Method Statement Index New

November 11, 2017 | Author: knabpsho | Category: Deep Foundation, Components, Structural Engineering, Civil Engineering, Engineering
Share Embed Donate


Short Description

Download Method Statement Index New...

Description

CADANGAN PEMBANGUNAN BANGUNAN TAMBAHAN BAGI IBU PEJABAT POLIS KONTINJEN KUALA LUMPUR (IPK KL) Item 1 2 3 4 5 6 7 8

Reference No. MH/KLPC/IPKKL/96/08 MH/KLPC/IPKKL/133/09 MH/KLPC/IPKKL/144/09 MH/KLPC/IPKKL/173/09 MH/KLPC/IPKKL/174/09 MH/KLPC/IPKKL/202/09 MH/KLPC/IPKKL/203/09 MH/KLPC/IPKKL/204/09

9

MH/KLPC/IPKKL/205/09

10 11 12 13

MH/KLPC/IPKKL/215/09 MH/KLPC/IPKKL/216/09 MH/KLPC/IPKKL/225/09 MH/KLPC/IPKKL/249/09

14 15 16 17 18

MH/KLPC/IPKKL/250/09 MH/KLPC/IPKKL/267/09 MH/KLPC/IPKKL/267/09

Remaks Method Statement for Civil & Structural Works Method Statement for the Construction of Tensar Segmental Retaining Wall Method Statement for the Construction of Bored Pile and Preliminary Pile Method Statement for Bored Pile: Girder Design Calculation for 600mm Diameter Testing Kentledge Method Statement for Determination Compressive Strenght of Concrete Core Method Statement for the Construction of R.C Wall Method Statement for the Construction Joint Method Statement for the Proposed Rectification for Anti-Termite Treatment Post Construction to Temporary Pondok Pengawal No.2 Method Statement for the Proposed Rectification Work For Laying of Polythelene (P.E) Sheet to Temporary Pondok Pengawal No.2 Method Statement for Site Clearing Work Method Statement for the Excavation Work & Earth Work Method Statement for Trial Bored Pile PTP3-BH10 (1200mm Dia.) Method Statement forBored Pile Inst.Auto. Pile Test , Load Transfer Analysis & Reporting Work for Inst. Test Pile PTP3-BH10 (1200mm dia.) Method Statement for the High strain Dynamic Pile Testing (PDA) for Working Bored Pile 600mm dia. Method Statement for Sound Monitoring Method Statement for Vibration Monitoring Method Statement for Sonic Integrity Logging Method Statement for Pile Integrity

Date Receive 2-Feb-09 2-Feb-09 17-Feb-09 17-Feb-09 27-Feb-09 27-Feb-09 6-Mar-09 4-Mar-09 10-Mar-09 10-Mar-09

8-Apr-09 13 April 2009 27-Apr-08 27-Apr-08

CADANGAN PEMBANGUNAN BANGUNAN TAMBAHAN BAGI IBU PEJABAT POLIS KONTINJEN KUALA LUMPUR (IPK KL)

METHOD STATEMENT SUBMISSION (C&S) Item

Reference No.

Remarks

Date Receive

1

MH/KLPC/IPKKL/96/08

Method Statement for Civil & Structural Works

2

MH/KLPC/IPKKL/133/09

Method Statement for the Construction of Tensar Segmental Retaining Wall

3

MH/KLPC/IPKKL/144/09

Method Statement for the Construction of Bored Pile and Preliminary Pile

2-Feb-09

4

MH/KLPC/IPKKL/173/09

Method Statement for Bored Pile: Girder Design Calculation for 600mm Diameter Testing Kentledge

17-Feb-09

5

MH/KLPC/IPKKL/174/09

Method Statement for Determination Compressive Strenght of Concrete Core

17-Feb-09

6

MH/KLPC/IPKKL/202/09

Method Statement for the Construction of R.C Wall

27-Feb-09

7

MH/KLPC/IPKKL/203/09

Method Statement for the Construction Joint

27-Feb-09

8

MH/KLPC/IPKKL/204/09

Method Statement for the Proposed Rectification for Anti-Termite Treatment Post Construction

9

MH/KLPC/IPKKL/205/09

Sheet to Temporary Pondok Pengawal No.2

4-Mar-09

10

MH/KLPC/IPKKL/215/09

Method Statement for Site Clearing Work

10-Mar-09

11

MH/KLPC/IPKKL/216/09

Method Statement for the Excavation Work & Earth Work

10-Mar-09

12

MH/KLPC/IPKKL/225/09

Method Statement for Trial Bored Pile PTP3-BH10 (1200mm Dia.)

13

MH/KLPC/IPKKL/249/09

Method Statement forBored Pile Inst.Auto. Pile Test , Load Transfer Analysis & Reporting Work

14

MH/KLPC/IPKKL/250/09

Method Statement for the High strain Dynamic Pile Testing (PDA) for Working Bored Pile 600mm dia.

15

MH/KLPC/IPKKL/267/09

Method Statement for Sound Monitoring

27-Apr-08

16

MH/KLPC/IPKKL/267/09

Method Statement for Vibration Monitoring

27-Apr-08

17

MH/KLPC/IPKKL/281(site)/09

Methos Statement for Bored Pile Rectification Work at TNB Substation Building Pile No.6,7,11

8-May-09

18

MH/KLPC/IPKKL/286(site)/09

Methos Statement for Bored Pile Rectification Work at TNB Substation Building Pile No.6,7,11

to Temporary Pondok Pengawal No.2

8-Apr-09 13 April 2009

Replacement of Sika Grout 213 with Sika Microcerete-2000 SP

11-May-09 11-May-09

19

MH/KLPC/IPKKL/287(site)/09

Methos Statement For Maintain Load Test of Working Pile 600mm dia.

20

MH/KLPC/IPKKL/310(site)/09

Method Statement for the Water Proofing Work to the Main Building for Basement Ground Beam and slab (Sika Top seal 107), RC Wall and lift Pit (Igolflex R), Marching Ground Slab (Igolflex R).

MH/ATSA/IPKKL/311(site)/09

6-Mar-09

Method Statement for the Proposed Rectification Work For Laying of Polythelene (P.E)

for Inst. Test Pile PTP3-BH10 (1200mm dia.)

21

2-Feb-09

Method Statement for the Water Proofing Work to the Main Building RC Flat Roof, Toilet Area&

4-Jun-09

Water Tank( Sika Top Seal 107)

12-Jun-09

STATUS A A A A A B A A A A A A A A A A A A A A A A