Inspec spectt fo for phys physic icaal dam damage / defect fects. s.
2
Verify Co Connecti ection onss as per appr pproved ved draw drawin ings gs..
3
Check ti tight ghtness of of al all co connection ions.
5
Check apparatus lists.
7
Test est Sw Switc itch che checcked ked fo for co correct ect fun funcction tion..
8
Check case earthing.
3. OPERATING DC SUPPLY CURRENT :
DC VOLT.(V)
DC CURRENT W/O FAULT(mA)
DC CURRENT DURING FAULT(mA)
(Relays de-energized/energized): de-energized/energized): 40 TE case: approx. 12.6 W / 34.1 W (Relays de-energized/energized): de-energized/energized): 84 TE case: approx. 14.5 W / 42.3 W Technical Data page: 2-17 4. ELECTRICAL TESTS:
(With relay energized condition) Measured auxiliary supply. Clock set at local time. Time maintained when auxiliary supply removed. Relay healthy (green) LED working. Trip (red) LED working. rating: continuous 4 Inom Note for testing: Load rating:
For 10 s: 30 Inom For 1 s: 100 Inom Nominal surge current: 250 I nom 5. INPUTS AND OUTPUTS TESTS: Tested by: Name : ENG/
HARI KUMAR
Signature & Date:
Witnessed by: Name ENG/ Signature & Date:
CALCULATED WATT(W)
AL- ALBABTAIN Record no.BABTAIN :
SITE INSPECTION AND TEST RECORD Description:
Order no.:
OVER CURRENT RELAY MICOM P139 Customer:
End Client:
SEC-COA
Sheet:
SEC-COA
Site:
2 of 4
Panel / Designation / Location no.:
S/S 8153
Project no.:
13.8 Kv Switchgear Section-A
11031066/00
Binary inputs:
Type
BI
X 241
U_1…. U_24
V
U_1 …. U_4
X Binary Output :
Result
U_01...U_06
Type
BO
Result
V
K_1……..K8
X
K_01…..K_06
6. Measurements Accuracy checks:
Applied Value
Expected Value ( A )
0.1In
120
0.5In
600
1 In
1200
1.5In Deviation measurement : ± 1 % at 20°C
Displayed value ( A )
1800
Technical Data page: 2-14 Elements
Trigger
Reset Ratio
±5%
approx. 0.95
Time Deviation
Phase Over current element & Earth fault
DMT : ± 1% + 20 ms to 40 ms
IDMT : ± 5 % + 10 to 25 ms at I>2Iref
Note: for "extremely inverse" IEC characteristics and for thermal overload characteristics: ± 7.5 % + 10 to 20 ms Operate time for relay is ≤40 ms, Technical Data page: 2-11……2-13 7.1) DT PICK UP AND DROP OFF ( I> & IN> Sensitivity Test ) :
OVER CURRENT RELAY
Current
R
Setting
P/U
Y D/O
P/U
Reset
B D/O
P/U
D/O
Ratio
0.5 In
Current Setting
1.0 In
0.2In 0.4In
1.2 In
0.8In
E/F RELAY P/U
D/O
7.2) DT TIME CHARACTERISTIC TEST ( I> & IN> ) :
Time Setting (s)
R
OVER CURRENT RELAY Y
3 Tested by: Name : ENG/
HARI KUMAR
Signature & Date:
Witnessed by: Name ENG/ Signature & Date:
B
E/F RELAY
Ratio
AL- ALBABTAIN Record no.BABTAIN :
SITE INSPECTION AND TEST RECORD Description:
Order no.:
OVER CURRENT RELAY MICOM P139 Customer:
End Client:
SEC-COA
Sheet:
SEC-COA
Site:
3 of 4
Panel / Designation / Location no.:
S/S 8153
Project no.:
13.8 Kv Switchgear Section-A
11031066/00
20 40 7.3) DT PICK UP AND DROP OFF ( I>> & IN>> Sensitivity Test ) :
OVER CURRENT RELAY
Current
R
Setting
P/U
Y D/O
P/U
Reset
B D/O
P/U
D/O
Ratio
0.8 In
Current Setting
1.5 In
0.5In 0.8In
2.0 In
1.0In
E/F RELAY P/U
D/O
Ratio
7.4) DT TIME CHARACTERISTIC TEST ( I>> & IN>> ) :
Time Setting (s)
OVER CURRENT RELAY Y
R
E/F RELAY
B
0 50 7.5) DT PICK UP AND DROP OFF (I>>> & IN>>> Sensitivity Test ) :
OVER CURRENT RELAY
Current
R
Setting
P/U
Y D/O
P/U
Reset
B D/O
P/U
D/O
Ratio
1.0 In
Current Setting
2.0 In
1.0In 1.3In
3.0 In
2.0In
E/F RELAY P/U
D/O
7.6) DT TIME CHARACTERISTIC TEST (I>>> & IN>>> ) :
Time Setting (s)
R
OVER CURRENT RELAY Y
B
E/F RELAY
0 50
7.7) IDMT CHARACTERISTICS TEST ( I> & IN> ) :
Time multiplier = 1 Function Tested by: Name : ENG/
HARI KUMAR
Signature & Date:
Operating Time (s) Witnessed by: Name ENG/ Signature & Date:
Ratio
AL- ALBABTAIN Record no.BABTAIN :
SITE INSPECTION AND TEST RECORD Description:
Order no.:
OVER CURRENT RELAY MICOM P139 Customer:
End Client:
SEC-COA
Sheet:
SEC-COA
Site:
4 of 4
Panel / Designation / Location no.:
S/S 8153
13.8 Kv Switchgear Section-A
Current
Injected
Calculated
0.2In
2*Is Current
10.02(s) Value
0.2In
10*Is
2.970
0.2In
2*Is
13.5
0.2In
10*Is
1.5
0.2In
2*Is
26.67
0.2In
10*Is
0.808
IEC LTI
0.2In
2*Is
120
Curve
0.2In
10*Is
13.33
IEC SI Curve
IEC VI Curve
IEC EI Curve
Project no.:
R
11031066/00
Y
B
N
7.8) TIME MULTIPLIER TESTS ( IN> ) :
IN> = 0.2In I inject = 2 Is
Curve: SI Time multiplier 0.2 0.5
N
Calculated Value 2.01 5.03
7.9) Breaker Failure Protection (50BF)
Current ( A )
Phase
Set
Pickup
Stage 1 Drop-off
Set
Optd
Stage 2 Set
R Y
20% In
150 ms
300 ms
80% In
500 ms
1.0 sec
B R Y B • • •
Communication with PC Check : _______________ Event Record Check : _______________ Disturbance Record Check : ________________