PERBANDINGAN CAMPURAN BETON
Beton campuran campuran 1 : 3 : 5 1 m³ Pc 3 m³ Ps 5 m³ Kr
= = =
1 3 5
x x x
1 m³ Beton Beton membutu membutuhkan hkan : Pc = 1/5.385 x 0.76 = 176.4159703 Ps Kr Beton campuran campuran 1 : 2 : 3 1 m³ Pc 2 m³ Ps 3 m³ Kr
= = =
1 2 3
1 m³ Beton Beton membutu membutuhkan hkan : Pc = 1/3.67 x 0.76 = 258.8555858 Ps Kr
0.760 0.675 0.520
= = = =
Kg
x x x
0.760 0.675 0.520
Kg
= = =
= = =
= = = =
0.760 2.025 2.600 5.385 0.141 4.4103993 0.376 0.483
0.760 1.350 1.560 3.670 0.207 6.4713896 0.368 0.425
m³ spesi basah m³ spesi basah m³ spesi basah m³ spesi basah basah m³ sak ~ 5 sak m³ m³
m³ spesi basah m³ spesi basah m³ spesi basah m³ spesi basah basah m³ sak ~ 7 sak m³ m³
ANALISA BETON BERTULANG Tabel Berat Besi mm
kg/m
Ø5
0.15
8000
14400
Ø6
0.22
8000
21120
4.9
Ø8
0.39
8000
37440
8.3
Ø 10
0.62
8000
59520
9.5
Ø 12
0.89
8000
85440
Ø 14
1.21
8000
116160
Ø 16
1.58
8000
151680
Begel 10/15 jarak 20cm
Sloof 15/20
per m 1
sa t
Volume
0.03
m3
Bekisting
0.4
Perancah d (m m ) Besi
per m3
sat
m2
13.3333
m2
m2
0.0000
m2
p (m )
Ø 10
1
4
4
2.48
Ø5
0.54
5
2.7
0.405
11.11111111 2.885
kg
96.1667
kg
7.5
per m3
sat
jmlh batang / m 3
per m 1
sa t
Volume
0.0375
m3
Bekisting
0.5
m2
13.3333
m2
m2
0.0000
m2
Perancah d (m m )
p (m )
Ø 12
1
5
5
4.45
Ø6
0.64
5
3.2
0.704
11.11111111 5.154
kg
137.4400
kg
7.111111111
per m3
sat
jmlh batang / m 3
Begel 10/15 jarak 20cm
Ringbalk 15/20
per m 1
sa t
Volume
0.03
m3
Bekisting
0.6
m2
20.0000
m2
Perancah
3
m2
100.0000
m2
2.885
kg
96.1667
kg
7.5
per m 1
sa t
per m3
sat
jmlh batang / m 3
Volume
0.0225
m3
Bekisting
0.4
m2
17.7778
m2
Perancah
2
btg
88.8889
btg
1.89
kg
84.0000
kg
8.148148148
per m 1
sa t
per m3
sat
jmlh batang / m 3
Volume
0.0225
m3
Bekisting
0.4
m2
17.7778
m2
d (m m ) Besi
p (m )
Ø 10
1
4
4
2.48
Ø5
0.54
5
2.7
0.405
Ringbalk, Latey 15/15
p (m )
Ø8
1
4
4
1.56
Ø5
0.44
5
2.2
0.33
Kolom Praktis 15/15
11.11111111
Begel 10/10 jarak 20cm
d (m m ) Besi
14.81481481
Begel 10/10 jarak 20cm
Perancah
btg d (m m )
Besi
Balok 15/25
166.666667
Begel 10/20 jarak 20cm
Sloof 15/25
Besi
jmlh batang / m 3
btg
p (m )
Ø8
1
4
4
1.56
Ø5
0.44
5
2.2
0.33
14.81481481 1.89
kg
84.0000
kg
8.148148148
per m3
sat
jmlh batang / m 3
222.222222
Begel 10/20 jarak 20cm per m 1
sa t
Volume
0.0375
m3
Bekisting
0.41
m2
10.9333
m2
Perancah
3
btg
80.0000
btg
Hal 2/42
d (m m ) Besi
p (m )
Ø 12
1
5
5
4.45
Ø6
0.64
5
3.2
0.704
11.11111111 5.154
kg
137.4400
kg
7.111111111
per m1
sa t
per m 3
sa t
jm lh batang / m3
Volume
0.045
m3
Bekisting
0.51
m2
11.3333
m2
Perancah
3
btg
66.6667
btg
Begel 10/25 jarak 15 - 20cm (17,5cm)
Balok 15/30
d (m m ) Besi
p (m )
Ø 12
1
7
Ø6
0.74
5.714
Balok 20/60
7
6.23
4.2284 0.9302
12.96296296 7.1602392
kg
159.1164
kg
7.830296296
per m 3
sa t
jm lh batang / m3
Begel 10/25 jarak 10 - 20cm (15cm) per m1
sa t
Volume
0.12
m3
Bekisting
0.51
m2
11.3333
m2
3
btg
66.6667
btg
Perancah d (m m ) Besi
p (m )
Ø 12
1
7
Ø6
0.74
5.714
7
6.23 7.1602392
kg
159.1164
kg
7.830296296
per m1
sa t
per m 3
sa t
jm lh batang / m3
Volume
0.03
m3
Bekisting
0.4
m2
13.3333
m2
Perancah
0.67
btg
22.3333
btg
Begel 10/15 jarak 20cm
Kolom 15/20
d (m m ) Besi
4.2284 0.9302
12.96296296
p (m )
Ø 10
1
4
4
2.48
Ø5
0.54
5
2.7
0.405
11.11111111 2.885
kg
96.1667
kg
7.5
per m1
sa t
per m 3
sa t
jm lh batang / m3
Volume
0.045
m3
Bekisting
0.51
m2
11.3333
m2
1
btg
22.2222
btg
Begel 10/25 jarak 15 - 20cm (17,5cm)
Kolom 15/30
Perancah d (m m ) Besi
p (m )
Ø 12
1
8
Ø6
0.74
5.714
8
7.12
4.2284 0.9302
14.81481481 8.0502392
kg
178.8942
kg
7.830296296
per m 3
sa t
jm lh batang / m3
Begel 10/25 jarak 15 - 20cm (17,5cm)
Kolom 30/30
per m1
sa t
Volume
0.09
m3
Bekisting
0.7
m2
7.7778
m2
1
btg
11.1111
btg
Perancah d (m m ) Besi
p (m )
Ø 16
1
4
4
6.32
3.703703704
Ø 12
1
4
4
3.56
3.703703704
Ø 10
1.09
5.714
kg
152.6836
kg
5.766907407
per m1
sa t
per m 3
sa t
jm lh batang / m3
Volume
0.0625
m3
Bekisting
0.6
m2
9.6000
m2
Perancah
1
btg
16.0000
btg
Begel 10/25 jarak 15 - 20cm (17,5cm)
Kolom 25/25
d (m m ) Besi
6.2283 3.8615 13.7415212
p (m )
Ø 16
4
0
0
0
8
7.12
10.66666667
Ø 12
1
8
Ø8
0.9
5.714
5.1426 3.1884
10.308412
kg
164.9346
kg
6.8568
Hal 3/42
Plat lantai t = 12cm
Jarak 25 x 25 cm (2 lapis) per m2
sa t
Volume
0.12
m3
Bekisting
1
Perancah
1 d (m m)
per m 3
sat
m2
8.3333
m2
m2
8.3333
m2
jm lh batang / m3
p (m )
Besi
0 Ø 10
Atap t = 8cm
1
16
16
9.92
9.92
kg
82.6667
kg
per m 3
sat
11.11111111
Jarak 20 x 20 cm (1 lapis) per m2
sa t
Volume
0.08
m3
Bekisting
1
m2
12.5000
m2
1
m2
12.5000
m2
3.9
kg
48.7500
kg
per m 3
sat
Perancah d (m m)
p (m )
Besi Ø8 Atap t = 10cm
1
10
10
3.9
Jarak 30 x 30 cm (2 lapis) per m2
sa t
Volume
0.1
m3
Bekisting
1
m2
10.0000
m2
1
m2
10.0000
m2
5.20026
kg
52.0026
kg
11.11166667
per unit
sa t
per m 3
sat
jm lh batang / m3
Volume
0.11675
m3
Bekisting
0.48
m2
4.1113
m2
29.8128
kg
255.3559
kg
3.169164882
per unit
sa t
per m 3
sat
jm lh batang / m3
Volume
0.054
m3
Bekisting
0.48
m2
4.1113
m2
Perancah d (m m)
jm lh batang / m3
p (m )
Besi
0 Ø8
1
13.334 13.334 5.2003
Begel 10/25 jarak 15cm
Voet plat 80x80
Perancah d (m m) Besi
p (m )
Ø 12
32.4
1
32.4
2 28 8.836
Ø6
0.74
6
4.44
0.9768
23.12633833
Begel 10/15 jarak 15cm
Voet plat 60x60
Perancah d (m m) Besi
p (m )
Ø 10
8.8
1
8.8
5.456
Ø5
0.54
5
2.7
0.405
Voet plat 100x100
13.58024691 5.861
kg
108.5370
kg
4.166666667
per m 3
sat
jm lh batang / m3
4.1113
m2
92.59259
Begel 30/30 jarak 15cm per unit
sa t
Volume
0.281
m3
Bekisting
0.48
m2
Perancah d (m m) Besi
p (m )
Ø 12
32.4
1
32.4
2 28 8.836
Ø6
0.74
6
4.44
0.9768
23.12633833 kg
255.3559
kg
3.169164882
per m1
sa t
per m 3
sat
jm lh batang / m3
Volume
0.186
m3
Bekisting
0.6
m2
3.2258
m2
Perancah
1
btg
5.3763
btg
balok 20/93
29.8128
Begel 10/25 jarak 15 - 20cm (17,5cm)
Hal 4/42
d (mm) Besi
p (m)
Ø 16
1
3
3
4.74
5.555555556
Ø 12
1
10
10
8.9
4.480286738
Ø8
2.15
5.714
12.285 4.7912
18.431189
kg
99.0924
kg
5.504077061
per m3
sat
jmlh batang / m3
Begel 10/25 jarak 15 - 20cm (17,5cm)
balok 20/60
per m1
sat
Volume
0.12
m3
Bekisting
0.6
m2
5.0000
m2
1
btg
8.3333
btg
Perancah d (mm) Besi
p (m)
Ø 16
1
3
3
4.74
5.555555556
Ø 12
1
6
6
5.34
4.166666667
Ø8
1.5
5.714
8.571
3.3427
13.42269
kg
111.8558
kg
5.952083333
per m3
sat
jmlh batang / m3
Begel 10/25 jarak 15 - 20cm (17,5cm)
Kolom 25/25
per m1
sat
Volume
0.0625
m3
Bekisting
0.6
m2
9.6000
m2
1
btg
16.0000
btg
Perancah d (mm) Besi
p (m) 4
0
0
0
Ø 12
Ø 16 1
8
8
7.12
10.66666667
Ø8
0.9
5.714
5.1426 3.1884
10.308412
kg
164.9346
kg
6.8568
Hal 5/42
Hal 6/42 DAFTAR HARGA SATUAN UPAH DAN BAHAN KOTA SEMARANG Tahun 2011 SATUAN NO.
URAIAN
HARGA SATUAN (RUPIAH)
A
UPAH:
1
Tukang Batu
hari
43,000
2
Tukang Besi
hari
43,000
3
Tukang Kayu
hari
43,000
4
Kepala Tukang
hari
47,000
5
Pekerja
hari
33,000
6
Mandor
hari
45,000
B
BAHAN/MATERIAL:
1
Amplas Tembok
lbr.
600
2
Amplas Sikkens
lbr.
2,500
3
Adukan ready mix K-225
m3
560,000
4
Alat bantu selang
lot
80,000
5
Batu Bata Welahan
bh.
400
6
Batu Belah
m3
100,000
7
Besi Beton
kg.
7,500
8
Bubungan Genteng beton flat
bh.
3,800
9
Cat Dasar
kg.
20,000
10
Cat Kilat
kg.
60,000
11
Cat Meni Nippon
kg.
15,000
12
Cat Dulux Ext
ltr.
70,000
13
Cat Tembok samping flinkote
kg.
26,000
14
Cat Tembok exterior mowilex
ltr.
55,000
15
Cat Tembok interior ex catylac
kg.
18,000
16
Cat plafond maxilite
kg.
8,800
17
Cat Alkali
kg.
23,750
18
Folding Gate
m2
285,000
19
Genteng beton flat
bh.
3,500
20
Gypsum 9 mm
lbr
46,000
21
Kalsiboard ex. Nusaboard 4,5 mm
lbr
45,000
22
Kaca Bening 5 mm
m2
60,000
23
Kaca Warna 10 mm
m2
250,000
24
Kawat Pengikat
kg.
14,000
25
Kayu Dolken
btg
12,000
26
Kayu Bengkirai Papan
m3
6,000,000
27
Kayu Bengkirai 6/12 x 4m
btg
200,000
28
Besi Hollow
btng
29
Kayu Usuk untuk Cor
m3
2,500,000
30
Koral Beton
m3
170,000
31
Lembar Seng
m1
25,000
32
List Gypsum
m1
12,000
33
Minyak Cat
ltr.
5,500
34
Multiplex 9mm
lbr
105,000
35
Paku bermacam-macam ukuran
kg
15,000
36
Paku Beton
bh.
500
37
Paku Biasa
kg.
15,000
38
Paku Gypsum
kg
30,000
39
Papan Cor
lbr
7,000
40
Pasir Muntilan
m3
130,000
41
Pasir Urug
m3
90,000
42
Plamir Kayu
kg.
11,000
43
Plamir Tembok
kg.
8,000
18,000
KET.
Hal 7/42 DAFTAR HARGA SATUAN UPAH DAN BAHAN KOTA SEMARANG Tahun 2011 SATUAN NO.
URAIAN
HARGA SATUAN (RUPIAH)
44
Split
m3
170,000
45
Semen Portland (PC)
zak
42,000
46
Semen Putih
zak
55,000
47
Tanah Urug
m3
50,000
48
Ter / Residu
ltr.
9,000
49
Thinner
ltr.
6,500
50
Alat Bantu / Steiger
Ls
18,000
51
Kayu Usuk 5/7 x 4m Bengkirai
btg
85,000
52
Kayu Reng 2/3 4 m Bengkirai
btg
13,000
53
Papan 2/30 x 4 m
lbr
110,000
54
Wood plank 2/20 x 4 m ex. Elephant
lbr
45,000
55
Keramik 40 x 40 cm ex platinum
dos
50,000
56
Keramik 33 x 33 cm platinum
dos
45,000
57
Keramik 30 x 30 cm ex asia tile
dos
35,000
58
Keramik 30 x 30 cm ex platinum
dos
35,000
59
Keramik 20 x 20 cm ex asia tile
dos
32,000
60
Keramik 25 x 33 cm platinum
dos
41,500
61
Keramik 20 x 25 cm ex asia tile
dos
35,000
62
List 25cm platinum
bh.
16,000
63
List 20cm asia tile
bh.
6,000
KET.
DAFTAR ANALISA PEKERJAAN PEMBANGUNAN RUMAH TINGGAL KOTA SEMARANG 2011 I.
PEKERJAAN PERSIAPAN 2
1. Analisa 1 m Pembersihan Lapangan 0.1000
Pekerja
@Rp.
33,000.00
Rp.
3,300.00
0.0500
Mandor
@Rp.
45,000.00
Rp.
2,250.00
Rp.
5,550.00
2,500,000.00
Rp.
7,500.00
5,550.00
2. Analisa 10 M' Pasangan Bouwplank 3
0.0030 M
Kayu Cor
@Rp.
6.0000 Btg
Kayu Gelam
@Rp.
12,000.00
Rp.
72,000.00
0.1000 Kg
Paku Biasa
@Rp.
15,000.00
Rp.
1,500.00
1.0000
Tukang
@Rp.
43,000.00
Rp.
43,000.00
0.1000
Kepala Tukang
@Rp.
47,000.00
Rp.
4,700.00
1.0000
Pekerja
@Rp.
33,000.00
Rp.
33,000.00
0.0500
Mandor
@Rp.
45,000.00
Rp.
2,250.00
82,950.00
163,950.00 Untuk 1 M' = 1/10
II.
Rp.
16,395.00
24,750.00
PEKERJAAN PONDASI. 3
1. Analisa 1 M Galian Tanah Pondasi 0.7500
Pekerja
@Rp.
33,000.00
Rp.
0.0250
Mandor
@Rp.
45,000.00
Rp.
1,125.00
Rp.
25,875.00
8,250.00
25,875.00
3
2. Analisa 1 M Urugan Tanah Kembali 0.2500
Pekerja
@Rp.
33,000.00
Rp.
0.0084
Mandor
@Rp.
45,000.00
Rp.
378.00
Rp.
8,628.00
8,628.00
3
3. Analisa 1 M Urugan Pasir Bawah Pondasi 1.2000 m3
Pasir Urug
@Rp.
90,000.00
Rp.
108,000.00
0.3000
Pekerja
@Rp.
33,000.00
Rp.
9,900.00
0.0100
Mandor
@Rp.
45,000.00
Rp.
450.00
Rp.
118,350.00
10,350.00
3
4. Analisa 1 M Aanstamping Batu Kali 3
1.1000 M
Batu Kali
@Rp.
100,000.00
Rp.
110,000.00
0.5000 M
Pasir Urug
@Rp.
90,000.00
Rp.
45,000.00
1.5000
Pekerja
@Rp.
33,000.00
Rp.
49,500.00
0.0750
Mandor
@Rp.
45,000.00
Rp.
3,375.00
Rp.
207,875.00
3
52,875.00
3
5. Analisa 1 M Pasangan Pondasi Batu Kali ad. 1 : 8 3
1.2000 M
Batu Kali
@Rp.
100,000.00
Rp.
120,000.00
2.4000 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
100,800.00
0.7600 M
Pasir Pasang
@Rp.
130,000.00
Rp.
98,800.00
0.6000
Tukang
@Rp.
43,000.00
Rp.
25,800.00
0.0600
Kepala Tukang
@Rp.
47,000.00
Rp.
2,820.00
1.5000
Pekerja
@Rp.
33,000.00
Rp.
49,500.00
0.0750
Mandor
@Rp.
45,000.00
Rp.
3,375.00
Rp.
401,095.00
3
81,495.00
3
6. Analisa 1 M Urugan Tanah Urug 3
1.2000 M
Tanah Urug
@Rp.
50,000.00
Rp.
60,000.00
0.3000
Pekerja
@Rp.
33,000.00
Rp.
9,900.00
0.0100
Mandor
@Rp.
45,000.00
Rp.
450.00
Rp.
70,350.00
10,350.00
Hal 8/42
III.
PEK. BETON BERTULANG Ad. 1:2:3 3
a. Analisa 1 M Beton ad. 1 : 2 : 3 (site mix K-225) 7.8960 Zak 0.4900 M
3
0.8200 M
3
Semen Portland (PC)
@Rp.
42,000.00
Rp.
331,632.00
Pasir Pasang
@Rp.
130,000.00
Rp.
63,700.00
Koral Beton
@Rp.
170,000.00
Rp.
139,400.00
0.2500
Tukang
@Rp.
43,000.00
Rp.
10,750.00
0.0250
Kepala Tukang
@Rp.
47,000.00
Rp.
1,175.00
1.6500
Pekerja
@Rp.
33,000.00
Rp.
54,450.00
0.0800
Mandor
@Rp.
45,000.00
Rp.
3,600.00
Rp.
604,707.00
560,000.00
69,975.00
3
b. Analisa 1 M Beton ad. 1 : 2 : 3 (ready mix K-225 berikut selang) 1.0000 M
3
Adukan ready mix K-225
@Rp.
560,000.00
Rp.
0.0450
Alat bantu selang
@Rp.
80,000.00
Rp.
3,600.00
1.0000
Upah Tenaga
@Rp.
34,987.50
Rp.
34,987.50
Rp.
598,587.50
42,000.00
Rp.
238,350.00
3
c. Analisa 1 M Beton ad. 1 : 3 : 5 (untuk konstruksi rabat, lantai kerja) 5.6750 Zak 0.5400 M
3
0.9100 M
3
1.0000
Semen Portland (PC)
@Rp.
Pasir Pasang
@Rp.
130,000.00
Rp.
70,200.00
Koral Beton
@Rp.
170,000.00
Rp.
154,700.00
Upah Tenaga
@Rp.
69,975.00
Rp.
69,975.00
Rp.
533,225.00
d. Analisa Tulang Besi 1 Kg Besi Beton Terpasang 1.0500 Kg
Besi Beton
@Rp.
7,500.00
Rp.
7,875.00
0.0150 Kg
Kawat Pengikat
@Rp.
14,000.00
Rp.
210.00
0.0070
Tukang
@Rp.
43,000.00
Rp.
301.00
0.0007
Kepala Tukang
@Rp.
47,000.00
Rp.
32.90
0.0070
Pekerja
@Rp.
33,000.00
Rp.
231.00
0.0004
Mandor
@Rp.
45,000.00
Rp.
18.00
Rp.
8,667.90
5,833.33
582.90
e. Analisa Upah Bekisting (dengan papan cor l=20cm p=200cm) / M2 (3x pakai) 0.8333 lbr
Papan cor
@Rp.
7,000.00
Rp.
0.2000 Kg
Paku Biasa
@Rp.
15,000.00
Rp.
3,000.00
0.2600
Tukang
@Rp.
43,000.00
Rp.
11,180.00
0.0260
Kepala Tukang
@Rp.
47,000.00
Rp.
1,222.00
0.5200
Pekerja
@Rp.
33,000.00
Rp.
17,160.00
0.0260
Mandor
@Rp.
45,000.00
Rp.
1,170.00
Rp.
39,565.33
30,732.00
f. Analisa Pembuatan Tiang Perancah /M2 (4x pakai) 1.5625 btg
Kayu Dolken
@Rp.
12,000.00
Rp.
18,750.00
0.2000 Kg
Paku
@Rp.
15,000.00
Rp.
3,000.00
0.3300
Tukang
@Rp.
43,000.00
Rp.
14,190.00
0.0300
Kepala Tukang
@Rp.
47,000.00
Rp.
1,410.00
0.6600
Pekerja
@Rp.
33,000.00
Rp.
21,780.00
0.0300
Mandor
@Rp.
45,000.00
Rp.
1,350.00
Rp.
60,480.00
38,730.00
1. Analisa Beton Bertulang Pondasi Foot Plat ad. 1:2:3 Kecil 1.0000 M
3
5.3333 M2 132.9211 Kg
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
Bekisting
@Rp.
39,565.33
Rp.
211,013.79
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,152,146.80
Rp.
1,961,748.09
2. Analisa Beton Bertulang Sloof Struktur ad. 1:2:3 1.0000 M
3
13.3300 M2 171.0900 Kg
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
Bekisting
@Rp.
39,565.33
Rp.
527,405.89
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,482,991.01
Rp.
2,608,984.40
Rp.
598,587.50
3. Analisa Beton Bertulang Sloof Praktis 15/20 ad. 1:2:3 1.0000 M
3
Beton cor ready mix K-225
@Rp.
598,587.50
Hal 9/42
13.3333 M2 138.4667 Kg
Bekisting
@Rp.
39,565.33
Rp.
527,536.46
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,200,215.51
Rp.
2,326,339.47
4. Analisa Beton Bertulang Kolom Struktur (15/20) ad. 1:2: 3 3
1.0000 M
13.3333 M2 5.5833 btg 138.4667 Kg
Beton cor site mix K-225
@Rp.
604,707.00
Rp.
604,707.00
Bekisting
@Rp.
39,565.33
Rp.
527,536.46
Tiang Perancah
@Rp.
7,500.00
Rp.
41,874.94
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,200,215.51
Rp.
2,374,333.91
604,707.00
5. Analisa Beton Bertulang Kolom Praktis 15/15 ad. 1:2:3 3
1.0000 M
17.7778 M2 131.7333 Kg
Beton cor site mix K-225
@Rp.
604,707.00
Rp.
Bekisting
@Rp.
39,565.33
Rp.
703,384.58
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,141,851.33
Rp.
2,449,942.91
598,587.50
Rp.
598,587.50
6. Analisa Beton Bertulang Balok 15/40 ad. 1:2:3 3
1.0000 M
11.8300 M2 1.6670 M2 213.8300 Kg
Beton cor ready mix K-225
@Rp.
Bekisting
@Rp.
39,565.33
Rp.
468,057.89
Tiang Perancah
@Rp.
60,480.00
Rp.
100,820.16
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,853,457.06
Rp.
3,020,922.61
7. Analisa Beton Bertulang Balok 15/20 ad. 1:2:3 3
1.0000 M
13.3333 M2 1.6670 M2 138.4667 Kg
Beton cor site mix K-225
@Rp.
604,707.00
Rp.
604,707.00
Bekisting
@Rp.
39,565.33
Rp.
527,536.46
Tiang Perancah
@Rp.
60,480.00
Rp.
100,820.16
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,200,215.51
Rp.
2,433,279.13
604,707.00
Rp.
604,707.00
7. Analisa Beton Bertulang Ring Balk 15/15 ad. 1:2: 3 3
1.0000 M
17.7778 M2 1.6670 M2 131.7333 Kg
Beton cor site mix K-225
@Rp.
Bekisting
@Rp.
39,565.33
Rp.
703,384.58
Tiang Perancah
@Rp.
60,480.00
Rp.
100,820.16
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,141,851.33
Rp.
2,550,763.07
8. Analisa Beton Bertulang Balok Latey 15/15 ad. 1:2:3 3
1.0000 M
Beton cor site mix K-225
@Rp.
604,707.00
Rp.
604,707.00
17.7778 M2
Bekisting
@Rp.
39,565.33
Rp.
703,384.58
84.0000 Kg
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
728,103.60
Rp.
2,036,195.18
9. Analisa Beton Bertulang Plat Lantai ad. 1:2:3 t = 12cm 3
1.0000 M
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
8.3330 M2
Bekisting
@Rp.
70,482.00
Rp.
587,326.51 multiplek
6.0000 M2
Tiang Perancah
@Rp.
60,480.00
Rp.
362,880.00
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
680,066.10
Rp.
2,228,860.10
78.4580 Kg
10. Analisa Beton Bertulang Plat Atap ad. 1:2:3 t = 10cm 3
1.0000 M
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
10.0000 M2
Bekisting
@Rp.
70,482.00
Rp.
704,820.00
10.0000 M2
Tiang Perancah
@Rp.
60,480.00
Rp.
604,800.00
52.0026 Kg
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
450,753.34
Rp.
2,358,960.84
11. Analisa Beton Bertulang Tangga ad. 1:2:3 t = 12cm 3
1.0000 M
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
8.3350 M2
Bekisting
@Rp.
70,482.00
Rp.
587,467.47
8.3520 M2
Tiang Perancah
@Rp.
60,480.00
Rp.
505,128.96
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
1,482,210.90
171.0000 Kg
Hal 10/42
Rp.
3,173,394.83
12. Analisa Beton Bertulang Dapur ad. 1:2:3 t = 8 cm 1.0000 M
3
Beton cor ready mix K-225
@Rp.
598,587.50
Rp.
598,587.50
12.5000 M2
Bekisting
@Rp.
33,732.00
Rp.
421,650.00 multiplek
12.5000 M2
Tiang Perancah
@Rp.
60,480.00
Rp.
756,000.00
48.7500 Kg
Besi Beton Tulangan
@Rp.
8,667.90
Rp.
422,560.13
Rp.
2,198,797.63
400.00
Rp.
32,000.00
IV.
PEKERJAAN DINDING DAN PLESTERAN 2
1. Analisa 1 M Pasangan Dinding Batu Bata ad. 1 : 4 80.0000 Bh 0.3962 Zak
Batu Bata Merah
@Rp.
Semen Portland (PC)
@Rp.
42,000.00
Rp.
16,640.40
Pasir Pasang
@Rp.
130,000.00
Rp.
5,460.00
0.1000
Tukang
@Rp.
43,000.00
Rp.
4,300.00
0.0100
Kepala Tukang
@Rp.
47,000.00
Rp.
470.00
0.3000
Pekerja
@Rp.
33,000.00
Rp.
9,900.00
0.0150
Mandor
@Rp.
45,000.00
Rp.
675.00
Rp.
69,445.40
400.00
Rp.
32,000.00
0.0420 M
3
15,345.00
2
2. Analisa 1 M Pasangan Dinding Batu Bata ad. 1 : 8 80.0000 Bh 0.2700 Zak
Batu Bata Merah
@Rp.
Semen Portland (PC)
@Rp.
42,000.00
Rp.
11,340.00
Pasir Pasang
@Rp.
130,000.00
Rp.
5,850.00
0.1000
Tukang
@Rp.
43,000.00
Rp.
4,300.00
0.0100
Kepala Tukang
@Rp.
47,000.00
Rp.
470.00
0.3000
Pekerja
@Rp.
33,000.00
Rp.
9,900.00
0.0150
Mandor
@Rp.
45,000.00
Rp.
675.00
Rp.
64,535.00
0.0450 M
3
15,345.00
2
3. Analisa 1 M Plesteran ad. 1 : 4 0.3300 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
13,860.00
Pasir Pasang
@Rp.
130,000.00
Rp.
3,250.00
0.1800
Tukang
@Rp.
43,000.00
Rp.
7,740.00
0.0180
Kepala Tukang
@Rp.
47,000.00
Rp.
846.00
0.3600
Pekerja
@Rp.
33,000.00
Rp.
11,880.00
0.0180
Mandor
@Rp.
45,000.00
Rp.
810.00
Rp.
38,386.00
0.0250 M
3
21,276.00
2
4. Analisa 1 M Plesteran ad. 1 : 8 tebal 2 cm 0.1950 Zak 0.0268 M
3
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,190.00
Pasir Pasang
@Rp.
130,000.00
Rp.
3,484.00
0.1800
Tukang
@Rp.
43,000.00
Rp.
7,740.00
0.0180
Kepala Tukang
@Rp.
47,000.00
Rp.
846.00
0.3600
Pekerja
@Rp.
33,000.00
Rp.
11,880.00
0.0180
Mandor
@Rp.
45,000.00
Rp.
810.00
Rp.
32,950.00
V.
21,276.00
PEKERJAAN LANTAI 3
1. Analisa 1 M Urugan Pasir Bawah Lantai 1.2000 M
3
Pasir Urug
@Rp.
90,000.00
Rp.
108,000.00
0.3000
Pekerja
@Rp.
33,000.00
Rp.
9,900.00
0.0100
Mandor
@Rp.
45,000.00
Rp.
450.00
Rp.
118,350.00
10,350.00
3
2. Analisa 1 M Beton Tumbuk ad. 1 : 3 : 5 4.0000 Zak 0.5000 M
3
1.0000 M
3
Semen Portland (PC)
@Rp.
42,000.00
Rp.
168,000.00
Pasir Pasang
@Rp.
130,000.00
Rp.
65,000.00
Koral Beton
@Rp.
170,000.00
Rp.
170,000.00
0.2000
Tukang
@Rp.
43,000.00
Rp.
8,600.00
0.0200
Kepala Tukang
@Rp.
47,000.00
Rp.
940.00
49,410.00
Hal 11/42
1.2000
Pekerja
@Rp.
33,000.00
Rp.
39,600.00
0.0060
Mandor
@Rp.
45,000.00
Rp.
270.00
Rp.
452,410.00
2
3. Analisa 1 M Pasangan Lantai Keramik 40 x 40 cm 1 : 6 tebal 3cm 6.5625 Bh 0.2030 Zak Zak 0.0321 M
3
Keramik 40 x 40
@Rp.
8,333.33
Rp.
54,687.50
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
0.1200
Tukang
@Rp.
43,000.00
Rp.
5,160.00
0.0120
Kepala Tukang
@Rp.
47,000.00
Rp.
564.00
0.2500
Pekerja
@Rp.
33,000.00
Rp.
8,250.00
0.0130
Mandor
@Rp.
45,000.00
Rp.
585.00
Rp.
81,945.50
6.25
14,559.00
2
3. Analisa 1 M Pasangan Lantai Keramik 33 x 33 cm 1 : 6 tebal 3cm 9.6419 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 33 x 33
@Rp.
5,000.00
Rp.
48,209.37
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
75,467.37
9.182736455
2
3. Analisa 1 M Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm 11.6667 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 30 x 30
@Rp.
3,181.82
Rp.
37,121.21
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
64,379.21
11.11111111
2
3. Analisa 1 M Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm bagus 11.6667 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 30 x 30
@Rp.
3,181.82
Rp.
37,121.21
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
64,379.21
16
2
3. Analisa 1 M Pasangan Lantai Keramik 20 x 20 cm 1 : 6 tebal 3cm 26.2500 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 20 x 20
@Rp.
1,280.00
Rp.
33,600.00 8,526.00
Semen Portland (PC)
@Rp.
42,000.00
Rp.
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
60,858.00
25
2
3. Analisa 1 M Pasangan keramik dinding 25 x 33 cm 1 : 6 tebal 3cm 12.7273 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 25 x 33
@Rp.
3,458.33
Rp.
44,015.15
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
71,273.15
12.12121212
2
3. Analisa 1 M Pasangan Keramik dinding 20 x 25 cm 1 : 6 tebal 3cm 21.0000 Bh 0.2030 Zak Zak 0.0321 M
3
1.0000
Keramik 20 x 25
@Rp.
1,750.00
Rp.
36,750.00
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
Upah Tenaga
@Rp.
14,559.00
Rp.
14,559.00
Rp.
64,008.00
20
1
3. Analisa 1 M Pasangan List Keramik 25 x 6 cm 1 : 6 tebal 3cm 4.2000 Bh
Keramik 25 x 6
@Rp.
16,000.00
Rp.
67,200.00
0.0122 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
511.56
Zak 0.0019 M
3
Semen Putih
@Rp.
55,000.00
Rp.
-
Pasir Pasang
@Rp.
130,000.00
Rp.
250.38
4
Hal 12/42
0.0600
Upah Tenaga
@Rp.
14,559.00
Rp.
873.54
Rp.
68,835.48
1
3. Analisa 1 M Pasangan List Keramik 20 x 6 cm 1 : 6 tebal 3cm 5.2500 Bh
Keramik 20 x 6
@Rp.
6,000.00
Rp.
31,500.00
0.0122 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
511.56
Semen Putih
@Rp.
55,000.00
Rp.
-
0.0019 M
Zak
Pasir Pasang
@Rp.
130,000.00
Rp.
250.38
0.0600
Upah Tenaga
@Rp.
14,559.00
Rp.
873.54
Rp.
33,135.48
3
5
2
8. Analisa 1 M Pasangan Lantai Batu Koral Sikat 2
1.2000 M
Batu Koral Sikat
@Rp.
75,000.00
Rp.
90,000.00
0.3000 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
12,600.00
3
0.0321 M
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
0.3500
Tukang
@Rp.
43,000.00
Rp.
15,050.00
0.0350
Kepala Tukang
@Rp.
47,000.00
Rp.
1,645.00
0.7000
Pekerja
@Rp.
33,000.00
Rp.
23,100.00
0.0350
Mandor
@Rp.
45,000.00
Rp.
1,575.00
Rp.
148,143.00
41,370.00
2
9. Analisa 1 M Pasangan Dinding Batu Alam 2
1.0500 M
Batu Alam
@Rp.
130,000.00
Rp.
136,500.00
0.2030 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,526.00
0.0321 M
Pasir Pasang
@Rp.
130,000.00
Rp.
4,173.00
0.3500
Tukang
@Rp.
43,000.00
Rp.
15,050.00
0.0350
Kepala Tukang
@Rp.
47,000.00
Rp.
1,645.00
0.6200
Pekerja
@Rp.
33,000.00
Rp.
20,460.00
0.0300
Mandor
@Rp.
45,000.00
Rp.
1,350.00
Rp.
187,704.00
42,000.00
Rp.
238,350.00
3
38,505.00
3
10. Analisa 1 M Rabat Beton ad. 1 : 2 : 3 5.6750 Zak 3
M
3
M 1.0000
VI.
Semen Portland (PC)
@Rp.
Pasir Pasang
@Rp.
130,000.00
Rp.
-
Koral Beton
@Rp.
170,000.00
Rp.
-
Upah Tenaga
@Rp.
69,975.00
Rp.
69,975.00
Rp.
308,325.00
PEKERJAAN ATAP 1
1. Analisa 1 M Pekerjaan Murplat, Gording, Nok, Jurai 0.2625 btg
Kayu Bengkirai
@Rp.
200,000.00
Rp.
52,500.00
0.0190 Kg
Paku Biasa
@Rp.
15,000.00
Rp.
285.00
0.0518
Tukang
@Rp.
43,000.00
Rp.
2,227.40
0.0052
Kepala Tukang
@Rp.
47,000.00
Rp.
243.65
0.0173
Pekerja
@Rp.
33,000.00
Rp.
570.90
0.0009
Mandor
@Rp.
45,000.00
Rp.
38.88
Rp.
55,865.83
3,080.83
2
2. Analisa 1 M Pasang Usuk dan Reng 0.5500 btg
Kayu Usuk 5/7
@Rp.
85,000.00
Rp.
46,750.00
0.8250 btg
Kayu Reng 2/3
@Rp.
13,000.00
Rp.
10,725.00
0.2500 Kg
Paku Biasa
@Rp.
15,000.00
Rp.
3,750.00
0.2000
Tukang
@Rp.
43,000.00
Rp.
8,600.00
0.0200
Kepala Tukang
@Rp.
47,000.00
Rp.
940.00
0.2000
Pekerja
@Rp.
33,000.00
Rp.
6,600.00
0.0100
Mandor
@Rp.
45,000.00
Rp.
450.00
Rp.
77,815.00
16,590.00
2
3. Analisa 1 M Pasang Atap Genteng Beton flat 10.0000 Bh
Genteng Beton
@Rp.
3,500.00
Rp.
35,000.00
0.1000
Tukang
@Rp.
43,000.00
Rp.
4,300.00
0.0100
Kepala Tukang
@Rp.
47,000.00
Rp.
470.00
0.2000
Pekerja
@Rp.
33,000.00
Rp.
6,600.00
11,820.00
Hal 13/42
0.0100
Mandor
@Rp.
45,000.00
Rp.
450.00
Rp.
46,820.00
3,800.00
Rp.
13,300.00
4. Analisa 1 M' Pasang Bubungan Genteng Beton 3.5000 Bh
Bubungan Genteng Beton
@Rp.
0.2000 Zak
Semen Portland (PC)
@Rp.
42,000.00
Rp.
8,400.00
0.0330 M
Pasir Pasang
@Rp.
130,000.00
Rp.
4,290.00
0.2000
Tukang
@Rp.
43,000.00
Rp.
8,600.00
0.0200
Kepala Tukang
@Rp.
47,000.00
Rp.
940.00
0.4000
Pekerja
@Rp.
33,000.00
Rp.
13,200.00
0.0200
Mandor
@Rp.
45,000.00
Rp.
900.00
Rp.
49,630.00
23,625.00
3
23,640.00
5. Analisa 1 M' Listplank Woodplank ex. Elephant Double 0.5250 lbr
Papan 2/20
@Rp.
45,000.00
Rp.
0.0250 Kg
Paku Biasa
@Rp.
15,000.00
Rp.
375.00
0.2000
Tukang
@Rp.
43,000.00
Rp.
8,600.00
0.0520
Kepala Tukang
@Rp.
47,000.00
Rp.
2,444.00
0.1900
Pekerja
@Rp.
33,000.00
Rp.
6,270.00
0.0095
Mandor
@Rp.
45,000.00
Rp.
427.50
Rp.
41,741.50
17,741.50
6. Analisa 1 M' Papan Sirip 0.2625 m3
Papan 2/20
@Rp.
45,000.00
Rp.
11,812.50
0.0250 kg
Paku
@Rp.
15,000.00
Rp.
375.00
0.0200
Tukang
@Rp.
43,000.00
Rp.
860.00
0.0020
Kepala Tukang
@Rp.
47,000.00
Rp.
94.00
0.0400
Pekerja
@Rp.
33,000.00
Rp.
1,320.00
0.0040
Mandor
@Rp.
45,000.00
Rp.
180.00
Rp.
14,641.50
2,454.00
7. Analisa 10 M' Talang Datar dengan Papan Talang 10.0000 m1
Lembar Seng
@Rp.
25,000.00
Rp.
250,000.00
5.5000 lbr
Papan 2/20
@Rp.
45,000.00
Rp.
247,500.00
8.0000
Tukang
@Rp.
43,000.00
Rp.
344,000.00
0.8000
Kepala Tukang
@Rp.
47,000.00
Rp.
37,600.00
5.0000
Pekerja
@Rp.
33,000.00
Rp.
165,000.00
0.2500
Mandor
@Rp.
45,000.00
Rp.
11,250.00
Rp.
1,055,350.00
Rp.
105,535.00
Untuk 1 M' = 1/10
VII.
557,850.00
PEKERJAAN PLAFOND DAN RANGKA 2
1. Analisa 1 M Pasang Plafond Gypsum 12 mm 0.3830 lbr
Gypsum 12 mm
@Rp.
46,000.00
Rp.
17,618.00
1.0500 btng
Besi Hollow
@Rp.
18,000.00
Rp.
18,900.00
0.1300 Kg
Kawat Penggantung
@Rp.
12,000.00
Rp.
1,560.00
38.0000 bh
Skrup Board
@Rp.
25.00
Rp.
950.00
Skrup Join Hollow
@Rp.
100.00
Rp.
210.00
0.0124 dos
Paku Beton
@Rp.
20,000.00
Rp.
248.00
0.0370 rol
Lakban kain
@Rp.
15,000.00
Rp.
555.00
0.0247 zak
Compound
@Rp.
60,000.00
Rp.
1,482.00
0.4000
Tukang
@Rp.
43,000.00
Rp.
17,200.00
0.0400
Kepala Tukang
@Rp.
47,000.00
Rp.
1,880.00
0.1000
Pekerja
@Rp.
33,000.00
Rp.
3,300.00
0.0140
Mandor
@Rp.
45,000.00
Rp.
630.00
Rp.
64,533.00
2.1000 bh
23,010.00
2
2. Analisa 1 M Pasang Plafond Kalsiboard 4,5 mm 0.3830 lbr
Kalsiboard 4,5 mm
@Rp.
46,000.00
Rp.
17,618.00
1.0500 btng
Besi Hollow
@Rp.
18,000.00
Rp.
18,900.00
Kawat Penggantung
@Rp.
12,000.00
Rp.
1,560.00
Skrup Board
@Rp.
25.00
Rp.
950.00
0.1300 Kg 38.0000 bh
Hal 14/42
2.1000 bh
Skrup Join Hollow
@Rp.
100.00
Rp.
210.00
0.0124 dos
Paku Beton
@Rp.
20,000.00
Rp.
248.00
0.0370 rol
Lakban kain
@Rp.
15,000.00
Rp.
555.00
0.0247 zak
Compound
@Rp.
60,000.00
Rp.
1,482.00
0.4000
Tukang
@Rp.
43,000.00
Rp.
17,200.00
0.0400
Kepala Tukang
@Rp.
47,000.00
Rp.
1,880.00
0.1000
Pekerja
@Rp.
33,000.00
Rp.
3,300.00
0.0140
Mandor
@Rp.
45,000.00
Rp.
630.00
Rp.
64,533.00
23,010.00
3. Analisa 10 M' Pasang List Profil Gypsum 10.0000 m'
List Gypsum
@Rp.
12,000.00
Rp.
120,000.00
0.5000
Tukang
@Rp.
43,000.00
Rp.
21,500.00
0.0500
Kepala Tukang
@Rp.
47,000.00
Rp.
2,350.00
0.5000
Pekerja
@Rp.
33,000.00
Rp.
16,500.00
0.0300
Mandor
@Rp.
45,000.00
Rp.
1,350.00
Rp.
161,700.00
Rp.
16,170.00
Untuk 1 M' = 1/10
VIII.
41,700.00
PEKERJAAN PINTU DAN JENDELA 3
1. Analisa 1 M Kusen Kayu Jati (KW II) 3
1.1000 M
Kayu Jati
@Rp.
6,000,000.00
Rp.
6,600,000.00
Tukang
@Rp.
43,000.00
Rp.
967,500.00
2.2500
Kepala Tukang
@Rp.
47,000.00
Rp.
105,750.00
9.0000
Pekerja
@Rp.
33,000.00
Rp.
297,000.00
0.3750
Mandor
@Rp.
45,000.00
Rp.
16,875.00
Rp.
7,987,125.00
22.5000
1,387,125.00
2. Analisa 1 M2 Daun Pintu Panil Jati (KW II) 0.0350 m3
Kayu Jati
@Rp.
6,000,000.00
Rp.
210,000.00
0.1000 kg
Paku Biasa
@Rp.
15,000.00
Rp.
1,500.00
5.0000
Tukang
@Rp.
43,000.00
Rp.
215,000.00
0.5000
Kepala Tukang
@Rp.
47,000.00
Rp.
23,500.00
1.6500
Pekerja
@Rp.
33,000.00
Rp.
54,450.00
0.0825
Mandor
@Rp.
45,000.00
Rp.
3,712.50
Rp.
508,162.50
296,662.50
2
3. Analisa 1 M Daun Jendela Jati Kaca Bening 5 mm (KW II) 0.0132 m3
Kayu Jati
@Rp.
6,000,000.00
Rp.
79,200.00
0.7500 m2
Kaca Bening 5mm
@Rp.
60,000.00
Rp.
45,000.00
4.0000
Tukang
@Rp.
43,000.00
Rp.
172,000.00
0.4000
Kepala Tukang
@Rp.
47,000.00
Rp.
18,800.00
1.3200
Pekerja
@Rp.
33,000.00
Rp.
43,560.00
0.0600
Mandor
@Rp.
45,000.00
Rp.
2,700.00
Rp.
361,260.00
66,000.00
237,060.00
2
4. Analisa 1 M Jendela Mati Kaca Bening 5 mm 1.1000 m2
Kaca Bening 5mm
@Rp.
60,000.00
Rp.
0.0150
Tukang
@Rp.
60,000.00
Rp.
900.00
0.1500
Kepala Tukang
@Rp.
43,000.00
Rp.
6,450.00
0.0150
Pekerja
@Rp.
47,000.00
Rp.
705.00
0.0008
Mandor
@Rp.
33,000.00
Rp.
24.75
Rp.
74,079.75
275,000.00
8,079.75
2
5. Analisa 1 M Jendela Mati Kaca Bening 10 mm 1.1000 m2
Kaca Bening 10mm
@Rp.
250,000.00
Rp.
0.0150
Tukang
@Rp.
60,000.00
Rp.
900.00
0.1500
Kepala Tukang
@Rp.
43,000.00
Rp.
6,450.00
0.0150
Pekerja
@Rp.
47,000.00
Rp.
705.00
0.0008
Mandor
@Rp.
33,000.00
Rp.
24.75
Rp.
283,079.75
8,079.75
Hal 15/42
IX.
PEKERJAAN PENGECATAN 2
1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Dulux 1.6670 Kg
Cat Tembok 2x
@Rp.
70,000.00
Rp.
116,690.00
0.8330 Kg
Alkali 1x
@Rp.
23,750.00
Rp.
19,783.75
2.0000 Lbr
Amplas Biasa
@Rp.
600.00
Rp.
1,200.00
0.1000 bh
Rol cat
@Rp.
12,500.00
Rp.
1,250.00
1.0000
Stegger
@Rp.
5,000.00
Rp.
5,000.00
0.6300
Tukang
@Rp.
43,000.00
Rp.
27,090.00
0.0630
Kepala Tukang
@Rp.
47,000.00
Rp.
2,961.00
0.2000
Pekerja
@Rp.
33,000.00
Rp.
6,600.00
0.0250
Mandor
@Rp.
45,000.00
Rp.
1,125.00
Rp.
181,699.75
Rp.
18,169.98
Untuk 1 M
2
37,776.00
2
1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Flinkote 1.6670 Kg
Cat Tembok 2x
@Rp.
26,000.00
Rp.
43,342.00
0.8330 Kg
Alkali 1x
@Rp.
23,750.00
Rp.
19,783.75
2.0000 Lbr
Amplas Biasa
@Rp.
600.00
Rp.
1,200.00
0.1000 bh
Rol cat
@Rp.
12,500.00
Rp.
1,250.00
1.0000
Stegger
@Rp.
5,000.00
Rp.
5,000.00
1.0000
Upah Tenaga
@Rp.
37,776.00
Rp.
37,776.00
Rp.
108,351.75
Rp.
10,835.18
Untuk 1 M
2
2
1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Mowilex 1.6670 Kg
Cat Tembok 2x
@Rp.
55,000.00
Rp.
91,685.00
0.8330 Kg
Alkali 1x
@Rp.
23,750.00
Rp.
19,783.75
2.0000 Lbr
Amplas Biasa
@Rp.
600.00
Rp.
1,200.00
0.1000 bh
Rol cat
@Rp.
12,500.00
Rp.
1,250.00
1.0000
Stegger
@Rp.
5,000.00
Rp.
5,000.00
1.0000
Upah Tenaga
@Rp.
37,776.00
Rp.
37,776.00
Rp.
156,694.75
Rp.
15,669.48
Untuk 1 M
2
2
2. Analisa 10 M Pengecatan Tembok 3x sapu Interior ex. Catylac 3.7500 Kg
Cat Tembok 3x
@Rp.
18,000.00
Rp.
67,500.00
0.5000 Lbr
Amplas Biasa
@Rp.
600.00
Rp.
300.00
0.0100 bh
Rol cat
@Rp.
12,500.00
Rp.
125.00
1.0000
Stegger
@Rp.
5,000.00
Rp.
5,000.00
1.0000
Upah Tenaga
@Rp.
37,776.00
Rp.
37,776.00
Rp.
110,701.00
Rp.
11,070.10
Untuk 1 M
2
2
3. Analisa 10 M Coating Batu Alam 2.0000 Kg
Coating Sicosol
@Rp.
45,000.00
Rp.
90,000.00
0.3500
Tukang
@Rp.
43,000.00
Rp.
15,050.00
0.0350
Kepala Tukang
@Rp.
47,000.00
Rp.
1,645.00
0.7000
Pekerja
@Rp.
33,000.00
Rp.
23,100.00
0.0350
Mandor
@Rp.
45,000.00
Rp.
1,575.00
Rp.
131,370.00
Rp.
13,137.00
Untuk 1 M
2
41,370.00
2
4. Analisa 10 M Pengecatan Kayu Mengkilat 3x sapu 2.8400 Kg
Cat Kilat
@Rp.
60,000.00
Rp.
170,400.00
1.4200 Kg
Cat Dasar
@Rp.
20,000.00
Rp.
28,400.00
2.0000 Ltr
Minyak Cat
@Rp.
5,500.00
Rp.
11,000.00
1.2000 Kg
Cat Meni Nippon
@Rp.
15,000.00
Rp.
18,000.00
0.8000 Kg
Plamir kayu
@Rp.
11,000.00
Rp.
8,800.00
3.0000 Lbr
Amplas Niken
@Rp.
2,500.00
Rp.
7,500.00
2.2500
Tukang
@Rp.
43,000.00
Rp.
96,750.00
0.2250
Kepala Tukang
@Rp.
47,000.00
Rp.
10,575.00
1.5000
Pekerja
@Rp.
33,000.00
Rp.
49,500.00
0.0750
Mandor
@Rp.
45,000.00
Rp.
3,375.00
Rp.
404,300.00
160,200.00
Hal 16/42
1
Untuk 1 M
Rp.
6,064.50
2
5. Analisa 10 M Cat Plafond 3x sapu 2.5000 Kg
Cat Tembok maxilite
@Rp.
8,800.00
Rp.
22,000.00
1.0000 Ls
Alat Bantu / Steiger
@Rp.
12,000.00
Rp.
12,000.00
0.6300
Tukang
@Rp.
43,000.00
Rp.
27,090.00
0.0630
Kepala Tukang
@Rp.
47,000.00
Rp.
2,961.00
0.2000
Pekerja
@Rp.
33,000.00
Rp.
6,600.00
0.0250
Mandor
@Rp.
45,000.00
Rp.
1,125.00
Rp.
71,776.00
Rp.
7,177.60
2
Untuk 1 M
X.
37,776.00
PEKERJAAN LAIN-LAIN 2
1. Analisa 10 M Analisa Pembersihan Akhir Lapangan 0.7500
Pekerja
@Rp.
33,000.00
Rp.
24,750.00
0.0375
Mandor
@Rp.
45,000.00
Rp.
1,687.50
Rp.
26,437.50
Rp.
2,643.75
2
Untuk 1 M = 1/10
26,437.50
Hal 17/42
TAHAP 1 RUMAH LB=89,7 / LT=144,7 m 2
nama
TAHAP 2 RUMAH LB=76,58 / LT=144,7 m 2 TAHAP 1+2 RUMAH LB=166,28/ LT=144,7 m2 luas tanah
144.700
luas lt 1 luas lt 2
89.700 76.580 166.280
luas thp 1
t1
bowplang
48.000
pondasi
48.710 41.780
90.490 t1
galian tanah pondasi 0.831
75.224
urugan tanah kembali 25.075 urugan pasir 0.070
6.334
anstamping 0.140
12.669
pondasi batu belah 0.300
27.371
footplat 26.000
0.107
2.776
0.034
0.878
lantai kerja 0.832
3.653 slof 15/20
0.000 0.000
0.030
0.000
0.038
3.512
tahap 1 0.023
0.799
slof 15/25 90.490 -2.830 6.000 0.000 93.660
kolom praktis
KOLOM
tahap 1
tahap 2 0.023
1.013
tahap 2
15 30
0.060 0.045
0.000 4.075
0.060 0.045
0.000 2.363
15 25 15 20
0.038 0.030
0.000 0.000
0.038 0.030
0.000 0.000
20 20
0.560
tahap 1
BALOK 15 30
51.450
20 40
51.520 0.000 102.970
0.027
3.388
0.020
0.000
0.030
0.887
0.023
0.000
0.045
1.070
0.063
0.000
15 25
0.000 0.000 15 20 ring balk
13.450
konsol
gunungan1
balok latey1
16.110
29.560
15 15
tahap 2
15 30
17.670 6.100 0.000 23.770
15 25
0.000 0.000 RING BALK
0.608
15 20
31.550 26.400
latey 15/20
gunungan
0.000 0.000
0.866 0.866
0.000 0.000
0.866 0.866
0.000
0.866
0.000
0.866
57.950
0.030
0.120
9.882
0.120
0.000
0.100
0.000
0.100
1.738
1.739
plat 12 cm tahap 1 82.350 82.350 plat 12 cm tahap 2
0.000 plat 10 cm tahap 1
0.000
plat 10 cm tahap 2 17.380
17.380 lefel 8 cm tahap1 2.136 4.200
6.336 kantilefer
2.800 dapur 9.136
0.080
1.614
0.080
1.294
waterproof
125.046
0.000
compound
39.896
lefel 8 tahap 2 16.180 . dapur 16.180
PLAT TANGGA 1.080
1.080 DINDING TAHAP 1 total
pelubang
eksterior
lt1
interior
260.960 45.140
281.532 dinding pagar
samping
19.600
36.050
31.360
81.190 plesteran
3.400
271.246
542.492
lt2
175.780
162.960
0.000
0.000
29.350 31.100 60.450 plesteran
3.400
169.370
338.740
lt3
0.000
3.550
plesteran
tahap 1
0.000
0.000
jumlah
luas
panjang
unting
luas total
pjg total
P1
1.000
6.700
7.640
2.000
0.075
6.700
7.790
P2
4.000
2.300
5.840
2.000
0.075
9.200
23.960
P3
2.000
1.780
5.140
2.000
0.075
3.560
10.580
PJ1
1.000
6.300
13.200
4.000
0.075
6.300
13.500
PJ2
6.300
13.200
4.000
0.075
0.000
0.000
PJ3
4.800
12.200
3.000
0.075
0.000
0.000
J1
4.400
11.960
4.000
0.075
0.000
0.000
J2
3.800
11.520
4.000
0.075
0.000
0.000
2.600 1.800
8.340 7.080
4.000 4.000
0.075 0.075
10.400 0.000
34.560 0.000
36.160
90.390
J3 j4
4.000
melamin
d kayu
d kaca
0.000
0.000
72.320
a. Engsel pintu (per pintu 3 bh / 1,5 psng) b. Kunci tanam 2x slag + handle c. Door stoper
TAHAP 2
jumlah
P1
luas
panjang
unting
luas total
pjg total
6.700
7.640
2.000
0.075
0.000
0.000
P2
2.000
2.300
5.840
2.000
0.075
4.600
11.980
P3
1.000
1.780
5.140
2.000
0.075
1.780
5.290
6.300
13.200
4.000
0.075
0.000
0.000
PJ2
1.000
6.300
13.200
4.000
0.075
6.300
13.500
PJ3
1.000
4.800
12.200
3.000
0.075
4.800
12.425
J1
1.000
4.400
11.960
4.000
0.075
4.400
12.260
J2
1.000
3.800
11.520
4.000
0.075
3.800
11.820
J3
3.000
2.600
8.340
4.000
0.075
7.800
25.920
j4
1.000
1.800
7.080
4.000
0.075
1.800
7.380
PJ1
d kayu
d kaca
melamin
a. Engsel pintu (per pintu 3 bh / 1,5 psng) b. Kunci tanam 2x slag + handle c. Door stoper
TAHAP 1 pasang batu andesit susun sirih pasang batu alam
TAHAP 2
20.100
BETON TUMBUK t1
t2 95.700
0.050 T1
4.785 T2
karpot K50 k40
74.700
45.100
K33 k30
6.150 5.900
19.430 2.100
24.720
9.860
70.420
54.760
K2525 K2533 K2020 K2025 kol kolan ps urug
4.785
PEKERJAAN ATAP talang 1
talang 2 8.000
0.000
0.866
8.000
0.866
0.000
9.238
luas atap tahap 1
tahap2 89.900
0.000
0.86603
0.000
89.900
0.866025
103.808
KERPUS t1
t2 27.240
0.000
0.866
27.240
0.866
0.000
Pas. Listplank
37.204
T1
T2 40.500
0.866025 0.866025
35.280 70.560
100.575
0.000
0.000
0.000 pasang gording
T1
40.500 T2
0.000
PLAFOND
T1
LIS
T2 75.800
63.100
75.800
63.100
T1
TRITISAN
0.000
T2 89.800
61.200
89.800
61.200
T1
T2 29.840
0.000
29.840
pipa tahap 1
tahap 2
5"
4"
3"
23.000
3/4" 12.000
1/2" panas 4" 31.600 10.000
3"
3/4" 1/2" panas 12.000 10.000 13.000
25.000
20.500
11.800
5"
4" 23.000
X.
3" 0.000
42.000
3/4" 48.800
1/2" panas 73.600
4"
3"
10.000
0.000
1/2" 12.000
1/2" panas
30.500
PEKERJAAN LAIN-LAIN
t1
1
Pasang railing besi tempa
11.06
19.900
m
2
Pasang lampu gantung
1.00
1.000
bh
3
Pasang lampu downlight SL
11.00
10.000
bh
4
Pasang lampu SL tempel
t2 1
bh
13.000
5
Pasang lampu taman
1.00
bh
6
Pasang lampu uplight kolam
bh
7
Pasang lampu spot dinding
bh
8
Pasang lampu downlight halogen
9
6.00
6.000
bh
Pasang saklar
10.00
8.000
bh
10
Pasang stop kontak
13.00
10.000
bh
11
Pasang titik lampu + stop kontak
32.00
12
Pasang MCB
13
Pipa PVC diameter 5" D
23.00
14
Pipa PVC diameter 4" D
0.00
0.000
m
15
Pipa PVC diameter 3" D
48.80
12.000
m
16
Pipa PVC diameter 3/4" AW
73.60
30.500
m
17
Pipa PVC diameter 1/2 " AW air panas
10.00
13.000
m
18
Kran tempel
3.00
2.000
bh
19
Floor drain (avour)
2.00
7.000
bh
20
Kloset duduk
2.00
1.000
bh
21
Kloset jongkok
22
Kitchen zink
1.00
wastafel Keran panas dingin
1.00
25
Pembersihan akhir
89.70
pagar panjang
galian tanah pondasi 0.000
urugan tanah kembali 0.000 urugan pasir 0.000
anstamping 0.140
0.000
pondasi batu belah 0.300
0.000
slof 15/20 0.000
0.000 0.000
0.030
0.000
kolom praktis 0.023
2.250
0.000
ring balk 15/20 0.000
0.030
0.000
bh 1
m
1.00
24
0.070
1.000
bh
1 1 1 1
bh
23
0.831
27.00
bh 1.00
bh
76.580
m
2
Pas. Dinding Bata adukan 1 : 8
0 Plesteran Dinding Bata adukan 1 : 8
0
d jendela
bv 1.000
roster
skonengan 7.640
tatapan
melamin pintu
7.640
0.000
0.000
5.840
23.360
0.000
0.000
5.140
10.280 0.000
0.000 0.000
0.000 0.000
8.680 8.680 8.480 1.000
0.000
d jendela
2.000
bv
18.000
8.410
0.000
0.000
0.000
7.800
0.000
0.000
0.000
6.480 6.360
25.920 0.000
0.000 0.000
0.000 0.000
0.000
0.000
0.000
67.200
0.000
0.000 0.000
18.000
roster 1.000
skonengan
tatapan
melamin pintu
7.640
0.000
0.000
0.000
5.840 5.140
11.680 5.140
0.000 0.000
0.000 0.000
0.000
0.000
0.000
8.680 8.680 8.480 1.000
18.000
8.410
8.410
0.000
0.000
7.800 6.480
7.800 19.440
0.000 0.000
0.000 0.000
6.360
6.360
0.000
0.000
58.830 0.000
2.000
18.000
0.000
0.000 0.000
RENCANA ANGGARAN BIAYA (KESELURUHAN)
Halaman 31/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
1
Pembersihan lapangan
Volume
90.00
m2 1
m
2
Pengukuran dan pasang bouwplank
3
Air Kerja dan Listrik
2.00
bln
4
Bedeng Dan Gudang
1.00
ls
5
Mobilisasi & demobilisasi
2.00
bln
II.
PEKERJAAN PONDASI
1
Galian tanah pondasi
2 3 4 5
Urugan tanah kembali bekas galian Urugan pasir bawah pondasi Pasangan pondasi batu belah ad 1 : 8 Pasangan Rolag batu belah ad 1 : 8
III.
PEK. BETON BERTULANG Ad. 1:2:3
1
Sloof 15/20
2
Kolom Praktis 15/15 Lt.1
42.00
SAT
58.72 14.70 4.95 21.05 0.70
1.94 2.16
3
m
3
m
3
m
3
m
3
m
M3 M
3 3
3
Balok Latey 15/20 Lt.1
0.40
M
4
Leufel t = 8 cm Lt.1
0.48
M3
5 6 7
Plat dapur t = 8 cm Kuda-kuda beton 15/20 Ringbalk 15/20
IV.
PEKERJAAN DINDING DAN PLESTERAN
1
Pas. Dinding Bata adukan 1 : 8 Lt.1
2
Plesteran Dinding Bata adukan 1 : 8 Lt.1
0.09 0.70 1.67
229.97 442.62
M
3
M
3
M
3
M2 M
2 2
3
Tali air Aluminium
1.30
M
4
Batu Alam andesit garis
2.22
M2
5
Batu Alam acak
V.
PEKERJAAN LANTAI
1
Rabat Beton Tumbuk t = 5 cm
2 3 4
Pasir Urug Bawah Lantai t=3 cm Pas. Keramik 40/40 Ruangan ex. Platinum Pas. Keramik 30/30 Teras,garasi ex. Platinum
5
Pas. Keramik Lantai KM/WC 25/25 ex Platinum
6
Pas. Keramik Dinding KM/WC 25/33 ex Platinum
7
Pas. List Keramik KM/WC 6/25 ex. Platinum
8
Pas. Keramik Dapur 20/20 ex Platinum
3.20
2.50
M
2
M3
harga satuan
JUMLAH
BOBOT
(Rp)
(Rp)
%
5,550.00
499,500.00
0.42
16,395.00
688,590.00
0.58
300,000.00
600,000.00
0.50
2,000,000.00
2,000,000.00
1.67
500,000.00
1,000,000.00
0.84
4,788,090.00
4.00
25,875.00
1,519,380.00
1.27
8,628.00
126,831.60
0.11
118,350.00
585,832.50
0.49
401,095.00
8,443,049.75
7.05
401,095.00
280,766.50
0.23
10,955,860.35
9.15
2,608,984.40
5,061,429.74
4.23
2,449,942.91
5,291,876.69
4.42
2,550,763.07
1,020,305.23
0.85
2,198,797.63
1,055,422.86
0.88
2,198,797.63
197,891.79
0.17
2,550,763.07
1,785,534.15
1.49
2,550,763.07
4,259,774.33
3.56
18,672,234.80
15.60
64,535.00
14,841,113.95
12.40
32,950.00
14,584,329.00
12.18
15,000.00
19,500.00
0.02
187,704.00
416,702.88
0.35
187,704.00
600,652.80
0.50
30,462,298.63
25.45
452,410.00
1,131,025.00
0.94
118,350.00
177,525.00
0.15
81,945.50
3,390,085.34
2.83
64,379.21
376,618.39
0.31
60,858.00
159,447.96
0.13
M
3
M
2
M
2
2.62
M
2
10.40
M2
80,590.00
838,136.00
0.70
5.20
M'
68,835.48
357,944.50
0.30
72,340.00
217,020.00
0.18
1.50 41.37 5.85
3.00
M
2
RENCANA ANGGARAN BIAYA (KESELURUHAN)
Halaman 32/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO 9
URAIAN PEKERJAAN Perkerasan Paving Carport
Volume 13.50
SAT M
2
harga satuan
JUMLAH
BOBOT
(Rp)
(Rp)
%
77,500.00
1,046,250.00
0.87
7,694,052.18
6.43
90,000.00
5,760,000.00
4.81
40,000.00
1,784,000.00
1.49
46,820.00
2,996,480.00
2.50
10,000.00
640,000.00
0.53
VI. PEKERJAAN ATAP 1 2 3
Pas. Rangka Atap Baja Ringan biasa Pas. Gording CNP Pas. Atap Genteng Beton Flat ex. Cemara
64.00
M2 M
2
M
2
64.00
M
2
44.60 64.00
4
Pas. Aluminium Foil
5
Pas. Kerpus Genteng
6.60
M'
49,630.00
327,558.00
0.27
6
Pas. Genteng Tepi
5.90
M'
25,000.00
147,500.00
0.12
7
Pas. Listplank Woodplank ex. Elephant
18.50
M'
41,741.50
772,217.75
0.65
12,427,755.75
10.38
VII. PEKERJAAN PLAFOND DAN RANGKA 1
Pasang Plafond Gypsum 9 mm ex. Elephant
40.25
M2
64,533.00
2,597,453.25
2.17
2
Pasang List Profil Gypsum Ruangan
56.75
M'
16,170.00
917,647.50
0.77
64,533.00
824,086.41
0.69
4,339,187.16
3.62
3
Pasang Plafond Kalsiboard (Tritisan)
12.77
M
2
VIII. PEKERJAAN PINTU DAN JENDELA 1
Kusen Aluminium 4" coklat
60.45
M'
55,000.00
3,324,750.00
2.78
2
Tatapan Pintu
20.10
M'
10,000.00
201,000.00
0.17
3
Daun Pintu Panil
4.00
lbr
1,350,000.00
5,400,000.00
4.51
4
Daun Pintu PVC
1.00
lbr
250,000.00
250,000.00
0.21
5
Daun Jendela Aluminium + Kaca Bening 5mm
7.00
lbr
450,000.00
3,150,000.00
2.63
6
Daun Jendela Aluminium + Kaca Bening 5mm BV
1.00
lbr
325,000.00
325,000.00
0.27
7
Kaca mati 5mm
1.60
bh
74,079.75
118,527.60
0.10
8
Pekerjaan Aksesoris Pintu dan Jendela : a. Engsel Pintu (per pintu 3 bh/1,5 Pasang) ex Sobar
6.00
psng
35,000.00
210,000.00
0.18
b. Kunci Tanam 2x Slag Pintu Ruangan ex. SES
4.00
bh
105,000.00
420,000.00
0.35
c. Handle Pintu Ruangan ex. Dexon
4.00
bh
60,000.00
240,000.00
0.20
d. Door Stoper ex. Gerber
4.00
bh
22,500.00
90,000.00
0.08
13,729,277.60
11.47
15,669.48
1,358,700.18
1.14
11,070.10
1,600,515.06
1.34
7,177.60
423,765.50
0.35
65,000.00
900,900.00
0.75
1,500.00
85,125.00
0.07
13,137.00
71,202.54
0.06
15,000.00
90,300.00
0.08
7,177.60
459,366.40
0.38
IX.
PEKERJAAN PENGECATAN
1
Pengecatan tembok ext mowilex
2 3 4 5 6 7 8
Pengecatan tembok interior Eco Emulsion Pengecatan plafond 3 x sapu Maxilite Melamin daun pintu panil Cat Lis Plafond Gypsum ex. Maxilite Coating Batu Alam ex. Propan Stone Care Compound Plat Leufel Cat Genteng
86.71 144.58 59.04 13.86 56.75 5.42 6.02 64.00
m3 2
m
2
m
2
m
1
m
2
m
2
m
2
m
RENCANA ANGGARAN BIAYA (KESELURUHAN)
Halaman 33/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO 9
URAIAN PEKERJAAN Pengecatan listplank
Volume 18.50
SAT 2
m
harga satuan
JUMLAH
BOBOT
(Rp)
(Rp)
%
6,064.50
112,193.25
0.09
5,102,067.93
4.26
X.
PEKERJAAN LAIN-LAIN
1
Pasang Lampu Taman ex. Zetalux
2.00
bh
155,000.00
310,000.00
0.26
2
Pasang Lampu Fitting SL ex. Philips
7.00
bh
40,000.00
280,000.00
0.23
3
Pasang Lampu Halogen
2.00
bh
75,000.00
150,000.00
0.13
4
Pasang Saklar Tunggal ex.Clipsal
3.00
bh
15,000.00
45,000.00
0.04
5
Pasang Saklar Ganda ex.Clipsal
4.00
bh
20,000.00
80,000.00
0.07
6
Pasang Stop Kontak ex.Broco
5.00
bh
20,000.00
100,000.00
0.08
7
Pasang Titik Lampu + Stop Kontak ex. Supreme
16.00
bh
75,000.00
1,200,000.00
1.00
8
Pasang Panel MCB 6 Group
1.00
bh
300,000.00
300,000.00
0.25
9
Pasang Stop Kontak AC ex.Broco
2.00
bh
45,000.00
90,000.00
0.08
10
Pasang Socket Telepon + Instalasi
1.00
bh
70,000.00
70,000.00
0.06
11
Pasang Socket Antene TV + Instalasi
1.00
bh
70,000.00
70,000.00
0.06
12
Monoblok + Jet Shower ex.HCG
1.00
bh
1,350,000.00
1,350,000.00
1.13
13
Kran Tempel Plastik
2.00
bh
30,000.00
60,000.00
0.05
14
Wash bak
1.00
bh
225,000.00
225,000.00
0.19
15
Kran Bebek dapur
1.00
bh
100,000.00
100,000.00
0.08
16
Kran Shower dingin ex. Washer
1.00
bh
350,000.00
350,000.00
0.29
17
Floor Drain
1.00
bh
32,500.00
32,500.00
0.03
18
Pipa PVC diameter 4" D ex. Wafin
13.00
M'
29,000.00
377,000.00
0.31
19
Pipa PVC diameter 3" D ex. Wafin
30.00
M'
19,000.00
570,000.00
0.48
20
Pipa PVC diameter 3/4" D ex. Maspion AW
29.00
M'
9,000.00
261,000.00
0.22
21
Pipa PVC diameter 1/2" D ex. Maspion AW
15.00
M'
7,000.00
105,000.00
0.09
22
Bak Tandon Air 3000 Lt (bawah)
1.00
M'
3,000,000.00
3,000,000.00
2.51
23
Septictank & Peresapan
1.00
bh
1,600,000.00
1,600,000.00
1.34
24
Pompa Air Shimizu
1.00
bh
450,000.00
450,000.00
0.38
25
Bak Kontrol
2.00
bh
60,000.00
120,000.00
0.10
2,643.75
237,937.50
0.20
11,533,437.50
9.63
119,704,261.90
100.00
26
Pembersihan Akhir
TOTAL BIAYA PEKERJAAN
90.00
M
2
2,602,266.56
RENCANA ANGGARAN BIAYA (KESELURUHAN)
Halaman 34/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)
NO
URAIAN PEKERJAAN
Volume
SAT
harga satuan
JUMLAH
BOBOT
(Rp)
(Rp)
%
REKAPITULASI RAB PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) BANGKA NO.
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
NILAI PEKERJAAN Rp. 4,788,090.00
II.
PEKERJAAN PONDASI
Rp.
10,955,860.35
9.15
III. PEK. BETON BERTULANG Ad. 1:2:3
Rp.
18,672,234.80
15.60
IV. PEKERJAAN DINDING DAN PLESTERAN
Rp.
30,462,298.63
25.45
V.
Rp.
7,694,052.18
6.43
VI. PEKERJAAN ATAP
Rp.
12,427,755.75
10.38
VII. PEKERJAAN PLAFOND DAN RANGKA
Rp.
4,339,187.16
3.62
VIII. PEKERJAAN PINTU DAN JENDELA
Rp.
13,729,277.60
11.47
IX. PEKERJAAN PENGECATAN
Rp.
5,102,067.93
4.26
X.
Rp.
11,533,437.50
9.63
Rp.
119,704,261.90
100
Rp.
119,704,261.90
PEKERJAAN LANTAI
PEKERJAAN LAIN-LAIN JUMLAH
Total Biaya Konstruksi Gedung
Semarang, Agustus 2011 Dibuat Oleh :
Ali Muhtarom, ST
NILAI BOBOT 4.00
URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO
I 1
URAIAN PEKERJAAN
PEKERJAAN PONDASI Pasang Bowplank
2 3
Urugan Pasir Bawah Pondasi Anstamping Batu belah
4
Pas Pondasi Batu Kali 1:8
II 1
VOLUME
SATUAN
42.00
m1
4.95
m3 m3
21.75
m3
PEKERJAAN BETON BERTULANG Pondasi voet plat besar
m3
2
Pondasi voet plat kecil
3
Sloof praktis 15/20
4
Sloof struktur
m3
5
Kolom Struktur besar
m3
6
Kolom Struktur 15/20
m3
m3
1.940
m3
JENIS BAHAN & TNG KERJA
Papan cor Usuk cor 4/6 Paku Pasir Urug Batu Kali Pasir urug Batu Kali Semen Pasir
Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor
Hal 36/42
SATUAN BHN
JUMLAH BAHAN
SATUAN
0.200 0.600 0.100 1.200 1.100 0.500 1.200 2.400 0.760
8.40 25.20 4.20 5.94 0.00 0.00 26.10 52.20 16.53
lbr btg kg m3 m3 m3 m3 zag m3
0.820 0.490 7.896 2.077 2.660 4.442 23.126 3.169 0.820 0.490 7.896 2.077 2.660 4.442 13.581 4.167 0.820 0.490 7.896 2.077 2.660 11.108 11.112 7.500 0.820 0.490 7.896 2.077 2.660 11.108 11.112 7.112 0.820 0.490 7.896 1.976 2.660 11.108 14.815 7.831 0.820 0.490 7.896 1.976 3.556 11.108
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.59 0.95 15.32 4.03 5.16 21.55 21.56 14.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr
URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO
I
URAIAN PEKERJAAN
VOLUME
SATUAN
JENIS BAHAN & TNG KERJA
Hal 37/42
SATUAN BHN
JUMLAH BAHAN
SATUAN
PEKERJAAN PONDASI
7
Tiang Praktis 15/15
8
Balok Struktur
9
Ring balk
10 Balok Latey
2.160
m3
m3
2.370
m3
0.400
m3
11 Plat lantai beton t=12cm
m3
12 Plat atap beton t=10cm
m3
13 Plat tangga beton t=12cm
m3
Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 8,3 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 9,5 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Kericak Pasir Semen Bendrat
11.112 7.500 0.820 0.490 7.896 1.976 3.556 14.809 14.815 8.150 0.820 0.490 7.896 1.976 3.556 11.111 9.854 12.963 7.831 0.820 0.490 7.896 1.976 3.556 8.333 14.809 11.112 7.500 0.820 0.490 7.896 1.976 3.556 2.833 14.809 14.815 8.149 0.820 0.490 7.896 0.780 2.000 8.333 6.944 11.112 0.820 0.490 7.896 0.780 4.000 3.907 8.330 11.112 0.820 0.490 7.896 0.780
0.00 0.00 1.77 1.06 17.06 4.27 7.68 31.99 32.00 17.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.94 1.16 18.71 4.68 8.43 19.75 35.10 26.34 17.78 0.33 0.20 3.16 0.79 1.42 1.13 5.92 5.93 3.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg m3 m3 zag kg kg btg lbr btg m3 m3 zag kg
URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO
I
URAIAN PEKERJAAN
VOLUME
SATUAN
JENIS BAHAN & TNG KERJA
Hal 38/42
SATUAN BHN
JUMLAH BAHAN
SATUAN
PEKERJAAN PONDASI
14 Leufel dan Plat Dapur t=8
0.570
15 Beton Tumbuk
III 1
2
IV 1
m3
m3
PEKERJAAN DINDING DAN PLESTERAN Pas. dinding bata ad 1:8
229.97
m2
Plesteran Dinding bata ad 1:8
442.62
m2
2.50
m3
PEKERJAAN LANTAI Rabat Beton Tumbuk 1:3:5 t=5
2
Pas. keramik lantai 50/50 ruangan 1:8
3
Pas. keramik lantai 40/40 ruangan 1:8
41.37
m2
4
Pas. keramik lantai 33,3/33,3 teras 1:8
5.85
m2
5
Pas. lantai tangga,teras 30/30 1:8
6
Pas. keramik lantai 25/25 KM/WC
7
Pas. keramik dinding 25/33 KM/WC
8
Pas. Keramik lantai 20/20 KM/WC
m2
9
Pas. Keramik dinding 20/25 KM/WC
m2
m2
m2
2.62
m2
10.40
m2
10 Pas. Keramik dinding 20/20 dapur
3.00
m2
7
Pas. Lis 6/25 KM/WC
5.20
m1
7
Pas. Lis 6/20 KM/WC
m1
Paku Usuk 4/6 Papan cor Besi 9,5 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Kericak Pasir Semen
4.000 3.907 6.940 13.283 0.820 0.490 7.896 0.780 4.000 3.907 8.330 10.940 0.910 0.540 5.675
0.00 0.00 0.00 0.00 0.47 0.28 4.50 0.44 2.28 2.23 4.75 6.24 0.00 0.00 0.00
kg btg lbr btg m3 m3 zag kg kg btg lbr btg m3 m3 zag
Batu Bata Semen Pasir Semen Pasir
77.000 0.270 0.045 0.195 0.027
17,707.69 62.09 10.35 86.31 11.86
buah zag m3 zag m3
Grosok Semen Keramik Semen Pasir Keramik Semen Pasir K eram ik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Lis 6/25 Semen Pasir Lis 6/20 Semen
0.000 5.675 4.000 0.203 0.032 6.250 0.203 0.032 9.183 0.203 0.032 11.111 0.203 0.032 16.000 0.203 0.032 12.121 0.203 0.032 25.000 0.203 0.032 20.000 0.203 0.032 25.000 0.203 0.032 4.000 0.012 0.002 5.000 0.012
0.00 14.19 0.00 0.00 0.00 258.56 8.40 1.33 53.72 1.19 0.19 0.00 0.00 0.00 41.92 0.53 0.08 126.06 2.11 0.33 75.00 0.61 0.10 0.00 0.00 0.00 75.00 0.61 0.10 20.80 0.06 0.01 0.00 0.00
m3 zag lbr zag m3 lbr zag m3 doz zag m3 lbr zag m3 lbr zag m3 doz zag m3 lbr zag m3 lbr zag m3 lbr zag m3 bh zag m3 bh zag
50/50
40/40
33,3/ 33,3
30/30
25/25
25/33
20/20
20/25
20/20
URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO
I
URAIAN PEKERJAAN
VOLUME
SATUAN
JENIS BAHAN & TNG KERJA
Hal 39/42
SATUAN BHN
JUMLAH BAHAN
SATUAN
PEKERJAAN PONDASI 11 Pas. Batu alam candi 20/20
m2
12 Pas. Batu alam 20x60
m2
13 Urugan Pasir Bawah Lantai t=3cm
1.50
m3
V 1
PEKERJAAN ATAP Pek gording, nok, jurai
m1
2
Pasang Usuk dan reng
m2
3
Pekerjaan Papan Lisplank & Papan Angin
4
Pekerjaan papan talang dan penutup
5
Pasang Kerpus genteng Beton
6 7
18.50
m1 m1
5.90
m1
Pasang Genteng Beton Gording kanal CNP15
64.00 44.60
m2 m1
PEKERJAAN PLAFOND DAN RANGKA Pekerjaan plafond gypsum ruangan
40.25
m2
2
Pekerjaan plafond kalsiboard tritisan
12.77
m2
VII 1
PEKERJAAN PENGECATAN Cat Tembok Eksterior abu2 mowilex
86.71
m2
144.58 64.00
m2 m2 m2 m2 m2
VI 1
5 6 7 8 9
Cat Tembok Interior catylac Cat Genteng Water proofing Coating batu alam ex. Sicosol Melamine daun pintu & roster
10 Cat Plafond 11 Cat kayu listplank
5.42
59.04 4.63
m2 m2
Pasir Batu alam 20/20 Semen Pasir Batu alam 20/60 Semen Pasir Pasir urug
0.002 26.250 0.203 0.032 14.375 0.203 0.032 1.200
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.80
m3 lembar zag m3 lembar zag m3 m3
Kayu 6/12 x 4m Paku Usuk 5/7 x 4m Reng 2/3 x 4m Paku Papan 2/20 x 2m Paku Papan 2/20 x 4m Seng datar Kerpus beton Semen Pasir Genteng Beton Kanal C
0.263 0.190 0.550 0.825 0.250 0.263 0.025 0.550 1.050 3.675 0.200 0.033 10.500 0.167
0.00 0.00 0.00 0.00 0.00 4.86 0.46 0.00 0.00 21.68 1.18 0.19 672.00 7.43
batang kg btg btg kg lembar kg lembar m1 buah zag m3 lembar btg
Jayaboard 1,2x2,4 Rangka Hollow Skrup board Compound Kal si board 1,2x2,4 Rangka Hollow Skrup board Compound
0.383 0.802 38.000 0.025 0.383 0.802 38.000 0.025
15.40 32.28 1,529.50 0.99 4.89 10.24 485.26 0.32
lembar batang bh zag lembar batang bh zag
0.167 0.083 0.375 0.125 0.375 0.375 0.284 0.200 0.250 0.284 0.200
14.45 7.22 54.22 8.00 0.00 2.03 0.00 0.00 14.76 1.31 0.93
Cat Tembok Alkali Cat Tembok Cat Genteng Water proofing Coating batu Melamine Thinner Cat Tembok Cat kayu Thinner
kg kg kg kg kg kg kg kg kg kg kg
KEBUTUHAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO I
URAIAN PEKERJAAN
1 2 3 4
PEKERJAAN PONDASI Pasang Bowplank Urugan Pasir Bawah Pondasi Pasangan Aanstamping Pas Pondasi Batu belah
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
PEKERJAAN BETON BERTULANG Pondasi voet plat besar Pondasi voet plat kecil Sloof 15/20 Sloof 15/25 Kolom struktur 15/25 Kolom struktur 15/20 Tiang Praktis 15/15 Balok beton 15/25 Ringbalk 15/20 Balok latey 15/15 Plat lantai beton t=12cm Plat atap beton t=10cm Plat tangga beton t=12cm Leufel t=8 Beton tumbuk
KERICAK
III 1 2 IV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 V 1 2 3 4 5 6 7
1.59 1.77 1.94 0.33 0.47
6.10 PEKERJAAN DINDING DAN PLESTERAN Pas. Dinding bata ad 1:8 Plesteran dinding ad 1:8 PEKERJAAN LANTAI Floor Lantai Btn Tumbuk 1:3:5 Pas. keramik 50/50 Pas. Keramik 40/40 Pas. keramik 33,3/33,3 Pas. keramik 30/30 Pas. keramik 25/25 Pas. keramik 25/33 Pas. keramik 20/20 Pas. keramik 20/25 Pas. Lis 6/25 KM/WC Pas. Lis 6/20 KM/WC Pas. keramik dapur 20/20 Pas. Batu candi 20/20 Pas. Batu andesit 15/30 Urugan Pasir Bawah Lantai PEKERJAAN ATAP Pek gording, nok & jurai Pas. Usuk dan reng Pek. Ppn. Angin & Listplank Pek. Talang dan Penutup Pas. Kerpus genteng beton Pas. Genteng Beton Gording kanal CNP15 SATUAN TOTAL BAHAN
PAKU
USUK 4/6
PAPAN COR
4.20
25.20
8.40
BESI 11,3
BESI 9,5 BESI 8,3 BESI 5,6 BESI 4,9
PASIR URUG
5.94 -
II
PASIR SEMEN 40 PASANG KG BENDRA
m3 6.1
16.53 16.53
52.20 52.20
0.95 1.06 1.16 0.20 0.28 3.65
15.32 17.06 18.71 3.16 4.50 58.75
10.35 11.86 22.21
62.09 86.31 148.40
1.33 0.19 0.08 0.33 0.10 0.01 0.10 -
14.19 8.40 1.19 0.53 2.11 0.61 0.06 0.61 -
2.14
27.70
-
4.20
4.03 4.27 4.68 0.79 0.44
-
-
-
-
5.94
BATU BELAH
26.10 26.10
25.20
8.40
-
5.16 7.68 8.43 1.42 2.28
-
19.75 1.13 2.23
21.55 31.99 35.10 5.92 4.75
14.22
24.97
23.11
99.31
-
47.89
44.16
-
53.19
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.80 1.80
-
-
-
-
-
-
-
-
btg 47.9
btg 44.2
btg 53.2
m3 7.7
m3 26.1
21.56
14.55
-
-
17.60
32.00 -
26.34
17.78 3.26
5.93 6.24
0.46 0.19
1.18
0.19
1.18
m3 44.7
zag 288.2
-
0.46
-
-
kg 14.2
kg 29.6
btng 48.3
lbr 107.7
btg -
btg -
Hal 41 / 42
REKAPITULASI KEBUTUHAN BAHAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO.
1 2 3 4
BAHAN/MATERIAL
Semen PC 40 kg Pasir Pasang Pasir Urug Batu Belah
SAT
zak 3
m
3
m
3
m
3
JUMLAH
HARGA SATUAN
HARGA TOTAL
288.23
Rp
42,000.00
Rp
12,105,521.40
44.72
Rp
130,000.00
Rp
5,813,323.10
7.74
Rp
90,000.00
Rp
696,600.00
26.10
Rp
100,000.00
Rp
2,610,000.00
5
Kericak
m
6.10
Rp
170,000.00
Rp
1,037,136.00
6
Bendrat
kg
14.22
Rp
14,000.00
Rp
199,019.24
7
Paku
kg
29.63
Rp
15,000.00
Rp
444,480.12
8
Usuk 4/6 (Cor)
btg
48.31
Rp
5,000.00
Rp
241,547.60
9
Papan cor
lbr
107.71
Rp
6,000.00
Rp
646,235.94
10
Besi Ø 12 (11,3) - 12
btg
-
Rp
86,080.80
Rp
11
Besi Ø 10 (9,5) - 12
btg
47.89
Rp
59,966.40
Rp
2,871,954.00
12
Besi Ø 9 (8,3) - 12
btg
44.16
Rp
37,720.80
Rp
1,665,833.51
13
Besi Ø 6 (5,6) - 12
btg
-
Rp
22,994.40
Rp
14
Besi Ø 5 (4,9) - 12
btg
53.19
Rp
15,678.00
Rp
833,890.87
15
Batu Bata
bh
17,707.69
Rp
400.00
Rp
7,083,076.00
16
Genteng Beton FLAT
lbr
672.00
Rp
3,500.00
Rp
2,352,000.00
17
Kerpus Genteng Beton
bh
21.68
Rp
4,500.00
Rp
97,571.25
18
Canal C15
btg
7.43
Rp
175,500.00
Rp
1,304,550.00
1
-
-
19
Seng datar
m
-
Rp
25,000.00
Rp
20
Papan GRC 2 m
lbr
4.86
Rp
45,000.00
Rp
21
Papan kayu 2/20
lbr
-
Rp
110,000.00
Rp
-
22
Kayu Balok 6/12
btg
-
Rp
-
23
Kayu Usuk 5/7
btg
-
Rp
-
24
Kayu Reng 2/3
btg
-
Rp
-
25
Cat Exterior mowilex
kg
14.45
Rp
63,000.00
Rp
910,637.09
29
Cat Alkali
kg
7.22
Rp
34,000.00
Rp
245,580.06
30
Cat Interior catylac
kg
54.22
Rp
15,000.00
Rp
813,262.50
31
Cat plafond maxilite
kg
14.76
Rp
9,000.00
Rp
132,840.00
32
Cat Genteng
kg
8.00
Rp
25,000.00
Rp
200,000.00
33
Sicosol
kg
2.03
Rp
50,700.00
Rp
103,047.75
34
Water proofing
kg
-
Rp
40,000.00
Rp
35
Cat Kayu
kg
1.31
Rp
35,000.00
Rp
36
Melamine
kg
-
Rp
45,000.00
Rp
37
Thinner
kg
0.93
Rp
18,000.00
Rp
16,650.00
38
Scrup board
bh
2,014.76
Rp
50.00
Rp
100,738.00
39
Compound
zag
1.31
Rp
2,000.00
Rp
2,619.19
40
Gypsum Board
lbr
15.40
Rp
45,000.00
Rp
693,165.38
41
Kalsiboard
lbr
4.89
Rp
45,000.00
Rp
219,918.56
42
List Gypsum Ruangan
m1
Rp
12,000.00
Rp
43
Besi Hollow 2/4
btg
Rp
14,000.00
Rp
44
Batu alam
2
m
2
42.52 -
218,531.25
45,972.50 -
595,308.56
Rp
-
Rp
-
Rp
-
45
Batu andesit 15/30
m
-
46
Keramik 50/50 platinum
dos
-
47
Keramik 40/40 asia tile
dos
43.09
Rp
32,500.00
Rp
1,400,546.88
48
Keramik 33,3/33,3 platinum
dos
5.97
Rp
45,000.00
Rp
268,595.04
Rp
120,000.00