Manual Operatico Guillotina Hidraulica QC11Y (4X16)
Short Description
Manual Operatico Guillotina Hidraulica QC11Y (4X16)...
Description
-_._--
,-~~
@
aXla
s:::-
ANHUI HDAIIA MACHINE . . MANUfA CTURIG ., lrD J: O \
'!>"v
•
-",v,
s~.._~-
'~;{.';.. .
~.
-~.
~
,
'o'
;'f~~.'. ," '.
>.
;M_,.(,
•
~ ,tt~:-'" '., •
'~-._.:-.
. --i
C)
g:
::;
-'
f
::;
S (.) C)
"
©
'" f.
C.
ir.
-o
N
en
i~
m
I
len z
~
@~
~COj
T~
~l~o( ~
0
8
e
I
-
¡ ¡
o
>
-'
i
LJ
.s:
i
&ss¡
1--
N
- O -
bf)
;=
u:
LJ
el
U
>
cj
>
(j)
> cV
>, (iJ
;:;: I
U
""
>. ..
o_
. :D
~
t--
> U
gl (j)
O '-' .:»
(fJ
. -i ,_)
(j)
U
u -> e .:D bJ} rv >
e
O
~
E 'O u
~
.w
e
'--i
-
u ...r::: ,_)
O -C
O
"
e
::J
::J
(j) U
(j)
.w
Ji () !Jj
O
~
'-' L..,
0
u:
u
e
(j)
ee
G
:ó
u e
C
>-. o,
G.l
>,
u
Q)
-o
e
cd
'"'O
...r::: _;¡ :::J
C E
c e s;
s.,
e
e
......)
c
:ó
>
U
(j)
U
.,......¡
>
,....;
::.:; _;¡
(j)
(j)
CL
u: c c
.s:
;:;.._
H
:v
U
Ji (j)
'_.
(j)
L
G.l
u ,_)
Ji
U L
.s:
~
u:
~
N
><
CO
7 :;;;;::
O ..D
..........-
h
O
~O
(j)
Q)
(fJ
~
LD
.-'
e
~
I
-<
CJ;
.:«
8
L
--_ E
,
...c ,...,
c:
'-'
><
""'" ~
'-../
.,
L
QC J l-scries hydraulic gurl loune 4.4
machinc
SI icaring
15
Hydraulic system introduction
This system carry out press plate. cutting. nitrogen
return cylinder back actions.
Hydraulie systems analysis
4.4.1
Hydraulic
system is mainly composed
of oil pump and val ves group.
l. Start oil pump: when press the oil pump button on controller, 2.Cutting
down:
cylindery18
foot on foot pedal
through
down, and hold-down
(YVO) get power,
SF 1, No.8
single way valve, the oil in cylinder
~ lindel'. then the oil in lower cavity of cylinder cylinder
the oil pump will start working. pressure
oil come
into
18 lower cavity go to upper cavity of
19 go to accumulator(l4),
the blade rest move
16 move down also.
3 Return: loose foot pedal SFl, valve 8 lose power, and blade rest move up. 4.Charge accumulator:
first add pure nítrogen
make screen show 'charge
accumulator'
val ve 8 gain power, pressure watch switch
gas (5-6kg) to accumulator,
((D," button, to
press ALM button and turn on shut off valve. Because
oil will come into accumulator
15, when the pressure
press
14 through
val ve 9, open pressure
is 8-10 Mpa, turn off shut off val ve 9, and loosen ALM
button. 5. Enlarge shearing angle: Please press accumulator 6.Reduce
"> +"
button, and electrornagnetic
ball valve gets power.
14 will release energy, and then shearing angle is enlarged.
shearing
ang1e: please press
"
e
s
s
QC l l-series hv~draulic
~auillotinc
6
and storage
6.1
c..:>
......
C
,_l)
UJ
Cl)
UJ
::J ::J TI TI TI
C0
UJ
-
c..:> e ...... c..:> UJ UJ Ol e Ol e e Cl) Ol ro ...... UJ ...... ...... ::J
ro ro x: ..o ro N
,_
l)
(Y)
;:s:
S C
......
:.00
,
ro ro ..o
L{")
co
41
1'--
N
~
L()
QC i l-series hydraulic guiiiotir-, 9.2.1
Inspection
l.
and adjustment
If discover
the distance
same when following 1)
.hearmg rnacniue
method of back gauge precision:
from two ends of back gauge apron to lower blade is not the
use, have affected
piare shearing
size precision,
can be adjusted
by the
methods
When back gauge plate 2 has slight bending, nut 3 to correct, when bending correction
2)
42
can adjust rear corresponding
regulating
is big, it needs to take down back gauge pI ate, correct on
device.
Straightness
of back gauge plate is good, but not parallel with lower blade edge, error is
bigger than lmm,
can disconnect
alone, make the distance then restore
link of synchronous
mechanism,
rotate a screw rod
is same which from back gauge plate two ends to lower blade,
link of synchronous
mechanism,
when error range
less than
1mm, can
adjust back gauge plate tuning screws 6 and 7 for precise adjustment.
2. Back gauge plate must keep a certain oblique angle with upper knife rest trajectory, upper knife rest make downward
movement,
blade should
this can ensure
plate
when
increase
gradually,
shearing.
Detection
method
That
the distance from back gauge plate to lower no collision
is: use Block
Dial
of back gauge plate and Indicator
with
magnet
adsorbed structure inside, gauge needle point block surface of back gauge plate vertically, when knife rest move downward, increase O.3~O.5mm . Ifthe
view dial indicator
reading,
reading not change or decrease
angle of back gauge plate 2 by regulating
and its value can only
gradually,
adjust screw 5 between
can adjust oblique
back gauge plate and
slide seat.
3. If discover
the value that back gauge location display device displayed
is not same with
current back gauge value. when using. lt can be adjusted by the following 1)
First let block plate move to a location size(forward)
(one-way
positioning
with the direction
to eliminare
of reducing
gap). then measure
gauge value of block plateo 2)
methods
Reset current back gauge value refer ro control systern introduction.
back gauge current
back
QC l l-senes -
hvdraulic '--'uuiliotir.c -hcarinz ~ -nachine
43
.....
10 Keep and maintenance 10.1 Machine lubrication Machine operators
lubrication
quality
an important
means
of guarantee
must be familiar with every part that need lubrication,
Every main lubrication lubrication
No.
IS
normal
use, machine
and lubricate regularly.
point of the machine adopt oil gun injection,
sub- plug lubrication.
points are as follows: lubrication
number
method
lubrication cycle (hour)
lubrication
oil model
and brand
there is point in both left and
1
right side of
block
2
8
upper ,middle ,down support Oil gun inject
there is one point on both left and right si de of
8
pad block
there is one point on both left ')
.)
and right side of slide nut
calcium base grease Oil gun inject
16
Oil gun injeet
48
-IGN491-1987
there is four points on rolling 4
bearing of both si des of back
oil
-N32GB443-1989
gauge screw rod
5
L-AN lubricating
there is one point on gap clearanee
regulating
serew rod
Oil gun injeet
48
manual 6
manuallubrieation
pump
concentrated
8
lubrieation Remarks:
after mix 50% of calcium-based
N32, then use. Details see machine
lubrication
grease and 50 percent label plate.
of L-AN lubricating
oil
44 10.1.1
Concentrate
Manual
manuallubrication
lubrication
pump
pump for simple centralization
manual
lubrication
system.
operation
simply and conveniently.
(1) Use rnethod:
For lubrication
parts, turn pump oil handle
operation.
pull out oil plug points of corresponding
then can make lubrication
rnedium
lubrication
reach to the corresponding
parts and lubricate.
(2) Use diagrams
of manual refueling device
manual lubrication diagrw¡ ioder bujl
head
O¡I pluq
Handle
'U
í de whec I
rall
I
32 hydf;)tJhc oíl hybr ¡ . in ;o . r ica t i on pump.
ubr i( (11)1 distr ibutor 2.
a' ih ha die mo s up and down.
3 Pul! out he pluO o íubncant ork:ng
ha d . e pomp m is ; he workec
l,nen _ Jrre~. eH h ~arls '
)
:~')l
nusl be
lime, es s
QC l l-series 11.. \e raulic Q:uillOlilk
sheari 1:'_2" . machme
'--"
45
10.2 Hydraulic system maintenance 10.2.1 Hydraulic
oil
(1) Check tank oillevel
and oil temperature
on regular(check
(2) First oil change after 500 work hours. hereafter
10.2.2 Oil filter (hydraulic
hydraulic
of hydraulic components,
every 2000 work time change oil one time.
oil filter)
Filter of oil filter need periodic cleanliness
level gauge);
system
cleaning,
if damage that need replace,
and causing
make hydraulic
oil pump poor oil-absorbing,
so as not to affect the blockage,
damage
system has malfunction.
10.2.3 Air filter (air filter cleaner)
Air Filters installed in the cover of fuel tank. The first cleaning
after two month
of machine
testing,
wash-down
in flux. Every four month
clean one time hereafter.
10.2.4 Connection
of hydraulic
components.
If there be oil leak that can take the following tighten
pipejoint
CIfhydraulic
Replace seals, and sometimes
10.2.5 Hydraulic
Relief
valve:
measures.
valve that tighten bolt ) require replace corresponding
joint
components
the normal
regulated
value
is equal
to maX1l11Um allowed
adjusted well befo re leave factory. and under normal circumstances
pressure.
have
users don't need adjustment.
QC 1 ¡ -series hvdraulic .
~Q.uil¡otin:
shcariru; ~ machme
10.3 Nitrogen return system maintenance in nitrogen) Every two months
.customer
release al! the accumulator inflection use,
pressure
oil. connect gas pressure
release
nitrogen,
crush
one time (open oil release
valve,
monitor gauge to the accumulator
valve), if found return speed of upper blade rest become slowly in process of machine
please check nitrogen pressure
charge
(Check pressure,
should check nitrogen
hydraulic
46
into the purity
speed(normally
of 99 percent
.if the pressure pure nitrogen
is 7 ~ 8 Map), it is forbidden
10.3.1 Operation
methods
of nitrogen
value is lower than its normal value, please according
to tbe upper
blade
rest return
to exceed 9Mpa, because it is dangerous.
accumulator
infla te, deflate,
monitoring
of nitrogen
pressure: (1) Take a bottom Nitrogen (2) release
hydraulic
center(this (3) Connect
with enough pressure
(8-1 OM) (It can be bought in gas stores);
oil in nitro gen accumulator,
make upper blade
rest fal! to lower dead
step must be finished, or can not charge nitro gen into nitrogen accumulator) the accumulator
inflation entrance
and nitro gen bottle interface
with tool equipped
with machine. (4) Clockwise
turn inflection
tool hand wheel slowly, the pressure
nitrogen pressure of accumulator. (5) Turn on valve switch on nitrogen immediately
loosen the deflection
cylinder slowly, then can crush in nitrogen to accumulator,
on pressure
after achieving
the required
gauge ,if the pressure
plug to release some pressure
pressure.
And then
is more then 7~8Mpa,
to decrease
When reach to the standard pressure value , please anticlockwise wheel .(shut the accumulator
current
(monitor the gas pressure of accumulator.)
shut valve to stop charging
check the value displayed
gauge wil! display
accumulator
please
gas pressure.
turn the inflation tool hand
inflation valve ) .at this time ,the pressure
gauge value will be
return to zero. (6) Please pressure
make sure that the nitrogen
bottom
and inflation
gauge display value is zero . dismount
process is finished
the inflation
tool valves
are shut . also the
tool . the accumulator
inflation
r)C JI-senes
hvdraulic
-
[!.uil¡ot!il,_ '--'
- macl-ine
',')'.:_:1f" .1E
47
pressure gauge Pneumatic valve hand wheel (switch) Deflation plug high-pressure
hose
Connect to Nitrogen steel bottle
ffi
Dangerous:
The inflated
nitrogen purity must be more than 99%
otherwise there will be the danger of an explosion!
C 1 ¡ -scrics
-
11 \
~
QUI
I i.tn, shcarinz
- machine
48
draulic lOA Machine parts maintenance Check all the parts of machine
regularly,
please change the broken parts imrnediately. affect the accuracy
of machine
even there is likely to endanger
such as: chain,
Otherwise
gear transmission
device,
etc.
it wili increase the extent of damage and
tools and normal work, also can shorten the life of the machine. the lives of the operator!
49 10.5 Easily damage parts(attach
»
picture)
-=
ci
-+-' j
c_:¡
:r: s: u
-"---
-o
=
~ ~ Q)
:::::J
-= c..:>
u
~
e .c: e _y
« ..
== '""
C'!
,'")
€~
>
-
c--, X C"'J
-
-
> -. -
> -
'--''--''--''--' 0'0'0'0u
.
(/)
::::>
(Í
-
-:=>
X
xc::::. 00
-
. r-.J
º 3'
<
::c
..
C'J
r.r¡
e ..
X
'-O
"e
iB
:;¡
O
(""'")e
,r¡
1
;;.
:E
c::c c::c >
<
,....,
=
,._ U
::c
c..,:)
. (""'") "'-
i
'<
o
'Z' - >- c - -.
co
r'O
r'O
X
X 00
'.O
-
00
n
X
n
X
....,
-
-. ...., ...., -u u u u .... ,
O'
::y
CY CY
C/l
~
-
~ r'O
-
"
'n
-
00
'
=
n
"-er"-
9
-
~ J "
~ o v;
< z
'!i z
co
:::>
i 8@
c-e
" I
'"
~ ~ ;¡¡
I
'< o
-e-
=
'.T,
11
\(:
-c ;¡
~
- e-
!Í
<
~
:s"
e
o
< Q
-c
~
'"
i2
«
o
0 0 6
QC l l-scries h) draulic g .r. ilotine shearing machine 51
11 Packing Iist No.
Cocle name
Name ancl specification
Units
A mount
ser
1
Rernark
1 . main machine 1
Hydraulic guillotine plate shearing machine
II. accessories 2
YDT1-ll
3
Pedal switch
piece
front support rack
piece
I
1 ')
.)
4
J8/17942.1-1995
lever type grease gun
prece
1
5
G8799- J 998
Anchor bolt M20x400
piece
4
6
G 86170-2000
Nut M20
prece
4
7
G8971-1985
gasket 20
piece
4
8
CQ.J-D-H/25
gas charging tool
set
1
electric box key
piece
1
9
III, Spare paI1S 10
G 83452.1-1992
O type seal ring 24x2.4
piece
4
11
G 83452.1-1992
O type seal ring 30x3.1
piece
4
12
G 83452.1-1992
O type seal ring 35x3.1
piece
4
13
G83452.I-J992
O type seal ring 45x3.1
prece
4
14
G 83452.1-1992
O type seal ring 60x3.5
piece
4
15
G 83452.1-1992
O type seal ring 55x3.1
piece
4
16
J8982-1997
Gasket 14
prece
4
17
J8982-1997
Gasket 27
prece
4
18
.J8982-1997
Gasket 33
piece
4
19
.J8982-1997
Gasket 42
prece
4
copy
1
cop)'
I
copy
I
20 21 22
Operation manual Qualified certificate Packing list
I
4type
52
Inspection NO:
1
Item
report
Method ot inspection
Precisicn
Diagram
By clearance gauge measure several sizes "S'ot The clearance the edge clearance between evenness between lhe upper blade and lower blade,Along the vertical the upper blade edge direction oí lower blade and lower blade edge (not less than three points per meter ).Error subject to the difference of the maximum reading and the minimum reading
Allowance
Check result
::SO. 05111111
Lt
OC>- ,
~
...
o/
Adjust back gauge to the foremost and final position,Using measuring tool measure the distance
2
3
4
Parallelism between the lower blade edge "L" between the lower blade edge and bar' JQe and back gauge surface in .11place. surface Error sub J the diñerenc.ie maximum reading a le minimum reading i' i 1000mm
Straightness al sheared plate shear plane
Parallelism al sheared plate
Put exai plate sr
clearan clearan two.En maxirru 1000m
llat ruler near
naneBv
luge measure rbetween the .ubiect lo the -reading in any
Using I .asurinu tool measurs in the vertical direction belween two shear plane,Error subiect to the difference 01 the maximum reading and the minimum readinu in anv 1000mm
,~
W4lJ? ~
f
}o:>\
::SO. 50111111
,r,r
~
-~;-:~.,I
\ ,"i","1 r/\-' '/
'-
h
1====1 f 1 ..
El
[
Lmax-1 OOOmm
,
w
..1
I} Lmax=1000mm
(fj \\7
::S 1. 00111111
.. 1
.-
. c:;¿; /
\
-> .
~/
J
View more...
Comments