MD1-0-T-060-05-00614-A Method Statement For Chemical Cleaning (Pre-Boiler Alkali Cleaning)
September 3, 2022 | Author: Anonymous | Category: N/A
Short Description
Download MD1-0-T-060-05-00614-A Method Statement For Chemical Cleaning (Pre-Boiler Alkali Cleaning)...
Description
FOR INFORMATION
A
Apr.10.. 2014 Apr.10
ISSUE FOR APPROV APPROVAL AL
REV.
DATE
DESCRIPTI DESCRIPTION ON
J.M Park DSGN
K.S.Kim CHKD
J.Son APPD
PROJECT :
TWO(2) x 500MW MONG DUONG 1 THERMAL POWER PLANT EMPLOYER :
CONSULTANT CONSULT ANT :
SUCONTRACTOR :
CONTRACTOR :
DESIGNED BY
J.M Park
CHECKED BY
K.S.Kim
Apr.10. 2014 2014 DATE
APPROVED BY
J.Son
DATE
TITLE :
METHOD STATEMENT FOR CHEMICAL CLEANING (PRE-BOILER ALKALI CLEANING)
Apr.10. 2014 2014 DATE DATE
PROJECT NUMBE NUMBER R
DOCUMENT NUMBER
REV REV..
Apr.10. 2014 2014
ADB/MD1-TPIP/EPC150911 ADB/MD1-TPIP/EPC15091 1
MD1-0-T-060-05-00614
A
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
CONTENTS
1. PURPOSE ----------------------------------------------------------------------------------------3
2. SCOPE OF APPLICATION ------------------------------------------------------------------3
3. REFERENCE DOCUMENTS AND DRAWINGSDRAWINGS- --------------------------------------- ------------------------------3 ------3
4. REFERENCE ------------------------------------------------------------------------------------3
5. RESPONSIBILITIES --------------------------------------------------------------------------4
6. SAFETY CONTROL ---------------------------------------------------------------------------4
7. PRECAUTIONS ---------------------------------------------------------------------------------5
8. CLASSIFICATION CLASSIFICATION AS LOOP PACKAGE---------PACKAGE---------- - ------------------------------------5 ------------------- -----------------5
9. CLANING VOLUME---------------------------------------------------------------------------5
10. MAIN TEMPORARY FACILITIES------------------------------------------------ACILITIES-------------------------- ------------------------------6 -------6
11. UTILITIES CONSUMPTION----------------------------------------------------------------7
12.TEMPORARY PIPING-------------------------------------------------------------------------8
13. CHEMICAL CLEANING PROCENURE--------------------------------------------------9 13.1.
ATTACHMENTS
1)
Site Inspection / Test Notification
2)
Temporary empora ry Piping Dwg.
3)
Valve List
4)
MSDS
Chemical Cleaning Procedure REV.0
2
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
1. PURPOSE
This specification covers the requirements for chemical cleaning of Mong Dong1 thermal power plant project.
Before a new thermal power plant is put into service the internal of tube
and pipe line should be cleaned by alkali cleaning to remove oil, grease, greas e, dirt.
2. SCOPE OF APPLICATION
This procedure shall be applied to the chemical cleaning -
Condensate system
-
Boiler Feedwater system
-
HRA & Primary Superheater
-
Intermediate & Finishing Superheaters
-
3. Reference Documents and Drawings
3.1. P&ID -
MD1-0-V-120-21-00011(1/4),Rev.2 MD1-0-V-12021-00011(1/4),Rev.2 : Condensate System
-
MD1-0-V-120-21-00013(3/4),Rev.2 MD1-0-V-12021-00013(3/4),Rev.2 : Condensate System
-
MD1-0-V-120-21-00031(1/2),Rev.2 MD1-0-V-12021-00031(1/2),Rev.2 : Feedwater Feedwater System
-
MD1-0-V-120-21-00032(2/2),Rev.2 MD1-0-V-12 0-21-00032(2/2),Rev.2 : Feedwater Feedwater System
-
MD1-D-V-161-21-06103 : Feedwater & Economizer System
-
MD1-D-V-161-21-06105 : HRA & Premary Superheater System
-
MD1-D-V-161-21-06106 MD1-DV-161-21-06106 : Intermediate & Finishing Superheater Superheaterss System
4. REFERENCE
4.1. American Society testing Material- ASTM 4.2. American National Standard Institute-ANSI 4.3. Hydraulic Institute Standard-HIS 4.4. Korean Standard-KS 4.5. Japanese Industrial Standard-JIS 4.6. Regulation related to preservation for environment and water quality qualit y 4.7. Regulation related to poison and toxic chemicals treatment
Chemical Cleaning Procedure REV.0
3
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
5. RESPONSIBILITIES
5.1. Construction Manager shall administrate and supervise for the performance of all work items described in this procedure. 5.2. Mechanical Manager is responsible for carrying out the required works for chemical cleaning. Quality assurance manager is responsible for the inspection and conformation for the materials and works. 5.3. Safety Control Manager shall administrate and supervise for chemical cleaning work and checking the job site.
6. SAFETY CONTROL
1) General Consideration It is fully supplemented to the existing conventional acid type cleansers. It has no toxic gas being generated, no inflammability, no vaporific, vaporific, no explosivity, and harmless to the human being's external body. The personnel should be knowledgeable of the hazards involved and adequate safety guidelines should be made available to all al l parties involved. 2) Safety Control A. The cleaning area should be closed off to unauthorized personnel. B. Necessary warning signs are posted. C. Cleaning agents, chemical, and other all of the chemical should be transported in closed containers, drum, or tanks, etc D. Protective clothing such as goggles, gloves, aprons, boots, helmets, etc. should be worn by the personnel involved E. During the chemical cleaning operation, clean running water should be available to wash away splashed hazardous chemicals. F. All piping and equipment used for chemical cleaning should be pressure tested prior to being used. All vents and overflows should be directed to safe locations, away from possible contact with personnel. G. Spent chemicals should be safely disposed in accordance with the Environmental protection Law.
Chemical Cleaning Procedure REV.0
4
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
7. PRECAUTIONS
1) Ascertain that no damage to personal could occur at alkali cleaning area. Install the safety ropes around the chemical cleaning area are a and the placard of danger or signboard 2) Protective clothing and gloves should be worn when handling the chemicals. Eye protection also to be provided. 3) Communication system between conductor and operator should be arranged. 4) The work area should be well lighted for around-the-clock operation and should be clear of obstruction. 5) All instruments, such as orifice plates, level instruments, gauge glasses, thermo-wells, and any other instruments shall be protected from cleaning solution by any means of substitution by spool assembly, valve closure, blocking off and/or removal from the line, etc.
6) Check that all temporary piping and equipment are properly connected to the system Hydrostatic testing should be done prior to start normal cleaning operation
8. CLASSIFI CLASSIFICA CATION TION AS LOOP LOO P PACKAGES PACKAGES
- Loop #1 : Condensate & Feedwater system Unit #1 - Loop #2 : Condensate & Feedwater system Unit #2
9. CLANING VOLUME
No.
Description
1
Condensate System
Volume/Loop#1(m3) Volume/Loop#2(m3)
Grand steam condenser
1.0
1.0
Feedwater heater#1A/1B
8.4
8.4
Feedwater heater#2
7.1
7.1
Feedwater heater#3
6.2
6.2
Feedwater heater#4
5.7
5.7
Piping
81.1
82.0
Chemical Cleaning Procedure REV.0
5
Remark
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
2
Feedwater System
Feedwater heater #6
5.9
5.9
Feedwater heater #7
6.4
6.4
Feedwater heater #8
5.8
5.8
126.7
131.0
Sub-Total
254.3
259.5
Temporary Piping
25.7
25.5
280.0
285.0
Piping
3
Grand- Total
565㎥
10. MAIN TEMPORARY FACILITIES
10.1. Temporary Equipment
No.
Description
Capacity 3
Quantity
1
Circulat Circulation ion Pump
100HP x 480m /hr x 80m
1 set
2
Chemical Feed Pump
1” x 100ℓ/min 100ℓ/min
2 sets
Remark
SUS
Chemical Injection 3
Diaphragm Pump
1” x 240ℓ/min 240ℓ/min
4
Portable Boiler
5.0 ton/hr
5
Circulation tank
20㎥ 20㎥ x C.S
1 set
Steel
6
Heat exchanger exchanger
3,000,000 kcal/hr
1 set
SUS
7
Jet Cleaner
250 Bar x 15HP, 16 ℓ/min
2sets
Mech-cleaning
Chemical Cleaning Procedure REV.0
2 sets
㎠ x 7kg/ 7kg/㎠
6
1 set
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
10.2. Temporary Materials No.
Description
Capacity
1
Pipe & Fitting Fittin g
SPP Sch. 20
2
Gate valve
10kg/cm , Flanged, Forged
3
Strainer
10kg/cm , Flanged
4
Check valve
5
Gaskets
6
Bolt, Nut, Consumables & Tools
Quantity
Remark
L/S Per each size
2
L/S Per each size
2
L/S 10”
10kg/cm , Flanged
2
L/S 8”, 4”
10kg/cm2, Non asbestos
L/S Per each size L/S
10.3. Analytic Equipment All steps of the process are guarded over analytically. The Following equipment is required and will be temporarily provided No.
Description
Capacity
Quantity
1 ~ 14
2 sets
NTU 0~1000
1 set
0~3999㎲ 0~3999 ㎲
1 set
0~1000ppm
1 set
1
p H meter
2
Turbidity meter
3
Conductivity meter
4
Oil Meter
5
Analysis reagent
-
1 set
6
Analysis apparatus
-
1 set
Chemical Cleaning Procedure REV.0
7
Remark
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
11. UTILITIES CONSUMPTION
11.1. Demineralized Water (Total Volume : 565㎥) No.
Step
Work Volume(m Volume(m3)
Times
Volume(m3)
Remark Include Temporary
1
Water Flushing Flushin g
565
2
1,130
2
Alkali Cleaning
565
1
565
3
Water Rinsing
565
1
565
4
Final Rinsing
565
1
565
5
2,825m
3
Demi.- water Consumption(m Consumption(m )
3
11.2. Portable Steam(Total Volume : 565㎥) No.
Step
Description
1
Water flushing flushin g
5 ton/hr x 3 hr =
3
Alkali Cleaning
5 ton/hr x 10 hr =
4
Water Rinsing
5 ton/hr x 8 hr =
Portable Steam Consumption(m Consumption(m3)
Package
2
3
Volume(m )
Remark
100
100m3
Note: According According to the variation variation of ambient ambient air temperature, temperature, the steam consumption has to be changed changed
12. TEMPORARY PIPING
12.1. Temporary Pump Station area 1) The pump station will be placed outside near road between Boiler Train A & B 2) Preparation of the ground 3) Delivery and placement of the temporary equipment 12.2. Connect Point 1) Supply line connects a temporary piping with pipe DN200 to the check valve bonnet
→ after removes internals of check valve : Circulation pump skid supply line 13LCB11AP001/13LCB12 13LCB1 1AP001/13LCB12AP001/13LCB1 AP001/13LCB11AP001→Grand 1AP001→Grand Steam Condenser→ Condenser→
Chemical Cleaning Procedure REV.0
8
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
NO.1 LP Feedwater HeaterA/B→NO.2 LP Feedwater→NO.3 Feedwater→NO.3 LP Feedwater Feedwater →NO.4 LP Feedwater→Deaterator & Feedwater Tank Tank Bypass→ Bypass→ Boiler Feedwater Booster Pumps Bypass(13LAC13AP001/13LAC12AP001 Bypass(13LAC13AP001/13LAC12AP001// →Boiler Feedwater Pumps(13LAC23AP001/13LAC22AP001/13L Pumps(13LAC23AP001/13LAC22AP001/13LAC21AP001) AC21AP001) →NO.6/7/8HP Feedwater Heater→11HAC01 Heat er→11HAC01AA091(Check AA091(Check Valve Valve Internal Remove) Remove) →200A Temporary Return Line Line
2) Return line connects a temporary t emporary piping header with pipe DN200 to the Check V Valve alve Circulation Tank
11HAC01AA091(Internal 11H AC01AA091(Internal Remove) 11LAE10AA402/11LAE20AA402
12.3. Electrical Power 1) The temporary pump station needs an electrical power supply. supply. 2) The 2 motors of 75kW and 1 motor 150kW 3) Power supply to the pump station 4) Temporary Generator 5) Rotation test 12.4. Service Line to Pump Station 1) Demineralized water line 2) Steam supply line from portable boiler 3) Waste water transfer line to waste water treatment pond 12.5. Sampling Point The sampling point will be installed at the inlet of the temporary circulation pumps. 12.6. Gauge installation Pressure gauges will be installed on discharge line of circulation pumps and temperature gauges will be installed on supply and Return line.
13. ALKALI CLEANING PROCEDURE This procedure mentioned in this document consists of following sequence of Operation.
Chemical Cleaning Procedure REV.0
9
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
[ CAUTION ]
AII necessary permits and/or safety documentation required to conduct the work must be in force prior to starting. Ensure that all personnel not involved in conducting the cleaning activities are clear of the area. When conducting these activities extra vigilance, caution and precautions are required to ensure that they are achieved in a safe manner.
1) Alkali cleaning for the boiler system with following procedure
Temporary Temporar y Piping Pipi ng
:
Air Leak Test – 5Bar
Water Flushing& Leak Test
:
Heating Up 70~80
Alkali Cleaning
:
Trisodium Trisodium Phosphate/Disodium Phosphate/Disodium Phosphate Oil, Alkalinity,PH Alkalinity,PH : 2~3 untill the constant
Water Rinsing 1~2 Time
:
PH-Control PH-Cont rol – PH7.5~8.5
Final Water Rinsing
:
Demi-water –PH 7.5~8.5
Inspection & Reinstall
:
Remain Oil Check : 1ppm Below Visual Check (Pipe Line)
NO
YES Protection
:
㎥
Waste Water Pond : 1,000
Chemical Cleaning Procedure REV.0
:
N2-Gas Charging or Elimin-ox
W W.. W. T. Pond
10
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
2) Cleaning Flow Chart
Circulation Pump Skid
13LCB11AP001 13LCB11AP001
Grand Steam Condenser
13LCB12AP001 13LCB13AP001 NO.1LP Feedwater Heater A/B
NO.2/3/4 LP Feedwater Heater
D/A & F/D Tank
13LCA26BR001DN400
13LAB11BR001DN350
By-Pass
13LAB12BR001DN350 13LAB13BR001DN350
F/D Booster pump,F/D Pumnp Bypass
NO.6/7/8 HP F/W Heater
13LAB30BR001DN600 13LAB30BR001DN600
13LAB33BR001DN600 13LAB33BR001DN600
11LAB33BR001DN450 11LAB33BR001DN450 12LAB33BR001DN450
11HAC01AA091
Temporary emporar y Piping Pipin g
Circulation Circul ation Tank (Pump Skid Return)
12HAC01AA091
3) Cleaning media (Total volume 565㎥)
No
Chemical
Purity (%)
Use Concentration
Q’ty(Kg)
Remark
(%) 1
Tri-Sodium Phosphate
98
1.0
5,765
Alkali cleaning
2
Di-Sodium Phosphate
98
0.3
1,730
Alkali cleaning
3
Sodium Sulfite
98
0.2
1,153
Alkali cleaning
4
Sodium Carbonate
98
0.5
2,883
Alkali cleaning
5
Detergent
100
0.02
113
Alkali cleaning
Chemical Cleaning Procedure REV.0
11
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
4) Preparation a. All MOV(Motor operated valve) must be ready for operation. b. All valve must be clearly identified and labeled l abeled after checking the correct valve position according to the valve list. c. Vents lines must be conducted to the ground, if not definitely done so then at leat by by hoses to avoid damage to the insulation and enable proper venting. d. All temporary valves must be installed near the t he connection point of the line to avoid dead ends. e. After completion of the temporary piping the whole system has to be filled fi lled up and a tightness test has to be executed. f. The internal of all control valves have to be removed and replaced by spool pieces. g. Waste water collecting colle cting pit must be empty, empty, discharge pumps ready for operation. operat ion. h. Sufficient light in all working area. i. Insulation must be completed to maintain temperature during alkali cleaning. j. After each step is performed, additional water flushing must be performed to meet design which is agreed with alkali cleaning company. company. k. Replace with the new gaskets on the valve & flange . l. Remove the flow meter and place the temporary spool, if any. m. Close the inlet/outlet valves of the control valve and open the bypass valve, if any. n. Install the temporary instruments on the places that the measuring is required. o. It shall be drained well using Nitrogen gas or oil free dry air. p. Close all root valves of permanent instruments.
5) Water flushing a. Before starting cleaning regulates all section valve in operation condition. b. Fill the Demi. Water to the circulation water tank. c. Start the circulation pump and fill the water to the cleaning section. d. Check the water leakage during circulation the water wa ter continuously continuously,, if and leakage is found, it should be repaired. e. Check the water quality. If the turbidity is high or much foreign materials are existed exist ed drain all water from the condensate c ondensate & feedwater system and refill the new water. f. After checking the all circulation system, increase the water temperature up to 70℃±5℃
Chemical Cleaning Procedure REV.0
12
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
by using the heating coil in the circulation water tank. g. Check that the normal water flow is maintained at each part. h. After one hour circulation make the flow to reverse direction. And repeat it several times. i. Finish the water flushing if the water quality qualit y is good turbidity (30ppm) 6) Alkali cleaning a. Before starting cleaning regulates all section valve in operation condition. b. Start the circulation water pump and fill the water to the cleaning suction. c. Supply the heating steam to the heating coils and increase the water temperature. d. Put the acid chemical into the system at 70 ℃ of water temperature. [ WARNING]
DURING THE CHEMICAL CLEANING OPERATION, CLEAN RUNNING WATER SHOULD BE AVAILABLE TO WASH AWAY SPLASHED HAZARDOUS CHEMICALS.
PROTECTIVE CLOTHING AND GLOVES SHOULD BE WORN WHEN HANDLING THE CHEMICALS.
EYE PROTECTION ALSO TO BE PROVIDED.
NECESSARY WARNING SIGNS ARE POSTED
THE CLEANING AREA SHOULD BE CLOSED OFF TO UNAUTHOTIZED PERSONNEL. P ERSONNEL.
TEMPORARY USED IN THE BOILER FOR THE DIESEL BLOCKS AROUND THE FIRE.
PREVENT A FIREIN AN DIESEL TANK CAN BE A FIRE EXTINGUISHER.
e. Maintain the water temperature 80℃±5℃. f. During alkali cleaning check the acid and alkali concentration and pH /oil concentration at intervals of one hour by sampling g. Make the flow to reverse and direction at interval of two hours. h. If the alkali concentration and pH/oil concentration level are maintained constantly over three ~two times the alkali cleaning works will be finished. 7) Drain of alkali cleaning solution After finishing the each step of alkali cleaning, the alkali cleaning solution will be drain to the temporary waste water pond through the chemical injection injecti on tank area sump.
Chemical Cleaning Procedure REV.0
13
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
8) Water rinsing After finishing the drain of each section secti on completely the water rinsing works to be done same as water flushing until the pH level is maintained to 7.5~8.5. The pH value of the solution is to be kept in required level. 9) Final water rinsing The continuous supply of demi-water is reached the PH is 7.5~8.5, circulating water inlet and outlet check the turbidity level is equal to t o the finish final water rinsing. The oil concentration in the water comes up, action levels less than 1ppm shut down Perform the following tasks. tasks. 10) All piping and equipment in water drained and to be ready for the inspection. inspect ion.
11) Inspection and restoration a. Inspection This process confirm a result of chemical cleaning. At that time we will refer to a analysis data. b. Visual check It shall be no oil, grease, paint in i n pipe and equipment inside. c. Restoration Restore the all temporary piping and equipment
12) Conservation After completion of restoration, the boiler system proper and the related piping are to filled with the Demi. Water contained by Eliminox 500ppm or charged with nitrogen gas (0.3~0.5kg /㎠)
13.1. Attachments
1)
Site Inspection / Test Notification
2)
Temporary Piping Dwg.
3) 4)
Valve Control List MSDS
Chemical Cleaning Procedure REV.0
14
Two(2) x 500MW 5 00MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
1)
Site Inspection / Test Notification
TWO (2) x 500MW MONG DOUNG 1 THERMAL POWER PLANT SITE INSPECTION / TEST NOTIFICATION
NOTIFICA NOTIFIC ATION NO.:
RE REF F. DRAWING DRAWING :
DISCIPLINE DISCIP LINE :
REF.. ITP NO: REF
SUBCONTRACTOR :
DATE DATE :
WITNESS/HOLD NO
DESCRIPTION
LOCATION
DATE/TIME
REMARKS HDEC
PREPARED BY :
RECEIVED BY :
RECEIVED BY :
Chemical Cleaning Procedure REV.0
15
EVN
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
:FC,FE,LCV,CHECKV/V :PSV
INSTALL HYDRO.TEST GAGING
:AT
SCREEN REMOVE
:CF
Chemical Cleaning Procedure REV.0
16
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
Chemical Cleaning Procedure REV.0
17
INTERNAL REMOVE
INSTALL REMOVE SPOOL
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
TEMPORARY PIPING BYPASS
Chemical Cleaning Procedure REV.0
18
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
Chemical Cleaning Procedure REV.0
19
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
Chemical Cleaning Procedure REV.0
20
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
Chemical Cleaning Procedure REV.0
21
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. 0
Chemical Cleaning Procedure REV.0
22
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
V LVE CONTROL LIST
Chemical Cleaning Procedure REV.0
23
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Chemical Cleaning Procedure REV.0
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
24
Chemical Cleaning Procedure REV.0
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
25
Chemical Cleaning Procedure REV.0
26
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 SODIUM CARBONATE
Material Safety Data Sheet Sodium carbonate ACC# 21080
Section 1 - Chemical Product and Company Identification MSDS Name: Sodium Name: Sodium carbonate Catalog Numbers: AC123670000, Numbers: AC123670000, AC123670010, AC123670025, AC206800000, AC206800010, AC206800025, AC207760000, AC207765000, AC207810000, AC207810010, AC424280000, AC424285000, S71987, S71987-1, S73074, S73075, S78416, S78419, S93359, S93360, BP357-1, NC9296359, NC9644731, S261-10, S263-1, S263-10, S263-3, S263-50, S263-500, S263-50LC, S495-500, XXS263PD140KG
Synonyms: Crystal Synonyms: Crystal carbonate; Disodium carbonate; Sal soda; Soda ash; Washing soda; Soda, calcined. Company Identification: Identification: Fisher Scientific 1 Reagent Lane Fair Lawn, NJ 07410 For information, call: 201-796-7100 call: 201-796-7100 Emergency Number: 201-796-7100 Number: 201-796-7100 For CHEMTREC assistance, call: 800-424-9300 call: 800-424-9300 For International CHEMTREC assistance, call: 703-527-3887 call: 703-527-3887
Section 2 - Composition, Information on Ingredients
CAS# CAS# 497-19-8
Chemical Name Name
Percent Percent
EINECS/ELINCS EINECS/ELINCS
100
207-838-8
Sodium carbonate anhydrou anhydrous s
Chemical Cleaning Procedure REV.0
27
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 3 - Hazards Identification
EMERGENCY OVERVIEW Appearance: white powder.
Warning! Harmful if inhaled. May cause eye and skin irritation with possible burns. May cause respiratory tract irritation. Hygroscopic (absorbs moisture from the air). Target Organs: Eyes, skin.
Effects Potential Health Effects
Eye: May Eye: May result in corneal injury. Contact with eyes may cause severe irritation, and possible eye burns. Skin: Contact Skin: Contact with skin causes irritation and possible po ssible burns, especially if the skin is wet or moist. Ingestion: May Ingestion: May cause irritation of the digestive di gestive tract. Inhalation: Harmful Inhalation: Harmful if inhaled. May cause irritation of the respiratory tract with burning pain in the nose and throat, thr oat, coughing, wheezing, shortness of breath and pul pulmonary monary edema. Chronic: Prolonged Chronic: Prolonged or repeated inhalation may cause nosebleeds, nasal congestion, erosion of the teeth, perforation per foration of the nasal septum, chest pain and bronchitis.
Section 4 - First Aid Measures
Eyes: Immediately Eyes: Immediately flush eyes with plenty of water for at least 15 minutes, occasionally lifting the upper and lower eyelids. Get medical aid imme diately. Skin: Get Skin: Get medical aid. Flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Wash clothing before reuse. reu se. Ingestion: Do Ingestion: Do not induce vomiting. vomitin g. If victim is conscious and alert, give 2-4 cupfuls of of
Chemical Cleaning Procedure REV.0
28
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 milk or water. Never give anything by mouth to an unconscious person. Get medical aid immediately.
Inhalation: Remove Inhalation: Remove from exposure and move to fresh air immediately. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Get medical aid if cough or other symptoms appear. Notes to Physician: Treat Physician: Treat symptomatically and supportively.
Section 5 - Fire Fighting Measures
General Information: As Information: As in any fire, wear w ear a self-contained breathing apparatus in pressure-demand, MSHA/NIOSH (approved or equivalent), and full protective gear. Runoff from fire control or dilution dil ution water may cause pollution.
Extinguishing Media: Substance Media: Substance is noncombustible; use agent most appropriate to to extinguish surrounding fire. Flash Point: Not Point: Not applicable. Autoignition Temperature: Not Temperature: Not available. Explosion Limits, Lower:Not Lower:Not available. Upper: Not Upper: Not available. NFPA Rating: (estimated) Rating: (estimated) Health: 2; Flammability: 0; Instability: 0
Section 6 - Accidental Release Measures
General Information: Use Information: Use proper personal protective equipment as indicated in Section 8. Spills/Leaks: Vacuum Spills/Leaks: Vacuum or sweep up material and place into a suitable di disposal sposal container. Clean up spills immediately, observing precautions in the Protective Equipment section. Avoid generating dusty conditions. Provide ventilation.
Section 7 - Handling and Storage
Chemical Cleaning Procedure REV.0
29
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Handling: Wash Handling: Wash thoroughly after handling. Remove contaminated clothing and wash before reuse. Use with adequate ventilation. Minimize Mini mize dust generation and accumulation. Do not get in eyes, on skin, or on clothing. Keep container tightly closed. Avoid ingestion and inhalation. Storage: Store Storage: Store in a tightly closed container. Store in a cool, dry, well-ventilated area away from incompatible substances.
Section 8 - Exposure Controls, Personal Protection
Engineering Controls: Good Controls: Good general ventilation should be b e sufficient to control airborne levels. Facilities storing or utilizing this material should be equipped equi pped with an eyewash facility and a safety shower.
Exposure Limits Limits
Chemical Name Name
ACGIH ACGIH
NIOSH NIOSH
OSHA - Final PELs PELs
none listed
none listed
Sodium carbonate anhydrous
none listed
OSHA Vacated PELs: Sodium PELs: Sodium carbonate anhydrous: No OSHA Vacated PELs are a re listed for this chemical. Personal Protective Equipment Equipment Eyes: Wear Eyes: Wear appropriate protective prot ective eyeglasses or chemical safety goggles as described by OSHA's eye and face protection regulations in 29 CFR 1910.133 or European Standard EN166. Skin: Wear Skin: Wear appropriate protective gloves and clothing to prevent skin exposure. Clothing: Wear Clothing: Wear appropriate protective clothing to minimize contact with skin. Respirators: Follow Respirators: Follow the OSHA respirator regulations found in 29 CFR 1910.134 or European Standard EN 149. Use a NIOSH/MSHA or European Standard EN 149 approved respirator if exposure limits are exceeded or if irritation or other symptoms are experienced.
Chemical Cleaning Procedure REV.0
30
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 9 - Physical and Chemical Properties
Physical State: Powder State: Powder Appearance: white Appearance: white Odor: odorless Odor: odorless pH: 11.6 pH: 11.6 (solution) Vapor Pressure: Not Pressure: Not available. Vapor Density: Not Density: Not available. Evaporation Rate:Not Rate:Not available. Viscosity: Not Viscosity: Not available. Boiling Point: 1600 Point: 1600 deg C Freezing/Melting Point:851 Point:851 deg C
Decomposition Temperature:400 Temperature:400 deg C Solubility: Soluble. Solubility: Soluble. Specific Gravity/Density:2.53 Gravity/Density:2.53 Molecular Formula:Na2CO3 Formula:Na2CO3 Molecular Weight:105.99 Weight:105.99
Section 10 - Stability and Reactivity
Chemical Stability: Stable Stability: Stable at room temperature in closed containers under normal storage and handling conditions. Decomposed by acids with effervescence, evolution of carbon dioxide. Conditions to Avoid: Dust Avoid: Dust generation, excess heat, moist air. Incompatibilities with Other Materials: Reacts Materials: Reacts explosively with red-hot alumium metal. Incompatible with ammonia + silver nitrate, 2,4-dinitrotoluene, 2,4,6-trinitrotoluene, sulfuric acid, sodium sulfide + water, lithium, phosphorus pentoxide, fluorine, and hydrogen peroxide. Hot concentrated solutions of sodium carbonate are mildly corrosive to steel.
Chemical Cleaning Procedure REV.0
31
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 Hazardous Decomposition Products: Carbon Products: Carbon dioxide, toxic fumes of sodium oxide. Hazardous Polymerization: Has Polymerization: Has not been reported.
Section 11 - Toxicologica Toxicologicall Informa Information tion
RTECS#: RTECS#: CAS# 497-19-8: CAS# 497-19-8: VZ4050000 LD50/LC50: LD50/LC50: CAS# 497-19-8: Draize test, rabbit, eye: 100 mg/24H Moderate; Draize test, rabbit, eye: 50 mg Severe; Draize test, rabbit, skin: 500 mg/24H Mild; Inhalation, mouse: LC50 = 1200 mg/m3/2H;
Inhalation, rat: LC50 = 2300 mg/m3/2H; Oral, mouse: LD50 = 6600 mg/kg; Oral, mouse: LD50 = 6600 mg/kg;
.
Oral, rat: LD50 = 4090 mg/kg;
Carcinogenicity: Carcinogenicity: CAS# 497-19-8: Not listed by ACGIH, IARC, NTP, or CA Prop 65.
Epidemiology: No Epidemiology: No information found Teratogenicity: No Teratogenicity: No information found Reproductive Effects: No Effects: No information found Mutagenicity: No Mutagenicity: No information found Neurotoxicity: No Neurotoxicity: No information found Other Studies: Studies:
Section 12 - Ecological Information
Ecotoxicity: Fish: Ecotoxicity: Fish: Bluegill/Sunfish: LC50 = 320 mg/L; 96 Hr.; Static Conditions
Chemical Cleaning Procedure REV.0
32
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 13 - Disposal Considera Considerations tions
Chemical waste generators must determine whether a discarded chemical is classified as a hazardous waste. US EPA guidelines for the classification determination are listed in i n 40 CFR Parts 261.3. Additionally, waste generators must consult state and local hazardous waste regulations to ensure complete and accurate classification. RCRA P-Series: None P-Series: None listed. RCRA U-Series: None U-Series: None listed.
Section 14 - Transport Information
US DOT DOT
Canada TDG TDG
Shipping Name: Name:
Not regulated
Not Regulated
Hazard Class: Class: UN Number: Number: Packing Group: Group:
Section 15 - Regulatory Information
US FEDERAL TSCA TSCA CAS# 497-19-8 is listed on the TSCA inventory. Health & Safety Reporting List List None of the chemicals are on the Health & Safety Reporting List. Chemical Test Rules Rules None of the chemicals in this product are under a Chemical Test Rule. Section 12b 12b None of the chemicals are listed under TSCA Section 12b.
Chemical Cleaning Procedure REV.0
33
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 TSCA Significant New Use Rule Rule None of the chemicals in this material have a SNUR under TSCA. CERCLA Hazardous Substances and corresponding RQs RQs None of the chemicals in this material have an RQ. SARA Section 302 Extremely Hazardous Substances Substances None of the chemicals in this product have a TPQ. SARA Codes Codes CAS # 497-19-8: immediate. Section 313 313 No chemicals are reportable under Section 313. Clean Air Act: Act: This material does not contain any hazardous air pollutants. This material does not contain any Class 1 Ozone depletors. This material does not contain any Class Cl ass 2 Ozone depletors. Clean Water Act: Act: None of the chemicals in this product are listed as Hazardous Substances under th the e
CWA. None of the chemicals in this product are listed as Priority Pollutants under the CWA. None of the chemicals in this product are listed as Toxic Pollutants under tthe he CWA. OSHA: OSHA: None of the chemicals in this product p roduct are considered highly hazardous by OSHA. STATE STATE CAS# 497-19-8 is not present on state lists from CA, PA, MN, MA, FL, or NJ.
California Prop 65 65
California No Significant Risk Level: None of the chemicals in this product are listed.
European/International European/Internation al Regulations European Labeling in Accordance with EC Directives Directives Hazard Symbols: Symbols: XI Risk Phrases: Phrases: R 36 Irritating to eyes.
Chemical Cleaning Procedure REV.0
34
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 Safety Phrases: Phrases: S 22 Do not breathe dust. S 26 In case of contact with eyes, rinse immediately with plenty of water and seek medical advice.
WGK (Water Danger/Protection) Danger/Protection) CAS# 497-19-8: 1 Canada - DSL/NDSL DSL/NDSL CAS# 497-19-8 is listed on Canada's DSL List. Canada - WHMIS WHMIS This product has a WHMIS classification of D2B. This product has been classified in accordance with the hazard criteria of the Controlled Products Regulations and the MSDS contains all of the information i nformation required by those regulations. Canadian Ingredient Disclosure List List
CAS# 497-19-8 is listed on the th e Canadian Ingredient Disclosure List.
Section 16 - Additional Information
MSDS Creation Date: 7/12/1999 Date: 7/12/1999 Revision #3 Date: 3/07/2005 Date: 3/07/2005
The information above is believed to be accurate and represents the best information currently available to us. However, we make no warranty of merchantability merchantability or any other warranty, express or implied, with respect to such information, and we assume no liability resulting from its use. Users should make their own investigati investigations ons to determine the su suitability itability of the information for their particular particular purposes. In no event shall Fisher be liable for any claims, losses, or damages of any third party or for lost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if Fisher has been advised of the possibility of such damages.
Chemical Cleaning Procedure REV.0
35
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 TRISODIUM PHOSPHATE
Sodium phosphate tribasic dodecahydrate do decahydrate ACC# 24500
Section 1 - Chemical Product and Company Identification MSDS Name: Sodium Name: Sodium phosphate tribasic dodecahydrate Catalog Numbers: AC206520010, Numbers: AC206520010, AC206520250, AC424400250, AC424405000, AC9537671, NC9810137, S376-3, S376-50, S377-3, S377-50, S377-500, S3773LC, S377500LC, XXS377PD12KG Synonyms: Trisodium Synonyms: Trisodium orthophosphate dodecahydrate; Sodium phosphate ph osphate tribasic dodecahydrate; Trisodium phosphate dodecahydrate; TSP dodecahydrate. Company Identification: Identification: Fisher Scientific 1 Reagent Lane
Fair Lawn, NJ 07410 For information, call: 201-796-7100 call: 201-796-7100 Emergency Number: 201-796-7100 Number: 201-796-7100 For CHEMTREC assistance, call: 800-424-9300 call: 800-424-9300 For International CHEMTREC assistance, call: 703-527-3887 call: 703-527-3887
Section 2 - Composition, Information on Ingredients
CAS# CAS# 10101-89-0
Chemical Name Name
Percent Percent
EINECS/ELINCS EINECS/ELINCS
>98
unlisted
Tribasic sodium phosphate dodecahydrate
Chemical Cleaning Procedure REV.0
36
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 3 - Hazards Identification
EMERGENCY OVERVIEW Appearance: colorless or white solid. i rritation. Warning! Causes eye, skin, and respiratory tract irritation. Target Organs: Respiratory system, eyes, skin.
Effects Potential Health Effects Eye: Causes Eye: Causes eye irritation. May cause transient corneal injury. i njury. Skin: Causes Skin: Causes skin irritation. Ingestion: Causes Ingestion: Causes digestive tract irritation.
Inhalation: Causes Inhalation: Causes respiratory tract irritation. Chronic: Chronic Chronic: Chronic inhalation may cause effects similar to those of acute inhalation. Effects may be delayed.
Section 4 - First Aid Measures
Eyes: Get Eyes: Get medical aid immediately. Do NOT allow victim to rub eyes or keep eyes closed. Extensive irrigation with water is required requi red (at least 30 minutes). Skin: Get Skin: Get medical aid immediately. Immediately flush skin with plenty of water for at least l east 15 minutes while removing contaminated clothing and shoes. Wash clothing before reuse. Destroy contaminated shoes. Ingestion: Do Ingestion: Do not induce vomiting. vomitin g. If victim is conscious and alert, give 2-4 cupfuls of of milk or water. Never give anything by mouth to an unconscious person. Get medical aid immediately. Inhalation: Get Inhalation: Get medical aid immediately. Remove from exposure and move to fresh air immediately. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Do NOT use mouth-to-mouth resuscitation. If breathing has ceased apply artificial respiration using oxygen and a suitable mechanical device such as a bag and a mask. Notes to Physician: Treat Physician: Treat symptomatically and supportively
Chemical Cleaning Procedure REV.0
37
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 5 - Fire Fighting Measures
General Information: As Information: As in any fire, wear w ear a self-contained breathing apparatus in pressure-demand, MSHA/NIOSH (approved or equivalent), and full protective gear. Material will not burn. Extinguishing Media: Substance Media: Substance is noncombustible; use agent most appropriate to to extinguish surrounding fire. Flash Point: Not Point: Not applicable. Autoignition Temperature: Not Temperature: Not applicable. Explosion Limits, Lower:Not Lower:Not available. Upper: Not Upper: Not available. NFPA Rating: (estimated) Rating: (estimated) Health: 2; Flammability: 0; Instability: 0
Section 6 - Accidental Release Measures
General Information: Use Information: Use proper personal protective equipment as indicated in Section 8. Spills/Leaks: Vacuum Spills/Leaks: Vacuum or sweep up material and place into a suitable di disposal sposal container. Avoid runoff into storm sewers and ditches which lead to waterways. Clean up spills immediately, observing precautions in the Protective Equipment section. Avoid generating g enerating dusty conditions. Provide ventilation.
Section 7 - Handling and Storage
Handling: Wash Handling: Wash thoroughly after handling. Minimize dust generation and accumulation. Do not get in eyes, on skin, or on clothing. Keep container tightly closed. Do not ingest or inhale. Use with adequate ventilation. Discard contaminated shoes.
Chemical Cleaning Procedure REV.0
38
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 Storage: Keep Storage: Keep container closed when not in use. Store in a cool, dry, well-ventilated area away from incompatible substances. Keep away from strong acids.
Section 8 - Exposure Controls, Personal Protection
Engineering Controls: Facilities Controls: Facilities storing or utilizing this material should be equipped with an eyewash facility and a safety shower. Use adequate ventilation to keep airborne concentrations low. Exposure Limits Limits
Chemical Name Name
ACGIH ACGIH
NIOSH NIOSH
OSHA - Final PELs PELs
none listed
none listed
Tribasic sodium phosphate
none listed
dodecahydrate Trisodium phosphate, none listed
none listed
none listed
anhydrous
OSHA Vacated PELs: Tribasic PELs: Tribasic sodium phosphate dodecahydrate: No OSHA Vacated PELs are listed for this chemical. Trisodium phosphate, anhydrous: No OSHA Vacated PELs are listed for this chemical. Personal Protective Equipment Equipment Eyes: Wear Eyes: Wear appropriate protective prot ective eyeglasses or chemical safety goggles as described by OSHA's eye and face protection regulations in 29 CFR 1910.133 or European Standard EN166. Skin: Wear Skin: Wear appropriate protective gloves to prevent skin exposure. Clothing: Wear Clothing: Wear appropriate protective clothing to prevent skin exposure. Respirators: A Respirators: A respiratory protection program that meets OSHA's 29 CFR 1910.134 and ANSI Z88.2 requirements or European Standard EN 149 must be followed whenever workplace conditions warrant respirator use.
Section 9 - Physical and Chemical Properties
Chemical Cleaning Procedure REV.0
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Physical State: Solid State: Solid Appearance: colorless Appearance: colorless or white Odor: odorless Odor: odorless pH: 11.9 pH: 11.9 @ 1% solution Vapor Pressure: Not Pressure: Not available. Vapor Density: Not Density: Not available. Evaporation Rate:Not Rate:Not available. Viscosity: Not available. Viscosity: Not Boiling Point: Not Point: Not available. Freezing/Melting Point:167 Point:167 deg F Decomposition Temperature:Not Temperature:Not available. Solubility: Soluble. Solubility: Soluble. Specific Gravity/Density:1.62 Gravity/Density:1.62 @ 68 캟 Molecular Formula:Na3PO4.12H2O Formula:Na3PO4.12H2O
39
Molecular Weight:380.11 Weight:380.11
Section 10 - Stability and Reactivity
Chemical Stability: Stable Stability: Stable at room temperature in closed containers under normal storage and handling conditions. Conditions to Avoid: High Avoid: High temperatures, dust generation. Incompatibilities with Other Materials: Strong Materials: Strong acids. Hazardous Decomposition Products: Oxides Products: Oxides of phosphorus, sodium oxide. Hazardous Polymerization: Has Polymerization: Has not been reported.
Chemical Cleaning Procedure REV.0
40
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 11 - Toxicologica Toxicologicall Informa Information tion
RTECS#: RTECS#: CAS# 10101-89-0: CAS# 10101-89-0: TC9575000 CAS# 7601-54-9: CAS# 7601-54-9: TC9490000 LD50/LC50: LD50/LC50: CAS# 10101-89-0: Oral, rat: LD50 = 7400 mg/kg; .
CAS# 7601-54-9: .
Carcinogenicity: Carcinogenicity: CAS# 10101-89-0: Not listed by ACGIH, IARC, NTP, or CA Prop 65. CAS# 7601-54-9: Not listed by ACGIH, IARC, NTP, or CA Prop 65.
Epidemiology: No Epidemiology: No information found Teratogenicity: No Teratogenicity: No information found Reproductive Effects: No Effects: No information found Mutagenicity: No Mutagenicity: No information found Neurotoxicity: No Neurotoxicity: No information found Other Studies: Studies:
Section 12 - Ecological Information
Ecotoxicity: No Ecotoxicity: No data available. No information available. Environmental: Phosphates Environmental: Phosphates promote the eutrophication of lakes and other bodies of water. Physical: No Physical: No information available. Other: No Other: No information available.
Chemical Cleaning Procedure REV.0
41
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0
Section 13 - Disposal Considera Considerations tions
Chemical waste generators must determine whether a discarded chemical is classified as a hazardous waste. US EPA guidelines for the classification determination are listed in i n 40 CFR Parts 261.3. Additionally, waste generators must consult state and local hazardous waste regulations to ensure complete and accurate classification. RCRA P-Series: None P-Series: None listed. RCRA U-Series: None U-Series: None listed.
Section 14 - Transport Information
US DOT DOT
Canada TDG TDG
NOT REGULATED FOR DOMESTIC Shipping Name: Name:
No information available. TRANSPORT
Hazard Class: Class: UN Number: Number: Packing Group: Group:
Section 15 - Regulatory Information
US FEDERAL TSCA TSCA CAS# 10101-89-0 is not on the TSCA Inventory because it is a hydrate. It is considered to be listed if the CAS number for the anhydrous form is on the inventory (40CFR720.3(u)(2)). CAS# 7601-54-9 is listed on the TSCA inventory.
Chemical Cleaning Procedure REV.0
42
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 Health & Safety Reporting List List None of the chemicals are on the Health & Safety Reporting List. Chemical Test Rules Rules None of the chemicals in this product are under a Chemical Test Rule. Section 12b 12b None of the chemicals are listed under TSCA Section 12b. TSCA Significant New Use Rule Rule None of the chemicals in this material have a SNUR under TSCA. CERCLA Hazardous Substances and corresponding RQs RQs CAS# 10101-89-0: 5000 lb final RQ (Listed under Sodium phosphate, tribasic); 2270 kg final RQ (Li
CAS# 7601-54-9: 5000 lb final RQ (Listed under Sodium phosphate,
tribasic); 2270 kg final RQ (Li SARA Section 302 Extremely Hazardous Substances Substances None of the chemicals in this product have a TPQ. SARA Codes Codes
CAS # 10101-89-0: immediate. CAS # 7601-54-9: immediate. Section 313 313
No chemicals are reportable under Section 313.
Clean Air Act: Act: This material does not contain any hazardous air pollutants. pol lutants. This material does not contain any Class 1 Ozone depletors. This material does not contain any Class 2 Ozone depletors. Clean Water Act: Act: CAS# 10101-89-0 is listed as a Hazardous Substance under the CWA. CAS# 7601-54-9 is listed as a Hazardous Substance under the CWA. None of the chemicals in this product are listed as Priority Pollutants under th the e CWA. None of the chemicals in this product are listed as Toxic Pollutants under th the e CWA. OSHA: OSHA: None of the chemicals in this product are considered highly hazardous by OSHA. STATE STATE CAS# 10101-89-0 can be found on the following state right to know lists: California, New Jersey, Pennsylvania, Massachusetts. CAS# 7601-54-9 can be found on the following state right to know lists: California, New Jersey, Pennsylvania, Minnesota, Massachusetts.
California Prop 65 65
Chemical Cleaning Procedure REV.0
43
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Chemical Cleaning Procedure REV. REV. 0 California No Significant Risk Level: None of the chemicals in this product are listed.
European/International European/Internation al Regulations European Labeling in Accordance with EC Directives Directives Hazard Symbols: Symbols: XI Risk Phrases: Phrases: R 36/37/38 Irritating to eyes, respiratory system and skin.
Safety Phrases: Phrases: S 26 In case of contact with eyes, rinse immediately with plenty of water and seek medical advice. S 37/39 Wear suitable gloves and eye/face protection.
WGK (Water Danger/Protection) Danger/Protection)
View more...
Comments