CBM FIELD DEVELOPMENT PROJECT TEST REPORT FOR SOLO RUN TEST FOR MOTORS Owner : Reliance Industries Ltd Contractor : L&T Hydrocarbon Engineering Limited
Sheet
Date of Testing : AC MOTOR CHECKOUT/NAMEPLATE DATA Motor Tested Serial Number:
Type:
KW:
Phase:
Voltage Rating:
Frequenc y: Class:
Current Rating: Motor Speed: Manufacturer:
1.
MECHANICAL PREPARATION/CHECKS
CHECK
1. Motor Bearings are greased. OK 2. Conduit and cable work complete. OK 3. Turn the motor/fan by hand and check for rubs. OK 4. Motor GROUNDING is done OK 5. Cable terminal block is sealed with compound filling material OK
2.
ELECTRICAL TEST PROCEDURES.
1. Lock main circuit breaker in the OFF position. (Door open)
OK 2. Check for loose wires or damaged components. OK 3. From the MCC, Megger the motor from phase to phase and phase to ground OK 4. Measure the resistance between motor phases. OK 5. Check the rating of the overload and set to rated full load current of the motor. OK 6. Unlock the circuit breaker, switch the selector switch to OFF and close the breaker. OK 7. Bump test the motor by switching selector to HAND, and verify correct rotation. OK 8. When the rotation is correct run the motor and record current. OK Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name: Designation: Signature & Date: Format No :LT/RIL/CBM/ELEC/ITP/016
Page No: 1 of 3
CBM FIELD DEVELOPMENT PROJECT TEST REPORT FOR SOLO RUN TEST FOR MOTORS Owner : Reliance Industries Ltd Contractor : L&T Hydrocarbon Engineering Limited
Sheet
9. Run for 4 hours and record the temperature, vibration levels, voltage and current. OK 10. Switch off and lock out motor after test. OK
Motor winding resistance: REF
Resistance Value
Inductance
U1 - U2 V1 - V2 W1 - W2
Motor Insulation resistance: REF
Resistance Value
R-Y R-B Y-B R - Earth Y - Earth B - Earth
Direction of Rotation: ________________________________________________ RUN TEST RESULTS
PHASE CURRENT
R
PHASE VOLTAGE
Parameters/Ti me
R-Y
START
30 MIN
60 MIN
90 MIN
120 MIN
150 MIN
180 MIN
210 MIN
240 MIN
Y B
Y-B B-R
TEMPER ATURE
RPM NDE
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name: Designation: Signature & Date: Format No :LT/RIL/CBM/ELEC/ITP/016
SAMPLE
Page No: 2 of 3
CBM FIELD DEVELOPMENT PROJECT TEST REPORT FOR SOLO RUN TEST FOR MOTORS Owner : Reliance Industries Ltd Contractor : L&T Hydrocarbon Engineering Limited
Sheet
DE AMBIENT TEMP WINDING TEMP *For motors with VFD, RPM of motor as per VFD output also shall be measured and recorded separately.
Details of test equipment’s used: IR Tester Make: ……… ……….
Range: ……..V
Sl. No: ………..
Cal due Date:
Range: ……..V
Sl. No: ………..
Cal due Date:
Range: ……..V
Sl. No: ………..
Cal due Date:
Range: ……..V
Sl. No: ………..
Cal due Date:
Clamp meter Make: ……… ………. Thermometer Make: ……… ………. Digital Multi meter Make: ……… ………. Micro ohm meter Make: ………
Range: ……..V
Sl. No: ………..
Cal due Date:
Sl. No: ………..
Cal due Date:
………. Digital tachometer Make: ………
Range: ……..V ……….
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name: Designation: Signature & Date: Format No :LT/RIL/CBM/ELEC/ITP/016
Page No: 3 of 3
CBM FIELD DEVELOPMENT PROJECT TEST REPORT FOR SOLO RUN TEST FOR MOTORS Owner : Reliance Industries Ltd Contractor : L&T Hydrocarbon Engineering Limited
Sheet
*all testing equipment details shall be added at time of preparation of final reports and reports to be attached
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name: Designation: Signature & Date: Format No :LT/RIL/CBM/ELEC/ITP/016