Almost 150 people participated jumping test at tip of the cantilever
2010.05.26 73
74
75
Measured Mode 1:
Predicted Mode 1:
Measured Mode 3:
Predicted Mode 3:
Key Findings
Viewing Platform Maximum capacity of 600 people for general use. Dancing activities are not recommended
Outdoor Restaurant Terrace Limit to 470 people for general dancing with restricted access to all viewing platform Indoor Restaurant Limit to 345 people for general dancing with restricted access to all viewing platform
76
Crowd Management
Construction Methods
77
Design Challenges
Heavy lifting to L55
Assembly at Level 1
78
Installation at L55/56/57 & Roofing
79
Lifting of Bridge Trusses
80
Lifting of Bridge Trusses
81
Bridge Trusses being slided into position
82
Lifting of Bridge Trusses
83
Lifting Gantries for Cantilever Backspan
84
Lifting of Cantilever Backspan
85
Lifting of Cantilever Backspan
86
Lifting of Cantilever Backspan
87
Lifting of Cantilever Segments
88
Lifting of Cantilever Segments
89
Lifting of Cantilever Segments
90
Lifting of Cantilever Segments
91
Lifting of Cantilever Segments
92
Lifting of Cantilever Segments
skypark
93
Overview of SkyPark
94
Fabrication of Box Girders
95
Backspan with 10m deep section
Segment 5 (24th December 2009)
96
Lifting - In Action
Challenge Against Time
99
Design Challenges
100
Tight Construction Programme and Collaboration with Arup Offices
What Values have been brought to Arup? Successful Cross Regional Collaboration Irrespective of Cultural Differences Skills and Experience Sharing among Offices and Staff Created Good Bonding and Networking Between Offices/Staff Enhanced Arup’s Reputation and Business Opportunities Enriched Arup’s Portfolio of World-class Iconic Projects