Master Rab Rumah Kecil

February 18, 2019 | Author: Ali Muhtarom | Category: N/A
Share Embed Donate


Short Description

Download Master Rab Rumah Kecil...

Description

PERBANDINGAN CAMPURAN BETON

Beton campuran campuran 1 : 3 : 5 1 m³ Pc 3 m³ Ps 5 m³ Kr

= = =

1 3 5

x x x

1 m³ Beton Beton membutu membutuhkan hkan : Pc = 1/5.385 x 0.76 = 176.4159703 Ps Kr Beton campuran campuran 1 : 2 : 3 1 m³ Pc 2 m³ Ps 3 m³ Kr

= = =

1 2 3

1 m³ Beton Beton membutu membutuhkan hkan : Pc = 1/3.67 x 0.76 = 258.8555858 Ps Kr

0.760 0.675 0.520

= = = =

Kg

x x x

0.760 0.675 0.520

Kg

= = =

= = =

= = = =

0.760 2.025 2.600 5.385 0.141 4.4103993 0.376 0.483

0.760 1.350 1.560 3.670 0.207 6.4713896 0.368 0.425

m³ spesi basah m³ spesi basah m³ spesi basah m³ spesi basah basah m³ sak ~ 5 sak m³ m³

 

m³ spesi basah m³ spesi basah m³ spesi basah m³ spesi basah basah m³ sak ~ 7 sak m³ m³

 

ANALISA BETON BERTULANG Tabel Berat Besi mm

kg/m

Ø5

0.15

8000

14400

Ø6

0.22

8000

21120

4.9

Ø8

0.39

8000

37440

8.3

Ø 10

0.62

8000

59520

9.5

Ø 12

0.89

8000

85440

Ø 14

1.21

8000

116160

Ø 16

1.58

8000

151680

Begel 10/15 jarak 20cm

Sloof 15/20

per m 1

sa t

Volume 

0.03

m3

Bekisting

0.4

Perancah d (m m ) Besi

per m3

sat

m2

13.3333

m2

m2

0.0000

m2

p (m )

Ø 10

1

4

4

2.48

Ø5

0.54

5

2.7

0.405

11.11111111 2.885

kg

96.1667

kg

7.5

per m3

sat

jmlh batang / m 3

per m 1

sa t

Volume 

0.0375

m3

Bekisting

0.5

m2

13.3333

m2

m2

0.0000

m2

Perancah d (m m )

p (m )

Ø 12

1

5

5

4.45

Ø6

0.64

5

3.2

0.704

11.11111111 5.154

kg

137.4400

kg

7.111111111

per m3

sat

jmlh batang / m 3

Begel 10/15 jarak 20cm

Ringbalk 15/20

per m 1

sa t

Volume 

0.03

m3

Bekisting

0.6

m2

20.0000

m2

Perancah

3

m2

100.0000

m2

2.885

kg

96.1667

kg

7.5

per m 1

sa t

per m3

sat

jmlh batang / m 3

Volume 

0.0225

m3

Bekisting

0.4

m2

17.7778

m2

Perancah

2

btg

88.8889

btg

1.89

kg

84.0000

kg

8.148148148

per m 1

sa t

per m3

sat

jmlh batang / m 3

Volume 

0.0225

m3

Bekisting

0.4

m2

17.7778

m2

d (m m ) Besi

p (m )

Ø 10

1

4

4

2.48

Ø5

0.54

5

2.7

0.405

Ringbalk, Latey 15/15

p (m )

Ø8

1

4

4

1.56

Ø5

0.44

5

2.2

0.33

Kolom Praktis 15/15

11.11111111

Begel 10/10 jarak 20cm

d (m m ) Besi

14.81481481

Begel 10/10 jarak 20cm

Perancah

btg d (m m )

Besi

Balok 15/25

166.666667

Begel 10/20 jarak 20cm

Sloof 15/25

Besi

jmlh batang / m 3

btg

p (m )

Ø8

1

4

4

1.56

Ø5

0.44

5

2.2

0.33

14.81481481 1.89

kg

84.0000

kg

8.148148148

per m3

sat

jmlh batang / m 3

222.222222

Begel 10/20 jarak 20cm per m 1

sa t

Volume 

0.0375

m3

Bekisting

0.41

m2

10.9333

m2

Perancah

3

btg

80.0000

btg

Hal 2/42

d (m m ) Besi

p (m )

Ø 12

1

5

5

4.45

Ø6

0.64

5

3.2

0.704

11.11111111 5.154

kg

137.4400

kg

7.111111111

per m1

sa t

per m 3

sa t

jm lh batang / m3

Volume 

0.045

m3

Bekisting

0.51

m2

11.3333

m2

Perancah

3

btg

66.6667

btg

Begel 10/25 jarak 15 - 20cm (17,5cm)

Balok 15/30

d (m m ) Besi

p (m )

Ø 12

1

7

Ø6

0.74

5.714

Balok 20/60

7

6.23

4.2284 0.9302

12.96296296 7.1602392

kg

159.1164

kg

7.830296296

per m 3

sa t

jm lh batang / m3

Begel 10/25 jarak 10 - 20cm (15cm) per m1

sa t

Volume 

0.12

m3

Bekisting

0.51

m2

11.3333

m2

3

btg

66.6667

btg

Perancah d (m m ) Besi

p (m )

Ø 12

1

7

Ø6

0.74

5.714

7

6.23 7.1602392

kg

159.1164

kg

7.830296296

per m1

sa t

per m 3

sa t

jm lh batang / m3

Volume 

0.03

m3

Bekisting

0.4

m2

13.3333

m2

Perancah

0.67

btg

22.3333

btg

Begel 10/15 jarak 20cm

Kolom 15/20

d (m m ) Besi

4.2284 0.9302

12.96296296

p (m )

Ø 10

1

4

4

2.48

Ø5

0.54

5

2.7

0.405

11.11111111 2.885

kg

96.1667

kg

7.5

per m1

sa t

per m 3

sa t

jm lh batang / m3

Volume 

0.045

m3

Bekisting

0.51

m2

11.3333

m2

1

btg

22.2222

btg

Begel 10/25 jarak 15 - 20cm (17,5cm)

Kolom 15/30

Perancah d (m m ) Besi

p (m )

Ø 12

1

8

Ø6

0.74

5.714

8

7.12

4.2284 0.9302

14.81481481 8.0502392

kg

178.8942

kg

7.830296296

per m 3

sa t

jm lh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)

Kolom 30/30

per m1

sa t

Volume 

0.09

m3

Bekisting

0.7

m2

7.7778

m2

1

btg

11.1111

btg

Perancah d (m m ) Besi

p (m )

Ø 16

1

4

4

6.32

3.703703704

Ø 12

1

4

4

3.56

3.703703704

Ø 10

1.09

5.714

kg

152.6836

kg

5.766907407

per m1

sa t

per m 3

sa t

jm lh batang / m3

Volume 

0.0625

m3

Bekisting

0.6

m2

9.6000

m2

Perancah

1

btg

16.0000

btg

Begel 10/25 jarak 15 - 20cm (17,5cm)

Kolom 25/25

d (m m ) Besi

6.2283 3.8615 13.7415212

p (m )

Ø 16

4

0

0

0

8

7.12

10.66666667

Ø 12

1

8

Ø8

0.9

5.714

5.1426 3.1884

10.308412

kg

164.9346

kg

6.8568

Hal 3/42

Plat lantai t = 12cm

Jarak 25 x 25 cm (2 lapis) per m2

sa t

Volume 

0.12

m3

Bekisting

1

Perancah

1 d (m m)

per m 3

sat

m2

8.3333

m2

m2

8.3333

m2

jm lh batang / m3

p (m )

Besi

0 Ø 10

Atap t = 8cm

1

16

16

9.92

9.92

kg

82.6667

kg

per m 3

sat

11.11111111

Jarak 20 x 20 cm (1 lapis) per m2

sa t

Volume 

0.08

m3

Bekisting

1

m2

12.5000

m2

1

m2

12.5000

m2

3.9

kg

48.7500

kg

per m 3

sat

Perancah d (m m)

p (m )

Besi Ø8 Atap t = 10cm

1

10

10

3.9

Jarak 30 x 30 cm (2 lapis) per m2

sa t

Volume 

0.1

m3

Bekisting

1

m2

10.0000

m2

1

m2

10.0000

m2

5.20026

kg

52.0026

kg

11.11166667

per unit

sa t

per m 3

sat

jm lh batang / m3

Volume 

0.11675

m3

Bekisting

0.48

m2

4.1113

m2

29.8128

kg

255.3559

kg

3.169164882

per unit

sa t

per m 3

sat

jm lh batang / m3

Volume 

0.054

m3

Bekisting

0.48

m2

4.1113

m2

Perancah d (m m)

jm lh batang / m3

p (m )

Besi

0 Ø8

1

13.334 13.334 5.2003

Begel 10/25 jarak 15cm

Voet plat 80x80

Perancah d (m m) Besi

p (m )

Ø 12

32.4

1

32.4

2 28 8.836

Ø6

0.74

6

4.44

0.9768

23.12633833

Begel 10/15 jarak 15cm

Voet plat 60x60

Perancah d (m m) Besi

p (m )

Ø 10

8.8

1

8.8

5.456

Ø5

0.54

5

2.7

0.405

Voet plat 100x100

13.58024691 5.861

kg

108.5370

kg

4.166666667

per m 3

sat

jm lh batang / m3

4.1113

m2

92.59259

Begel 30/30 jarak 15cm per unit

sa t

Volume 

0.281

m3

Bekisting

0.48

m2

Perancah d (m m) Besi

p (m )

Ø 12

32.4

1

32.4

2 28 8.836

Ø6

0.74

6

4.44

0.9768

23.12633833 kg

255.3559

kg

3.169164882

per m1

sa t

per m 3

sat

jm lh batang / m3

Volume 

0.186

m3

Bekisting

0.6

m2

3.2258

m2

Perancah

1

btg

5.3763

btg

balok 20/93

29.8128

Begel 10/25 jarak 15 - 20cm (17,5cm)

Hal 4/42

d (mm) Besi

p (m)

Ø 16

1

3

3

4.74

5.555555556

Ø 12

1

10

10

8.9

4.480286738

Ø8

2.15

5.714

12.285 4.7912

18.431189

kg

99.0924

kg

5.504077061

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)

balok 20/60

per m1

sat

Volume 

0.12

m3

Bekisting

0.6

m2

5.0000

m2

1

btg

8.3333

btg

Perancah d (mm) Besi

p (m)

Ø 16

1

3

3

4.74

5.555555556

Ø 12

1

6

6

5.34

4.166666667

Ø8

1.5

5.714

8.571

3.3427

13.42269

kg

111.8558

kg

5.952083333

per m3

sat

jmlh batang / m3

Begel 10/25 jarak 15 - 20cm (17,5cm)

Kolom 25/25

per m1

sat

Volume 

0.0625

m3

Bekisting

0.6

m2

9.6000

m2

1

btg

16.0000

btg

Perancah d (mm) Besi

p (m) 4

0

0

0

Ø 12

Ø 16 1

8

8

7.12

10.66666667

Ø8

0.9

5.714

5.1426 3.1884

10.308412

kg

164.9346

kg

6.8568

Hal 5/42

Hal 6/42 DAFTAR HARGA SATUAN UPAH DAN BAHAN KOTA SEMARANG Tahun 2011 SATUAN NO.

URAIAN

HARGA SATUAN (RUPIAH)

A

UPAH:

1

Tukang Batu

hari

43,000

2

Tukang Besi

hari

43,000

3

Tukang Kayu

hari

43,000

4

Kepala Tukang

hari

47,000

5

Pekerja

hari

33,000

6

Mandor

hari

45,000

B

BAHAN/MATERIAL:

1

Amplas Tembok

lbr.

600

2

Amplas Sikkens

lbr.

2,500

3

Adukan ready mix K-225

m3

560,000

4

Alat bantu selang

lot

80,000

5

Batu Bata Welahan

bh.

400

6

Batu Belah

m3

100,000

7

Besi Beton

kg.

7,500

8

Bubungan Genteng beton flat

bh.

3,800

9

Cat Dasar

kg.

20,000

10

Cat Kilat

kg.

60,000

11

Cat Meni Nippon

kg.

15,000

12

Cat Dulux Ext

ltr.

70,000

13

Cat Tembok samping flinkote

kg.

26,000

14

Cat Tembok exterior mowilex

ltr.

55,000

15

Cat Tembok interior ex catylac

kg.

18,000

16

Cat plafond maxilite

kg.

8,800

17

Cat Alkali

kg.

23,750

18

Folding Gate

m2

285,000

19

Genteng beton flat

bh.

3,500

20

Gypsum 9 mm

lbr

46,000

21

Kalsiboard ex. Nusaboard 4,5 mm

lbr

45,000

22

Kaca Bening 5 mm

m2

60,000

23

Kaca Warna 10 mm

m2

250,000

24

Kawat Pengikat

kg.

14,000

25

Kayu Dolken

btg

12,000

26

Kayu Bengkirai Papan

m3

6,000,000

27

Kayu Bengkirai 6/12 x 4m

btg

200,000

28

Besi Hollow

btng

29

Kayu Usuk untuk Cor

m3

2,500,000

30

Koral Beton

m3

170,000

31

Lembar Seng

m1

25,000

32

List Gypsum

m1

12,000

33

Minyak Cat

ltr.

5,500

34

Multiplex 9mm

lbr

105,000

35

Paku bermacam-macam ukuran

kg

15,000

36

Paku Beton

bh.

500

37

Paku Biasa

kg.

15,000

38

Paku Gypsum

kg

30,000

39

Papan Cor

lbr

7,000

40

Pasir Muntilan

m3

130,000

41

Pasir Urug

m3

90,000

42

Plamir Kayu

kg.

11,000

43

Plamir Tembok

kg.

8,000

18,000

KET.

Hal 7/42 DAFTAR HARGA SATUAN UPAH DAN BAHAN KOTA SEMARANG Tahun 2011 SATUAN NO.

URAIAN

HARGA SATUAN (RUPIAH)

44

Split

m3

170,000

45

Semen Portland (PC)

zak

42,000

46

Semen Putih

zak

55,000

47

Tanah Urug

m3

50,000

48

Ter / Residu

ltr.

9,000

49

Thinner

ltr.

6,500

50

Alat Bantu / Steiger

Ls

18,000

51

Kayu Usuk 5/7 x 4m Bengkirai

btg

85,000

52

Kayu Reng 2/3 4 m Bengkirai

btg

13,000

53

Papan 2/30 x 4 m

lbr

110,000

54

Wood plank 2/20 x 4 m ex. Elephant

lbr

45,000

55

Keramik 40 x 40 cm ex platinum

dos

50,000

56

Keramik 33 x 33 cm platinum

dos

45,000

57

Keramik 30 x 30 cm ex asia tile

dos

35,000

58

Keramik 30 x 30 cm ex platinum

dos

35,000

59

Keramik 20 x 20 cm ex asia tile

dos

32,000

60

Keramik 25 x 33 cm platinum

dos

41,500

61

Keramik 20 x 25 cm ex asia tile

dos

35,000

62

List 25cm platinum

bh.

16,000

63

List 20cm asia tile

bh.

6,000

KET.

DAFTAR ANALISA PEKERJAAN PEMBANGUNAN RUMAH TINGGAL KOTA SEMARANG 2011 I.

PEKERJAAN PERSIAPAN 2

1. Analisa 1 m Pembersihan Lapangan 0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0500

Mandor

@Rp.

45,000.00

Rp.

2,250.00

Rp.

5,550.00

2,500,000.00

Rp.

7,500.00

5,550.00

2. Analisa 10 M' Pasangan Bouwplank 3

0.0030 M

Kayu Cor

@Rp.

6.0000 Btg

Kayu Gelam

@Rp.

12,000.00

Rp.

72,000.00

0.1000 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

1,500.00

1.0000

Tukang

@Rp.

43,000.00

Rp.

43,000.00

0.1000

Kepala Tukang

@Rp.

47,000.00

Rp.

4,700.00

1.0000

Pekerja

@Rp.

33,000.00

Rp.

33,000.00

0.0500

Mandor

@Rp.

45,000.00

Rp.

2,250.00

82,950.00

163,950.00 Untuk 1 M' = 1/10

II.

Rp.

16,395.00

24,750.00

PEKERJAAN PONDASI. 3

1. Analisa 1 M Galian Tanah Pondasi 0.7500

Pekerja

@Rp.

33,000.00

Rp.

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

25,875.00

8,250.00

25,875.00

3

2. Analisa 1 M Urugan Tanah Kembali 0.2500

Pekerja

@Rp.

33,000.00

Rp.

0.0084

Mandor

@Rp.

45,000.00

Rp.

378.00

Rp.

8,628.00

8,628.00

3

3. Analisa 1 M Urugan Pasir Bawah Pondasi 1.2000 m3

Pasir Urug

@Rp.

90,000.00

Rp.

108,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

118,350.00

10,350.00

3

4. Analisa 1 M Aanstamping Batu Kali 3

1.1000 M

Batu Kali

@Rp.

100,000.00

Rp.

110,000.00

0.5000 M

Pasir Urug

@Rp.

90,000.00

Rp.

45,000.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

207,875.00

3

52,875.00

3

5. Analisa 1 M Pasangan Pondasi Batu Kali ad. 1 : 8 3

1.2000 M

Batu Kali

@Rp.

100,000.00

Rp.

120,000.00

2.4000 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

100,800.00

0.7600 M

Pasir Pasang

@Rp.

130,000.00

Rp.

98,800.00

0.6000

Tukang

@Rp.

43,000.00

Rp.

25,800.00

0.0600

Kepala Tukang

@Rp.

47,000.00

Rp.

2,820.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

401,095.00

3

81,495.00

3

6. Analisa 1 M Urugan Tanah Urug 3

1.2000 M

Tanah Urug

@Rp.

50,000.00

Rp.

60,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

70,350.00

10,350.00

Hal 8/42

III.

PEK. BETON BERTULANG Ad. 1:2:3 3

a. Analisa 1 M Beton ad. 1 : 2 : 3 (site mix K-225) 7.8960 Zak 0.4900 M

3

0.8200 M

3

Semen Portland (PC)

@Rp.

42,000.00

Rp.

331,632.00

Pasir Pasang

@Rp.

130,000.00

Rp.

63,700.00

Koral Beton

@Rp.

170,000.00

Rp.

139,400.00

0.2500

Tukang

@Rp.

43,000.00

Rp.

10,750.00

0.0250

Kepala Tukang

@Rp.

47,000.00

Rp.

1,175.00

1.6500

Pekerja

@Rp.

33,000.00

Rp.

54,450.00

0.0800

Mandor

@Rp.

45,000.00

Rp.

3,600.00

Rp.

604,707.00

560,000.00

69,975.00

3

b. Analisa 1 M Beton ad. 1 : 2 : 3 (ready mix K-225 berikut selang) 1.0000 M

3

Adukan ready mix K-225

@Rp.

560,000.00

Rp.

0.0450

Alat bantu selang

@Rp.

80,000.00

Rp.

3,600.00

1.0000

Upah Tenaga

@Rp.

34,987.50

Rp.

34,987.50

Rp.

598,587.50

42,000.00

Rp.

238,350.00

3

c. Analisa 1 M Beton ad. 1 : 3 : 5 (untuk konstruksi rabat, lantai kerja) 5.6750 Zak 0.5400 M

3

0.9100 M

3

1.0000

Semen Portland (PC)

@Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

70,200.00

Koral Beton

@Rp.

170,000.00

Rp.

154,700.00

Upah Tenaga

@Rp.

69,975.00

Rp.

69,975.00

Rp.

533,225.00

d. Analisa Tulang Besi 1 Kg Besi Beton Terpasang 1.0500 Kg

Besi Beton

@Rp.

7,500.00

Rp.

7,875.00

0.0150 Kg

Kawat Pengikat

@Rp.

14,000.00

Rp.

210.00

0.0070

Tukang

@Rp.

43,000.00

Rp.

301.00

0.0007

Kepala Tukang

@Rp.

47,000.00

Rp.

32.90

0.0070

Pekerja

@Rp.

33,000.00

Rp.

231.00

0.0004

Mandor

@Rp.

45,000.00

Rp.

18.00

Rp.

8,667.90

5,833.33

582.90

e. Analisa Upah Bekisting (dengan papan cor l=20cm p=200cm) / M2 (3x pakai) 0.8333 lbr

Papan cor

@Rp.

7,000.00

Rp.

0.2000 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

3,000.00

0.2600

Tukang

@Rp.

43,000.00

Rp.

11,180.00

0.0260

Kepala Tukang

@Rp.

47,000.00

Rp.

1,222.00

0.5200

Pekerja

@Rp.

33,000.00

Rp.

17,160.00

0.0260

Mandor

@Rp.

45,000.00

Rp.

1,170.00

Rp.

39,565.33

30,732.00

f. Analisa Pembuatan Tiang Perancah /M2 (4x pakai) 1.5625 btg

Kayu Dolken

@Rp.

12,000.00

Rp.

18,750.00

0.2000 Kg

Paku

@Rp.

15,000.00

Rp.

3,000.00

0.3300

Tukang

@Rp.

43,000.00

Rp.

14,190.00

0.0300

Kepala Tukang

@Rp.

47,000.00

Rp.

1,410.00

0.6600

Pekerja

@Rp.

33,000.00

Rp.

21,780.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

60,480.00

38,730.00

1. Analisa Beton Bertulang Pondasi Foot Plat ad. 1:2:3 Kecil 1.0000 M

3

5.3333 M2 132.9211 Kg

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

Bekisting

@Rp.

39,565.33

Rp.

211,013.79

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,152,146.80

Rp.

1,961,748.09

2. Analisa Beton Bertulang Sloof Struktur ad. 1:2:3 1.0000 M

3

13.3300 M2 171.0900 Kg

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

Bekisting

@Rp.

39,565.33

Rp.

527,405.89

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,482,991.01

Rp.

2,608,984.40

Rp.

598,587.50

3. Analisa Beton Bertulang Sloof Praktis 15/20 ad. 1:2:3 1.0000 M

3

Beton cor ready mix K-225

@Rp.

598,587.50

Hal 9/42

13.3333 M2 138.4667 Kg

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,326,339.47

4. Analisa Beton Bertulang Kolom Struktur (15/20) ad. 1:2: 3 3

1.0000 M

13.3333 M2 5.5833 btg 138.4667 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Tiang Perancah

@Rp.

7,500.00

Rp.

41,874.94

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,374,333.91

604,707.00

5. Analisa Beton Bertulang Kolom Praktis 15/15 ad. 1:2:3 3

1.0000 M

17.7778 M2 131.7333 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,141,851.33

Rp.

2,449,942.91

598,587.50

Rp.

598,587.50

6. Analisa Beton Bertulang Balok 15/40 ad. 1:2:3 3

1.0000 M

11.8300 M2 1.6670 M2 213.8300 Kg

Beton cor ready mix K-225

@Rp.

Bekisting

@Rp.

39,565.33

Rp.

468,057.89

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,853,457.06

Rp.

3,020,922.61

7. Analisa Beton Bertulang Balok 15/20 ad. 1:2:3 3

1.0000 M

13.3333 M2 1.6670 M2 138.4667 Kg

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

Bekisting

@Rp.

39,565.33

Rp.

527,536.46

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,200,215.51

Rp.

2,433,279.13

604,707.00

Rp.

604,707.00

7. Analisa Beton Bertulang Ring Balk 15/15 ad. 1:2: 3 3

1.0000 M

17.7778 M2 1.6670 M2 131.7333 Kg

Beton cor site mix K-225

@Rp.

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

Tiang Perancah

@Rp.

60,480.00

Rp.

100,820.16

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,141,851.33

Rp.

2,550,763.07

8. Analisa Beton Bertulang Balok Latey 15/15 ad. 1:2:3 3

1.0000 M

Beton cor site mix K-225

@Rp.

604,707.00

Rp.

604,707.00

17.7778 M2

Bekisting

@Rp.

39,565.33

Rp.

703,384.58

84.0000 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

728,103.60

Rp.

2,036,195.18

9. Analisa Beton Bertulang Plat Lantai ad. 1:2:3 t = 12cm 3

1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

8.3330 M2

Bekisting

@Rp.

70,482.00

Rp.

587,326.51 multiplek

6.0000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

362,880.00

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

680,066.10

Rp.

2,228,860.10

78.4580 Kg

10. Analisa Beton Bertulang Plat Atap ad. 1:2:3 t = 10cm 3

1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

10.0000 M2

Bekisting

@Rp.

70,482.00

Rp.

704,820.00

10.0000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

604,800.00

52.0026 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

450,753.34

Rp.

2,358,960.84

11. Analisa Beton Bertulang Tangga ad. 1:2:3 t = 12cm 3

1.0000 M

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

8.3350 M2

Bekisting

@Rp.

70,482.00

Rp.

587,467.47

8.3520 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

505,128.96

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

1,482,210.90

171.0000 Kg

Hal 10/42

Rp.

3,173,394.83

12. Analisa Beton Bertulang Dapur ad. 1:2:3 t = 8 cm 1.0000 M

3

Beton cor ready mix K-225

@Rp.

598,587.50

Rp.

598,587.50

12.5000 M2

Bekisting

@Rp.

33,732.00

Rp.

421,650.00 multiplek

12.5000 M2

Tiang Perancah

@Rp.

60,480.00

Rp.

756,000.00

48.7500 Kg

Besi Beton Tulangan

@Rp.

8,667.90

Rp.

422,560.13

Rp.

2,198,797.63

400.00

Rp.

32,000.00

IV.

PEKERJAAN DINDING DAN PLESTERAN 2

1. Analisa 1 M Pasangan Dinding Batu Bata ad. 1 : 4 80.0000 Bh 0.3962 Zak

Batu Bata Merah

@Rp.

Semen Portland (PC)

@Rp.

42,000.00

Rp.

16,640.40

Pasir Pasang

@Rp.

130,000.00

Rp.

5,460.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0150

Mandor

@Rp.

45,000.00

Rp.

675.00

Rp.

69,445.40

400.00

Rp.

32,000.00

0.0420 M

3

15,345.00

2

2. Analisa 1 M Pasangan Dinding Batu Bata ad. 1 : 8 80.0000 Bh 0.2700 Zak

Batu Bata Merah

@Rp.

Semen Portland (PC)

@Rp.

42,000.00

Rp.

11,340.00

Pasir Pasang

@Rp.

130,000.00

Rp.

5,850.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0150

Mandor

@Rp.

45,000.00

Rp.

675.00

Rp.

64,535.00

0.0450 M

3

15,345.00

2

3. Analisa 1 M Plesteran ad. 1 : 4 0.3300 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

13,860.00

Pasir Pasang

@Rp.

130,000.00

Rp.

3,250.00

0.1800

Tukang

@Rp.

43,000.00

Rp.

7,740.00

0.0180

Kepala Tukang

@Rp.

47,000.00

Rp.

846.00

0.3600

Pekerja

@Rp.

33,000.00

Rp.

11,880.00

0.0180

Mandor

@Rp.

45,000.00

Rp.

810.00

Rp.

38,386.00

0.0250 M

3

21,276.00

2

4. Analisa 1 M Plesteran ad. 1 : 8 tebal 2 cm 0.1950 Zak 0.0268 M

3

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,190.00

Pasir Pasang

@Rp.

130,000.00

Rp.

3,484.00

0.1800

Tukang

@Rp.

43,000.00

Rp.

7,740.00

0.0180

Kepala Tukang

@Rp.

47,000.00

Rp.

846.00

0.3600

Pekerja

@Rp.

33,000.00

Rp.

11,880.00

0.0180

Mandor

@Rp.

45,000.00

Rp.

810.00

Rp.

32,950.00

V.

21,276.00

PEKERJAAN LANTAI 3

1. Analisa 1 M Urugan Pasir Bawah Lantai 1.2000 M

3

Pasir Urug

@Rp.

90,000.00

Rp.

108,000.00

0.3000

Pekerja

@Rp.

33,000.00

Rp.

9,900.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

118,350.00

10,350.00

3

2. Analisa 1 M Beton Tumbuk ad. 1 : 3 : 5 4.0000 Zak 0.5000 M

3

1.0000 M

3

Semen Portland (PC)

@Rp.

42,000.00

Rp.

168,000.00

Pasir Pasang

@Rp.

130,000.00

Rp.

65,000.00

Koral Beton

@Rp.

170,000.00

Rp.

170,000.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

49,410.00

Hal 11/42

1.2000

Pekerja

@Rp.

33,000.00

Rp.

39,600.00

0.0060

Mandor

@Rp.

45,000.00

Rp.

270.00

Rp.

452,410.00

2

3. Analisa 1 M Pasangan Lantai Keramik 40 x 40 cm 1 : 6 tebal 3cm 6.5625 Bh 0.2030 Zak Zak 0.0321 M

3

Keramik 40 x 40

@Rp.

8,333.33

Rp.

54,687.50

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.1200

Tukang

@Rp.

43,000.00

Rp.

5,160.00

0.0120

Kepala Tukang

@Rp.

47,000.00

Rp.

564.00

0.2500

Pekerja

@Rp.

33,000.00

Rp.

8,250.00

0.0130

Mandor

@Rp.

45,000.00

Rp.

585.00

Rp.

81,945.50

6.25

14,559.00

2

3. Analisa 1 M Pasangan Lantai Keramik 33 x 33 cm 1 : 6 tebal 3cm 9.6419 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 33 x 33

@Rp.

5,000.00

Rp.

48,209.37

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

75,467.37

9.182736455

2

3. Analisa 1 M Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm 11.6667 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 30 x 30

@Rp.

3,181.82

Rp.

37,121.21

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,379.21

11.11111111

2

3. Analisa 1 M Pasangan Lantai Keramik 30 x 30 cm 1 : 6 tebal 3cm bagus 11.6667 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 30 x 30

@Rp.

3,181.82

Rp.

37,121.21

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,379.21

16

2

3. Analisa 1 M Pasangan Lantai Keramik 20 x 20 cm 1 : 6 tebal 3cm 26.2500 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 20 x 20

@Rp.

1,280.00

Rp.

33,600.00 8,526.00

Semen Portland (PC)

@Rp.

42,000.00

Rp.

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

60,858.00

25

2

3. Analisa 1 M Pasangan keramik dinding 25 x 33 cm 1 : 6 tebal 3cm 12.7273 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 25 x 33

@Rp.

3,458.33

Rp.

44,015.15

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

71,273.15

12.12121212

2

3. Analisa 1 M Pasangan Keramik dinding 20 x 25 cm 1 : 6 tebal 3cm 21.0000 Bh 0.2030 Zak Zak 0.0321 M

3

1.0000

Keramik 20 x 25

@Rp.

1,750.00

Rp.

36,750.00

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

Upah Tenaga

@Rp.

14,559.00

Rp.

14,559.00

Rp.

64,008.00

20

1

3. Analisa 1 M Pasangan List Keramik 25 x 6 cm 1 : 6 tebal 3cm 4.2000 Bh

Keramik 25 x 6

@Rp.

16,000.00

Rp.

67,200.00

0.0122 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

511.56

Zak 0.0019 M

3

Semen Putih

@Rp.

55,000.00

Rp.

-

Pasir Pasang

@Rp.

130,000.00

Rp.

250.38

4

Hal 12/42

0.0600

Upah Tenaga

@Rp.

14,559.00

Rp.

873.54

Rp.

68,835.48

1

3. Analisa 1 M Pasangan List Keramik 20 x 6 cm 1 : 6 tebal 3cm 5.2500 Bh

Keramik 20 x 6

@Rp.

6,000.00

Rp.

31,500.00

0.0122 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

511.56

Semen Putih

@Rp.

55,000.00

Rp.

-

0.0019 M

Zak

Pasir Pasang

@Rp.

130,000.00

Rp.

250.38

0.0600

Upah Tenaga

@Rp.

14,559.00

Rp.

873.54

Rp.

33,135.48

3

5

2

8. Analisa 1 M Pasangan Lantai Batu Koral Sikat 2

1.2000 M

Batu Koral Sikat

@Rp.

75,000.00

Rp.

90,000.00

0.3000 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

12,600.00

3

0.0321 M

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.7000

Pekerja

@Rp.

33,000.00

Rp.

23,100.00

0.0350

Mandor

@Rp.

45,000.00

Rp.

1,575.00

Rp.

148,143.00

41,370.00

2

9. Analisa 1 M Pasangan Dinding Batu Alam 2

1.0500 M

Batu Alam

@Rp.

130,000.00

Rp.

136,500.00

0.2030 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,526.00

0.0321 M

Pasir Pasang

@Rp.

130,000.00

Rp.

4,173.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.6200

Pekerja

@Rp.

33,000.00

Rp.

20,460.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

187,704.00

42,000.00

Rp.

238,350.00

3

38,505.00

3

10. Analisa 1 M Rabat Beton ad. 1 : 2 : 3 5.6750 Zak 3

M

3

M 1.0000

VI.

Semen Portland (PC)

@Rp.

Pasir Pasang

@Rp.

130,000.00

Rp.

-

Koral Beton

@Rp.

170,000.00

Rp.

-

Upah Tenaga

@Rp.

69,975.00

Rp.

69,975.00

Rp.

308,325.00

PEKERJAAN ATAP 1

1. Analisa 1 M Pekerjaan Murplat, Gording, Nok, Jurai 0.2625 btg

Kayu Bengkirai

@Rp.

200,000.00

Rp.

52,500.00

0.0190 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

285.00

0.0518

Tukang

@Rp.

43,000.00

Rp.

2,227.40

0.0052

Kepala Tukang

@Rp.

47,000.00

Rp.

243.65

0.0173

Pekerja

@Rp.

33,000.00

Rp.

570.90

0.0009

Mandor

@Rp.

45,000.00

Rp.

38.88

Rp.

55,865.83

3,080.83

2

2. Analisa 1 M Pasang Usuk dan Reng 0.5500 btg

Kayu Usuk 5/7

@Rp.

85,000.00

Rp.

46,750.00

0.8250 btg

Kayu Reng 2/3

@Rp.

13,000.00

Rp.

10,725.00

0.2500 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

3,750.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

77,815.00

16,590.00

2

3. Analisa 1 M Pasang Atap Genteng Beton flat 10.0000 Bh

Genteng Beton

@Rp.

3,500.00

Rp.

35,000.00

0.1000

Tukang

@Rp.

43,000.00

Rp.

4,300.00

0.0100

Kepala Tukang

@Rp.

47,000.00

Rp.

470.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

11,820.00

Hal 13/42

0.0100

Mandor

@Rp.

45,000.00

Rp.

450.00

Rp.

46,820.00

3,800.00

Rp.

13,300.00

4. Analisa 1 M' Pasang Bubungan Genteng Beton 3.5000 Bh

Bubungan Genteng Beton

@Rp.

0.2000 Zak

Semen Portland (PC)

@Rp.

42,000.00

Rp.

8,400.00

0.0330 M

Pasir Pasang

@Rp.

130,000.00

Rp.

4,290.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0200

Kepala Tukang

@Rp.

47,000.00

Rp.

940.00

0.4000

Pekerja

@Rp.

33,000.00

Rp.

13,200.00

0.0200

Mandor

@Rp.

45,000.00

Rp.

900.00

Rp.

49,630.00

23,625.00

3

23,640.00

5. Analisa 1 M' Listplank Woodplank ex. Elephant Double 0.5250 lbr

Papan 2/20

@Rp.

45,000.00

Rp.

0.0250 Kg

Paku Biasa

@Rp.

15,000.00

Rp.

375.00

0.2000

Tukang

@Rp.

43,000.00

Rp.

8,600.00

0.0520

Kepala Tukang

@Rp.

47,000.00

Rp.

2,444.00

0.1900

Pekerja

@Rp.

33,000.00

Rp.

6,270.00

0.0095

Mandor

@Rp.

45,000.00

Rp.

427.50

Rp.

41,741.50

17,741.50

6. Analisa 1 M' Papan Sirip 0.2625 m3

Papan 2/20

@Rp.

45,000.00

Rp.

11,812.50

0.0250 kg

Paku

@Rp.

15,000.00

Rp.

375.00

0.0200

Tukang

@Rp.

43,000.00

Rp.

860.00

0.0020

Kepala Tukang

@Rp.

47,000.00

Rp.

94.00

0.0400

Pekerja

@Rp.

33,000.00

Rp.

1,320.00

0.0040

Mandor

@Rp.

45,000.00

Rp.

180.00

Rp.

14,641.50

2,454.00

7. Analisa 10 M' Talang Datar dengan Papan Talang 10.0000 m1

Lembar Seng

@Rp.

25,000.00

Rp.

250,000.00

5.5000 lbr

Papan 2/20

@Rp.

45,000.00

Rp.

247,500.00

8.0000

Tukang

@Rp.

43,000.00

Rp.

344,000.00

0.8000

Kepala Tukang

@Rp.

47,000.00

Rp.

37,600.00

5.0000

Pekerja

@Rp.

33,000.00

Rp.

165,000.00

0.2500

Mandor

@Rp.

45,000.00

Rp.

11,250.00

Rp.

1,055,350.00

Rp.

105,535.00

Untuk 1 M' = 1/10

VII.

557,850.00

PEKERJAAN PLAFOND DAN RANGKA 2

1. Analisa 1 M Pasang Plafond Gypsum 12 mm 0.3830 lbr

Gypsum 12 mm

@Rp.

46,000.00

Rp.

17,618.00

1.0500 btng

Besi Hollow

@Rp.

18,000.00

Rp.

18,900.00

0.1300 Kg

Kawat Penggantung

@Rp.

12,000.00

Rp.

1,560.00

38.0000 bh

Skrup Board

@Rp.

25.00

Rp.

950.00

Skrup Join Hollow

@Rp.

100.00

Rp.

210.00

0.0124 dos

Paku Beton

@Rp.

20,000.00

Rp.

248.00

0.0370 rol

Lakban kain

@Rp.

15,000.00

Rp.

555.00

0.0247 zak

Compound

@Rp.

60,000.00

Rp.

1,482.00

0.4000

Tukang

@Rp.

43,000.00

Rp.

17,200.00

0.0400

Kepala Tukang

@Rp.

47,000.00

Rp.

1,880.00

0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0140

Mandor

@Rp.

45,000.00

Rp.

630.00

Rp.

64,533.00

2.1000 bh

23,010.00

2

2. Analisa 1 M Pasang Plafond Kalsiboard 4,5 mm 0.3830 lbr

Kalsiboard 4,5 mm

@Rp.

46,000.00

Rp.

17,618.00

1.0500 btng

Besi Hollow

@Rp.

18,000.00

Rp.

18,900.00

Kawat Penggantung

@Rp.

12,000.00

Rp.

1,560.00

Skrup Board

@Rp.

25.00

Rp.

950.00

0.1300 Kg 38.0000 bh

Hal 14/42

2.1000 bh

Skrup Join Hollow

@Rp.

100.00

Rp.

210.00

0.0124 dos

Paku Beton

@Rp.

20,000.00

Rp.

248.00

0.0370 rol

Lakban kain

@Rp.

15,000.00

Rp.

555.00

0.0247 zak

Compound

@Rp.

60,000.00

Rp.

1,482.00

0.4000

Tukang

@Rp.

43,000.00

Rp.

17,200.00

0.0400

Kepala Tukang

@Rp.

47,000.00

Rp.

1,880.00

0.1000

Pekerja

@Rp.

33,000.00

Rp.

3,300.00

0.0140

Mandor

@Rp.

45,000.00

Rp.

630.00

Rp.

64,533.00

23,010.00

3. Analisa 10 M' Pasang List Profil Gypsum 10.0000 m'

List Gypsum

@Rp.

12,000.00

Rp.

120,000.00

0.5000

Tukang

@Rp.

43,000.00

Rp.

21,500.00

0.0500

Kepala Tukang

@Rp.

47,000.00

Rp.

2,350.00

0.5000

Pekerja

@Rp.

33,000.00

Rp.

16,500.00

0.0300

Mandor

@Rp.

45,000.00

Rp.

1,350.00

Rp.

161,700.00

Rp.

16,170.00

Untuk 1 M' = 1/10

VIII.

41,700.00

PEKERJAAN PINTU DAN JENDELA 3

1. Analisa 1 M Kusen Kayu Jati (KW II) 3

1.1000 M

Kayu Jati

@Rp.

6,000,000.00

Rp.

6,600,000.00

Tukang

@Rp.

43,000.00

Rp.

967,500.00

2.2500

Kepala Tukang

@Rp.

47,000.00

Rp.

105,750.00

9.0000

Pekerja

@Rp.

33,000.00

Rp.

297,000.00

0.3750

Mandor

@Rp.

45,000.00

Rp.

16,875.00

Rp.

7,987,125.00

22.5000

1,387,125.00

2. Analisa 1 M2 Daun Pintu Panil Jati (KW II) 0.0350 m3

Kayu Jati

@Rp.

6,000,000.00

Rp.

210,000.00

0.1000 kg

Paku Biasa

@Rp.

15,000.00

Rp.

1,500.00

5.0000

Tukang

@Rp.

43,000.00

Rp.

215,000.00

0.5000

Kepala Tukang

@Rp.

47,000.00

Rp.

23,500.00

1.6500

Pekerja

@Rp.

33,000.00

Rp.

54,450.00

0.0825

Mandor

@Rp.

45,000.00

Rp.

3,712.50

Rp.

508,162.50

296,662.50

2

3. Analisa 1 M Daun Jendela Jati Kaca Bening 5 mm (KW II) 0.0132 m3

Kayu Jati

@Rp.

6,000,000.00

Rp.

79,200.00

0.7500 m2

Kaca Bening 5mm

@Rp.

60,000.00

Rp.

45,000.00

4.0000

Tukang

@Rp.

43,000.00

Rp.

172,000.00

0.4000

Kepala Tukang

@Rp.

47,000.00

Rp.

18,800.00

1.3200

Pekerja

@Rp.

33,000.00

Rp.

43,560.00

0.0600

Mandor

@Rp.

45,000.00

Rp.

2,700.00

Rp.

361,260.00

66,000.00

237,060.00

2

4. Analisa 1 M Jendela Mati Kaca Bening 5 mm 1.1000 m2

Kaca Bening 5mm

@Rp.

60,000.00

Rp.

0.0150

Tukang

@Rp.

60,000.00

Rp.

900.00

0.1500

Kepala Tukang

@Rp.

43,000.00

Rp.

6,450.00

0.0150

Pekerja

@Rp.

47,000.00

Rp.

705.00

0.0008

Mandor

@Rp.

33,000.00

Rp.

24.75

Rp.

74,079.75

275,000.00

8,079.75

2

5. Analisa 1 M Jendela Mati Kaca Bening 10 mm 1.1000 m2

Kaca Bening 10mm

@Rp.

250,000.00

Rp.

0.0150

Tukang

@Rp.

60,000.00

Rp.

900.00

0.1500

Kepala Tukang

@Rp.

43,000.00

Rp.

6,450.00

0.0150

Pekerja

@Rp.

47,000.00

Rp.

705.00

0.0008

Mandor

@Rp.

33,000.00

Rp.

24.75

Rp.

283,079.75

8,079.75

Hal 15/42

IX.

PEKERJAAN PENGECATAN 2

1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Dulux 1.6670 Kg

Cat Tembok 2x

@Rp.

70,000.00

Rp.

116,690.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

0.6300

Tukang

@Rp.

43,000.00

Rp.

27,090.00

0.0630

Kepala Tukang

@Rp.

47,000.00

Rp.

2,961.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

181,699.75

Rp.

18,169.98

Untuk 1 M

2

37,776.00

2

1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Flinkote 1.6670 Kg

Cat Tembok 2x

@Rp.

26,000.00

Rp.

43,342.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

108,351.75

Rp.

10,835.18

Untuk 1 M

2

2

1. Analisa 10 M Pengecatan Tembok 3x sapu Eksterior ex. Mowilex 1.6670 Kg

Cat Tembok 2x

@Rp.

55,000.00

Rp.

91,685.00

0.8330 Kg

Alkali 1x

@Rp.

23,750.00

Rp.

19,783.75

2.0000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

1,200.00

0.1000 bh

Rol cat

@Rp.

12,500.00

Rp.

1,250.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

156,694.75

Rp.

15,669.48

Untuk 1 M

2

2

2. Analisa 10 M Pengecatan Tembok 3x sapu Interior ex. Catylac 3.7500 Kg

Cat Tembok 3x

@Rp.

18,000.00

Rp.

67,500.00

0.5000 Lbr

Amplas Biasa

@Rp.

600.00

Rp.

300.00

0.0100 bh

Rol cat

@Rp.

12,500.00

Rp.

125.00

1.0000

Stegger

@Rp.

5,000.00

Rp.

5,000.00

1.0000

Upah Tenaga

@Rp.

37,776.00

Rp.

37,776.00

Rp.

110,701.00

Rp.

11,070.10

Untuk 1 M

2

2

3. Analisa 10 M Coating Batu Alam 2.0000 Kg

Coating Sicosol

@Rp.

45,000.00

Rp.

90,000.00

0.3500

Tukang

@Rp.

43,000.00

Rp.

15,050.00

0.0350

Kepala Tukang

@Rp.

47,000.00

Rp.

1,645.00

0.7000

Pekerja

@Rp.

33,000.00

Rp.

23,100.00

0.0350

Mandor

@Rp.

45,000.00

Rp.

1,575.00

Rp.

131,370.00

Rp.

13,137.00

Untuk 1 M

2

41,370.00

2

4. Analisa 10 M Pengecatan Kayu Mengkilat 3x sapu 2.8400 Kg

Cat Kilat

@Rp.

60,000.00

Rp.

170,400.00

1.4200 Kg

Cat Dasar

@Rp.

20,000.00

Rp.

28,400.00

2.0000 Ltr

Minyak Cat

@Rp.

5,500.00

Rp.

11,000.00

1.2000 Kg

Cat Meni Nippon

@Rp.

15,000.00

Rp.

18,000.00

0.8000 Kg

Plamir kayu

@Rp.

11,000.00

Rp.

8,800.00

3.0000 Lbr

Amplas Niken

@Rp.

2,500.00

Rp.

7,500.00

2.2500

Tukang

@Rp.

43,000.00

Rp.

96,750.00

0.2250

Kepala Tukang

@Rp.

47,000.00

Rp.

10,575.00

1.5000

Pekerja

@Rp.

33,000.00

Rp.

49,500.00

0.0750

Mandor

@Rp.

45,000.00

Rp.

3,375.00

Rp.

404,300.00

160,200.00

Hal 16/42

1

Untuk 1 M

Rp.

6,064.50

2

5. Analisa 10 M Cat Plafond 3x sapu 2.5000 Kg

Cat Tembok maxilite

@Rp.

8,800.00

Rp.

22,000.00

1.0000 Ls

Alat Bantu / Steiger

@Rp.

12,000.00

Rp.

12,000.00

0.6300

Tukang

@Rp.

43,000.00

Rp.

27,090.00

0.0630

Kepala Tukang

@Rp.

47,000.00

Rp.

2,961.00

0.2000

Pekerja

@Rp.

33,000.00

Rp.

6,600.00

0.0250

Mandor

@Rp.

45,000.00

Rp.

1,125.00

Rp.

71,776.00

Rp.

7,177.60

2

Untuk 1 M

X.

37,776.00

PEKERJAAN LAIN-LAIN 2

1. Analisa 10 M Analisa Pembersihan Akhir Lapangan 0.7500

Pekerja

@Rp.

33,000.00

Rp.

24,750.00

0.0375

Mandor

@Rp.

45,000.00

Rp.

1,687.50

Rp.

26,437.50

Rp.

2,643.75

2

Untuk 1 M = 1/10

26,437.50

Hal 17/42

TAHAP 1 RUMAH LB=89,7 / LT=144,7 m 2

nama

TAHAP 2 RUMAH LB=76,58 / LT=144,7 m 2 TAHAP 1+2 RUMAH LB=166,28/ LT=144,7 m2 luas tanah

144.700

luas lt 1 luas lt 2

89.700 76.580 166.280

luas thp 1

t1

bowplang

48.000

pondasi

48.710 41.780

90.490 t1

galian tanah pondasi 0.831

75.224

urugan tanah kembali 25.075 urugan pasir 0.070

6.334

anstamping 0.140

12.669

pondasi batu belah 0.300

27.371

footplat 26.000

0.107

2.776

0.034

0.878

lantai kerja 0.832

3.653 slof 15/20

0.000 0.000

0.030

0.000

0.038

3.512

tahap 1 0.023

0.799

slof 15/25 90.490 -2.830 6.000 0.000 93.660

kolom praktis

KOLOM

tahap 1

tahap 2 0.023

1.013

tahap 2

15 30

0.060 0.045

0.000 4.075

0.060 0.045

0.000 2.363

15 25 15 20

0.038 0.030

0.000 0.000

0.038 0.030

0.000 0.000

20 20

0.560

tahap 1

BALOK 15 30

51.450

20 40

51.520 0.000 102.970

0.027

3.388

0.020

0.000

0.030

0.887

0.023

0.000

0.045

1.070

0.063

0.000

15 25

0.000 0.000 15 20 ring balk

13.450

konsol

gunungan1

balok latey1

16.110

29.560

15 15

tahap 2

15 30

17.670 6.100 0.000 23.770

15 25

0.000 0.000 RING BALK

0.608

15 20

31.550 26.400

latey 15/20

gunungan

0.000 0.000

0.866 0.866

0.000 0.000

0.866 0.866

0.000

0.866

0.000

0.866

57.950

0.030

0.120

9.882

0.120

0.000

0.100

0.000

0.100

1.738

1.739

plat 12 cm tahap 1 82.350 82.350 plat 12 cm tahap 2

0.000 plat 10 cm tahap 1

0.000

plat 10 cm tahap 2 17.380

17.380 lefel 8 cm tahap1 2.136 4.200

6.336 kantilefer

2.800 dapur 9.136

0.080

1.614

0.080

1.294

waterproof

125.046

0.000

compound

39.896

lefel 8 tahap 2 16.180 . dapur 16.180

PLAT TANGGA 1.080

1.080 DINDING TAHAP 1 total

pelubang

eksterior

lt1

interior

260.960 45.140

281.532 dinding pagar

samping

19.600

36.050

31.360

81.190 plesteran

3.400

271.246

542.492

lt2

175.780

162.960

0.000

0.000

29.350 31.100 60.450 plesteran

3.400

169.370

338.740

lt3

0.000

3.550

plesteran

tahap 1

0.000

0.000

jumlah

luas

panjang

unting

luas total

pjg total

P1

1.000

6.700

7.640

2.000

0.075

6.700

7.790

P2

4.000

2.300

5.840

2.000

0.075

9.200

23.960

P3

2.000

1.780

5.140

2.000

0.075

3.560

10.580

PJ1

1.000

6.300

13.200

4.000

0.075

6.300

13.500

PJ2

6.300

13.200

4.000

0.075

0.000

0.000

PJ3

4.800

12.200

3.000

0.075

0.000

0.000

J1

4.400

11.960

4.000

0.075

0.000

0.000

J2

3.800

11.520

4.000

0.075

0.000

0.000

2.600 1.800

8.340 7.080

4.000 4.000

0.075 0.075

10.400 0.000

34.560 0.000

36.160

90.390

J3  j4

4.000

melamin

d kayu

d kaca

0.000

0.000

72.320

a. Engsel pintu (per pintu 3 bh / 1,5 psng) b. Kunci tanam 2x slag + handle c. Door stoper 

TAHAP 2

jumlah

P1

luas

panjang

unting

luas total

pjg total

6.700

7.640

2.000

0.075

0.000

0.000

P2

2.000

2.300

5.840

2.000

0.075

4.600

11.980

P3

1.000

1.780

5.140

2.000

0.075

1.780

5.290

6.300

13.200

4.000

0.075

0.000

0.000

PJ2

1.000

6.300

13.200

4.000

0.075

6.300

13.500

PJ3

1.000

4.800

12.200

3.000

0.075

4.800

12.425

J1

1.000

4.400

11.960

4.000

0.075

4.400

12.260

J2

1.000

3.800

11.520

4.000

0.075

3.800

11.820

J3

3.000

2.600

8.340

4.000

0.075

7.800

25.920

 j4

1.000

1.800

7.080

4.000

0.075

1.800

7.380

PJ1

d kayu

d kaca

melamin

a. Engsel pintu (per pintu 3 bh / 1,5 psng) b. Kunci tanam 2x slag + handle c. Door stoper 

TAHAP 1 pasang batu andesit susun sirih pasang batu alam

TAHAP 2

20.100

BETON TUMBUK t1

t2 95.700

0.050 T1

4.785 T2

karpot K50 k40

74.700

45.100

K33 k30

6.150 5.900

19.430 2.100

24.720

9.860

70.420

54.760

K2525 K2533 K2020 K2025 kol kolan ps urug

4.785

PEKERJAAN ATAP talang 1

talang 2 8.000

0.000

0.866

8.000

0.866

0.000

9.238

luas atap tahap 1

tahap2 89.900

0.000

0.86603

0.000

89.900

0.866025

103.808

KERPUS t1

t2 27.240

0.000

0.866

27.240

0.866

0.000

Pas. Listplank

37.204

T1

T2 40.500

0.866025 0.866025

35.280 70.560

100.575

0.000

0.000

0.000 pasang gording

T1

40.500 T2

0.000

PLAFOND

T1

LIS

T2 75.800

63.100

75.800

63.100

T1

TRITISAN

0.000

T2 89.800

61.200

89.800

61.200

T1

T2 29.840

0.000

29.840

pipa tahap 1

tahap 2

5"

4"

3"

23.000

3/4" 12.000

1/2" panas 4" 31.600 10.000

3"

3/4" 1/2" panas 12.000 10.000 13.000

25.000

20.500

11.800

5"

4" 23.000

X.

3" 0.000

42.000

3/4" 48.800

1/2" panas 73.600

4"

3"

10.000

0.000

1/2" 12.000

1/2" panas

30.500

PEKERJAAN LAIN-LAIN

t1

1

Pasang railing besi tempa

11.06

19.900

m

2

Pasang lampu gantung

1.00

1.000

bh

3

Pasang lampu downlight SL

11.00

10.000

bh

4

Pasang lampu SL tempel

t2 1

bh

13.000

5

Pasang lampu taman

1.00

bh

6

Pasang lampu uplight kolam

bh

7

Pasang lampu spot dinding

bh

8

Pasang lampu downlight halogen

9

6.00

6.000

bh

Pasang saklar

10.00

8.000

bh

10

Pasang stop kontak

13.00

10.000

bh

11

Pasang titik lampu + stop kontak

32.00

12

Pasang MCB

13

Pipa PVC diameter 5" D

23.00

14

Pipa PVC diameter 4" D

0.00

0.000

m

15

Pipa PVC diameter 3" D

48.80

12.000

m

16

Pipa PVC diameter 3/4" AW

73.60

30.500

m

17

Pipa PVC diameter 1/2 " AW air panas

10.00

13.000

m

18

Kran tempel

3.00

2.000

bh

19

Floor drain (avour)

2.00

7.000

bh

20

Kloset duduk

2.00

1.000

bh

21

Kloset jongkok

22

Kitchen zink

1.00

wastafel Keran panas dingin

1.00

25

Pembersihan akhir

89.70

pagar panjang

galian tanah pondasi 0.000

urugan tanah kembali 0.000 urugan pasir 0.000

anstamping 0.140

0.000

pondasi batu belah 0.300

0.000

slof 15/20 0.000

0.000 0.000

0.030

0.000

kolom praktis 0.023

2.250

0.000

ring balk 15/20 0.000

0.030

0.000

bh 1

m

1.00

24

0.070

1.000

bh

1 1 1 1

bh

23

0.831

27.00

bh 1.00

bh

76.580

m

2

Pas. Dinding Bata adukan 1 : 8

0 Plesteran Dinding Bata adukan 1 : 8

0

d jendela

bv 1.000

roster

skonengan 7.640

tatapan

melamin pintu

7.640

0.000

0.000

5.840

23.360

0.000

0.000

5.140

10.280 0.000

0.000 0.000

0.000 0.000

8.680 8.680 8.480 1.000

0.000

d jendela

2.000

bv

18.000

8.410

0.000

0.000

0.000

7.800

0.000

0.000

0.000

6.480 6.360

25.920 0.000

0.000 0.000

0.000 0.000

0.000

0.000

0.000

67.200

0.000

0.000 0.000

18.000

roster 1.000

skonengan

tatapan

melamin pintu

7.640

0.000

0.000

0.000

5.840 5.140

11.680 5.140

0.000 0.000

0.000 0.000

0.000

0.000

0.000

8.680 8.680 8.480 1.000

18.000

8.410

8.410

0.000

0.000

7.800 6.480

7.800 19.440

0.000 0.000

0.000 0.000

6.360

6.360

0.000

0.000

58.830 0.000

2.000

18.000

0.000

0.000 0.000

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 31/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

1

Pembersihan lapangan

Volume

90.00

m2 1

m

2

Pengukuran dan pasang bouwplank

3

Air Kerja dan Listrik

2.00

bln

4

Bedeng Dan Gudang

1.00

ls

5

Mobilisasi & demobilisasi

2.00

bln

II.

PEKERJAAN PONDASI

1

Galian tanah pondasi

2 3 4 5

Urugan tanah kembali bekas galian Urugan pasir bawah pondasi Pasangan pondasi batu belah ad 1 : 8 Pasangan Rolag batu belah ad 1 : 8

III.

PEK. BETON BERTULANG Ad. 1:2:3

1

Sloof 15/20

2

Kolom Praktis 15/15 Lt.1

42.00

SAT

58.72 14.70 4.95 21.05 0.70

1.94 2.16

3

m

3

m

3

m

3

m

3

m

M3 M

3 3

3

Balok Latey 15/20 Lt.1

0.40

M

4

Leufel t = 8 cm Lt.1

0.48

M3

5 6 7

Plat dapur t = 8 cm Kuda-kuda beton 15/20 Ringbalk 15/20

IV.

PEKERJAAN DINDING DAN PLESTERAN

1

Pas. Dinding Bata adukan 1 : 8 Lt.1

2

Plesteran Dinding Bata adukan 1 : 8 Lt.1

0.09 0.70 1.67

229.97 442.62

M

3

M

3

M

3

M2 M

2 2

3

Tali air Aluminium

1.30

M

4

Batu Alam andesit garis

2.22

M2

5

Batu Alam acak

V.

PEKERJAAN LANTAI

1

Rabat Beton Tumbuk t = 5 cm

2 3 4

Pasir Urug Bawah Lantai t=3 cm Pas. Keramik 40/40 Ruangan ex. Platinum Pas. Keramik 30/30 Teras,garasi ex. Platinum

5

Pas. Keramik Lantai KM/WC 25/25 ex Platinum

6

Pas. Keramik Dinding KM/WC 25/33 ex Platinum

7

Pas. List Keramik KM/WC 6/25 ex. Platinum

8

Pas. Keramik Dapur 20/20 ex Platinum

3.20

2.50

M

2

M3

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

%

5,550.00

499,500.00

0.42

16,395.00

688,590.00

0.58

300,000.00

600,000.00

0.50

2,000,000.00

2,000,000.00

1.67

500,000.00

1,000,000.00

0.84

4,788,090.00

4.00

25,875.00

1,519,380.00

1.27

8,628.00

126,831.60

0.11

118,350.00

585,832.50

0.49

401,095.00

8,443,049.75

7.05

401,095.00

280,766.50

0.23

10,955,860.35

9.15

2,608,984.40

5,061,429.74

4.23

2,449,942.91

5,291,876.69

4.42

2,550,763.07

1,020,305.23

0.85

2,198,797.63

1,055,422.86

0.88

2,198,797.63

197,891.79

0.17

2,550,763.07

1,785,534.15

1.49

2,550,763.07

4,259,774.33

3.56

18,672,234.80

15.60

64,535.00

14,841,113.95

12.40

32,950.00

14,584,329.00

12.18

15,000.00

19,500.00

0.02

187,704.00

416,702.88

0.35

187,704.00

600,652.80

0.50

30,462,298.63

25.45

452,410.00

1,131,025.00

0.94

118,350.00

177,525.00

0.15

81,945.50

3,390,085.34

2.83

64,379.21

376,618.39

0.31

60,858.00

159,447.96

0.13

M

3

M

2

M

2

2.62

M

2

10.40

M2

80,590.00

838,136.00

0.70

5.20

M'

68,835.48

357,944.50

0.30

72,340.00

217,020.00

0.18

1.50 41.37 5.85

3.00

M

2

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 32/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO 9

URAIAN PEKERJAAN Perkerasan Paving Carport

Volume 13.50

SAT M

2

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

%

77,500.00

1,046,250.00

0.87

7,694,052.18

6.43

90,000.00

5,760,000.00

4.81

40,000.00

1,784,000.00

1.49

46,820.00

2,996,480.00

2.50

10,000.00

640,000.00

0.53

VI. PEKERJAAN ATAP 1 2 3

Pas. Rangka Atap Baja Ringan biasa Pas. Gording CNP Pas. Atap Genteng Beton Flat ex. Cemara

64.00

M2 M

2

M

2

64.00

M

2

44.60 64.00

4

Pas. Aluminium Foil

5

Pas. Kerpus Genteng

6.60

M'

49,630.00

327,558.00

0.27

6

Pas. Genteng Tepi

5.90

M'

25,000.00

147,500.00

0.12

7

Pas. Listplank Woodplank ex. Elephant

18.50

M'

41,741.50

772,217.75

0.65

12,427,755.75

10.38

VII. PEKERJAAN PLAFOND DAN RANGKA 1

Pasang Plafond Gypsum 9 mm ex. Elephant

40.25

M2

64,533.00

2,597,453.25

2.17

2

Pasang List Profil Gypsum Ruangan

56.75

M'

16,170.00

917,647.50

0.77

64,533.00

824,086.41

0.69

4,339,187.16

3.62

3

Pasang Plafond Kalsiboard (Tritisan)

12.77

M

2

VIII. PEKERJAAN PINTU DAN JENDELA 1

Kusen Aluminium 4" coklat

60.45

M'

55,000.00

3,324,750.00

2.78

2

Tatapan Pintu

20.10

M'

10,000.00

201,000.00

0.17

3

Daun Pintu Panil

4.00

lbr

1,350,000.00

5,400,000.00

4.51

4

Daun Pintu PVC

1.00

lbr

250,000.00

250,000.00

0.21

5

Daun Jendela Aluminium + Kaca Bening 5mm

7.00

lbr

450,000.00

3,150,000.00

2.63

6

Daun Jendela Aluminium + Kaca Bening 5mm BV

1.00

lbr

325,000.00

325,000.00

0.27

7

Kaca mati 5mm

1.60

bh

74,079.75

118,527.60

0.10

8

Pekerjaan Aksesoris Pintu dan Jendela : a. Engsel Pintu (per pintu 3 bh/1,5 Pasang) ex Sobar

6.00

psng

35,000.00

210,000.00

0.18

b. Kunci Tanam 2x Slag Pintu Ruangan ex. SES

4.00

bh

105,000.00

420,000.00

0.35

c. Handle Pintu Ruangan ex. Dexon

4.00

bh

60,000.00

240,000.00

0.20

d. Door Stoper ex. Gerber

4.00

bh

22,500.00

90,000.00

0.08

13,729,277.60

11.47

15,669.48

1,358,700.18

1.14

11,070.10

1,600,515.06

1.34

7,177.60

423,765.50

0.35

65,000.00

900,900.00

0.75

1,500.00

85,125.00

0.07

13,137.00

71,202.54

0.06

15,000.00

90,300.00

0.08

7,177.60

459,366.40

0.38

IX.

PEKERJAAN PENGECATAN

1

Pengecatan tembok ext mowilex

2 3 4 5 6 7 8

Pengecatan tembok interior Eco Emulsion Pengecatan plafond 3 x sapu Maxilite Melamin daun pintu panil Cat Lis Plafond Gypsum ex. Maxilite Coating Batu Alam ex. Propan Stone Care Compound Plat Leufel Cat Genteng

86.71 144.58 59.04 13.86 56.75 5.42 6.02 64.00

m3 2

m

2

m

2

m

1

m

2

m

2

m

2

m

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 33/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO 9

URAIAN PEKERJAAN Pengecatan listplank

Volume 18.50

SAT 2

m

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

%

6,064.50

112,193.25

0.09

5,102,067.93

4.26

X.

PEKERJAAN LAIN-LAIN

1

Pasang Lampu Taman ex. Zetalux

2.00

bh

155,000.00

310,000.00

0.26

2

Pasang Lampu Fitting SL ex. Philips

7.00

bh

40,000.00

280,000.00

0.23

3

Pasang Lampu Halogen

2.00

bh

75,000.00

150,000.00

0.13

4

Pasang Saklar Tunggal ex.Clipsal

3.00

bh

15,000.00

45,000.00

0.04

5

Pasang Saklar Ganda ex.Clipsal

4.00

bh

20,000.00

80,000.00

0.07

6

Pasang Stop Kontak ex.Broco

5.00

bh

20,000.00

100,000.00

0.08

7

Pasang Titik Lampu + Stop Kontak ex. Supreme

16.00

bh

75,000.00

1,200,000.00

1.00

8

Pasang Panel MCB 6 Group

1.00

bh

300,000.00

300,000.00

0.25

9

Pasang Stop Kontak AC ex.Broco

2.00

bh

45,000.00

90,000.00

0.08

10

Pasang Socket Telepon + Instalasi

1.00

bh

70,000.00

70,000.00

0.06

11

Pasang Socket Antene TV + Instalasi

1.00

bh

70,000.00

70,000.00

0.06

12

Monoblok + Jet Shower ex.HCG

1.00

bh

1,350,000.00

1,350,000.00

1.13

13

Kran Tempel Plastik

2.00

bh

30,000.00

60,000.00

0.05

14

Wash bak

1.00

bh

225,000.00

225,000.00

0.19

15

Kran Bebek dapur

1.00

bh

100,000.00

100,000.00

0.08

16

Kran Shower dingin ex. Washer

1.00

bh

350,000.00

350,000.00

0.29

17

Floor Drain

1.00

bh

32,500.00

32,500.00

0.03

18

Pipa PVC diameter 4" D ex. Wafin

13.00

M'

29,000.00

377,000.00

0.31

19

Pipa PVC diameter 3" D ex. Wafin

30.00

M'

19,000.00

570,000.00

0.48

20

Pipa PVC diameter 3/4" D ex. Maspion AW

29.00

M'

9,000.00

261,000.00

0.22

21

Pipa PVC diameter 1/2" D ex. Maspion AW

15.00

M'

7,000.00

105,000.00

0.09

22

Bak Tandon Air 3000 Lt (bawah)

1.00

M'

3,000,000.00

3,000,000.00

2.51

23

Septictank & Peresapan

1.00

bh

1,600,000.00

1,600,000.00

1.34

24

Pompa Air Shimizu

1.00

bh

450,000.00

450,000.00

0.38

25

Bak Kontrol

2.00

bh

60,000.00

120,000.00

0.10

2,643.75

237,937.50

0.20

11,533,437.50

9.63

119,704,261.90

100.00

26

Pembersihan Akhir

TOTAL BIAYA PEKERJAAN

90.00

M

2

2,602,266.56

RENCANA ANGGARAN BIAYA (KESELURUHAN)

Halaman 34/42 PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY)

NO

URAIAN PEKERJAAN

Volume

SAT

harga satuan

JUMLAH

BOBOT

(Rp)

(Rp)

%

REKAPITULASI RAB PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) BANGKA NO.

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

NILAI PEKERJAAN Rp. 4,788,090.00

II.

PEKERJAAN PONDASI

Rp.

10,955,860.35

9.15

III. PEK. BETON BERTULANG Ad. 1:2:3

Rp.

18,672,234.80

15.60

IV. PEKERJAAN DINDING DAN PLESTERAN

Rp.

30,462,298.63

25.45

V.

Rp.

7,694,052.18

6.43

VI. PEKERJAAN ATAP

Rp.

12,427,755.75

10.38

VII. PEKERJAAN PLAFOND DAN RANGKA

Rp.

4,339,187.16

3.62

VIII. PEKERJAAN PINTU DAN JENDELA

Rp.

13,729,277.60

11.47

IX. PEKERJAAN PENGECATAN

Rp.

5,102,067.93

4.26

X.

Rp.

11,533,437.50

9.63

Rp.

119,704,261.90

100

Rp.

119,704,261.90

PEKERJAAN LANTAI

PEKERJAAN LAIN-LAIN JUMLAH

Total Biaya Konstruksi Gedung

Semarang, Agustus 2011 Dibuat Oleh :

Ali Muhtarom, ST

NILAI BOBOT 4.00

URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO

I 1

URAIAN PEKERJAAN

PEKERJAAN PONDASI Pasang Bowplank

2 3

Urugan Pasir Bawah Pondasi Anstamping Batu belah

4

Pas Pondasi Batu Kali 1:8

II 1

VOLUME

SATUAN

42.00

m1

4.95

m3 m3

21.75

m3

PEKERJAAN BETON BERTULANG Pondasi voet plat besar

m3

2

Pondasi voet plat kecil

3

Sloof praktis 15/20

4

Sloof struktur

m3

5

Kolom Struktur besar

m3

6

Kolom Struktur 15/20

m3

m3

1.940

m3

JENIS BAHAN & TNG KERJA

Papan cor Usuk cor 4/6 Paku Pasir Urug Batu Kali Pasir urug Batu Kali Semen Pasir

Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Papan cor

Hal 36/42

SATUAN BHN

JUMLAH BAHAN

SATUAN

0.200 0.600 0.100 1.200 1.100 0.500 1.200 2.400 0.760

8.40 25.20 4.20 5.94 0.00 0.00 26.10 52.20 16.53

lbr btg kg m3 m3 m3 m3 zag m3

0.820 0.490 7.896 2.077 2.660 4.442 23.126 3.169 0.820 0.490 7.896 2.077 2.660 4.442 13.581 4.167 0.820 0.490 7.896 2.077 2.660 11.108 11.112 7.500 0.820 0.490 7.896 2.077 2.660 11.108 11.112 7.112 0.820 0.490 7.896 1.976 2.660 11.108 14.815 7.831 0.820 0.490 7.896 1.976 3.556 11.108

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.59 0.95 15.32 4.03 5.16 21.55 21.56 14.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg lbr

URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO

I

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG KERJA

Hal 37/42

SATUAN BHN

JUMLAH BAHAN

SATUAN

PEKERJAAN PONDASI

7

Tiang Praktis 15/15

8

Balok Struktur

9

Ring balk

10 Balok Latey

2.160

m3

m3

2.370

m3

0.400

m3

11 Plat lantai beton t=12cm

m3

12 Plat atap beton t=10cm

m3

13 Plat tangga beton t=12cm

m3

Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Papan cor Besi 8,3 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 11,3 Besi 5,6 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 9,5 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Besi 4,9 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 9,5 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Kericak Pasir Semen Bendrat

11.112 7.500 0.820 0.490 7.896 1.976 3.556 14.809 14.815 8.150 0.820 0.490 7.896 1.976 3.556 11.111 9.854 12.963 7.831 0.820 0.490 7.896 1.976 3.556 8.333 14.809 11.112 7.500 0.820 0.490 7.896 1.976 3.556 2.833 14.809 14.815 8.149 0.820 0.490 7.896 0.780 2.000 8.333 6.944 11.112 0.820 0.490 7.896 0.780 4.000 3.907 8.330 11.112 0.820 0.490 7.896 0.780

0.00 0.00 1.77 1.06 17.06 4.27 7.68 31.99 32.00 17.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.94 1.16 18.71 4.68 8.43 19.75 35.10 26.34 17.78 0.33 0.20 3.16 0.79 1.42 1.13 5.92 5.93 3.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

btg btg m3 m3 zag kg kg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg btg m3 m3 zag kg kg btg lbr btg m3 m3 zag kg kg btg lbr btg m3 m3 zag kg

URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO

I

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG KERJA

Hal 38/42

SATUAN BHN

JUMLAH BAHAN

SATUAN

PEKERJAAN PONDASI

14 Leufel dan Plat Dapur t=8

0.570

15 Beton Tumbuk

III 1

2

IV 1

m3

m3

PEKERJAAN DINDING DAN PLESTERAN Pas. dinding bata ad 1:8

229.97

m2

Plesteran Dinding bata ad 1:8

442.62

m2

2.50

m3

PEKERJAAN LANTAI Rabat Beton Tumbuk 1:3:5 t=5

2

Pas. keramik lantai 50/50 ruangan 1:8

3

Pas. keramik lantai 40/40 ruangan 1:8

41.37

m2

4

Pas. keramik lantai 33,3/33,3 teras 1:8

5.85

m2

5

Pas. lantai tangga,teras 30/30 1:8

6

Pas. keramik lantai 25/25 KM/WC

7

Pas. keramik dinding 25/33 KM/WC

8

Pas. Keramik lantai 20/20 KM/WC

m2

9

Pas. Keramik dinding 20/25 KM/WC

m2

m2

m2

2.62

m2

10.40

m2

10 Pas. Keramik dinding 20/20 dapur

3.00

m2

7

Pas. Lis 6/25 KM/WC

5.20

m1

7

Pas. Lis 6/20 KM/WC

m1

Paku Usuk 4/6 Papan cor Besi 9,5 Kericak Pasir Semen Bendrat Paku Usuk 4/6 Papan cor Besi 8,3 Kericak Pasir Semen

4.000 3.907 6.940 13.283 0.820 0.490 7.896 0.780 4.000 3.907 8.330 10.940 0.910 0.540 5.675

0.00 0.00 0.00 0.00 0.47 0.28 4.50 0.44 2.28 2.23 4.75 6.24 0.00 0.00 0.00

kg btg lbr btg m3 m3 zag kg kg btg lbr btg m3 m3 zag

Batu Bata Semen Pasir Semen Pasir

77.000 0.270 0.045 0.195 0.027

17,707.69 62.09 10.35 86.31 11.86

buah zag m3 zag m3

Grosok Semen Keramik Semen Pasir Keramik Semen Pasir K eram ik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Keramik Semen Pasir Lis 6/25 Semen Pasir Lis 6/20 Semen

0.000 5.675 4.000 0.203 0.032 6.250 0.203 0.032 9.183 0.203 0.032 11.111 0.203 0.032 16.000 0.203 0.032 12.121 0.203 0.032 25.000 0.203 0.032 20.000 0.203 0.032 25.000 0.203 0.032 4.000 0.012 0.002 5.000 0.012

0.00 14.19 0.00 0.00 0.00 258.56 8.40 1.33 53.72 1.19 0.19 0.00 0.00 0.00 41.92 0.53 0.08 126.06 2.11 0.33 75.00 0.61 0.10 0.00 0.00 0.00 75.00 0.61 0.10 20.80 0.06 0.01 0.00 0.00

m3 zag lbr zag m3 lbr zag m3 doz zag m3 lbr zag m3 lbr zag m3 doz zag m3 lbr zag m3 lbr zag m3 lbr zag m3 bh zag m3 bh zag

50/50

40/40

33,3/ 33,3

30/30

25/25

25/33

20/20

20/25

20/20

URAIAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO

I

URAIAN PEKERJAAN

VOLUME

SATUAN

JENIS BAHAN & TNG KERJA

Hal 39/42

SATUAN BHN

JUMLAH BAHAN

SATUAN

PEKERJAAN PONDASI 11 Pas. Batu alam candi 20/20

m2

12 Pas. Batu alam 20x60

m2

13 Urugan Pasir Bawah Lantai t=3cm

1.50

m3

V 1

PEKERJAAN ATAP Pek gording, nok, jurai

m1

2

Pasang Usuk dan reng

m2

3

Pekerjaan Papan Lisplank & Papan Angin

4

Pekerjaan papan talang dan penutup

5

Pasang Kerpus genteng Beton

6 7

18.50

m1 m1

5.90

m1

Pasang Genteng Beton Gording kanal CNP15

64.00 44.60

m2 m1

PEKERJAAN PLAFOND DAN RANGKA Pekerjaan plafond gypsum ruangan

40.25

m2

2

Pekerjaan plafond kalsiboard tritisan

12.77

m2

VII 1

PEKERJAAN PENGECATAN Cat Tembok Eksterior abu2 mowilex

86.71

m2

144.58 64.00

m2 m2 m2 m2 m2

VI 1

5 6 7 8 9

Cat Tembok Interior catylac Cat Genteng Water proofing Coating batu alam ex. Sicosol Melamine daun pintu & roster

10 Cat Plafond 11 Cat kayu listplank

5.42

59.04 4.63

m2 m2

Pasir Batu alam 20/20 Semen Pasir Batu alam 20/60 Semen Pasir Pasir urug

0.002 26.250 0.203 0.032 14.375 0.203 0.032 1.200

0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.80

m3 lembar zag m3 lembar zag m3 m3

Kayu 6/12 x 4m Paku Usuk 5/7 x 4m Reng 2/3 x 4m Paku Papan 2/20 x 2m Paku Papan 2/20 x 4m Seng datar Kerpus beton Semen Pasir Genteng Beton Kanal C

0.263 0.190 0.550 0.825 0.250 0.263 0.025 0.550 1.050 3.675 0.200 0.033 10.500 0.167

0.00 0.00 0.00 0.00 0.00 4.86 0.46 0.00 0.00 21.68 1.18 0.19 672.00 7.43

batang kg btg btg kg lembar kg lembar m1 buah zag m3 lembar btg

Jayaboard 1,2x2,4 Rangka Hollow Skrup board Compound Kal si board 1,2x2,4 Rangka Hollow Skrup board Compound

0.383 0.802 38.000 0.025 0.383 0.802 38.000 0.025

15.40 32.28 1,529.50 0.99 4.89 10.24 485.26 0.32

lembar batang bh zag lembar batang bh zag

0.167 0.083 0.375 0.125 0.375 0.375 0.284 0.200 0.250 0.284 0.200

14.45 7.22 54.22 8.00 0.00 2.03 0.00 0.00 14.76 1.31 0.93

Cat Tembok Alkali Cat Tembok Cat Genteng Water proofing Coating batu Melamine Thinner Cat Tembok Cat kayu Thinner

kg kg kg kg kg kg kg kg kg kg kg

KEBUTUHAN BAHAN BANGUNAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO I

URAIAN PEKERJAAN

1 2 3 4

PEKERJAAN PONDASI Pasang Bowplank Urugan Pasir Bawah Pondasi Pasangan Aanstamping Pas Pondasi Batu belah

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PEKERJAAN BETON BERTULANG Pondasi voet plat besar Pondasi voet plat kecil Sloof 15/20 Sloof 15/25 Kolom struktur 15/25 Kolom struktur 15/20 Tiang Praktis 15/15 Balok beton 15/25 Ringbalk 15/20 Balok latey 15/15 Plat lantai beton t=12cm Plat atap beton t=10cm Plat tangga beton t=12cm Leufel t=8 Beton tumbuk

KERICAK

III 1 2 IV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 V 1 2 3 4 5 6 7

1.59 1.77 1.94 0.33 0.47

6.10 PEKERJAAN DINDING DAN PLESTERAN Pas. Dinding bata ad 1:8 Plesteran dinding ad 1:8 PEKERJAAN LANTAI Floor Lantai Btn Tumbuk 1:3:5 Pas. keramik 50/50 Pas. Keramik 40/40 Pas. keramik 33,3/33,3 Pas. keramik 30/30 Pas. keramik 25/25 Pas. keramik 25/33 Pas. keramik 20/20 Pas. keramik 20/25 Pas. Lis 6/25 KM/WC Pas. Lis 6/20 KM/WC Pas. keramik dapur 20/20 Pas. Batu candi 20/20 Pas. Batu andesit 15/30 Urugan Pasir Bawah Lantai PEKERJAAN ATAP Pek gording, nok & jurai Pas. Usuk dan reng Pek. Ppn. Angin & Listplank Pek. Talang dan Penutup Pas. Kerpus genteng beton Pas. Genteng Beton Gording kanal CNP15 SATUAN TOTAL BAHAN

PAKU

USUK 4/6

PAPAN COR

4.20

25.20

8.40

BESI 11,3

BESI 9,5 BESI 8,3 BESI 5,6 BESI 4,9

PASIR URUG

5.94 -

II

PASIR SEMEN 40 PASANG KG BENDRA

m3 6.1

16.53 16.53

52.20 52.20

0.95 1.06 1.16 0.20 0.28 3.65

15.32 17.06 18.71 3.16 4.50 58.75

10.35 11.86 22.21

62.09 86.31 148.40

1.33 0.19 0.08 0.33 0.10 0.01 0.10 -

14.19 8.40 1.19 0.53 2.11 0.61 0.06 0.61 -

2.14

27.70

-

4.20

4.03 4.27 4.68 0.79 0.44

-

-

-

-

5.94

BATU BELAH

26.10 26.10

25.20

8.40

-

5.16 7.68 8.43 1.42 2.28

-

19.75 1.13 2.23

21.55 31.99 35.10 5.92 4.75

14.22

24.97

23.11

99.31

-

47.89

44.16

-

53.19

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1.80 1.80

-

-

-

-

-

-

-

-

btg 47.9

btg 44.2

btg 53.2

m3 7.7

m3 26.1

21.56

14.55

-

-

17.60

32.00 -

26.34

17.78 3.26

5.93 6.24

0.46 0.19

1.18

0.19

1.18

m3 44.7

zag 288.2

-

0.46

-

-

kg 14.2

kg 29.6

btng 48.3

lbr 107.7

btg -

btg -

Hal 41 / 42

REKAPITULASI KEBUTUHAN BAHAN PROYEK RUMAH TINGGAL TYPE 46/90 M2 (Bpk. REDY) NO.

1 2 3 4

BAHAN/MATERIAL

Semen PC 40 kg Pasir Pasang Pasir Urug Batu Belah

SAT

zak 3

m

3

m

3

m

3

JUMLAH

HARGA SATUAN

HARGA TOTAL

288.23

Rp

42,000.00

Rp

12,105,521.40

44.72

Rp

130,000.00

Rp

5,813,323.10

7.74

Rp

90,000.00

Rp

696,600.00

26.10

Rp

100,000.00

Rp

2,610,000.00

5

Kericak  

m

6.10

Rp

170,000.00

Rp

1,037,136.00

6

Bendrat

kg

14.22

Rp

14,000.00

Rp

199,019.24

7

Paku

kg

29.63

Rp

15,000.00

Rp

444,480.12

8

Usuk 4/6 (Cor)

btg

48.31

Rp

5,000.00

Rp

241,547.60

9

Papan cor

lbr

107.71

Rp

6,000.00

Rp

646,235.94

10

Besi Ø 12 (11,3) - 12

btg

-

Rp

86,080.80

Rp

11

Besi Ø 10 (9,5) - 12

btg

47.89

Rp

59,966.40

Rp

2,871,954.00

12

Besi Ø 9 (8,3) - 12

btg

44.16

Rp

37,720.80

Rp

1,665,833.51

13

Besi Ø 6 (5,6) - 12

btg

-

Rp

22,994.40

Rp

14

Besi Ø 5 (4,9) - 12

btg

53.19

Rp

15,678.00

Rp

833,890.87

15

Batu Bata

bh

17,707.69

Rp

400.00

Rp

7,083,076.00

16

Genteng Beton FLAT

lbr

672.00

Rp

3,500.00

Rp

2,352,000.00

17

Kerpus Genteng Beton

bh

21.68

Rp

4,500.00

Rp

97,571.25

18

Canal C15

btg

7.43

Rp

175,500.00

Rp

1,304,550.00

1

-

-

19

Seng datar  

m

-

Rp

25,000.00

Rp

20

Papan GRC 2 m

lbr

4.86

Rp

45,000.00

Rp

21

Papan kayu 2/20

lbr

-

Rp

110,000.00

Rp

-

22

Kayu Balok 6/12

btg

-

Rp

-

23

Kayu Usuk 5/7

btg

-

Rp

-

24

Kayu Reng 2/3

btg

-

Rp

-

25

Cat Exterior mowilex

kg

14.45

Rp

63,000.00

Rp

910,637.09

29

Cat Alkali

kg

7.22

Rp

34,000.00

Rp

245,580.06

30

Cat Interior catylac

kg

54.22

Rp

15,000.00

Rp

813,262.50

31

Cat plafond maxilite

kg

14.76

Rp

9,000.00

Rp

132,840.00

32

Cat Genteng

kg

8.00

Rp

25,000.00

Rp

200,000.00

33

Sicosol

kg

2.03

Rp

50,700.00

Rp

103,047.75

34

Water proofing

kg

-

Rp

40,000.00

Rp

35

Cat Kayu

kg

1.31

Rp

35,000.00

Rp

36

Melamine

kg

-

Rp

45,000.00

Rp

37

Thinner

kg

0.93

Rp

18,000.00

Rp

16,650.00

38

Scrup board

bh

2,014.76

Rp

50.00

Rp

100,738.00

39

Compound

zag

1.31

Rp

2,000.00

Rp

2,619.19

40

Gypsum Board

lbr

15.40

Rp

45,000.00

Rp

693,165.38

41

Kalsiboard

lbr

4.89

Rp

45,000.00

Rp

219,918.56

42

List Gypsum Ruangan

m1

Rp

12,000.00

Rp

43

Besi Hollow 2/4

btg

Rp

14,000.00

Rp

44

Batu alam

2

m

2

42.52 -

218,531.25

45,972.50 -

595,308.56

Rp

-

Rp

-

Rp

-

45

Batu andesit 15/30

m

-

46

Keramik 50/50 platinum

dos

-

47

Keramik 40/40 asia tile

dos

43.09

Rp

32,500.00

Rp

1,400,546.88

48

Keramik 33,3/33,3 platinum

dos

5.97

Rp

45,000.00

Rp

268,595.04

Rp

120,000.00

View more...