Saigon M&C Tower Project Method Statement For Ductworks
General Aim
Scope of works Methodology I. Duct Installation Works 1. Air Duct Connection 2. Air Duct Seal 3. Air Duct Insulation II. Air Devices Installation Works 1. Volume Dampers (VD), Volume Control Dampers (VCD), Fire Dampers (FD). 2. Diffuser, Grille 3. Plenum Chamber, Silencer Chamber 4. Flexible Duct, Canvas Joints 5. Louver, Access Door, Outdooor Hood
A
12/03/09
C.T.P N.A.K L.Q.K J.R.P
FIRST ISSUE
Page 2
Saigon M&C Tower Project Method Statement For Ductworks
General: Items: - The Method Statement for Air Distribution Installation Works.
Aim: The aim of works is to describe mechanical works associated with installation of Air Distribution Installation Works and to ensure compliance with contract requirements, specification and quality control.
Scope of Works: The scope of work for this method statement shall include all the Ductworks for the SAIGON M&C TOWER Project.
Methodology:
I. Duct Installation Works: Table1: Rectangular Duct Thickness Schedule Largest Dimension (mm) Duct Size (L max)
Up to 400
Steel Sheet Thickness
0.5
600
800 ~ 1250
1600 ~ 2500
Above 2500
0.8
1.0
1.2
0.6
1. Air Duct Connection: Table 2: Regulation for air duct connection Schedule Corner Angle Duct Connection
Companion Angle Duct
C , TDC
NA
TDC
NA
NA
Flange-40x40x3.0mm
NA
Flange-40x40x4.0mm
Less than 600 (mm) Duct size 601 to 1500 (mm) largest dimension 1501 to 2500 (mm) (mm) Over 2500 (mm) Maximum Spacing (mm)
1100
1200
Size of Bolt & Nut (mm)
8 mm
8 mm
Diameter (mm)
3.2 mm
3.2 mm
Maximum Spacing on Center (mm)
65 mm
65 mm
Rivet
Page 3
Saigon M&C Tower Project Method Statement For Ductworks
Table 3: Support, hanger, spacing schedule Less than
Duct size
Hanger
Vertical support
400
400 ~ 999
1000 ~1999
2000 ~ 2500
Over 2500
V-
U-
50x50x3.5
80x38x3.5
2 x Φ10
2 x Φ10
2 x Φ12
3000
2500
2500
2500
V30x30x2.5
V-40x40x3
V-
U-
50x50x3.5
80x38x3.5
Angle steel
V-30x30x2.5
V30x30x2.5
V-40x40x3
Round bar
2 x Φ8
2 x Φ10
Max. pitch L
3000
Angle steel
V-30x30x2.5
Max. pitch L
One point for each floor
1.1 Duct size over 1500mm: ) For duct size largest dimension over 1500mm show be as Figure 01: Concrete slab
Anchor bolt
Hanger rod M10 Air flow
Air flow
Air Duct W
Angle steel (see table 3) L ≤ 1200
Detail A
Figure 01: Typical duct connection detail (using flange joint) ) Detail A show be as Figure 02, Figure 03: 100
100
100 Angle steel flange (see table 02)
Sealed Bolt hole 8mm
Figure 02: Detail of bolt spacing for flange joint Page 4
Saigon M&C Tower Project Method Statement For Ductworks
5mm thk Washer
Rubber gasket Width: 25mm, 5mm thk
Bolt & Nut 8mm
Rivet 3.2mm
Air Duct
Angle steel flange (see table 02) Figure 03: Detail of connection angle for flange
1.2 Duct size under 1500mm: ) For duct size largest dimension under 1500mm show be as Figure 04 Air flow Air flow
Main duct Change between section Detail B
L W
Branch duct
L = 0.25W; L≥150mm
Air flow Figure 4: Branch duct connection detail (using Transverse Duct Connector (TDC) joint) ) Detail B show be as Figure 05, Figure 06, Figure 07 Cross aim brace
C
B
C
A
4 hole Φ10
A
C
B
C
Air duct
A ≤ 150 mm B ≤ 200 mm 100 mm ≤ C ≤ 150 mm
Figure 05: Detail of Cross Aim Brace Spacing Page 5
Saigon M&C Tower Project Method Statement For Ductworks
Cross Aim Brace (see table 4)
Rubber gasket (see figure 08) TDC Corner (see table 4)
Air Duct
Figure 06: Cross Aim Brace detail Table 4: Size, Thickness and Spacing of TDC Joint Schedule Duct Size largest dimension (mm)
Less than 700
700~1200
1200~1500
Size of TDC Duct End (minimum) (mm)
30
30
30
Thickness of TDC Corner (minimum) (mm)
1.2
1.2
1.2
1.0
1.0
1.0
1100
1100
1100
Thickness of Cross Arm Brace (minimum)(mm) Maximum Spacing (mm)
TDC joint Corner plate (see detail)
Air duct
Max 1100 TDC flange Bolt M10 TDC corner 1.2mm thk TDC duct end (see table 4) Nut M10 Rubber gasket (see figure 08) Nut M10
Bolt M10 Rubber gasket (see figure 08)
Figure 07: Typical TDC assembly detail Page 6
Saigon M&C Tower Project Method Statement For Ductworks
Rubber gasket Width: 25mm Thickness: 5mm
15-20mm
Bolt hole 8mm Figure 08: Typical rubber gasket installation detail ) Note: ? Support, hanger will be concerned on method statement of M&E Support System Installation Work: ME - REE - T+ - MS – G+ - GEN - 003
2. Air Duct Seal: Bolt hole 10mm TDC joint
Seal
Air Duct
50
Figure 09: Position of Seal for TDC Joint Seal Angle flange joint
Bolt hole 8mm 50
Air Duct
Figure 10: Possition of Seal for Angle Flange Joint Page 7
Saigon M&C Tower Project Method Statement For Ductworks
Seal (Inside Only)
Seal Air Duct
Figure 11: Possition of Sealant for Duct Seam 3. Air Duct Insulation: Table 5: Duct Insulation Specification Schedule Applicable scope Supply air duct Return air duct Smoke exhaust duct
Material
Type
Density
Thickness
Glasswool
Blanket
48kg/m3
25mm
48kg/m3
25mm
Rockwool
Board
60kg/m3
50mm
Glasswool
Blanket
48kg/m3
50mm
Supply air chambers and sound attenuation fittings Attached Alu. Tape (Width 50mm)
Board insulation 50mm (see table 5)
Seam
Pin Φ1.6mm (see figure 15)
Alu. Sheet Cladding (if any)
Air duct Metal clips
Adhesive
Figure 12: Typical smoke exhause duct insulation detail Page 8
Saigon M&C Tower Project Method Statement For Ductworks
Alu. foil facing Metal clip
Air
du
Alu. sheet cladding (Non-flammable)
ct
Glasswool for AC duct Rockwool for smoke exhaust duct
Pin Φ1.6mm (see figure 15) Figure 13: Ducting insulation layer detail
Glasswool 25mm thk
Glass cloth
Metal clips
Air duct Pins Φ1.6mm (see figure 14) `
Figure 14: Insulation detail for supply air chambers and sound attenuation fitings
Page 9
Saigon M&C Tower Project Method Statement For Ductworks
Max. 300mm
Max. 300mm
Pin Φ1.6mm Metal clip
Insulated duct
Bare duct Max. 300mm Max. 300mm
Figure 15: Shape & distance of pins
Page 10
Saigon M&C Tower Project Method Statement For Ductworks
Front view Pin Φ 1.6mm 50mm 25mm Flange joint Metal slip Glasswool 25mm thk 50mm 25mm Attached alu. tape 25mm
Glasswool 25mm thk
TDC joint Alu. Tape 50mm
TDC or Flange joint
25mm Attached alu. tape 25mm
50mm
Plan view Figure 16: Typical insulation menthod for TDC joint & flange joint
Glasswool 25mm thk (inside diffuser box)
Glasswool 25mm thk (outside duct) Chamber box
Air flow
Screw Glasswool 25mm thk (outside duct)
Aluminum tape 25mm
Ceiling
Figure 17: Detail of typical insulation for diffuser box Metal slip
Page 11
Attached alu. tape 25mm
Saigon M&C Tower Project Method Statement For Ductworks
Wall
Screw
Air duct
Frame
Glasswool 25mm thk (outside duct)
Tapping
Figure 18: Detail of typical insulation for grille (VHS type)
II. Air Devices Installation Works: 1. Volume Dampers (VD), Volume Control Dampers (VCD), Fire Damer (FD): TDC joint
VD Air flow
D
Air duct
L
VD
L = 8D D: diameter of air duct Air Fan Concrete slab
Concrete foundation
Figure 19: Detail of setting damper Table 6: Quantity of hanger rods for Fire Damper Rectangular Duct
Spiral Duct
Duct size or Diameter (mm)
Less than 300
Over 300
Less than 300
Over 300
Quantity of hanger rods (nos)
2
4
2
4
Page 12
Saigon M&C Tower Project Method Statement For Ductworks
Branch duct
Access door FD Concrete floor slab
Fire damper Wall
Anchor bolt Angle steel Bolt M8
Rubber pad
Vertical duct
Insulation 25mm
PLAN VIEW
Anchor bolt
Wall
Rockwool 50mm Concrete floor slab
V-Angle steel Bolt M8
Hanger rod
Fire damper Insulation 25mm
Vertical duct VCD
Access door FD
Duct elbow
V-Angle steel
FRONT VIEW Figure 20: Typical damper installation detail Page 13
Saigon M&C Tower Project Method Statement For Ductworks
2. Diffusers, Registers: Connection with Duct
Connection with chamber box
H+50mm
D
H+50mm
Flexible 100mm or over
W+50mm Flexible
Chamber box D
D+50mm K
Ceiling
Air duct K
Ceiling
W×H K = 150 ~ 300mm
W×H H, W: Dimension of Diffusers opening size for ceiling (mm) d : Diameter of flexible duct (mm)
Figure 21: Example of connection with chamber & duct
SUPPLY AIR CHAMBER BOX
Insulation (inside) Glasswool 25mm thk
Insulation (outside) Glass wool 25mm thk
Opposed blade damper (if any)
Insulation (outside) Glass wool 25mm thk
Ceiling
Figure 22: Detail of typical installation for supply air diffuser Page 14
Saigon M&C Tower Project Method Statement For Ductworks
Insulation (inside) Glasswool 25mm thk
RETURN AIR CHAMBER BOX
Insulation (outside) Glass wool 25mm thk
Screw Ceiling
Figure 23: Detail of typical installation for return air grille
EXHAUST AIR CHAMBER BOX
Opposed blade damber (if any) Screw Ceiling
Figure 24: Detail of typical connection for exhause air grille
3. Plenum Chamber, Silencer Chamber: ? Sound Absorber for Chamber shall be used glasswool 50mm thk, 48 kg/cm3 density. Table 7: Galvanized steel sheet thickness for Chamber Longest Dimension of Chamber (mm) Chamber Size (L max) (mm)
Less than 800
800 ~ 1500
1500 or Over
Steel Sheet Thickness (mm)
0.8
1.0
1.2
Page 15
Saigon M&C Tower Project Method Statement For Ductworks
A
Sound Absorber by glasswool 50mm thk
Silencer Elbow
R A L Figure 25: Silencer Elbow Chamber Detail
Sound Absorber by glasswool 50mm thk
B
Silencer Chamber
Detail D Detail E
A
Figure 26: Silencer Chamber Detail
Detail E GI sheet cover 0.6mm thk
25~50mm Air Duct
Pin Φ 1.6mm
Sound Absorber by glasswool 50mm thk
Page 16
Saigon M&C Tower Project Method Statement For Ductworks
Detail D Sound Absorber by glasswool 50mm thk Pin Φ1.6mm
25~50mm
75mm 100~150mm Figure 27: Chamber Jointing Detail
4. Flexible Duct, Canvas Joints a) Flexible Duct:
Insulation (inside) Glasswool 25mm thk
Steel band G.I.sheet 0.6mm thk
Bolt M6
FLEXIBLE DUCT
AIR DUCT
SUPPLY AIR CHAMBER BOX
Steel band G.I.sheet 0.6mm thk Insulation (outside) Glasswool 25mm thk
Screw 3.2Ø
Opposed blade damper (if any) Insulation (outside) Glass wool 50mm thk
Ceiling
Figure 28: Detail of typical connection between flexible duct & chamber box
Page 17
Saigon M&C Tower Project Method Statement For Ductworks
b) Canvas Joints: Duct canvas
Detail F
Air duct
Air duct
L
Flange joint
L = 200 ~ 250 (mm)
Figure 29: Canvas Joint Detail
Detail F Rubber gasket (width:5mm) Angle steel flange
Washer
Bolt and nut M8 Rivet 3.2mm
Air duct
Canvas Joint Cuff 5mm or more
Galvanized steel sheet ( same as duct thickness)
Insulation (inside) Glasswool 25mm thk
RETURN CHAMBER BOX
Insulation (outside) Glasswool 25mm thk
AIR DUCT
Screw
Flange joint (refer to detail G) Canvas
Ceiling
Figure 30: Detail of typical connection between canvas & chamber box Page 18
Saigon M&C Tower Project Method Statement For Ductworks
5. Louver, Access door, Outdoor Hood: a) Louver:
Concrete slab Wall
Anchor bolt
Mortar Grout
Louver
Hanger rod
Chamber box 500mm
Anchor bolt
Access door (see figure 32)
Figure 31: Typical Louver Installation Detail
Page 19
Angle steel (see table 3)
Saigon M&C Tower Project Method Statement For Ductworks
b) Access door: Steel plate Screw 3.2Ø
Air duct Sach lock
Aluminium
Aluminium
Steel plate
Sach lock
Figure 32: Typical Access Door Installation Detail
c) Outdoor Hood:
Mortar Wall Sealant Rockwool 60kg/m3 Outdoor hood Screw Air duct Insect Screen (if any)
Chamber box
GI sheet cover 0.6 mm thk
. Figure 33: Typical Outdoor Hood Installation Detail Page 20