MM Purchasing User Manual

August 26, 2017 | Author: rukometlas | Category: Computing, Technology, Business, Computing And Information Technology
Share Embed Donate


Short Description

MM Purchasing User Manual...

Description

MM COURSE: PURCHASING

BSNL

USER MANUAL: Purchasing Version:1.0

01/09/2010

Page | 1

MM COURSE: PURCHASING

Table of Contents FLOWCHART ................................................................................................................................................................... 4 1. Purchase requisition ................................................................................................................................................. 5

1.

MM-ME51N-Create Purchase Requisition for Account Assignment .................................................................... 5

2.

MM-ME51N-Create Purchase Requisition for Asset .......................................................................................... 12

3.

MM-ME51N-Create Purchase Requisition for Non Valuated materials ............................................................. 18

4.

MM-ME51N-Create Purchase Requisition for Stock materials .......................................................................... 23

5.

MM-ME52N-Change Purchase Requisition ........................................................................................................ 30

6.

MM-ME53N-Display Purchase Requisition ........................................................................................................ 37

7.

MM-ME56-To assign source of supply to requisitions ....................................................................................... 41

8.

MM-ZMMF_PR- PR Output ................................................................................................................................ 44

2.

Request for Quotation............................................................................................................................................. 47

1.

MM-ME41-Create Quotation ............................................................................................................................. 47

2.

MM-ME47-Maintain Quotation ......................................................................................................................... 68

3.

MM-ME48-Display Quotation ............................................................................................................................ 77

4.

MM-ME49-RFQ Comparison .............................................................................................................................. 82

5.

MM-ZMMF_PC-Print Price Comparison Report ................................................................................................. 86

6.

MM-ME9A-Message Output RFQ ....................................................................................................................... 89

3.

Contract/APO .......................................................................................................................................................... 93

1.

MM-ME31K-Create Contract with reference to PR............................................................................................ 93

2.

MM-ME31K-Create Contract with reference to RFQ ....................................................................................... 106

3.

MM-ME32K-Change Contract .......................................................................................................................... 118

4.

MM-ME33K-Display Contract ........................................................................................................................... 125

5.

MM-ME9K-Message Output Contracts ............................................................................................................ 133

6.

MM-ZMMF_APO-Message output APO ........................................................................................................... 137

4.

Purchase Order/Release Order ............................................................................................................................ 141

1.

MM-ME21N-Create Purchase Order-Account Assignment.............................................................................. 141

2.

MM-ME21N-Create Purchase Order-Assets .................................................................................................... 160

3.

MM-ME21N-Create Purchase Order-Non-Valuated Material.......................................................................... 181

Page | 2

MM COURSE: PURCHASING 4.

MM-ME21N-Create Purchase Order-Project Stock.......................................................................................... 199

5.

MM-ME21N-Create Purchase Order-Stock Materials ...................................................................................... 218

6.

MM-ME21N-Create Purchase Order-Subcontracting & Repair ....................................................................... 236

7.

MM-ME21N-ZSTE-Stock Transfer PO External ................................................................................................. 243

8.

MM-ME21N-ZSTI-Stock Transfer PO Internal................................................................................................... 247

9.

MM-ME22N-Change Purchase Order............................................................................................................... 251

10.

MM-ME23N-Display Purchase Order ........................................................................................................... 256

11.

MM-ZMMP_POTOL-PO Tolerance ............................................................................................................... 259

12.

MM-ME9F-Message Output Purchase Orders ............................................................................................. 262

13.

MM-ZMMP_SPO-Ultimate Consignee Details .............................................................................................. 266

14.

MM-ZMMF_SPO-Ultimate Consignee Details Print ..................................................................................... 271

15.

MM-ZMMP_POAMEND-Purchase Order Amendment ................................................................................ 275

16.

MM-ZMMF_POAMEND-Print Purchase Order Amendment ........................................................................ 279

5.

Approvals .............................................................................................................................................................. 283

1.

MM-SBWP-PR_APO_PO_RFQ approval process .............................................................................................. 284

IMORTANT TRANSACTION CODES .......................................................................................................................... 295

Page | 3

MM COURSE: PURCHASING

FLOWCHART

Page | 4

MM COURSE: PURCHASING

1. Purchase requisition

1.

MM-ME51N-Create Purchase Requisition for Account Assignment

Overview

Direct requirements from various departments for O&M materials to be directly charged to cost centre.

Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasing cycle. Purchase Requisition for materials whose cost will be directly charged to cost centre. The document will be used to provide material requirements of non valuated materials from all departments to the purchasing department. The purpose of requisitioning should be expense in nature and the material requisitioned will not be part of inventory at the plant. The requisition authorizes the Purchasing department to purchase materials in specific quantities within a specified time frame. It is an internal document and is not used outside of the company. Note: A Requisition of this nature will be created for codified materials. Incase material code is not available; the field may be kept blank. But in that case a proper material text has to be filled along with the material group so as to help classify the item. -Such a requisition will lead to direct consumption at time of purchase, thus purchase will not affect moving average price of the material as cost will be booked to the cost centre entered in requisition.

Page | 5

MM COURSE: PURCHASING

Input - Required Fields

Field Value / Comments

Document Type

Type of requisition

Material Code

Account Assignment

Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number K for Cost Centre

Plant

Plant code requiring material - Click on the drop down button to select

Quantity

Quantity to be requisitioned ( unit of measurement) will be defaulted

Valuation Price Requisitioner

Estimate Price per unit – Will be defaulted if previous purchase exists ,can be still changed by user Initials of Requisitioner

Req Tracking Number

A reference number for tracking this requisition

Cost Centre

Cost Centre to which cost of purchase will be booked

Output - Results Requisition will be created

Comments The requisition is assigned a PR number which is now subject to release in 2 steps – Initiator and Competent Authority.

Tips and Tricks 

Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner and Requisition Tracking Number.

Page | 6

MM COURSE: PURCHASING Procedure Steps

Access transaction by:

Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing>Purchase Requisition>Create ME51N

Transaction

On screen “Create Purchase Requisition”: enter header level information specified in the table below: Page | 7

MM COURSE: PURCHASING

Page | 8

MM COURSE: PURCHASING

Fields Document Type

Description Defines type of requisition

R/O/C R

User Action and Values Please refer the attached annexure

Comments

Header Note Required For

Header Text

O

Any comments that are not are generic to all items

Will not appear in print out

Required For Item Text

O

To be entered as text against the first Item only

Probable Vendor List

Probable Vendor List Item Text

O

Delivery Text

Delivery Text

O

List of probable vendors with complete relevant information to be entered as text against the first item only Delivery related texts can be maintained as text against the first item only

Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out

R = Required, O = Optional, C = Conditional

On the same screen, in “Create Purchase Requisition: Item Overview”: enter information specified in the table below:

Acct assignment Category

Cost Centre

Page | 9

MM COURSE: PURCHASING

Fields

Description Material Code

R/O/C R

User Action and Values Material code

Account Assignment “A”

Account to book cost

R

K for Cost Centre

Short Text

Description of material

C

Material Group

Classification of materials on basis of nature

C

Will be defaulted if material code is selected otherwise has to be entered manually Please refer the attached annexure

Plant

Plant requiring material basis ofR

Valuation Price

Estimated Price per unit

C

Cost Centre

Cost Centre

R

Storage location

Key for determining storage location for a specific plant

O

Delivery date

Date on which the goods are to be delivered. If delivery date is sooner than the system calculated lead time, a warning will be issued The organization for which the procurement needs to be done

C

This is defaulted as the date 90 days from present date. It can be changed if required.

C

Please refer the attached annexure

Material

Purchasing Organizatio n

Enter plant where material is to be shipped User to enter in the condition when the purchase history record is different from his estimate.

Comments Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number

In case it is a first time purchase, then this field is required to be filled.

Cost Centre to which cost will be booked Can be entered from drop down list

Page | 10

MM COURSE: PURCHASING Purchasing Group

Nature of group preparing requisition

C

Requisitioner

Indicates for whom the material is ordered This number can be used to facilitate the monitoring of material procurement

R R

A reference number for tracking this requisition

Item text

O

Technical specifications of the item not covered by the existing material descriptions

Req. tracking number

Item Text

Please refer the attached annexure Initials of requisitioner

It‟s a text page so there is no system check on its contents. This will be printed in the PR.

Repeat above for each item in Purchase Requisition.

Click on the check button

to check the document

System displays a message at the Bottom of the screen.

Click on the save folder to produce a numbered requisition, or hit Control + S.

Page | 11

MM COURSE: PURCHASING 2.

MM-ME51N-Create Purchase Requisition for Asset

Overview

Direct requirements from various departments for materials to be directly capitalized to an Internal order.

Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasing cycle. Purchase Requisition for direct capitalization is for those materials whose cost will be directly capitalized to an Internal order. The document will be used to provide requirements of capital nature items from all departments to the purchasing department. The purpose of requisitioning should be capital in nature and the material requisitioned may/may not be part of inventory at the plant. The requisition authorizes the Purchasing department to purchase materials in specific quantities within a specified time frame. It is an internal document and is not used outside of the company. Note : -A Requisition of this nature can be created with or without material codes. Incase material code is not available; the field may be kept blank. But in that case a proper material text has to be filled along with the material group so as to help classify the item. -Such a requisition will lead to direct cost booking to the Internal order related to the scheme , thus purchase will not affect moving average price of the material as cost will be booked to the order entered in requisition.

Page | 12

MM COURSE: PURCHASING

Input - Required Fields

Field Value / Comments

Document Type

Type of requisition

Material Code

Account Assignment “A”

Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number A for Assest

Plant

Plant code requiring material - Click on the drop down button to select

Quantity

Quantity to be requisitioned ( unit of measurement) will be defaulted Estimate Price per unit – Will be defaulted if previous purchase exists ,can be still changed by user Initials of Requisitioner

Valuation Price Requisitioner Req Tracking Number

Internal Order

Output - Results Requisition will be created

A reference number for tracking this requisition , eg – Mech/04/08 where Mech represents Mechanical department, 04 for year 2004 and 08 could be a running serial no. Order in Projects to which cost of purchase will be booked

Comments The requisition is assigned a PR number which is now subject to release in 2 steps – Initiator and Approver. Only after approval the requisition is available for processing at MM Cell.

Tips and Tricks



Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner and Req Tracking Number.

Page | 13

MM COURSE: PURCHASING

Procedure Steps

Access transaction by:

Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing>Purchase Requisition>Create ME51N

Transaction

Page | 14

MM COURSE: PURCHASING On screen “Create Purchase Requisition”: enter header level information specified in the table below:

Fields Document Type

Description Defines type of requisition

R/O/C R

User Action and Values Please refer the attached annexure

Header Note Required For

Header Text

O

Any comments that are not are generic to all items

Will not appear in print out

Required For Item Text

R

To be entered as text against the first Item only

Probable Vendor List

Probable Vendor List Item Text

O

Delivery Text

Delivery Text

O

List of probable vendors with complete relevant information to be entered as text against the first item only Delivery related texts can be maintained as text against the first item only

Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out

R = Required, O = Optional, C = Conditional

Page | 15

Comments

MM COURSE: PURCHASING On the same screen “Create Purchase Requisition: Item Overview”: enter information specified in the table below: Fields

Description Material Code

R/O/C R

User Action and Values Material code

Account Assignment “A”

Account to book cost

R

F Internal Order

Short Text

Description of material

C

Material Group

Classification of materials on basis of nature

C

Will be defaulted if material code is selected otherwise has to be entered manually Please refer the attached annexure

Plant

Plant requiring material basis ofR

Valuation Price

Estimated Price per unit

C

Order

Internal Order

R

Storage location

Key for determining storage location for a specific plant

O

Delivery date

Date on which the goods are to be delivered. If delivery date is sooner than the system calculated lead time, a warning will be issued

C

Material

Enter plant where material is to be shipped User to enter in the condition when the purchase history record is different from his estimate.

Order in Projects to which cost of purchase will be booked Can be entered from drop down list This is defaulted as the date 90 days from present date. It can be changed if required.

Page | 16

Comments Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number

In case it is a first time purchase, then this field is required to be filled.

MM COURSE: PURCHASING Purchasing Organizati on

Organization for which procurement needs to be done

C

Purchasing Group

Nature of group preparing requisition

C

Requisitioner

Indicates for whom the material is ordered This number can be used to facilitate the monitoring of material procurement

R R

A reference number for tracking this requisition

Item text

O

Technical specifications of the item not covered by the existing material descriptions

Req. tracking number

Item Text

Please refer the attached annexure

Please refer the attached annexure Initials of requisitioner

It‟s a text page so there is no system check on its contents. This will be printed in the PR.

Repeat above for each item in Purchase Requisition

Click on the save

folder to produce a numbered requisition, or hit Control + S.

Page | 17

MM COURSE: PURCHASING 3.

MM-ME51N-Create Purchase Requisition for Non Valuated materials

Overview

Direct requirements from various departments for O&M non valuated materials to be kept in Inventory.

Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasing cycle. Purchase Requisition for non valuated materials will be used to provide requirements of non valuated materials from all departments to the purchasing department. The purpose of requisitioning should be expense in nature and the material requisitioned should be part of inventory at the plant. The requisition authorizes the Purchasing department to purchase materials in specific quantities within a specified time frame. It is an internal document and is not used outside of the company. Note : -A Requisition of this nature will be created for codified materials. Incase material code is not available; the field may be kept blank. But in that case a proper material text has to be filled along with the material group so as to help classify the item. -Such a requisition will lead to direct consumption at time of purchase thus subsequent tracking of inventory will only be for the sake of quantity and not value as such items have nil stock value.

Input - Required Fields

Field Value / Comments

Document Type

Type of requisition

Material Code

Account Assignment “A”

Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number K for Cost Centre

Plant

Plant code requiring material - Click on the drop down button to select

Quantity

Quantity to be requisitioned ( unit of measurement) will be defaulted Estimate Price per unit – Will be defaulted if previous purchase exists ,can be still changed by user Initials of Requisitioner

Valuation Price Requisitioner

Page | 18

MM COURSE: PURCHASING Req Tracking Number

A reference number for tracking this requisition

Cost Centre

Cost Centre to which cost of purchase will be booked

Output - Results Requisition will be created

Comments The requisition is assigned a PR number which is now subject to release in 2 steps – Initiator and Final Approver. Only after approval the requisition is available for processing at MM Cell.

Procedure Steps

Access transaction by: Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing>Purchase Requisition>Create ME51N

Transaction

Page | 19

MM COURSE: PURCHASING On screen “Create Purchase Requisition”: enter header level information specified in the table below:

Fields Document Type

Description Defines type of requisition

R/O/C R

User Action and Values Please refer the attached annexure

Header Note Required For

Header Text

O

Any comments that are not are generic to all items

Will not appear in print out

Required For Item Text

R

To be entered as text against the first Item only

Probable Vendor List

Probable Vendor List Item Text

O

List of probable vendors with complete relevant information to be entered as text against the first item only

Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out

Page | 20

Comments

MM COURSE: PURCHASING Delivery Text

Delivery Text

O

Delivery related texts can be maintained as text against the first item only

Only if this text is maintained against item 1 will it appear in print out

R = Required, O = Optional, C = Conditional

On the same screen, in “Create Purchase Requisition: Item Overview”: enter information specified in the table below:

Fields

Description Material Code

R/O/C R

User Action and Values Material code

Account Assignment “A”

Account to book cost

R

K for Cost Centre

Short Text

Description of material

C

Material Group

Classification of materials on basis of nature

C

Will be defaulted if material code is selected otherwise has to be entered manually Please refer the attached annexure

Plant

Plant requiring material basis ofR

Valuation Price

Estimated Price per unit

C

Cost Centre

Cost Centre

R

Material

Enter plant where material is to be shipped User to enter in the condition when the purchase history record is different from his estimate.

Cost Centre to which cost will be booked

Page | 21

Comments Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number

In case it is a first time purchase, then this field is required to be filled.

MM COURSE: PURCHASING Storage location

Key for determining storage location for a specific plant

O

Can be entered from drop down list

Delivery date

Date on which the goods are to be delivered. If delivery date is sooner than the system calculated lead time, a warning will be issued Organization for which procurement is needs to be done

C

It can be changed if required.

C

Please refer the attached annexure

Nature of group preparing requisition

C

Please refer the attached annexure

Indicates for whom the material is ordered This number can be used to facilitate the monitoring of material procurement

R

Initials of requisitioner

R

A reference number for tracking this requisition

Item text

O

Technical specifications of the item not covered by the existing material descriptions

Purchasing Organizati on Purchasing Group Requisitioner Req. tracking number

Item Text

It‟s a text page so there is no system check on its contents. This will be printed in the PR.

Repeat above for each item in Purchase Requisition

Click on the save folder

to produce a numbered requisition, or hit Control + S.

Page | 22

MM COURSE: PURCHASING 4.

MM-ME51N-Create Purchase Requisition for Stock materials

Overview

Direct requirements from various departments for stock materials to be kept in Inventory.

Business Process Description Overview A requisition defines the need for a material or service. It is the primary document in the purchasing cycle. Purchase Requisition for stock materials will be used to provide material requirements from all departments to the purchasing department. The purpose of requisitioning should be stocking in nature and the material requisitioned should be part of valuated inventory at the plant. The requisition authorizes the Purchasing department to purchase materials in specific quantities within a specified time frame. It is an internal document and is not used outside of the company. Note : -A Requisition of this nature will be created for codified materials only. -Such a requisition is not meant for direct consumption at time of purchase, it is for initiating purchase for purpose of inventorying. Any consumption will be subsequent by means of a reservation. - Since objective is to stock this material, no account at the time of requisition is to be assigned.

Input - Required Fields

Field Value / Comments

Document Type

Type of requisition

Material Code

Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number Plant code requiring material - Click on the drop down button to select

Plant

Requisitioner

Quantity to be requisitioned ( unit of measurement) will be defaulted Estimate Price per unit – Will be defaulted if previous purchase exists ,can be still changed by user Initials of Requisitioner

Req Tracking Number

A reference number for tracking this requisition

Quantity Valuation Price

Page | 23

MM COURSE: PURCHASING

Output - Results Requisition will be created

Comments The requisition is assigned a PR number which is now subject to release in 2 steps – Initiator and Final Approver. Only after approval the requisition is available for processing at MM Cell.

Tips and Tricks



Set up the user defaults for each user to force the system to plug in default data, i.e. Plant, Requisitioner and Req Tracking Number.

Procedure Steps

Access transaction by:

Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing>Purchase Requisition>Create ME51N

Transaction

Page | 24

MM COURSE: PURCHASING On screen “Create Purchase Requisition”: enter header level information specified in the table below:

Page | 25

MM COURSE: PURCHASING

Fields

Description Defines type of requisition

R/O/C R

User Action and Values Please refer the attached annexure

Header Note Required For

Header Text

O

Any comments that are not are generic to all items

Will not appear in print out

Required For Item Text

O

To be entered as text against the first Item only

Probable Vendor List

Probable Vendor List Item Text

O

Delivery Text

Delivery Text

O

List of probable vendors with complete relevant information to be entered as text against the first item only Delivery related texts can be maintained as text against the first item only

Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out Only if this text is maintained against item 1 will it appear in print out

Document Type

Page | 26

Comments

MM COURSE: PURCHASING

On the same screen, in “Create Purchase Requisition: Item Overview”: enter information specified in the table below:

Page | 27

MM COURSE: PURCHASING Fields Material

Description Material Code

R/O/C R

Plant

Plant requiring material

R

Valuation Price

Estimated Price per unit

C

Storage location

Key for determining storage location for a specific plant

O

Delivery date

Date on which the goods are to be delivered. If delivery date is sooner than the system calculated lead time, a warning will be issued Organization for which procurement needs to be done

C

It can be changed if required.

R

Please refer the attached annexure

Nature of group preparing requisition

C

Please refer the attached annexure

Indicates for whom the material is ordered This number can be used to facilitate the monitoring of material procurement

R

Initials of requisitioner

R

A reference number for tracking this requisition

Purchasing Organizati on Purchasing Group Requisitioner Req. tracking number

User Action and Values Material code

Comments Click on the drop down button to select under any one of the options available – Plant material by description or Material group or Material Type or Old material number Enter plant where material is Type the plant to be shipped Code or select drop down menu User to enter in the condition In case if it is when the purchase history adopted from record is different from his material master, estimate. then this field is required to be filled. Can be entered from drop down list

Page | 28

MM COURSE: PURCHASING Item Text

Item text

O

Technical specifications of the item not covered by the existing material descriptions

It‟s a text page so there is no system check on its contents. This will be printed in the PR.

R = Required, O = Optional, C = Conditional

Repeat above for each item in Purchase Requisition

Use the check button

.

If the system does not generate any error message then Click on the save Control + S. System will generate a number at the bottom of the screen

Page | 29

button

or hit

MM COURSE: PURCHASING 5.

MM-ME52N-Change Purchase Requisition

Overview A purchase requisition needs to be changed. A change in quantity and/or required date is the primary triggers for this transaction.

Business Process Description Overview Prior to changing or deleting a requisition, the requisitioner needs to know the status of the requisition. If the requisition has been processed into a purchase order, any changes will not be reflected on the purchase order. The requisitioned needs to contact the buyer directly. If someone else has deleted the requisition, a new requisition will have to be created, as it is not possible to change a deleted requisition.

Input - Required Fields Purchase requisition number Item Details

Field Value / Comments Can be found using Display function or List display function Identifies what can be changed or deleted

Output – Results Requisition changed or deleted

Comments If Requisition has status „Not Edited‟ then changes made will reflect in RFQ and Purchase Order.

Tips and Tricks If a requisition has been deleted, you can still use that requisition and create a new one using the canceled requisition as a reference.

To save the document, you can click on the save folder.

Page | 30

MM COURSE: PURCHASING Procedural Steps

Access transaction by:

Via Menus Via Transaction Code

Logistics>Materials Management>Purchase>Purchase Requisition>Change ME52N

Transaction

Page | 31

MM COURSE: PURCHASING On screen “Change Purchase Requisition”, the last Requisition saved will be displayed as default. To enter different number select the icon window to select other document.

.System will display another

Then delete the document default one and type other PR number and select other document tab. System will display other Purchase document.

Field Name Requisition Number

Description Requisition Number

R/O/C R

User Action and Values Comments If you don‟t want to work with Requisition can the defaulted requisition, click be found using on the „Other Requisition‟ the Display or button on the header bar (It has List Display been shown with an function. arrow).Enter a unique requisition number that requires to be changed. (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button.

Page | 32

MM COURSE: PURCHASING

On the same screen, to delete requisition or item: Click on the line of the item to be deleted

Page | 33

MM COURSE: PURCHASING Click on the Delete (trash can) icon.

Select “Yes” on the pop up box to delete the item

Page | 34

MM COURSE: PURCHASING The item is now flagged for deletion (see the column labeled “D”; there will be a checkmark).

On the same screen, to change quantity, price, date required, text etc., enter information in the fields as specified in the table below:

Page | 35

MM COURSE: PURCHASING Field Name Item Number Val. Price Delivery date Quantity Text

Description Item number

R/O/C R

Price change Date Change

O O

User Action and Values Selects the item number that needs to be changed Change price if required Change date if required

Quantity Change Text change

O O

Change quantity if required Change or add text if required

Comments

This holds true for all texts – Required for, Probable Vendor list and Delivery Text (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Finally use check button System displays Click on the Save button

to save the changes.

Page | 36

MM COURSE: PURCHASING 6.

MM-ME53N-Display Purchase Requisition

Overview User needs to view information regarding purchase requisitions, including item information and status of requisitions. User may not have the authority to change, so they can only look in display mode.

Business Process Description Overview This BPP demonstrates a function that allows you to view/monitor the status of individual purchase requisitions.

Input - Required Fields Purchase requisition number

Field Value / Comments Can be found using Display function or List display function

Output - Results View status of Requisition

Comments

Tips and Tricks

There are two methods for displaying requisitions - Display and List Display. List display is a more comprehensive method of displaying requisitions, and is addressed in BPP “MM-ME5A-List Display-Purchase Requisitions”

Page | 37

MM COURSE: PURCHASING Procedural Steps

Via Menus Via Transaction Code

Logistics>Materials Management>Purchase>Purchase Requisition>Display ME53N

Access transaction by:

Transaction

Page | 38

MM COURSE: PURCHASING On screen “Display Purchase Requisition”, the last Requisition saved will be shown. To display other requisition select other purchase requisition icon PR number and press enter.

Field Name Requisition Number

Description Requisition Number

R/O/C R

. Type the respective

User Action and Values Comments If you don‟t want to work with Requisition can the defaulted requisition, click be found using on the „Other Requisition‟ the Display or button on the header bar (It has List Display been shown with an function. arrow).Enter a unique requisition number that requires to be displayed. (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 39

MM COURSE: PURCHASING Click on the Enter button.

Menu Name Details

Description Item Details

R/O/C

User Action and Values

O

Comments

Displays every detail from the item overview screen such as material, qty, material master data, plant etc. Text Text Overview O Displays any text fields in the Overview Purchaser requisition Release Purchase requisition approval O Displays strategy for purchase strategy approval Status Item history statistics O Displays statistics on status of PR and also the changes made to the requisition Account Account assignments for C Displays the G/L account to Assignment items which the items are charged , if s it is an account assigned PR Services Service items C This is only possible in the case of service items Value C This is only possible in the case of Limits service items (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 40

MM COURSE: PURCHASING 7.

MM-ME56-To assign source of supply to requisitions

Overview To assign source of supply to requisitions

BUSINESS PROCESS PROCEDURE OVERVIEW When you make any contract you need to assign it to a source of supply/vendor to close the transaction or the requisition processing cycle.

Input – Required Fields Purchase requisition number

Field Values/Comments If the number is known, enter it. If not, search for it.

Purchasing group

Enter the purchasing group.

Output - Results Displays the screen showing the requisition number and the contract number.

Page | 41

MM COURSE: PURCHASING Procedural Steps

Access transaction by:

Via Menus Via Transaction Code

(a) Logistics  Material Management Purchasing  Purchase requisition Follow on functions Assign-ME56 ME56

On screen “Assign source of supply to requisitions”, enter Press information in the fields as shown in the table below. EXECUTE

Enter the Purchase requisition number.

Page | 42

MM COURSE: PURCHASING Field Name

Description

Purchase requisition

Numeric key that uniquely identifies the purchase requisition document. Purchasing group for the requisition.

Purchasing group

R/O/ C O

User Action and Values

Comments

If unknown, conduct a matchcode search

O Press

Screen showing the contract number and the requisition number. Click the CHECK BOX tab.

and press “ASSIGN AUTOMATICALLY”

Click the CHECK BOX The following screen shows the output. Click on SAVE button

Page | 43

.

MM COURSE: PURCHASING

8.

MM-ZMMF_PR- PR Output

Overview

A Purchase requisition needs to be printed.

Business Process Procedure Overview This procedure details how to print a Purchase requisition in R/3.

Input – Required Fields Purchase Requisition Number

Field Value/Comments Enter the number of the purchase requisition document which needs to be printed.

Output - Results A successfully printed Request for Quotation

Comments

Page | 44

MM COURSE: PURCHASING Procedural Steps

Access transaction by:

ZMMF_PR

Via Transaction Code

On screen “Purchase requisition output”, enter information in the fields as specified in the table below:

Enter the purchase requisition number.

Field Name

Description

Purchase requisition number

Takes the document number.

R/O/C C

User Action and Values

Comment s

Enter the required requisition document number.

Press (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

The output screen shows the document as displayed below.

Page | 45

MM COURSE: PURCHASING

Click on PRINT PREVIEW tab The print preview screen .

Click on the PRINT tab

.

button.

Page | 46

MM COURSE: PURCHASING

2. Request for Quotation 1.

MM-ME41-Create Quotation

Overview



Purchasing determines that a quotation is required from vendors.

Business Process Procedure Overview SAP provides the capability of creating and issuing single or multiple items Request for Quotes (RFQ‟s). Vendors must have master records created or be categorized as „one time‟ vendors The Request for quotation may be created w.r.t a Purchase Requisition incase requirement has come from user department else it can be created without any reference also. Both cases have been discussed in this document.

Input - Required Fields RFQ Type Language RFQ Date Quotation Deadline Purchasing Org Purchasing group

Field Value / Comments Default is „ZRFQ‟ for Material Default is „EN‟ for English Default is creation date Must be prior to required delivery date specified Enter Purchasing Organization identifier Enter Purchasing group number

Output - Results Saved RFQ

Comments Each RFQ per vendor will receive a separate document number.

Tips and Tricks

The collective number in the header screen of the RFQ is an important method to link the copies of the RFQ issued to the different vendors. SAP treats each issuance to a different vendor as a separate RFQ document and this collective number can be used to search and provide comparison reporting.

Page | 47

MM COURSE: PURCHASING Procedural Steps

CASE 1: CREATION OF RFQ W.R.T PURCHASE REQUISITION

Via Menu Via Transaction Code

(a) Logistics > Material Management > Purchasing > RFQ/quotation > Request for Quotation> Create ME41

Access Transaction by:

Page | 48

MM COURSE: PURCHASING On screen “Create RFQ: Initial Screen”, enter information in the fields as specified in the table below:

Page | 49

MM COURSE: PURCHASING

Now select the tab Reference to PReq Tab and fill the all required field as mentioned in the table below.

Page | 50

MM COURSE: PURCHASING

Field Name RFQ Type

Description Default is „AN‟

R/O/C R

Language RFQ Date

Default is „EN‟ - English Default is creation date

R R

Quotation Deadline

The due date for vendor quotations

R

Enter the due date in the date format assigned in the system

Purchasing Org. Reference to Preq Purchase Requisition Requisn Item

Purchasing Organization responsible for RFQ Field to allow Purchase Requisition reference Purchase Requisition field for entry Requisition Item number

R

Please refer the attached annexure Click on this field

R

User Action and Values Please refer the attached annexure Not to be changed May be changed if required

Comments

The RFQ can be created for future issuance. If the deadline is stated as a date after the required delivery date, the user will be given an error message when the delivery date is entered.

R

Enter Requisition No. against which RFQ is being floated O Enter only if all requisition items are not to be taken to RFQ Note: On the above table, in column “R/O/C”; “R” = required, “O” = Optional, “C” = Conditional) Note: The ‘Default Data for Items’ fields will carry these values against all items on the RFQ. Although carried onto the Item screens, these values may be changed within the transaction. Useful if the majority of the items have common data (delivery date, plant, etc.). Enter the appropriate data if desired. (Optional)

After entering above values press enter to move to next screen - Create RFQ: Header Data.

Page | 51

MM COURSE: PURCHASING

On screen” Create RFQ: Header Data”, enter information in the fields as specified in the table below:

Page | 52

MM COURSE: PURCHASING Field Name Coll. No.

Validity start Validity end Applic. By Bindg. Per. Target Value BSNL Number

Description

R/O/C

User Action and Values

Collective number

R

Enter a number to track vendors of the same RFQ

Validity start

O

Enter date quotation will start

Validity end

O

Enter date quotation will end.

Application date Binding period

O O

Enter closing date of Bids Enter date period is binding

Displays the target value

O

Enter the target value

BSNL Document number

R

Enter any alphanumeric value

Comments This will be a 10 digit code identifying the BID/ RFQ

It is a 50 digit alphanumeric key

After entering above values press enter to move to next screen - Create RFQ: Selection List: Purchase Requisitions

On screen “Create RFQ: Selection List: Purchase Requisitions”, enter information in the fields as specified in the table below:

Page | 53

MM COURSE: PURCHASING Field Name Sloc

Description Storage Location where material will be delivered and stored if ordered

R/O/C O

User Action and Values Enter or select Storage Location from table

Select Requisition line items for processing and click on the RFQ. System will take you to the next screen – Create RFQ: Item 00001

Comments Strictly optional. Storage Location may be entered later at the time of P.O. creation or Goods Receipt.

button to copy requisition details to

On screen “Create RFQ: Item 00010”, enter information in the fields as specified in the table below:

Page | 54

MM COURSE: PURCHASING

Field Name Delivery Date

Description Date of delivery

R/O/C R

User Action and Values Defaulted from Requisition, needs to be changed if it is earlier than Quotation deadline date

Comments

After entering above values press enter to move to next screen - Create RFQ: Item Overview

Now specify the vendors invited to quote by clicking on the Vendor address

Page | 55

button or F7 key.

MM COURSE: PURCHASING On screen ‘Create RFQ: Vendor Address’, enter information in the fields as specified in the table below:

Page | 56

MM COURSE: PURCHASING Field Name Vendor

Description Vendor number

R/O/C R

User Action and Values Enter valid vendor number and press enter

Name

Vendor Name

C

Up to 4 lines available

Street & House #

Street address and/or House #

C

Postal Code Postal code and city / town / village C & City

Country

Name of country

C

Table validated / selection

Region

In some countries, the region forms part of the address. The meaning depends on the country.

C

Table validated / selection

Postal Code Zip Code / Postal Code

C

Page | 57

Comments If vendor master does not exist, use a one-time vendor number (if allowed) Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor.

MM COURSE: PURCHASING

Telephone

Telephone #

C

Fax

Fax #

C

E-mail

E-Mail address

C

Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master.

After entering all vendor details, save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation of the same RFQ data to a new vendor by following the steps outlined in 1.5 above. The system will display the message RFQ Created under the number ___________.

Return to Main Purchasing Menu. (Select Yellow up Pointing Arrow, Shift F3) Refer to Business Process Procedure “Display a RFQ” - to verify this result.

Page | 58

MM COURSE: PURCHASING CASE 2: CREATION OF RFQ WITHOUT PURCHASE REQUISITION

Access Transaction by:

Via Menu Via Transaction Code

(a) Logistics > Material Management > Purchasing > RFQ/quotation > Request for Quotation> Create ME41

On screen “Create RFQ: Initial Screen”, enter information in the fields as specified in the table below:

Page | 59

MM COURSE: PURCHASING Field Name RFQ Type

Description Default is „AN'

R/O/C R

User Action and Values Please refer the attached annexure

Language RFQ Date

Default is „EN‟ - English Default is creation date

R R

Not to be changed May be changed if required

Quotation Deadline

The due date for vendor quotations

R

Enter the due date in the date format assigned in the system

Purchasing Org. Purchasing group

Purchasing Organization responsible for RFQ Requisitioning group Identifier

R

Please refer the attached annexure Please refer the attached annexure

Item Category

Key defining how the procurement of a material or service item is controlled. Date on which the goods are to be delivered or the service is to be performed. Key for location within the company code where goods are required. Number of the storage location where the material is stored. A plant may contain one or more storage locations. Key that you use to group together several materials or services with the same attributes, and to assign them to a particular material group.

O

Enter Item Category if required

O

Enter delivery date

O

Enter Plant

O

Enter Storage Location

O

Please refer the attached annexure

Delivery Date Plant

Storage Location

Material Group

R

Page | 60

Comments

The RFQ can be created for future issuance. If the deadline is stated as a date after the required delivery date, the user will be given an error message when the delivery date is entered.

If RFQ is being created w.r.t Purchase Requisition then system will pick from Requisition, user need not enter

MM COURSE: PURCHASING Requisition Tracking Number

Number that facilitates O Enter requisition tracking monitoring of the number procurement process for required materials or services. This number can relate to an external "need note" (notice of requirements) that was not generated in the system. Note: On the above table, in column “R/O/C”; “R” = required, “O” = Optional, “C” = Conditional)

Note: The ‘Default Data for Items’ fields will carry these values against all items on the RFQ. Although carried onto the Item screens, these values may be changed within the transaction. Useful if the majority of the items have common data (delivery date, plant, etc.). Enter the appropriate data if desired. (Optional) After entering above values press enter to move to next screen - Create RFQ: Header Data.

Page | 61

MM COURSE: PURCHASING On screen” Create RFQ: Header Data”, enter information in the fields as specified in the table below:

Page | 62

MM COURSE: PURCHASING

Field Name Company code Coll. No.

Validity start Validity end Applic. By Bindg. Per.

Description

R/O/C

User Action and Values

Company code

R

Needs to be entered

Collective number

R

Enter a number to track vendors of the same RFQ

Validity start

O

Enter date quotation will start

Validity end

O

Enter date quotation will end.

Application date Binding period

O O

Enter closing date of Bids Enter date period is binding

Comments

This will be a 10 digit code identifying the BID/ RFQ

After entering above values press enter to move to next screen - Create RFQ: Item overview

On screen “Create RFQ: Item Overview”, enter information in the fields as specified in the table below:

Page | 63

MM COURSE: PURCHASING

Field Name Item

Description R/O/C Number that uniquely R identifies an item within the RFQ Item Category - determines if O standard purchase or other such as 3rd party order, etc. Material Number R

User Action and Values Defaults - Line items are defined by the system in increments of 10. Default is blank - standard purchase

RFQ Quantity Delivery Date Material Group

Quantity of Material requested for quotation Date required if ordered

R

Must be numeric

R

Must be in correct date format

Group of material which this material belongs

N/A

Please refer the attached annexure

Plant

Plant where material is required

R

Sloc

Storage Location where material will be delivered and stored if ordered

O

Enter or select Plant from table. Note: the material master must exist for that plant. Enter or select Storage Location from table

I

Material

Enter material number

Page | 64

Comments No User Action Typically no user action required All stock material must have material numbers

Needs to be entered in case of non codified materials

Strictly optional. Storage Location may be entered later at the time of P.O. creation or Goods receipt

MM COURSE: PURCHASING

Now specify the vendors invited to quote by clicking on the Vendor address

button or F7 key.

On screen ‘Create RFQ: Vendor Address’, enter information in the fields as specified in the table below:

Page | 65

MM COURSE: PURCHASING Field Name Vendor

Description Vendor number

R/O/C R

User Action and Values Enter valid vendor number and press enter

Name

Vendor Name

C

Up to 4 lines available

Street & House #

Street address and/or House #

C

Postal Code Postal code and city / town / village C & City

Country

Name of country

C

Table validated / selection

Region

In some countries, the region forms part of the address. The meaning depends on the country.

C

Table validated / selection

Postal Code Zip Code / Postal Code

C

Page | 66

Comments If vendor master does not exist, use a one-time vendor number (if allowed) Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor.

MM COURSE: PURCHASING

Telephone

Telephone #

C

Fax

Fax #

C

E-mail

E-Mail address

C

Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master. Only required if One-time vendor. Defaulted from vendor master.

After entering all vendor details, save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation of the same RFQ data to a new vendor by following the steps outlined in 2.5 above. The system will display the message RFQ Created under the number ___________.

Return to Main Purchasing Menu. (Select Yellow up Pointing Arrow, Shift F3) Refer to Business Process Procedure “Display a RFQ” - to verify this result.

Page | 67

MM COURSE: PURCHASING 2.

MM-ME47-Maintain Quotation

Overview Vendor communicates price for material and as a result the RFQ (Request for Quotation) needs to be updated.

Business Process Procedure Overview In Purchasing, the RFQ and the quotation form a single document. Prices and conditions quoted by vendors are entered in the original RFQ. If you have issued an RFQ to several vendors, you can have the system display the most favorable quotation submitted. You can also store the prices and terms of delivery from certain quotations in an info record for future accessing. A quotation is legally binding on the vendor for a certain period. The quotation is the vendor‟s response to a request for quotation issued by a purchasing organization. A quotation consists of items in which the total quantity and delivery date of an offered material or service is specified.

Input – Required Fields RFQ Output - Results Quotation entered

Field Value/Comments Enter RFQ No. for which a price or prices need to be entered. Comments Enter all relevant data received by vendor, price, date available, etc.

Tips and Tricks If you are simply entering a price against a RFQ, you can follow these easy steps: Choose RFQ/quotation Quotation Maintain. (The initial screen for maintaining quotations appears.) Enter the number of the RFQ and press ENTER. (The RFQ item overview screen appears.) You can enter the vendor's price per item on the item detail screen (see steps 4 and 5) or directly on the item overview screen.

Page | 68

MM COURSE: PURCHASING Choose Item

ils to enter quotation data on the item detail screen.

Enter the vendor’s quotation. Save your data.

Procedural Steps

Access transaction by:

Via Menu Via Transaction Code

(a) Logistics > Materials Management > Purchasing > RFQ/quotation > Quotation > Maintain ME47

On screen “Maintain Quotation: Initial Screen”, enter information in the fields as specified in the table below:

Field Name RFQ

Description RFQ Number

R/O/C R

User Action and Values Enter RFQ Number for which price entries are to be made.

Comments Search help can be used to locate the appropriate value. (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 69

MM COURSE: PURCHASING

Press the Enter key, or click on the green Enter icon to proceed. View the screen “Maintain Quotation: Header Data” by clicking on the Header data icon in the toolbar.

Page | 70

MM COURSE: PURCHASING

Enter information in the fields as specified in the table below. Some fields will not be available for input, as they are reference fields only. Field Name Administrative Fields: Qout. Dead. Validity start Validity end Applic. By Bindg. Per. Terms of Payment & Delivery: Payment terms

Reference Data: Quotation Date

Description

R/O/C

User Action and Values

Quotation deadline Validity start Validity end Application date Binding period

R O O O O

Supplied from initial screen Enter date quotation will start Enter date quotation will end. Enter closing date of Bids Enter date period is binding

Key for defining payment terms composed of cash discount percentages and payment periods.

O

Enter appropriate value if necessary.

Date quotation submitted

O

Enter date if desired.

Comments

(F4) search help can be used to locate the appropriate value.

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 71

MM COURSE: PURCHASING Once all necessary header data has been maintained, the user can then enter the price information in one of two fashions:

Page | 72

MM COURSE: PURCHASING Enter the price in the “Net Price” field on the “Maintain Quotation: Item Overview” screen. This price should be the basic price exclusive of discounts/surcharges. To enter more detailed information in addition to the net price, select the line item and click on the Item conditions icon.

Here various conditions as per vendor quotation will be maintained. Drop down on the open field of “Condition type” and choose the type of condition to be levied for this basic price. Please note that basic price is referred to as Gross price in this screen since Net will be calculated after taking into account all conditions. Examples could be Discount (start with -), Surcharge (start with +), Freight charges, Inspection charges conditions are either in % or per unit or Absolute value basis.

Page | 73

etc. Most

MM COURSE: PURCHASING 1.6.3.2 If CST/LST or Excise duty is applicable, the same has to be entered via the tax code. To choose this code, go back to Item overview screen. Select the material item line and go to Item Details screen. Enter the tax code here. If a purchase order is created by referencing an RFQ, this code facilitates the determination of the tax amount when the invoice is entered in the system. The tax code has to be entered for each item in the Quotation.

Page | 74

MM COURSE: PURCHASING Header Conditions – There may be some conditions that are applicable on the total amount of the Quotation. These header conditions can be maintained at header level so that item wise repetition is not required. To enter these conditions, goto Item overview screen and Choose Header  Conditions. The value of these conditions will be apportioned to individual items.

Page | 75

MM COURSE: PURCHASING Click on the green Back arrow to return to the ‘Overview’ screen once data has been maintained. There is a field for quotation comments that will segregate quotations as per their status, Comments such as Not Responded, Regret case, Technically Unqualified, Commercially Unqualified, Techno-commercially Accepted, Unsuccessful bid, Lowest Technocomm. Accepted are available to choose from. These comments are to be entered in the Item details screen under Quotation comments.

Once all quotation information has been successfully entered, save the data by clicking on the Save button, or press the keys. A message will be displayed that the data has been saved.

Page | 76

MM COURSE: PURCHASING 3.

MM-ME48-Display Quotation

Overview

The need arises to display a quotation already maintained for an RFQ (Request for Quotation) in the system.

Business Process Description Overview This BPP will discuss the procedure to display a quotation in the R/3 system.

Input - Required Fields RFQ number

Field Value / Comments RFQ number for which you want to display quotation information.

Output - Results Quotation is displayed.

Display Only format.

Comments

Tips and Tricks

By consistently using the collective number field on RFQ’s, the search for the required RFQ number is much simpler.

Changes can not be made in this mode. If changes are required, transaction ME47can be used to maintain quotation data. See BPP MM-ME47-Maintain Quotation.doc for reference.

Page | 77

MM COURSE: PURCHASING Procedural Steps

Access transaction by:

Via Menu

Logistics > Materials Management > Purchasing > RFQ/Quotation > Quotation > Display

Via Transaction Code

ME48

On the “Display Quotation: Initial Screen” screen, enter information in the fields as specified in the table below:

Field Name RFQ

Description RFQ number

R/O/C R

Comments Matchcode (F4) search functions can be used to find an appropriate RFQ in the system. (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Press the Enter key or click on the green

User Action and Values Enter RFQ number (typically a non-intelligent system generated number).

Enter icon.

On the “Display Quotation: Item Overview” screen the following data will be returned in display-only format: Page | 78

MM COURSE: PURCHASING

Field Name Item Number Material Short Text RFQ quantity OuN Delivery Date Price Material Group Plant Storage Location D R Texts

Description Item within RFQ Material master number Description of the material or service to be procured The quantity of material required Order Unit Date that the material will be due The price that the vendor has quoted for this item Material group that the item most closely belongs to Plant number Storage location number Deletion indicator Rejection indicator specifying that the vendor is to receive a rejection letter in respect of his quotation. Text associated with a line item. An icon will appear in the text field if text has been entered. Simply click on the icon to view the associated text

Page | 79

MM COURSE: PURCHASING

More detailed information can be viewed by clicking on any one of the following toolbar icons.

Button Name Header details (F6) Vendor address (F7) Partners (Ctrl-Shift-F5) Messages (Shift-F1) Item details (F2)

Information Returned Administrative field values and Reference data. Vendor name, address, search terms, communication data, etc. Partner Schema (if applicable) Printing information Line item specific data (select line on RFQ and click on icon)

Example: In the event that the header data needs to be displayed, use the menu path Header  Details, or click on the Display Header icon. On the “Display Quotation: Header Data” screen the following data will be returned in display only format:

Page | 80

MM COURSE: PURCHASING

Field Name RFQ RFQ Type Vendor Company Code Purchasing Group Purchasing Organization RFQ date Validity start Validity end Payment terms Collective number Quot. dead. Applic. by Bindg. per. Target val Quotation date

Description RFQ number Type of RFQ Vendor number Company code Purchasing group code Purchasing organization number Date of RFQ creation. Start of the period in which the RFQ may be submitted End of the period in which the RFQ may be submitted Terms stipulated by vendor Number used to collectively group RFQ‟s Date by which the vendor is to submit the quotation Date by which the bidder is to express an interest in submitting a bid. Date for which the quotation is valid and binding Target value of the contract. Date quote submitted by vendor

To return , click on the green Back button keys.

, the yellow Exit button

Page | 81

or press the

MM COURSE: PURCHASING 4.

MM-ME49-RFQ Comparison

Overview The need arises to make a price based comparison of the different quotations sent by vendors to select the most suitable vendor.

BUSINESS PROCESS PROCEDURE OVERVIEW This BPP will discuss the procedure to compare different quotations to select the most suitable vendor for the material.

Input – Required Fields Purchasing Organization Collective RFQ number

Field Values/Comments Enter the number of the purchasing organization under which the procurement will be done. Enter the Collective RFQ number for the quotations to be compared.

Output - Results A list o A comparative analysis of the different quotations.

Procedural Steps

Access transaction by:

Via Menu

Logistics>Material management>Purchasing>RFQ/Quotation>Quotation>ME49 Price Comparison

Via Transaction Code

ME49

Page | 82

MM COURSE: PURCHASING On screen “Price Comparison List”,enter information in the fields as specified in the below table:

Enter the Purchasing Organization and the Collective RFQ number

Field Name Purchasing Organizatio n Collective RFQ number

Mean Value Quotation

Description Purchasing Organization number

Collective RFQ number for the quotations to be compared

R

User Action and Values Enter Purchasing Organization number

Enter the collective RFQ number

Select this indicator if the basis for comparison is to

Minimum Value Quotation

R/O/C R

be the average price from

O Click on

all quotations.

Include discounts Select this indicator if the

Page | 83

Comments Match code (F4)

MM COURSE: PURCHASING basis for comparison is to be the lowest price from all

O

Tick the check box.

O

Tick the check box.

quotations. Specifies whether the Include delivery costs Determine effective price

percentage discount granted on the purchase price in accordance with the terms of payment is to be taken into account in determining the price.

Select the field if the delivery costs are to be taken into account in calculating the price. Tick the check box. Select the field if the effective price is to be

O

computed.

O

Tick the check box.

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Comparative analysis of the different quotations displaying the ranking of the different quotations.

Page | 84

MM COURSE: PURCHASING

Double click on the price to be rejected.

Now the user can select the most suitable quotation and reject the others (in the above case rank2 and rank 3). Double click on the price of the quotation to be rejected and tick the check box.

Click on the SAVE button

Check the REJECTION INDICATOR box. Click on SAVE button

.

Repeat the same process for other quotations /items to be rejected.

Page | 85

MM COURSE: PURCHASING

5.

MM-ZMMF_PC-Print Price Comparison Report

Overview

Once we have maintained the quotation received from vendor in the system then we will compare them

Prerequisite: 1. Quotations to be compared should be maintained in the system

Business Process:

1. Print or Price Comparison Report Sr. No. 1

Activity Price Comparison Report

T Code ZMMF_PC

Remarks

Procedural Steps:

In the Screen ”Driver Programme for Price Comparison Smart form(MM014)” enter the following Data:

Field Name Purchasing Organization Quotation No. Collective RFQ Vendor Material

Description

R/O/C

User Action and Values

Enter Purchasing Organization

R

Enter Purchasing Organization

Enter Quotation Number

O

Enter Quotation Number

Enter Collective RFQ number

R

Enter Collective RFQ number

Enter Vendor Code Enter Material Number

O O

Enter Vendor Code Enter Material Number

Page | 86

Commen ts

MM COURSE: PURCHASING

After entering the Selection Parameter, press Execute button

Enter Printer

Click here for Print Preview

Click here for Print

Page | 87

MM COURSE: PURCHASING

Page | 88

MM COURSE: PURCHASING

6.

MM-ME9A-Message Output RFQ

Overview

A Request for Quotation needs to be printed

Business Process Procedure Overview This procedure details how to print a Request for Quotation created in R/3

Input – Required Fields Message Data

Field Value/Comments Details the type of message to print.

Output - Results A successfully printed Request for Quotation

Comments

Tips and Tricks

The more search parameters that are entered the more efficient the search and the less unnecessary information that is displayed.

Page | 89

MM COURSE: PURCHASING Procedural Steps

Access transaction by: Via Menu

Via Transaction Code

Logistics>Materials Management>Purchasing >RFQ/Quotation>Request for Quotation>Messages>Print/Transmit ME9A

On screen “Message Output”, enter information in the fields as specified in the table below:

Page | 90

MM COURSE: PURCHASING

Field Name Purch. Doc. Data Document Number Vendor Purchasing Organizatio n Purchasing Group Document Type

Document Date Message Data Application

Message type Processing status

Creation date Time created

Description

R/O/C

User Action and Values

PO Number

O

Choose from drop down menu

Vendor # Purchasing Organization #

O O

Choose from drop down menu Please refer the attached annexure

Purchasing Group #

O

Please refer the attached annexure

Identifier allowing differentiation between the various kinds of purchasing document in the SAP system Date on which the purchasing document was created.

O

Please refer the attached annexure

O

Enter Document date or choose from drop down menu

Subdivides the usage of a condition for the use in different application areas Specifies the kind of output

R

EA defaults for RFQ

O

Choose from drop down menu

Indicates the status1 indicates the process was successful. 2 indicates an error 0 indicates the process has not yet started Date the message is create

C

Default is 0

O

Enter date or choose the drop down menu Defaults to time started

Comment s

Displays the time the message C was created (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Execute button.

Page | 91

MM COURSE: PURCHASING On screen “Message Output” select the appropriate Request for Quotation and perform the following:

Select the check box Click on

and and/ or

Page | 92

MM COURSE: PURCHASING

3. Contract/APO 1.

MM-ME31K-Create Contract with reference to PR

Overview

Business needs should be defined through a requisition. If the requisition needs to be converted into a contract, then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor. Here we will find how to create contract with reference to PR

Business Process Description Overview A contract establishes a long-term agreement with a vendor to supply a material or service. Contracts may either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetary amount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the vendor will provide to us. This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 for stock material. Contracts do not specify delivery dates; this is determined when “release orders” are issued against the contract.

Input - Required Fields Purchase requisition

Field Value / Comments Select from drop down list

Page | 93

MM COURSE: PURCHASING

Output - Results Contract document

Comments Document Created.

Tips and Tricks

By providing as much input information as possible when creating contracts, the user can save time by minimizing the inputs at the time of the order release.

By selecting the PR all data will gate copied over to the screen.

Page | 94

MM COURSE: PURCHASING

Procedural Steps

Access Create Contract by;

Via Menu Via Transaction Code

(a) Logistics>Materials Management>Purchasing>Outline agreement>Contract >Create ME31K

In the “Create Contract: Initial Screen”, Select the Reference to the PReq

Click on Reference to PReq

Page | 95

MM COURSE: PURCHASING

Enter the Proper PReq number.

Enter the Proper PReq number

Field Name Vendor

Description Vendor for which the contract is for

R/O/C C

User Action and Values Vendor number known or via search

Agreement type

Specify what kind of outline agreement

R

Agreement Date Agreement

Date of the contract

R

Agreement number

C

Purch.

Organization for which the contract R

Please refer the attached annexure ZAED, ZANB, ZAPO, ZARC, ZASR. Defaults today‟s date into this field Leave blank, if the system is This number configured to assign numbers will be internally or enter desired determined number internally Please refer the attached annexurePicked from

Page | 96

Comments If not mentioned in Preq Picked from Preq.

MM COURSE: PURCHASING Organizatio n

is valid

PReq Press

Enter the vendor

Page | 97

MM COURSE: PURCHASING On the “Create Contract: Header Data” screen, enter information as specified in the fields in the table below:

Enter the validity end date

Enter target value

Enter BSNL APO number

Field Name Agreement date Validity start Validity end Payment terms Target val Exch. rate

Description Date the agreement was created Beginning date of contract period. Date that the contract expires.

R/O/C R R R

Terms stipulated by vendor

O

Target value of the contract. Exchange rate of the currency

R O

User Action and Values Supplied from initial screen Defaults today‟s date into the field. Change if necessary Enter the date until the contract will be valid Defaults from vendor master. Change if necessary Required for value contracts Change if necessary

Page | 98

Comments Grayed out

MM COURSE: PURCHASING Ex. Rate fx.

Incoterms BSNL APO number

Fixing of exchange rate. Indicates the purchase order currency and the exchange rate cannot be changed during invoice verification. Freight terms stipulated by vendor BSNL Number

O

O

Defaults from vendor master. Change if necessary Required for value

R

Press

On screen “Create Contract: Overview: Reference Document Items”, enter information in the fields as specified in the table below:

2. Select the line item

3. Click on Adopt Details

Page | 99

1. Enter the storage location

MM COURSE: PURCHASING

Field Name Sloc

Description Storage Location where material will be delivered and stored if ordered

R/O/C O

User Action and Values Enter or select Storage Location from table

Select line items of reference document and click on the take you to the next screen – Create Contract: Item 000010

Page | 100

Comments Strictly optional. Storage Location may be entered later at the time of P.O. creation or Goods Receipt.

button to copy details to Contract. System will

MM COURSE: PURCHASING On the “Create Contract: Item 00010” screen, enter information as specified in the fields in the table below:

2.Press OK button 1.Enter the Net order price

Page | 101

MM COURSE: PURCHASING

Field Name A

Description Account Assignment Category. Key to determine who will be paying for the consumable material or service. Description of the material or service to be procured

R/O/C O

User Action and Values Will default from original screen if information has been entered.

C

Targ. qty.

The quantity for which the contract is valid

Oun Net Order Price Tax code

Order Unit Basic price to be entered

O for “WK” R for “MK” C R

Defaults from material master. Enter a text for material not maintained in the material master (ex. Non stock materials) Enter the number of pieces or amount of service for the contract.

Tax Code

O

Tracking No.

Will be defaulted from reference document

O

Short Text

Defaults from material master. Required when Preq is used as reference document Will be defaulted from reference document, if available Can be changed if required Press

Page | 102

Comments

Can be entered fro ED,CST,LST capture

MM COURSE: PURCHASING Upon entering all of this information, the user have the option to use the radio buttons / icons on the menu bar to update or view more information that pertains to the contract.

2. Click on vendor address icon

1. Enter the continue

Page | 103

MM COURSE: PURCHASING On screen Create Contract: Additional data for Item; enter information in the fields as specified in the table below:

2. Press save button

1. Enter the vendor address here

Field Name Planned delivery time

GR processing time Net Weight Gross weight Volume

Description Time in days in which delivery can be achieved unless entered differently in this screen Lag time in days in which goods receipt is expected after physical receipt Net weight per order unit

R/O/C O

User Action and Values Defaults from Material Master

O

Defaults from Material Master

O

Gross weight of unit

O O

Defaults from Material Master Defaults from Material Master Defaults from Material Master

Page | 104

Comments

MM COURSE: PURCHASING Press icon

, contract will be created and contract number will be displayed

APO number will be generated

Page | 105

MM COURSE: PURCHASING 2.

MM-ME31K-Create Contract with reference to RFQ

Overview

Business needs should be defined through a requisition. If the requisition needs to be converted into a contract, then it can either be created w.r.t the requisition or a quotation maintained for a particular vendor. Here we will find how to create contract with reference to RFQ

Business Process Description Overview A contract establishes a long-term agreement with a vendor to supply a material or service. Contracts may either be value contracts or quantity contracts. Value contracts have a ceiling that is a monetary amount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the vendor will provide to us. This procedure outlines the steps involved in creating a standard quantity or value contract in R/3 for stock material. Contracts do not specify delivery dates; this is determined when “release orders” are issued against the contract.

Input - Required Fields

Field Value / Comments

Request for quotation

Select from drop down list

Output - Results Contract document

Document Created.

Comments

Page | 106

MM COURSE: PURCHASING Tips and Tricks

By providing as much input information as possible when creating contracts, the user can save time by minimizing the inputs at the time of the order release.

By selecting the RFQ all data will gate copied over to the screen.

Page | 107

MM COURSE: PURCHASING Procedural Steps

Access Create Contract by;

Via Menu Via Transaction Code

(a) Logistics>Materials Management>Purchasing>Outline agreement>Contract >Create ME31K

In the “Create Contract: Initial Screen”, Select the Reference to the RFQ

Click on Reference to RFQ

Page | 108

MM COURSE: PURCHASING Enter the Proper RFQ number.

Enter the Proper RFQ number

Field Name Vendor

Description Vendor for which the contract is for

R/O/C C

User Action and Values Vendor number known or via search

Agreement type

Specify what kind of outline agreement

R

Agreement Date Agreement

Date of the contract

R

Agreement number

C

Purch.

Organization for which the contract R

Please refer the attached annexure ZAED, ZANB, ZAPO, ZARC, ZASR. Defaults today‟s date into this field Leave blank, if the system is This number configured to assign numbers will be internally or enter desired determined number internally Please refer the attached annexurePicked from

Page | 109

Comments If not mentioned in RFQ Picked from RFQ

MM COURSE: PURCHASING Organizatio n

is valid

RFQ Press

On the “Create Contract: Header Data” screen, enter information as specified in the fields in the table below:

Enter the validity end date

Enter target value

Enter BSNL APO number

Page | 110

MM COURSE: PURCHASING

Field Name Agreement date Validity start Validity end Payment terms Target val Exch. rate Ex. Rate fx.

Incoterms BSNL APO number

Description Date the agreement was created Beginning date of contract period. Date that the contract expires.

R/O/C R R R

Terms stipulated by vendor

O

Target value of the contract. Exchange rate of the currency Fixing of exchange rate. Indicates the purchase order currency and the exchange rate cannot be changed during invoice verification. Freight terms stipulated by vendor BSNL Number

R O O

O R

User Action and Values Supplied from initial screen Defaults today‟s date into the field. Change if necessary Enter the date until the contract will be valid Defaults from vendor master. Change if necessary Required for value contracts Change if necessary

Defaults from vendor master. Change if necessary Required for value Press

Page | 111

Comments Grayed out

MM COURSE: PURCHASING On screen “Create Contract: Overview: Reference Document Items”, enter information in the fields as specified in the table below:

2. Select the line item

Field Name Sloc

3. Click on Adopt Details

Description Storage Location where material will be delivered and stored if ordered

1. Enter the storage location

R/O/C O

User Action and Values Enter or select Storage Location from table

Page | 112

Comments Strictly optional. Storage Location may be entered later at the time of P.O. creation or Goods Receipt.

MM COURSE: PURCHASING

Select line items of reference document and click on the take you to the next screen – Create Contract: Item 000010

button to copy details to Contract. System will

On the “Create Contract: Item 00010” screen, enter information as specified in the fields in the table below:

2. Press OK button

1. Enter the Net order price if required

Page | 113

MM COURSE: PURCHASING

Field Name A

Description Account Assignment Category. Key to determine who will be paying for the consumable material or service. Description of the material or service to be procured

R/O/C O

User Action and Values Will default from original screen if information has been entered.

C

Targ. qty.

The quantity for which the contract is valid

Oun Net Order Price Tax code

Order Unit Basic price to be entered

O for “WK” R for “MK” C R

Defaults from material master. Enter a text for material not maintained in the material master (ex. Non stock materials) Enter the number of pieces or amount of service for the contract.

Tax Code

O

Tracking No.

Will be defaulted from reference document

O

Short Text

Defaults from material master. Required when Preq is used as reference document Will be defaulted from reference document, if available Can be changed if required Press

Page | 114

Comments

Can be entered fro ED,CST,LST capture

MM COURSE: PURCHASING

Upon entering all of this information, the user have the option to use the radio buttons / icons on the menu bar to update or view more information that pertains to the contract.

2. Click on vendor address icon

2. Enter the continue

Page | 115

MM COURSE: PURCHASING On screen Create Contract: Additional data for Item; enter information in the fields as specified in the table below:

2. Press save button

1. Enter the vendor address here if required

Field Name Planned delivery time

GR processing time Net Weight Gross weight Volume

Description Time in days in which delivery can be achieved unless entered differently in this screen Lag time in days in which goods receipt is expected after physical receipt Net weight per order unit

R/O/C O

User Action and Values Defaults from Material Master

O

Defaults from Material Master

O

Gross weight of unit

O O

Defaults from Material Master Defaults from Material Master Defaults from Material Master

Page | 116

Comments

MM COURSE: PURCHASING

Press icon

, contract will be created and contract number will be displayed

APO number will be generated

Page | 117

MM COURSE: PURCHASING 3.

MM-ME32K-Change Contract

Overview A contract for stock material needs to be changed. This can either be a standard quantity contract or a value contract.

Business Process Description Overview This procedure outlines the steps involved in displaying a standard quantity or value contract in R/3 for stock material. A contract establishes a long-term agreement with a vendor to supply a material or service. Contracts may either be value contracts or quality contracts. Value contracts have a ceiling, which is a monetary amount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the vendor will provide to us. Contracts do not specify delivery dates, as this is determined when “release orders” are issued against the contract. If an existing contract requires to be displayed, this procedure should be used.

Input - Required Fields Agreement

Field Value / Comments Agreement Number

Output - Results Changed Contract

Comments

Page | 118

MM COURSE: PURCHASING Tips and Tricks

By providing as much input information as possible when creating contracts, the user can save time by minimizing the inputs at the time of the order release. Procedural Steps

Access transaction by: Via Menus Via Transaction Code

(a) Logistics > Materials Management > Purchasing > Outline agreement > Contract > Change ME32K

In the “Change Contract: Initial Screen”, enter information as specified in the fields in the table below:

nter the required APO number

Page | 119

MM COURSE: PURCHASING Field Name Agreement

Description Number of Agreement requiring change

R/O/C R

User Action and Values You must input the number of the agreement to be changed.

Comments

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button.

In the Change Contract: Item Overview Screen” the following fields will default and some can be changed as noted:

Change the required data on this screen

Page | 120

MM COURSE: PURCHASING

Field Name Short Text Target Qty SLOC Vendor

Description Description of Material Quantity to be procured Storage Location Name/Number of Vendor

R/O/C O O O R

Agreement type Agreement Date Agreement

Specify what kind of outline agreement Date of the contract

R

Agreement number

C

Item category

Key defining how the procurement of the material or service is handled. Key to determine who will be paying for the consumable material or service. Plant number

C

Will default in per agreement to be changed

O

Material group

O

Select from drop-down menu, this value can be changed if required Enter plant here if you wish for the plant number to be defaulted into all line items for the contract. Also, you only specify the plant if the contract is plant-specific. Please refer the attached annexure

Account Assignment Category Plant

Material Group

R

O

User Action and Values Change if required Change if required Change if required Vendor for agreement will default Please refer the attached annexure Defaults date of agreement into this field Number of agreement to be changed will default.

Comments

This number will be determined internally

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 121

MM COURSE: PURCHASING Click on the Header button.

On the “Change Contract: Header Data” screen, change information as specified in the fields in the table below:

Change the header level data on this screen

Page | 122

MM COURSE: PURCHASING Field Name Administrat ive Fields Agreement date Item number interval Validity start Validity end Terms of Delivery and Payment Payment terms Target val Exch. Rate Incoterms

Description

Date the agreement was created The way the line items are numbered. Beginning date of contract period. Date that the contract expires.

Terms stipulated by vendor

R/O/C

R

User Action and Values

Supplied from initial screen

Comments

Grayed out

O R R

O

Defaults today‟s date into the field. Change if necessary Enter the date until the contract will be valid

Defaults from vendor master. Change if necessary Required for value contracts Change if necessary

Target value of the contract. O/R Exchange rate of the O currency Freight terms stipulated by O Defaults from vendor master. vendor Change if necessary (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Upon entering all of this information, you have the option to use the radio buttons / icons on the menu bar to update or view more information that pertains to the contract. Select and item, and click on the Additional Data button. On screen Change Contract: Additional data for Item; modify information in the fields as specified in the table below:

Page | 123

MM COURSE: PURCHASING

Change additional data on this screen

Field Name Planned delivery time

Description R/O/C User Action and Values Comments Time in days in which O Defaults from Material delivery can be achieved Master but can be changed unless entered differently in here this screen GR processing Lag time in days in which O Defaults from Material time goods receipt is expected Master after physical receipt Incoterms Point of transfer of O Defaults from Vendor Master ownership (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Save

button.

A message will be displayed stating that the contract has been changed. Page | 124

MM COURSE: PURCHASING 4.

MM-ME33K-Display Contract

Overview User wishes to display an existing Contract

Business Process Description Overview This procedure outlines the steps involved in displaying a standard quantity or value contract in R/3 for stock material. A contract establishes a long-term agreement with a vendor to supply a material or service. Contracts may either be value contracts or quality contracts. Value contracts have a ceiling, which is a monetary amount that should not be exceeded. A quantity contact specifies a ceiling of goods or services that the vendor will provide to us. Contracts do not specify delivery dates, as this is determined when “release orders” are issued against the contract. If an existing contract requires to be displayed, this procedure should be used.

Input - Required Fields Agreement

Field Value / Comments Agreement number

Output - Results Displayed Contract

Comments

Tips and Tricks

By providing as much input information as possible when creating contracts, the user can save time by minimizing the inputs at the time of the order release.

Page | 125

MM COURSE: PURCHASING Procedural Steps

Access transaction by: Via Menu

(a) Logistics > Materials Management > Purchasing > Outline agreement > Contract > Display

Via Transaction Code

ME33K

In the “Display Contract: Initial Screen”, enter information as specified in the fields in the table below:

Enter the required APO number

Page | 126

MM COURSE: PURCHASING Field Name Agreement

Description Number of Agreement requiring change

R/O/C R

User Action and Values You must input the number of the agreement to be displayed.

Comments

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. In the Display Contract: Item Overview Screen” the following fields will be displayed. In a ‘Display’ format, fields can not be changed.

Click on header button

Page | 127

MM COURSE: PURCHASING

Field Name Short Text Target Qty SLOC Vendor

Description Description of Material Quantity to be procured Storage Location Name/Number of Vendor

R/O/C O O O R

Agreement type Agreement Date Agreement

Specify what kind of outline agreement Date of the contract

R

Agreement number

C

Item category

Key defining how the procurement of the material or service is handled. Key to determine who will be paying for the consumable material or service. Plant number Material group

C

Will default in per agreement to be changed

O

Field will display

O O

Field will display Please refer the attached annexure

Account Assignment Category Plant Material Group

R

User Action and Values Field will display a name Field will display a quantity Field will display an SLOC Vendor for agreement will default Please refer the attached annexure Defaults date of agreement into this field Number of agreement to be displayed will default.

Click on the Header button.

Page | 128

Comments

This number will be determined internally

MM COURSE: PURCHASING On the “Display Contract: Header Data” screen, view information as explained in the table below:

Header level data

Page | 129

MM COURSE: PURCHASING

Field Name Administrat ive Fields Agreement date Item number interval Validity start Validity end Terms of Delivery and Payment Payment terms Exch. Rate Ex. Rate fx.

Incoterms

Description

Date the agreement was created The way the line items are numbered. Beginning date of contract period. Date that the contract expires.

R/O/C

User Action and Values

R

Supplied from initial screen

O

Field will display

R R

Defaults today‟s date into the field. Change if necessary Field will display

Terms stipulated by vendor

O

Field will display

Exchange rate of the currency Fixing of exchange rate. Indicates the purchase order currency and the exchange rate cannot be changed during invoice verification. Freight terms stipulated by vendor

O

Field will display

O

Field will display

O

Field will display

Page | 130

Comments

Grayed out

MM COURSE: PURCHASING Upon viewing all of this information, there is the option to use the radio buttons / icons on the menu bar to view more information that pertains to the contract. Select an item and click on the Additional Data button. On screen Display Contract: Additional data for Item; display information in the fields as specified in the table below:

Additional data on this screen

Page | 131

MM COURSE: PURCHASING Field Name Planned delivery time

GR processing time Net Weight Gross weight Volume Incoterms

Description Time in days in which delivery can be achieved unless entered differently in this screen Lag time in days in which goods receipt is expected after physical receipt Net weight per order unit

R/O/C O

User Action and Values Field will display

O

Field will display

O

Gross weight of unit

O O O

Defaults from Material Master Defaults from Material Master Defaults from Material Master Defaults from Vendor Master

Point of transfer of ownership

To exit, click on the Exit button.

Click on exit button

Page | 132

Comments

MM COURSE: PURCHASING 5.

MM-ME9K-Message Output Contracts

Overview A Contract needs to be printed

Business Process Procedure Overview This procedure details how to print a Contract created in R/3

Input – Required Fields Message Data

Field Value/Comments Details the type of message to print.

Output - Results A successfully printed Contract

Comments

Tips and Tricks

The more search parameters that are entered the more efficient the search and the less unnecessary information that is displayed.

Page | 133

MM COURSE: PURCHASING Procedural Steps

Access transaction by: Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing >Outline Agreement > Contract>Messages>Print/Transmit ME9F

On screen “Message Output”, enter information in the fields as specified in the table below:

Page | 134

MM COURSE: PURCHASING Field Name Purch. Doc. Data Document Number Vendor Purchasing Organizatio n Purchasing Group Document Type

Document Date Message Data Application

Message type Processing status

Creation date Time created

Description

R/O/C

User Action and Values

Contract Number

O

Choose from drop down menu

Vendor # Purchasing Organization #

O O

Choose from drop down menu Please refer the attached annexure

Purchasing Group #

O

Please refer the attached annexure

Identifier allowing differentiation between the various kinds of purchasing document in the SAP system Date on which the purchasing document was created.

O

Please refer the attached annexure

O

Enter Document date or choose from drop down menu

Subdivides the usage of a condition for the use in different application areas Specifies the kind of output

R

EV defaults for Contract

O

Choose from drop down menu

Indicates the status1 indicates the process was successful. 2 indicates an error 0 indicates the process has not yet started Date the message is create

C

Default is 0

O

Enter date or choose the drop down menu Defaults to time started

Comment s

Displays the time the message C was created (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Execute button. On screen “Message Output” select the appropriate Contract and perform the following:

Page | 135

MM COURSE: PURCHASING

Select the check box Click on

and and/ or

Page | 136

MM COURSE: PURCHASING

6.

MM-ZMMF_APO-Message output APO

Trigger:

To take the print out of the unreleased APO

Prerequisite: Appropriate APO number should be known

Business Process:

Print out of the APO. Sr. No. 1

Activity

T Code

Enter purchasing document number APO number

ZMMF_APO

Procedural Steps: In the Screen ”Output message” enter the following Data:

Field Name Purchasing document number Application

Description

R/O/C

Enter purchasing document number APO

R

Enter the Application type

R

User Action and Values

Comment s

Enter purchasing document numberAPO number EV By Default

Page | 137

MM COURSE: PURCHASING

After entering the Selection Parameter, press Execute button

In message output screen, enter the Document Number as shown below & Execute F8.

Enter the document Number and mandatory input parameter and then execute (F8)

Page | 138

MM COURSE: PURCHASING

a. Select the document number, press the output message.

Print will be send to the set printer. Click on output message

Select the Document

Page | 139

MM COURSE: PURCHASING b. Print Output.

Page | 140

MM COURSE: PURCHASING

4. Purchase Order/Release Order 1.

MM-ME21N-Create Purchase Order-Account Assignment

Overview A purchase order for Account Assignment needs to be created, and the vendor is known.

Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. Purchase Order for direct charge materials covers those cases when items are purchased only for a special purpose in mind and whose value is booked to a cost centre. Once received by goods receipt transaction these materials are not reflected in inventory, neither quantity nor value.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Account Assignment Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code Cost Centre Material code Nature of Purchase System Date will default File Tracking Number Tax code for – ED / CST / LST

Page | 141

MM COURSE: PURCHASING Output - Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code. One Purchase Order may be created for several purchase requisitions or RFQs.

Page | 142

MM COURSE: PURCHASING Procedural Steps

CASE I: Purchase Order Creation w.r.t Quotation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

Select appropriate PO Document type from the following: Sr. No.

PO Document Type

Document Type description

1

ZDGO

Purchase Orders issued under DGS&D Rates

2

ZEDO

Educational Purchase Orders released against Educational APO

3

ZEMO

Emergency Purchase Orders; doesn’t need reference of APO and can be created directly.

4

ZNBO

Need Based Purchase Order released against Need Based APO

5

ZNPO

Intermediate Receipt reference from Non-POC location.

6

ZRCO

PO issued against Rate Contracts and PO issued against DGS&D rates

7

ZRPO

Regular Purchase Orders released against Advanced Purchase Orders

Page | 143

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on Document Overview On button as shown below:

Select the appropriate Document Type

On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 144

MM COURSE: PURCHASING

Page | 145

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 146

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate RFQ number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

Account Assignment Category: K All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

On screen “Create Purchase Order”, enter information in the fields as specified in the table below: Field Name Tracking No.

Description Reference Tracking number

R/O/C R

User Action and Values Comments Tracking number to be entered here (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 147

MM COURSE: PURCHASING Click on the Enter button.

On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items.

Page | 148

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Page | 149

MM COURSE: PURCHASING

Select the Texts tab

Enter Item text under the appropriate heading

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 150

MM COURSE: PURCHASING CASE II: Purchase Order Creation w.r.t Requisition Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 151

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 152

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate PR number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket Account Assignment Category: K

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Page | 153

MM COURSE: PURCHASING Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 154

MM COURSE: PURCHASING Click on the Enter button. The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number

Page | 155

MM COURSE: PURCHASING CASE III: Direct Purchase Order Creation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, enter information in the fields as specified in the table below. After each entry press enter to proceed in the below mentioned sequence:

Page | 156

MM COURSE: PURCHASING Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Vendor

Vendor number

R

Header Purchasing Organization Purchasing Group Company Code Item Overview Material

Section Header Purchasing organization code

R

Search by drop down menu

Purchasing group code

R

Search by drop down menu

Company code for purchase

R

Search by drop down menu

Material number

R

Plant

Facility where goods are produced or sold. Account where costs are allocated

R

Search by drop down menu to locate non valuated material code Enter plant

R

Enter to book costs

Vendor selling price for good Required units / quantity Text from the material master record Unit that good is purchased

R R R

Enter price Enter quantity Default from master record

R

Date material is required Currency used for plant Grouping together of materials by characteristics Location where stock is stored

R R R

Defaults from material master, change if required Enter delivery date Default Defaults from material master,

Acct. assignment category Net Price PO Quantity Short text Unit of measure Delivery Date Currency Material group Storage Location

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date) Vendor number known or search by drop down

Comments

Item Overview

O

Enter storage location, if required

Tracking number

Number that facilitates monitoring of the procurement of required materials

R

To be entered as per Purchaser‟s requirement

Requisitioner

To whom material is ordered

O

Name or initials of

Page | 157

Cost Center (K) to charge costs to cost centers

Required for stock item, can be entered even later at time of Goods receipt Can be used in List display to list all PO‟s created by a certain buyer.

MM COURSE: PURCHASING requisitioner (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Enter the G/L Account No.

Enter the cost center

Page | 158

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

G/L Account

General Ledger Account

Cost Center

Represents a separate location of cost incidence. The definition can be based on functional requirements, allocation criteria, activities or services provided physical location, and/or area of responsibility.

R/O/C R

User Action and Values Required to be chosen from drop down

C

Required to be chosen from drop down

R

Choose cost centre from drop down

Comments Will need to be entered by choosing from drop down Required to be manually entered only if material code has not been entered This action is required when A/c assign – K is used

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 159

MM COURSE: PURCHASING 2.

MM-ME21N-Create Purchase Order-Assets

Overview A purchase order for Asset material needs to be created, and the vendor is known.

Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. Purchase Order for Asset covers those items purchased under an Asset: therefore their value can be booked to an Asset account.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Account Assignment Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code A for Internal Order Material code Nature of Purchase System Date will default Tracking Number Tax code for – ED / CST / LST

Output - Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Page | 160

MM COURSE: PURCHASING Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code.

One Purchase Order may be created for several purchase requisitions or RFQs.

Page | 161

MM COURSE: PURCHASING Procedural Steps

CASE I: Purchase Order Creation w.r.t Quotation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

Select appropriate PO Document type from the following: Sr. No.

PO Document Type

Document Type description

1

ZDGO

Purchase Orders issued under DGS&D Rates

2

ZEDO

Educational Purchase Orders released against Educational APO

3

ZEMO

Emergency Purchase Orders; doesn’t need reference of APO and can be created directly.

4

ZNBO

Need Based Purchase Order released against Need Based APO

5

ZNPO

Intermediate Receipt reference from Non-POC location.

6

ZRCO

PO issued against Rate Contracts and PO issued against DGS&D rates

7

ZRPO

Regular Purchase Orders released against Advanced Purchase Orders

Page | 162

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on Document Overview On button as shown below:

Select the appropriate Document Type

Page | 163

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 164

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 165

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate RFQ number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

Account Assignment Category: A

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Item Overview RFQ

Item Overview

RFQ item

Tracking No.

Reference document number

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date)

C

Comments

Enter the RFQ number which Use drop down has been finalized to place tool to refer to order RFQ list Item number C Item No. 1,2 and so on of If left blank all RFQ to be chosen for items will be reference copied from RFQ Reference Tracking number R Tracking number to be entered here (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 166

MM COURSE: PURCHASING

Click on the Enter button. On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Page | 167

MM COURSE: PURCHASING

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items.

Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 168

MM COURSE: PURCHASING Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Page | 169

MM COURSE: PURCHASING

Select the Texts tab

Enter Item text under the appropriate heading

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 170

MM COURSE: PURCHASING

CASE II: Purchase Order Creation w.r.t Requisition

Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 171

MM COURSE: PURCHASING

Page | 172

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 173

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate PR number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

Account Assignment Category: A

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Click on the Enter button. On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

Page | 174

MM COURSE: PURCHASING On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items. Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 175

MM COURSE: PURCHASING Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 176

MM COURSE: PURCHASING CASE III: Direct Purchase Order Creation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, enter information in the fields as specified in the table below. After each entry press enter to proceed in the below mentioned sequence:

Page | 177

MM COURSE: PURCHASING Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Vendor

Vendor number

R

Header Purchasing Organization Purchasing Group Company Code Item Overview Material

Section Header Purchasing organization code

R

Search by drop down menu

Purchasing group code

R

Search by drop down menu

Company code for purchase

R

Enter if not defaulted in from purchasing org or group

Material number

R

Plant

Facility where goods are produced or sold. Account where costs are allocated

R

Search by drop down menu to locate non valuated material code Enter plant

R

Enter to book costs

Vendor selling price for good Required units / quantity Text from the material master record Unit that good is purchased

R R R

Enter price Enter quantity Default from master record

R

Date material is required Currency used for plant Grouping together of materials by characteristics Location where stock is stored

R R R

Defaults from material master, change if required Enter delivery date Default Default from master record

Acct. assignment category Net Price PO Quantity Short text Unit of measure Delivery Date Currency Material group Storage Location

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date) Vendor number known or search by drop down

Comments

Item Overview

O

Enter storage location, if required

Tracking number

Number that facilitates monitoring of the procurement of required materials

R

To be entered as per Purchaser‟s requirement

Requisitioner

To whom material is ordered

O

Name or initials of requisitioner

Page | 178

Choose A – Assets

Required for stock item, can be entered even later at time of Goods receipt Can be used in List display to list all PO‟s created by a certain buyer.

MM COURSE: PURCHASING (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Select the Appropriate Asset code from the drop down

Page | 179

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

G/L Account

General Ledger Account

Asset Number

Represents the Asset account where inventory price has booked.

R/O/C R

User Action and Values Will default from RFQ if maintained there.

C

Required to be chosen from drop down

R

Choose Asset number from drop down

Comments Will need to be entered by choosing from drop down Required to be manually entered only if material code has not been entered This action only to be done when A/c assign – A is used

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 180

MM COURSE: PURCHASING 3.

MM-ME21N-Create Purchase Order-Non-Valuated Material

Overview A purchase order for Non valuated material needs to be created and the vendor is known.

Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. Purchase Order for Non valuated materials covers those administrative items and insurance spares whose value is booked to an account. Once received, only quantity tracking is possible since materials are nonvaluated.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Account Assignment Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code Cost Centre Material code Nature of Purchase System Date will default File Tracking Number Tax code for – ED / CST / LST

Output - Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Page | 181

MM COURSE: PURCHASING Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code.

One Purchase Order may be created for several purchase requisitions or RFQs.

Page | 182

MM COURSE: PURCHASING Procedural Steps

CASE I: Purchase Order Creation w.r.t Quotation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

Select appropriate PO Document type from the following: Sr. No.

PO Document Type

Document Type description

1

ZDGO

Purchase Orders issued under DGS&D Rates

2

ZEDO

Educational Purchase Orders released against Educational APO

3

ZEMO

Emergency Purchase Orders; doesn’t need reference of APO and can be created directly.

4

ZNBO

Need Based Purchase Order released against Need Based APO

5

ZNPO

Intermediate Receipt reference from Non-POC location.

6

ZRCO

PO issued against Rate Contracts and PO issued against DGS&D rates

7

ZRPO

Regular Purchase Orders released against Advanced Purchase Orders

Page | 183

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on Document Overview On button as shown below:

Select the appropriate Document Type

Page | 184

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 185

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 186

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate RFQ number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

Account Assignment Category: K

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

On screen “Create Purchase Order”, enter information in the fields as specified in the table below: Field Name Tracking No.

Description Reference Tracking number

R/O/C R

User Action and Values Comments Tracking number to be entered here (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 187

MM COURSE: PURCHASING Click on the Enter button.

On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items

Page | 188

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Page | 189

MM COURSE: PURCHASING Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Select the Texts tab

Enter Item text under the appropriate heading

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 190

MM COURSE: PURCHASING CASE II: Purchase Order Creation w.r.t Requisition Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 191

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 192

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate PR number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

Account Assignment Category: K

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Click on the Enter button.

Page | 193

MM COURSE: PURCHASING On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items. Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number

Page | 194

MM COURSE: PURCHASING CASE III: Direct Purchase Order Creation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, enter information in the fields as specified in the table below. After each entry press enter to proceed in the below mentioned sequence:

Page | 195

MM COURSE: PURCHASING Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Vendor

Vendor number

R

Header Purchasing Organization Purchasing Group Company Code Item Overview Material

Section Header Purchasing organization code

R

Search by drop down menu

Purchasing group code

R

Search by drop down menu

Company code for purchase

R

Search by drop down menu

Material number

R

Plant

Facility where goods are produced or sold. Account where costs are allocated

R

Search by drop down menu to locate non valuated material code Enter plant

R

Enter to book costs

Vendor selling price for good Required units / quantity Text from the material master record Unit that good is purchased

R R R

Enter price Enter quantity Default from master record

R

Date material is required Currency used for plant Grouping together of materials by characteristics Location where stock is stored

R R R

Defaults from material master, change if required Enter delivery date Default Defaults from material master,

Acct. assignment category Net Price PO Quantity Short text Unit of measure Delivery Date Currency Material group Storage Location

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date) Vendor number known or search by drop down

Comments

Item Overview

O

Enter storage location, if required

Tracking number

Number that facilitates monitoring of the procurement of required materials

R

To be entered as per Purchaser‟s requirement

Requisitioner

To whom material is ordered

O

Name or initials of

Page | 196

Required for stock item, can be entered even later at time of Goods receipt Can be used in List display to list all PO‟s created by a certain buyer.

MM COURSE: PURCHASING requisitioner (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional) Click on the Enter button.

On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items. Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Required to be chosen from drop down

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 197

MM COURSE: PURCHASING

Click on the Enter button.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 198

MM COURSE: PURCHASING

4.

MM-ME21N-Create Purchase Order-Project Stock

Overview A purchase order for Project Stock material needs to be created, and the vendor is known. Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. Purchase Order for Project stock materials covers those items purchased under a project; therefore their value is booked to a Project account. Once received, quantity and value tracking is possible.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Account Assignment Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code A for Internal Order Material code Nature of Purchase System Date will default Tracking Number Tax code for – ED / CST / LST

Page | 199

MM COURSE: PURCHASING Output – Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code.

One Purchase Order may be created for several purchase requisitions or RFQs.

Page | 200

MM COURSE: PURCHASING Procedural Steps

CASE I: Purchase Order Creation w.r.t Quotation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

Select appropriate PO Document type from the following: Sr. No.

PO Document Type

Document Type description

1

ZDGO

Purchase Orders issued under DGS&D Rates

2

ZEDO

Educational Purchase Orders released against Educational APO

3

ZEMO

Emergency Purchase Orders; doesn’t need reference of APO and can be created directly.

4

ZNBO

Need Based Purchase Order released against Need Based APO

5

ZNPO

Intermediate Receipt reference from Non-POC location.

6

ZRCO

PO issued against Rate Contracts and PO issued against DGS&D rates

7

ZRPO

Regular Purchase Orders released against Advanced Purchase Orders

Page | 201

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on Document Overview On button as shown below:

Select the appropriate Document Type

Page | 202

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 203

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 204

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate RFQ number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Account Assignment Category: P Drag the appropriate Purchasing Document number in the basket

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Item Overview RFQ

Item Overview

RFQ item

Tracking No.

Reference document number

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date)

C

Comments

Enter the RFQ number which Use drop down has been finalized to place tool to refer to order RFQ list Item number C Item No. 1,2 and so on of If left blank all RFQ to be chosen for items will be reference copied from RFQ Reference Tracking number R Tracking number to be entered here (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 205

MM COURSE: PURCHASING

Click on the Enter button.

On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items.

Page | 206

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Page | 207

MM COURSE: PURCHASING Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Page | 208

MM COURSE: PURCHASING

Select the Texts tab

Enter Item text under the appropriate heading

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 209

MM COURSE: PURCHASING CASE II: Purchase Order Creation w.r.t Requisition Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 210

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Execute

or F8.

Enter Plant here

Enter Document Date here

Page | 211

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate PR number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Account Assignment Category: P Drag the appropriate Purchasing Document number in the basket

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Page | 212

MM COURSE: PURCHASING On the ‘Header Details’ screen, enter the BSNL Doc number on the customer data tab .

On the ‘Item Details’ screen, enter the Tax Code for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab –Invoice. Tax code is mandatory for all items.

Page | 213

MM COURSE: PURCHASING Field Name Tax Code

Description Tax Code

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button and Check

R/O/C R

User Action and Values Will default from RFQ if maintained there.

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 214

MM COURSE: PURCHASING CASE III: Direct Purchase Order Creation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, enter information in the fields as specified in the table below. After each entry press enter to proceed in the below mentioned sequence:

Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Vendor

Vendor number

R

Header Purchasing Organization

Section Header Purchasing organization code

R

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date) Vendor number known or search by drop down Search by drop down menu

Page | 215

Comments

MM COURSE: PURCHASING Purchasing Group Company Code Item Overview Material

Purchasing group code

R

Search by drop down menu

Company code for purchase

R

Enter if not defaulted in from purchasing org or group

Material number

R

Plant

Facility where goods are produced or sold. Account where costs are allocated

R

Search by drop down menu to locate non valuated material code Enter plant

R

Enter to book costs

Vendor selling price for good Required units / quantity Text from the material master record Unit that good is purchased

R R R

Enter price Enter quantity Default from master record

R

Date material is required Currency used for plant Grouping together of materials by characteristics Location where stock is stored

R R R

Defaults from material master, change if required Enter delivery date Default Default from master record

Acct. assignment category Net Price PO Quantity Short text Unit of measure Delivery Date Currency Material group Storage Location

Item Overview

O

Enter storage location, if required

To be entered as per Purchaser‟s requirement

Tracking number

Number that facilitates monitoring of the procurement of required materials

R

Requisitioner

To whom material is ordered

O

Choose P – Project

Required for stock item, can be entered even later at time of Goods receipt Can be used in List display to list all PO‟s created by a certain buyer.

Name or initials of requisitioner (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional

Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Page | 216

MM COURSE: PURCHASING

Enter the WBS Element Number Field Name Tax Code

Description Tax Code

G/L Account

General Ledger Account

WBS Element Number

Represents the Project account where inventory price has booked.

R/O/C R

User Action and Values Will default from RFQ if maintained there.

C

Required to be chosen from drop down

R

Choose WBS number from drop down

Comments Will need to be entered by choosing from drop down Required to be manually entered only if material code has not been entered This action only to be done when A/c assign – P is used

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 217

MM COURSE: PURCHASING 5.

MM-ME21N-Create Purchase Order-Stock Materials

Overview

A purchase order for valuated materials needs to be created, and the vendor is known. The materials will be stocked before they are consumed in plant activities.

Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code Material code Nature of Purchase System Date will default File Tracking Number Tax code for – ED / CST / LST

Page | 218

MM COURSE: PURCHASING Output - Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code.

One Purchase Order may be created for several purchase requisitions or RFQs.

Page | 219

MM COURSE: PURCHASING Procedural Steps

CASE I: Purchase Order Creation w.r.t Quotation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

Select appropriate PO Document type from the following: Sr. No.

PO Document Type

Document Type description

1

ZDGO

Purchase Orders issued under DGS&D Rates

2

ZEDO

Educational Purchase Orders released against Educational APO

3

ZEMO

Emergency Purchase Orders; doesn’t need reference of APO and can be created directly.

4

ZNBO

Need Based Purchase Order released against Need Based APO

5

ZNPO

Intermediate Receipt reference from Non-POC location.

6

ZRCO

PO issued against Rate Contracts and PO issued against DGS&D rates

7

ZRPO

Regular Purchase Orders released against Advanced Purchase Orders

Page | 220

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on Document Overview On button as shown below:

Select the appropriate Document Type

Page | 221

MM COURSE: PURCHASING On screen “Create Purchase Order”, Click on On button Purchasing Document which may be any of the following:

and select appropriate

 Purchase Order – It will be used if you want to copy from existing PO  Request for Quotation – If PO is to be made with reference to RFQ  Contracts – If a contract exist and you need to create PO with reference to that contract  Purchase Requisitions – If you want to create with reference to PR

Page | 222

MM COURSE: PURCHASING On screen “Purchasing Documents” Enter the plant and document date and click on Excecute

or F8.

Enter Plant here

Enter Document Date here

Page | 223

MM COURSE: PURCHASING On screen “Create Purchase Order”, drag the appropriate RFQ number with reference to which you want to create PO into the basket below:

on the right side at the top as shown

Drag the appropriate Purchasing Document number in the basket

All the necessary details will be picked from Purchasing Document if you are referring any purchasing document. If you are not referring any purchasing document then you have to enter all required detail manually

Page | 224

MM COURSE: PURCHASING On screen “Create Purchase Order”, enter information in the fields as specified in the table below (Optional)

Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Item Overview RFQ

Item Overview

RFQ item

Tracking No.

Reference document number

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date)

C

Comments

Enter the RFQ number which Use drop down has been finalized to place tool to refer to order RFQ list Item number C Item No. 1,2 and so on of If left blank all RFQ to be chosen for items will be reference copied from RFQ Reference Tracking number R Tracking number to be entered here (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 225

MM COURSE: PURCHASING Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below:

Select the appropriate Tax Code from the available list in the field Tax code under the tab – Invoice. Tax code is mandatory for all items.

Page | 226

MM COURSE: PURCHASING

You can check calculation of taxes by pressing the tab

Page | 227

Taxes

MM COURSE: PURCHASING

Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 228

MM COURSE: PURCHASING Click on the Enter button. Click on Text tab to enter Header Text in PO

Click on Text tab and enter text under the appropriate heading.

Entering of BSNL old reference number Select the tab Customer Data and make your entry in the field BSNL Document number

Enter BSNL reference number here

Page | 229

MM COURSE: PURCHASING Entering of Purchasing Conditions in Purchase Order For e.g. if you want to add purchasing conditions like Freight, Discount in the Purchase order then select the tab Conditions at the item level

Select appropriate Pricing Select the Conditions

Enter the value of Pricing

Press this tab to insert new pricing conditions and press F4 to get the list of available conditions

Page | 230

MM COURSE: PURCHASING Entering the Item Text in the PO If you want to maintain text at Item Level then select the tab Texts in the Item level and enter text under the appropriate heading.

Select the Texts tab

Enter Item text under the appropriate heading

Page | 231

MM COURSE: PURCHASING Checking the Output / Printer setting for PO To check the printer setting click on the tab Messages Click here to check the settings of PO output

Output Type should be – NEU Medium should be – 1- Print Output Partner Function should be – VN After checking the above select the line item and click on the tab Communication Method

Page | 232

MM COURSE: PURCHASING

Check Printer tick on the Print Immediately and Release after output should be there

Page | 233

MM COURSE: PURCHASING The Purchase Order may be posted by clicking on the Save

button.

A message will be displayed stating that the purchase order was saved, with the purchase order number.

Press Save Button

Page | 234

MM COURSE: PURCHASING

After pressing the save button you will get the PO number at the bottom of screen

Page | 235

MM COURSE: PURCHASING 6.

MM-ME21N-Create Purchase Order-Subcontracting & Repair

Overview

A purchase order for subcontracting needs to be created, and the subcontractor (vendor) is known. The raw materials will be issued to the subcontractor and the finished goods will be received.

Business Process Procedure Overview A purchase order is a legal document used to record an individual purchase (negotiated terms, conditions and pricing) with the vendor or arrange for a delivery based on prior agreement. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

Input - Required Fields Vendor Purchasing Organization Purchasing Group Date Material Qty Net Price Delivery Date Plant Material code Document Type Purchase Order Date Req Tracking Number Tax Code

Field Value / Comments Vendor number Purchasing Organization code Purchasing Group code Purchase order date – default is system date Material which is being purchased Quantity of Purchase Effective purchase price Anticipated Delivery Date Plant code Material code Nature of Purchase System Date will default File Tracking Number Tax code for – ED / CST / LST

Page | 236

MM COURSE: PURCHASING Output - Results Purchase order document

Comments Can be changed, displayed or printed which can then be printed to send to vendor

Tips and Tricks

Click the Personal Settings button on the tool bar, this function is for default information for purchase order header data and also purchase order item data. This will reduce the amount of redundancy in the data entry, i.e. plant, company code.

Page | 237

MM COURSE: PURCHASING Procedural Steps

Purchase Order Creation Access transaction by: Via Menu

Logistics>Materials Management>Purchasing>Purchase Order> Create>Vendor/Supplying Plant Known

Via Transaction Code

ME21N

On screen “Create Purchase Order”, enter information in the fields as specified in the table below. After each entry press enter to proceed in the below mentioned sequence:

Item category: L Account Assignment category: K

Page | 238

MM COURSE: PURCHASING Field Name Document Type Doc. date

Description Document type

R/O/C R

Purchase order date

R

Vendor

Vendor number

R

Header Purchasing Organization Purchasing Group Company Code Item Overview Material

Section Header Purchasing organization code R

Material number

R

Plant

Facility where goods are produced or sold. Vendor selling price for good Required units / quantity Text from the material master record Unit that good is purchased

R

Search by drop down menu, it should be end with R Enter plant

R R R

Enter price Enter quantity Default from master record

R

Date material is required Currency used for plant Grouping together of materials by characteristics Location where stock is stored

R R R

Defaults from material master, change if required Enter delivery date Default Defaults from material master

O

Enter storage location, if required

Tracking number

Number that facilitates monitoring of the procurement of required materials

R

To be entered as per Purchaser‟s requirement

Requisitioner

For whom material is ordered In case of subcontracting PO

O

Name or initials of requisitioner Enter L Subcontracting

Net Price PO Quantity Short text Unit of measure Delivery Date Currency Material group Storage Location

Item Category

Purchasing group code

R

Company code for purchase

R

User Action and Values Please refer the attached annexure Date PO created (defaults to today‟s date) Vendor number known or search by drop down

Comments ZNBO

Please refer the attached annexure Please refer the attached annexure Enter if not defaulted in from purchasing org or group

Item Overview

R

Page | 239

Required for stock item, can be entered even later at time of Goods receipt Can be used in List display to list all PO‟s created by a certain buyer. Potential entry is employee number.

MM COURSE: PURCHASING (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button. On the ‘Item Details’ screen, enter the following for each Item. Enter information in table below: Field Name Tax Code

Description Tax Code

R/O/C R

User Action and Values Will default from RFQ if maintained there.

Comments Will need to be entered by choosing from drop down

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

To Explode the BOM click on Components field or click on the component field to enter the child parts.

Click on the Component s

Page | 240

MM COURSE: PURCHASING Enter all the required details

Enter the Damage material number

Enter the Quantity

Page | 241

MM COURSE: PURCHASING Click on the back button. Press enter, than go to Account Assignment and Enter the Appropriate G/L A/c and Cost center.

Enter the G/L Account Number Enter the Cost Center Number

Click on the Enter button and Check

the Purchase order.

The Purchase Order may be posted by clicking on the Save button. A message will be displayed stating that the purchase order was saved, with the purchase order number.

Page | 242

MM COURSE: PURCHASING 7.

MM-ME21N-ZSTE-Stock Transfer PO External

Overview



PO Type ZSTE-External Purchase Order will be created if material is being Stock Transferred from Plant of One Company Code to other plant of another Company Code

Business Process Description Overview This process describes how to Create External Stock Transfer

Input - Required Fields Material Plant Quantity Vendor Price

Field Value/Comments Material To be Stock Transferred Plant Which Need the material Quantity Required Enter Vendor Code Price at which material is to be Stock Transferred

Output - Results PO Number

Comments PO type ZSTE created

Page | 243

MM COURSE: PURCHASING Procedural Steps Create Purchase Order

Access the transaction by T Code: Transaction Code

ME21N - Create ME22N - Change ME23N - Display

On the Screen “Create Purchase Order” enter the following details: Field Name Document Type

Description Select the Appropriate PO Type

R/O/C R

Document Overview On Select PR Number Tax Code

Click on the Tab Document Overview On

R

Search the PR with reference to which you want to create PO Enter the appropriate Tax Code

R R

User Action and Values Select PO Type – ZSTE(Stock transfer External) Click on the Tab Document Overview On

Comments

Select the required PR number Select the Tax Code IA for creating PO in Depot

Create Purchase Order with Reference to Purchase Requisition.

Select Document Type: ZSTE Select Purchase Requisition Number & Click on Adopt

Page | 244

MM COURSE: PURCHASING All the Details adopts from the Purchase Requisition.

Enter the Invoice

Enter the Tax Code

Page | 245

MM COURSE: PURCHASING On the Screen “Create Purchase Order” press Save button

Stock Transfer External order Created

Page | 246

MM COURSE: PURCHASING 8.

MM-ME21N-ZSTI-Stock Transfer PO Internal

Overview

PO Type ZSTI-Internal Purchase Order will be created if material is being Stock Transferred within same Company Code Business Process Description Overview This process describes how to Create Internal Stock Transfer Purchase order

Input - Required Fields Material Plant Quantity Vendor

Field Value/Comments Material To be Stock Transferred Plant Which Need the material Quantity Required Enter Vendor Code

Output - Results PO Number

Comments PO type ZSTI created

Page | 247

MM COURSE: PURCHASING Procedural Steps Create Purchase Order

Access the transaction by T Code: Transaction Code

ME21N - Create ME22N - Change ME23N - Display

On the Screen “Create Purchase Order” enter the following details: Field Name Document Type Document Overview On Select PR Number Item Category

Description Select the Appropriate PO Type

R/O/C R

Click on the Tab Document Overview On

R

Search the PR with reference to which you want to create PO Item Category should be “U” in case of Internal Stock Transfer Purchase Order

R R

User Action and Values Select PO Type – ZSTI(Stock transfer Internal) Click on the Tab Document Overview On Select the required PR number Item Category should be “U” in case of Internal Stock Transfer Purchase Order

All other necessary details will be copied from PR if you are creating PO with reference to PR. Create Purchase Order with reference to Purchase Requisition.

Page | 248

Comments

MM COURSE: PURCHASING

Select Document Type: ZSTI

Select PR Number and Click on Adopt button

All other necessary details will be copied from PR.

Page | 249

MM COURSE: PURCHASING On the Screen “Create Purchase Order” press Save button

Page | 250

MM COURSE: PURCHASING 9.

MM-ME22N-Change Purchase Order

Overview

A purchase order needs to be changed. A change in quantity and/or other required details are the primary triggers for this transaction.

Business Process Description Overview Prior to changing or deleting a purchase order, a written approval needs to be taken. If part of the purchase order quantity has already been received, then any changes made in the purchase order will only reflect in subsequent goods receipts. If someone else has deleted the purchase order, a new purchase order will have to be created, as it is not possible to change a deleted Purchase order.

Input - Required Fields Purchase order number

Field Value / Comments Can be found using drop down

Output – Results Purchase order changed or deleted

Comments The Purchase order records changes made including old value, new value, date, time and id of the person who has made changes.

Tips and Tricks If a purchase order has been deleted, you can still use that purchase order and create a new one using the canceled purchase order as a reference. System by default displays the most recently opened Purchase order, so if changes need to be made to another order, the number has to be typed on the ‘Other Purchase order’ button. To save the document, you can click on the save folder.

Page | 251

MM COURSE: PURCHASING Since Purchase order processing is an enjoy transaction, change purchase order can also be viewed from transaction ME21N by clicking on the

button.

Procedural Steps

Access transaction by: Via Menus Via Transaction Code

Logistics>Materials Management>Purchase>Purchase order>Change ME22N

On screen “Change Purchase order”, the last Purchase order saved will be shown. Enter information in the fields as specified in the table below:

Enter the PO Number

Page | 252

MM COURSE: PURCHASING Field Name Purchase order Number

Description Purchase order Number

R/O/C R

User Action and Values Comments If you don‟t want to work with Purchase order the defaulted purchase order, can be found click on the „Other Purchase using the order‟ button on the header bar Display or List (It has been shown with an Display arrow).Enter a unique purchase function. order number that requires to be changed. (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Enter button.

Page | 253

MM COURSE: PURCHASING On the same screen, to change quantity, price, date required, text etc., enter information in the fields as specified in the table below:

Field Name Item Number Net Price Delivery date Quantity Text

Description Item number

R/O/C R

Price change Date Change

O O

User Action and Values Selects the item number that needs to be changed Change price if required Change date if required

Quantity Change Text change

O O

Change quantity if required Change or add text if required

Comments

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

On the same screen, to Delete purchase order or item: Click on the line of the item to be deleted Click on the Delete (trash can) icon, or use menu path Edit>Delete

Click on Delete button

Page | 254

MM COURSE: PURCHASING Select “Yes” on the pop up box to delete the item

The item is now flagged for deletion (see the column labeled “D”; there will be a checkmark).

Click on the SAVE Button.

Page | 255

MM COURSE: PURCHASING 10. MM-ME23N-Display Purchase Order Overview A purchase order needs to be displayed. A Display of quantity and/or required details is the primary triggers for this transaction.

Business Process Description Overview There are two methods for Displaying Purchase Orders - Display and list Display.

Input - Required Fields Purchase order number

Field Value / Comments Can be found using drop down

Output – Results Purchase order displayed

Comments The Purchase order records all changes made even details such as old value, new value, date, time and id of the person who has made changes.

Tips and Tricks

System by default displays the most recently opened Purchase order, so if displays need to be made to another order, the number has to be typed on the ‘Other Purchase order’ button.

List display is a more comprehensive method of displaying Purchase Orders, because it will allow for detailed searches on various criteria. It is covered in the BPP – ‘MM-ME2N-Purchase Orders by PO Number’.

Page | 256

MM COURSE: PURCHASING Since Purchase order processing is an enjoy transaction, display purchase order can also be viewed from transaction ME21N by clicking on the

button. Procedural Steps

Access transaction by: Via Menus Via Transaction Code

Logistics>Materials Management>Purchase>Purchase order>Display ME23N

On screen “Display Purchase order”, the last Purchase order saved will be shown. Enter information in the fields as specified in the table below:

Field Name Purchase order Number

Description Purchase order Number

R/O/C R

User Action and Values If you don‟t want to work with the defaulted purchase order, click on the „Other Purchase order‟ button on the header bar (It has been shown with an arrow).Enter a unique purchase order number that requires to be displayed.

Comments Purchase order can be found using the Display or List Display function.

(Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Page | 257

MM COURSE: PURCHASING

Click on the Enter button. On the same screen, to display quantity, price, date required, text etc., select item number and view the item specific fields in the item details screen as below:

Field Name Net Price Delivery date Quantity Text

Description Price display Date Display

R/O/C O O

User Action and Values Display price if required Display date if required

Comments

Quantity Display O Display quantity if required Text display O Display if required (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Save button Page | 258

MM COURSE: PURCHASING 11. MM-ZMMP_POTOL-PO Tolerance Overview A set tolerance limits for the PO. BUSINESS PROCESS PROCEDURE OVERVIEW Sometimes it may happen that there is variation in the price quoted . So, tolerance limits are defined for the document type to avoid any discrepancy at a later stage and help in smooth work flow and document processing.

Procedural Steps

Access transaction by: Via Transaction Code

ZMMP_POTOL

On screen “Display view “Table for Enter Tolerance Limit”: Overview”: Click on the tab

Page | 259

MM COURSE: PURCHASING Click on the NEW ENTERIES

Field Name Company Code Category Type Perc.1

Description The company code for which you want to define the tolerance limits Document category Enter the document type Amount of tolerance

tab .

R/O/ C R

User Action and Values Enter the company code

R R R

Enter the document category Enter the document type. Enter the value of tolerance.

Make the entries in the appropriate field and click on SAVE SAVE tab

Page | 260

tab.

Comments

MM COURSE: PURCHASING

EXIT button

Make the entries in the required fields.

After setting the tolerance limits click on the exit button

Page | 261

MM COURSE: PURCHASING 12. MM-ME9F-Message Output Purchase Orders Overview A Purchase Order needs to be printed

Business Process Procedure Overview This procedure details how to print a purchase order created in R/3

Input – Required Fields Message Data

Field Value/Comments Details the type of message to print.

Output – Results A successfully printed purchase order

Comments

Tips and Tricks

The more search parameters that are entered the more efficient the search and the less unnecessary information that is displayed.

Page | 262

MM COURSE: PURCHASING Procedural Steps

Access transaction by:

Via Menu Via Transaction Code

Logistics>Materials Management>Purchasing >Purchase Order>Messages>Print/Transmit ME9F

On screen “Message Output”, enter information in the fields as specified in the table below:

Page | 263

MM COURSE: PURCHASING Field Name Purch. Doc. Data Document Number Vendor Purchasing Organizatio n Purchasing Group Document Type

Document Date Message Data Application

Message type Processing status

Creation date Time created

Description

R/O/C

User Action and Values

PO Number

O

Choose from drop down menu

Vendor # Purchasing Organization #

O O

Choose from drop down menu Please refer the attached annexure

Purchasing Group #

O

Please refer the attached annexure

Identifier allowing differentiation between the various kinds of purchasing document in the SAP system Date on which the purchasing document was created.

O

Please refer the attached annexure

O

Enter Document date or choose from drop down menu

Subdivides the usage of a condition for the use in different application areas Specifies the kind of output

R

EF defaults for Purchase Order

O

Choose from drop down menu

Indicates the status1 indicates the process was successful. 2 indicates an error 0 indicates the process has not yet started Date the message is create

C

Default is 0

O

Enter date or choose the drop down menu Defaults to time started

Comment s

Displays the time the message C was created (Note: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional)

Click on the Execute button. On screen “Message Output” select the appropriate Purchase Order and perform the following:

Page | 264

MM COURSE: PURCHASING

Select the check box Click on

and and/ or

Message>

Page | 265

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF