. # Stainless Steel Cladding materials.

Storage condition shall be as per Manfacture's Recommendation

Add: DEP PV 30484031-P6000FP-000-PV-Clause 2.5 "Items which have been exposed to a salty atmosphere during transit, storage or after erection shall be thoroughly washed with potable water containing less then 50 ppm chlorides and dried.

Add : Expansion joint application details/prodedure

Add : Expansion joint application details/prodedure

Flange area insulation method, removable boxes.

ITP No. ?

Attached all inspection check-list (Report format)

All equipment shall be KNPC safety certified and in good working condition. All involved personnel shuld have received the required safety induction and othe appropriate training.