PT. BHAKTI ENERGI PERSADA
MineScape Training
Minescape Reserving and Scheduling Manual 1.
2.
Minescape Open Cut Coal 1.1.
Minescape blocking
1.2.
Projection solid with batter slope for reserves calculation
1.3.
Projection solid
1.4.
Reserves calculation
Excel or CSV Database 2.1.
Create reserves database in Excel or CSV file
2.2.
Create polygon database in Excel or CSV file
2.3.
Scheduling
Page 1 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Minescape Open Cut Coal 1.1. Minescape blocking 1.
Buatlah poligon pit shell (batas-batas pit).
Open write design file blocks.
Click
Click
Create layer untuk rancangan pit baru: Pit00
Klik kanan
Click
Click
Page 2 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Attach design file subcrop lapisan batubara: subcrp_floor_update, layer SEAM1.
Click
Click
Page 3 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Untuk latihan, buatlah poligon pit shell pada daerah subcrop seam 1 dengan ukuran kira-kira 3×2 km.
Page 4 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Tekan Ctrl+G untuk memunculkan grid. Grid akan berguna sebagai alat bantu dalam menentukan ukuran pit shell.
Click
Page 5 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
±3 km
±2 km
2.
Berikan tag design segment pada pit shell dengan memilih menu Strip Design>Tag Design Segments…
Click
3.
Buat side definition dengan mengklik kanan bagian Side Definition lalu pilih Create,,,.
Klik kanan
Click
Page 6 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Contoh beberapa Side Definition: Side Definitions: HW63
ILLEG_HW
VERTICAL
Angles
Angles
Angles
If (label == „coal‟) then 70 else 63 endif
70
90
Offset
Offset
0
0
Offset If range(level, totroof+3, topo-1) then if range(level,-29.5,-30.5) then 5 elseif range(level,-9.5,-10.5) then 10 elseif range(level, 10.5,9.5) then 5 elseif range(level,30.5,29.5) then 10 elseif range(level,50.5,49.5) then 5 elseif range(level,70.5,69.5) then 10 else 0 endif else 0 endif
Page 7 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click Kemudian double click pit shell.
Click
Page 8 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 4.
MineScape Training
Buatlah tiga layer baru, yaitu untuk batter block (BB), batter block intersection (BB_Intersect) dan solid (BB_Solid).
Klik kanan
Click
Click
Click Click Lalu buat start line dan end line-nya.
Page 9 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 5.
MineScape Training
Buka menu Strip Design>Generate Strips… End line
Pit shell
Start line (garis dekat subcrop)
Click
Page 10 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
6.
MineScape Training
Buat batter strip dengan cara yang sama tetapi dengan start line parallel terhadap highwall dan dengan interior strips = vertikal. End line
Pit shell
Start line
Page 11 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 12 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 7.
MineScape Training
Buatlah perpotongan antar strip dengan block strip dengan memilih menu Strip Design>Strip Intersection…
Click Sembunyikan semua layer kecuali layer BB_intersect.
Click
Page 13 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Click
Click
Page 14 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 8.
MineScape Training
Gabungkan batter block yang berukuran kecil dengan batter block lain yang berada di dekatnya. Buka Minescape Explorer, User Commands – bbmerge.
Double click
Pilih batter block yang pertama.
Double click
Page 15 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training Pilih batter block yang ke-dua.
Double click
Masukkan nama batter block yang telah dimerger (pilih nama batter block pertama).
Click
Page 16 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training Hapus batter block ke-dua.
Click + [delete]
Page 17 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
1.2.
MineScape Training
Projection Solid with Batter Slope for Reserves Calculation
1. Buka menu Strip Design>Project Solids… 2. Masukkan nama batter block dalam kolom Block Names. 3. Masukkan nama layer BB_Solid.
4. Buatlah atau sunting pit projection rules dengan meng-klik kanan bagian Pit Projection Rules. Projection rule harus dibuat sesuai hasil kajian kestabilan lereng.
Page 18 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 19 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 20 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
1.4.
MineScape Training
Reserves calculation 1.
Pilih menu Reserves>Sample>Solids…
Page 21 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 22 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 2.
MineScape Training
Pilih menu Reserves>Evaluate Samples>Mining Reserves…
Click
Click
Page 23 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 3.
MineScape Training
Pilih menu Reserves>Accumulate Samples…
Click
Click 4.
Pilih menu Reserves>Reformat Samples>Block…
Click
Page 24 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Page 25 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 26 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Excel or CSV Database 2.1. Create reserves database in Excel or CSV file 1.
Ekspor file tab_ressol4 ke dalam format Excel.
2-Click
1-Click
Page 27 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Page 28 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
2.2. Create polygon database in Excel or CSV file 1.
Buka file xls_ressol4.
2.
Buat dua kolom baru, yaitu kolom OB dan COAL.
OB = TOTALVOLUME – GROUP1_VOLUME
COAL = TOTALRRMASS
Page 29 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA 3.
MineScape Training
Buat pivot table dari semua data tersebut.
Pilih semua cell (tekan Ctrl+A)
Pilih menu Insert>PivotTabel.
Click
Page 30 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Drag
Drag
Page 31 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Drag
Drag “Values”
Page 32 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Urutkan kolom A mulai dari level yang paling tinggi (misal: P90, P80, P70, …, P00, M10, M20, dst.).
5.
Untuk mempermudah penyuntingan, pivot table harus di-copy ke sheet lain
Pilih semua cell (tekan Ctrl+A)
Page 33 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
Copy semua cell (tekan Ctrl+C).
Pindah ke sheet baru, lalu pilih Paste>Paste Values.
MineScape Training
Page 34 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Click
Hapus baris-baris yang kosong yang menjadi pemisah antar level (misal antara P90 dengan P80)
Lakukan formatting seperlunya (lihat gambar berikut).
Page 35 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Permukaan topografi (hijau)
Lantai batubara (hitam)
Page 36 of 37 Created by Fajar Herdian Akhzan
PT. BHAKTI ENERGI PERSADA
MineScape Training
Nama tiap solid menunjukkan lokasi blok penambangan.
Blok SOL002_xxx
Blok SOL003_xxx
Dan seterusnya…
2.3. Scheduling