METHOD OF STA STATEMENT

Fiber Optic Testing and Termination

Fiber Optic cable Testing procedure Using Arc FusionSplicer-FSM-60S Fiber optic cable fusion splicing provides the lowest-db loss. Special equipment called Arc fusion splicer is used to perform the ber fusion splicing. High precision arc fusion splices are using to achieve lowest db loss. This equipment can be used for dierent t!pe of ber"s S#$ ##%.etc.

Fiber optic cable splicing procedure &. Glanding- 'roper clamp or gland will be used to secure the ber cable. (. !reparation-)emove all the '*+ insulation and armored sheathing. 'ut the ber cable in to the ber shelf. ,. Sur"ace #leaning-se a ell! or other cleaner to clean the ber cable. /. #leaning-+lean the ber cores with pure 01123 alcohol. +lean the ber with high qualit! alcohol because dust partials from the ber coating surface can be enter inside the protection sleeve and might result in a future ber brea4.

5. Slee$es - 'lace the required length protection sleeve each core

carefull!. 6. Fiber Stripping - )emove outer coating of ber cores required length as per ber t!pe with a precision stripping tool. +lean the bared ber core with pure 01123 alcohol.

7. #lea$ing- Set the stripped ber on the cleaver to cleave the ber. 'roper cleaving is a main important step for a good result.

8. Start- +lean the equipment before starting the wor4. se select mode for determine ber cable t!pe if ber t!pe is not identied to select Auto splice mode.

1. Mounting-Set the cleaved ber core onto the ber holder with protruding required length as per the ber t!pe &9.

&&.

Align%ent & Splicing-:oading the ber to the arc Fusion

splicer between the v-groove edge and tip of electrode. After completion of ber automatic alignment arc discharge is performed to splice the bers.

&(.

Splice 'oss-;stimated splice loss is displa!ed upon

completion of splicing. Splice loss is aected b! certain factors.

&,.

. #a4e sure the splice point is located at the center of the

protection sleeve.

&/.

'lace ber with protection sleeve in the center of the tube

heater. The heating c!cle starts automaticall! as soon on the tube heater is closed.

&5.

Ta4e out the protected sleeve ber core from the tube heater

and put inside ber splice tra!. Arrange spliced ber core properl! in the shelf.

F()E* O!T(# #A)'E TEST(NG !*O#EDU*E US(NG AN*(TSU A##ESS MASTE* OTD* + MT-,0.A + 06./Optical Ti%e De%ine *eect Meter i.