Manual de Temblorinas Md3 Mi Swaco

January 15, 2024 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Manual de Temblorinas Md3 Mi Swaco...

Description

Installation, Operation & Maintenance Manual

MD-3 Shale Shaker Parallel Mode With Vent Hood Per Assemblies: MD3C00000-00AD = No Motors/Controls MD3C00000-01AD = 440-480V/60 Hz, Controls Mounted MD3C00000-02AD = 440-480V/60 Hz, Controls Shipped Loose

UL/ATEX Certified Worldwide Headquarters: P.O. Box 42842 Houston, Texas 77242-2842 Tel: 281-561-1300 Fax: 281-561-1441 www.miswaco.com E-mail: [email protected]

Manual Part #: 90-91-037 Rev. A

DISCLAIMER Recommendations made by M-I SWACO are advisory only. M-I SWACO shall not be liable under any guarantees or warranties, expressed or implied, in any manner or form, AND ALL WARRANTIES, EXPRESSED OR IMPLIED, ARE HEREBY SPECIFICALLY EXCLUDED, and M-I SWACO shall not be liable for the failure to obtain any particular results from the use of any recommendation made by it or from the use of this material. In no event shall M-I SWACO be liable for incidental or consequential damages.

© Copyright 2009 M-I SWACO Publication Date: April 2009 All other products, brand, or trade names used in this publication are the trademarks or registered trademarks of their respective owners. All rights reserved. This publication is the property of, and contains information proprietary to M-I SWACO. No part of this publication may be reproduced in any form or by any means, including electronic, mechanical, or otherwise, without the prior written permission of M-I SWACO. Information contained within this publication is subject to change without notice.

Section 1.01

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: User Manual Index

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: User Manual Index Section 1.01

USER MANUAL INDEX Section No. Section 1 1.01 1.02 1.03 1.04 1.05 Section 2 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 Section 3 3.01 3.02 Section 4 4.01 4.02 4.03 Section 5 5.01 Section 6 6.01 Section 7 7.01 Section 8 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 Section 9 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 Section 10 Section 11

Description Introduction User Manual Index Intended Usage Symbols Safety Personnel Protective Equipment (PPE) Main Data (Includes Data Sheets) Main Equipment List Cable Schedule Utilities Schedule/Consumption Data Data For Health, Environment & Safety Equipment Data Sheet Data Sheets – Induction Motor Weight Data Sheet Noise Data Sheets Technical Description Functional Description Operation Mode Description Preparation Installation & Commissioning Procedure Unpacking, Lifting & Handling Preservation & Storage Operating Instructions Operating Instructions Maintenance Instructions Corrective & Preventative Maintenance Instructions Spare Parts List Recommended Spare Parts List (RSPL) Drawings General Arrangement Piping & Instrument Diagram Mud Flow Diagram Foundation Plan Hydraulic/Pneumatic Schematic Cable Block Diagram General Arrangement – Control Stations Wiring Schematics Detailed Drawings with Part Lists Final Assembly Unfinished Unit Basket Assembly Feeder Assembly Vent Hood Assembly Wiring Assembly Pneumatic Enclosure Assembly Top Deck Pneumatic Routing Middle Deck Pneumatic Routing Bottom Deck Pneumatic Routing Martin Screen Motor Manual Declaration of Conformity

MD-3 Shale Shaker Document Title: User Manual Index Section 1.01

3

NOTES:

4

MD-3 Shale Shaker Document Title: Manual Index Section 1.01

Section 1.02

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Intended Usage

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Intended Usage Section 1.02

INTENDED USAGE This documentation is intended for use by field engineering, installation, operation and repair personnel for the proper installation and maintenance of equipment manufactured by M-I SWACO. Every effort has been made to ensure the accuracy of the information contained herein. M-I SWACO will not be held liable for errors in this material, or for consequences arising from misuse of this material.

MD-3 Shale Shaker Document Title: Intended Usage Section 1.02

3

NOTES:

4

MD-3 Shale Shaker Document Title: Intended Usage Section 1.02

Section 1.03

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Symbols

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Symbols Section 1.03

SYMBOLS Notes, Cautions & Warnings Notes, cautions and warnings appear throughout this manual to provide additional information and to advise on specific actions to protect personnel from potential injury or fatal conditions. They also inform of actions necessary to prevent equipment damage or conditions that may void equipment warranties.

ATTENTION

This symbol draws attention to safety measures which MUST be observed to prevent DAMAGE to equipment.

CAUTION

This symbol draws attention to safety measures which MUST be observed to prevent an ACCIDENT from occurring.

WARNING

This symbol draws attention to safety measures which MUST be observed to prevent PERSONAL injury.

NOTE:

This symbol draws attention to general operating notes which should be especially observed.

Packaging The symbols that may be shown on the package are noted below. Their meanings are as follows:

MD-3 Shale Shaker Document Title: Symbols Section 1.03

3

Safety Warning Icons & Explanations Refer to the illustrations on the following page to easily recognize safety concerns and responsibilities to follow. Each illustration is accompanied with an explanation for the user to be readily alert for and pay attention to during operation and maintenance of the equipment. SAFETY WARNING ICONS & EXPLANATIONS ELECTRICAL: Electrical wire to hand with electricity symbol running through indicates shock hazard is present.

HEAVY PARTS: Hand with heavy object on top indicates heavy parts can crush and harm.

HEAVY PARTS: Foot with heavy object on top indicates heavy parts can crush them.

MOVING PARTS: Human figure with an arm caught between gears indicates moving equipment parts present a danger to life or limb. CHEMICAL: Drops of liquid on hand indicates material will cause burns or irritation to human skin or tissue.

MOVING PARTS: Hand with fingers caught between gears indicates moving equipment parts present a danger to life or limb. EXPLOSION: Rapidly expanding symbol indicates material may explode if subjected to high temperatures, sources of ignition or high pressure. POISON: Skull and crossbones indicate that a material is poisonous or is a danger to life.

FIRE: Flame indicates material may ignite and cause burns.

LOCK OUT: Open lock with direction arrow indicates to operator to ensure ALL input power sources are locked out and tagged out according to regulation. FLYING PARTICLES: Arrows bouncing of face indicates parts/particles flying through air will harm face and present a danger to life or limb. EAR PROTECTION: Headphones over ears indicate noise level will harm ears.

HOT: Hand over flame indicates that surfaces may be hot.

READ MANUAL: Wrench over book indicates the necessity to read the instructions before performing any operations .

4

VAPOR/FUMES: Human figure in a cloud indicates that material vapors/fumes present a danger to life or limb.

HELMET PROTECTION: Arrow bouncing off head with helmet indicates falling parts present a danger to life. ELECTRICAL: Electrical wire to arm with electricity symbol running through human body indicates shock hazard is present.

MD-3 Shale Shaker Document Title: Symbols Section 1.03

Section 1.04

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Safety

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Safety Section 1.04

SAFETY Equipment manufactured by M-I SWACO is installed and operated in a drilling rig environment involving hazardous operations. Proper care is important for safe and reliable equipment operation and rig personnel safety. Operation and service procedures described within this manual are recommended methods of performing proper operations and safety methods. Consult Local or National codes for any other safety regulations required for this type of environment.

CAUTION Read the following procedures BEFORE installing or performing maintenance on M-I SWACO equipment to avoid injuries to personnel or damage to equipment.

1.

Lockout/tagout power to unit BEFORE beginning work.

2.

Do not perform maintenance or repairs to equipment while unit is in operation.

3.

Wear personal protective equipment (PPE) per Section 1.06.

4.

All personnel performing installation, operations and maintenance procedures on this equipment should be trained on rig safety, operations and maintenance of this equipment.

MD-3 Shale Shaker Document Title: Safety Section 1.04

3

NOTES:

4

MD-3 Shale Shaker Document Title: Safety Section 1.04

Section 1.05

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Personal Protective Equipment (PPE)

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Protective Personal Equipment (PPE) Section 1.05

PERSONAL PROTECTIVE EQUIPMENT (PPE) All personnel working on or around M-I SWACO equipment must wear Personal Protective Equipment (PPE). Below is a list of what personnel should wear unless Local or National codes require different PPE apparel.     

Approved hard hat. Approved safety glass with shields or a face mask. Approved safety glasses. Approved gloves. Approved outer garments.

Check with Local or National Codes for additional requirements.

MD-3 Shale Shaker Document Title: Personal Protective Equipment (PPE) Section 1.05

3

NOTES:

4

MD-3 Shale Shaker Document Title: Personal Protective Equipment (PPE) Section 1.05

Section 2.01

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Main Equipment List

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Main Equipment List Section 2.01

TABLE 1. MAIN EQUIPMENT LIST

Description

Manufacturer

Performance

Materials

Weight (Approximate) Dry

Shale Shaker

M-I SWACO

See Data Sheet No. 2.05

AC Motor - Shale Shaker

Italvibras G. Silingardi (Martin Motors)

See Data Sheet No. 2.06

Electrical Isolator Electrical Control

Crouse-Hinds

Electrical Pilot Box

MD-3 Shale Shaker Document Title: Main Equipment List Section 2.01

N/A

Operating

Dims. (mm) Section LxHxW

Carbon/ 3034 kg 6681 kg See Section 2.07 Stainless Steel (6690 lbs.) (14,730 lbs.)

Cast Iron

250 kg (550 lbs.)

250 kg (550 lbs.)

1473 x 347 x 363

304SS

11.34 kg (25 lbs.)

312 x 255 x 200

Cast Aluminum

49.9 kg (110 lbs.)

622.3 x 381 x 279

304SS

11.34 kg (25 lbs.)

203 x 366 x 282

2.05

2.06

8.07

3

NOTES:

4

MD-3 Shale Shaker Document Title: Main Equipment List Section 2.01

Section 2.02

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Cable Schedule

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Cable Schedule Section 2.02

TABLE 1. CABLE SCHEDULE Cable Description

Cable Standard

N/A

N/A

4C x 14 AWG (2.1mm2) 16C x 16 AWG (1.3 mm2) 4C x 14 AWG (2.1mm2) 4C x 14 AWG (2.1mm2)

NEK 606/UL 1309 NEK 606/UL 1309 NEK 606/UL 1309 NEK 606/UL 109

MD-3 Shale Shaker Document Title: Cable Schedule Section 2.02

Cable Start Client Supply EExe Disconnect EExd Enclosure EExd Enclosure EExd Enclosure

Cable Start Gland N/A CMP 20PX2KX CMP 25PX2KX

Cable Finish EExe Disconnect EExd Enclosure EExe Control Panel

Cable Finish Gland CMP 20PX2KX CMP 20PX2KX CMP 25PX2KX

CMP 20PX2KX

Motor #2

CMP 20PX2KX

CMP 20PX2KX

Motor #1

CMP 20PX2KX

3

NOTES:

4

MD-3 Shale Shaker Document Title: Cable Schedule Section 2.02

Section 2.03

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Utilities Schedule / Consumption Data

Total No. of Pages 4

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Utilities Schedule/Consumption Data Section 2.03

TABLE 1. UTILITIES SCHEDULE/CONSUMPTION DATA Description Shale Shaker 2-Motor Drive

Voltage 440-480V

Motor Motor 1 Motor 2

MD-3 Shale Shaker Document Title: Utilities Schedule/Consumption Data Section 2.03

Electrical Input Power 3.40 kW

Output Power 2.75 kW (3.7 hp)

Frequency 60 Hz

3

NOTES:

4

MD-3 Shale Shaker Document Title: Utilities Schedule/Consumption Data Section 2.03

Section 2.04

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Data for Health, Environment & Safety

Total No. of Pages 22

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Data for Health, Environment & Safety Section 2.04

Section 2.05

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Equipment Data Sheets

Total No. of Pages 8

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

NORSOK R-CR-001 Tag Number Unit Service Size & Type Supplier Manufacturer Model Location/Module Number Required Inquiry Number Quote Number Job Number Serial Number

SHALE SHAKER DATA SHEET

RDS-027 MARCH 25, 2009

N/A MD-3 Shale Shaker Mud Treatment System MD-3 Shale Shaker M-I SWACO M-I SWACO Single Shaker N/A 1 N/A N/A N/A N/A

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

3

NORSOK R-CR-001

RDS-027 MARCH 25, 2009

SHALE SHAKER DATA SHEET

1

PROCESS

2

Filtered Medium

3

Suspended Solids

4

Particle Size Range

Micron

45-2000

5

Degree of Filtration

Micron

45-2000

6

Density

7

Viscosity

8

Flowrate Normal

m3/h

9

Flowrate Design

m /h

Dependent on Drilling Conditions

10

Minimum Filter Flow

m3/h

N/A

11

Maximum Filter Flow

m3/h

N/A

12

Filter Type

13

Media Bed

14

Grain Size Range

15

Number of Beds

16

Bed Volume

17

Bed Deepness

18

Backwash Liquid

19

Anticipated Life

20

Cartridge

21

Type of Mesh

22

Filtering Area

23

Nominal Pore Size

24

DESIGN DATA

25

Code

N/A

26

Code for Design of Support

N/A

27

Specifications

N/A

28

Joint Efficiency/Category

29

Operating Pressure

30 31 32 33

Drilling Fluid Drilled Solids and Mud Chemicals

kg/m3

Dependent on Drilling Fluid Properties

cP

Dependent on Drilling Fluid Properties

3

Media Bed/Cartridge

Dependent on Drilling Conditions

Pre-Tensioned, Mesh on PPO Frame N/A

Micron

Dependent on Screen Selections 3 Beds (6 Screens Per Bed)

m3

N/A

mm

N/A N/A

Year

> 7 (Dependent on Service) N/A Stainless Steel Wire Cloth

m2 Micron

7. 0 (2.3 Scalping Deck, 4.7 Primary Decks) Dependent on Screen Selection

N/A barg

Atmosphere

Design Pressure

barg

Atmosphere

Test Pressure

barg

Atmosphere

Differential Pressure Clean

bar

Atmosphere

Maximum Differential Pressure Dirty

bar

Atmosphere

NOTES:

4

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

NORSOK R-CR-001

RDS-027 MARCH 25, 2009

SHALE SHAKER DATA SHEET

46

Operating Temperature

0C

30

47

Design Temperature

0C

-20 to 50

48

Operating Volume

m3

N/A

49

Total Volume

m3

N/A

50

Inside Diameter

mm

N/A

51

Length Tan/Tan or Height Tan/Tan

mm

N/A

52

Horizontal or Vertical Vessel

N/A

53

Type of Heads

N/A

54

One Piece or Welded Heads

55

Corrosion Allowance

mm

N/A

56

Shell Thickness Includes. c.a.

mm

N/A

57

Head Thickness Includes. c.a.

mm

N/A

58

Skirt Thickness

mm

N/A

59

Skirt Height

mm

N/A

60

Saddle Plate Thickness

mm

N/A

61

Lifting Lugs

4 Lifting Points on Skid

62

Platform Supports

N/A

63

Ladder Attachments

64

Free Height Required for Maintenance

mm

1800-2000

65

Free Space Required for Any Direction

mm

610 at Discharge End (24 in.) [ 500 Elsewhere]

66

WEIGHTS

67

Shale Shaker (Empty)

kg

3034 (6690 lbs.)

68

Shale Shaker (Operating)

kg

6681 (14,730 lbs.)

69

Weight of Back Box

kg

N/A

70

Weight of Feeder Tank Assembly

kg

108 (240 lbs.)

71

Weight of Extract Hood

kg

N/A

72

Weight Total (Shipping Less Screens)

kg

2925 (6450 lbs.)

73

NOTES:

84

N/A

N/A

MATERIALS

DESCRIPTION

85

Shaker Basket

Carbon Steel/316-L SST

86

Shaker Skid

Carbon Steel

87

Gutter

Carbon Steel

88

Back Box

Carbon Steel

89

Screen

304 Stainless Steel/PPO

90

Ventilation Hood

304 Stainless Steel

91

Brackets/Supports

Carbon Steel

92

Ladders/Platforms

N/A

93

Name Plate

304 Stainless Steel

94

Bolt for Exterior Flanges

Yellow Chromate Plated Carbon Steel

95

Nuts for Exterior Flanges

Yellow Chromate Plated Carbon Steel

96

Trays

N/A

97

Lifting Lugs

Carbon Steel

98

Gaskets

N/A

99

Exterior Pipe Work

N/A

100

Foundation Bolts

N/A

101

Interior Pipe Work

N/A

102 Interior Header MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

CERT. DIN 50049

MDS NUMBER

N/A

5

NORSOK R-CR-001 105 MATERIALS (continued) 106

RDS-027 MARCH 25, 2009 CERT. DIN 50049

SHALE SHAKER DATA SHEET

Base Plate

MDS NUMBER

Carbon Steel

108 109

NOTES:

110 111 112 113 114 121

PROTECTIVE COATING

122

Surface Preparation Inside

Steel Grit Blast

123

Paint Inside

Paint Per M-I SWACO SS103 (Zinc Rich Primer, Epoxy Mid-Coat and Polyurethane Top Coat)

124

Surface Preparation Outside

Steel Grit Blast

125

Paint Outside

Paint per M-I SWACO SS103 (Zinc Rich Primer, Epoxy Mid-Coat and Polyurethane Top Coat)

126

Preservation Coating for Storage

Cosmoline on Motor Mount Surfaces

127

NOTES:

128 129 130 131

NOZZLES

132

MARK

NUMBER OFF

SERVICE

133

6

Spray Bar

134

1

Compressed Air Supply

135

1

Header Box

DN

PN

TYPE 1/4” NPT Flat Spray Nozzle 1/4" NPT Painted Template

136 137 138 139 140 141 142 143 144 145 146

INSTRUMENTATION MARK

NUMBER OFF

SERVICE

DN

PN

TYPE

147 148 149 150 151 152 153 154 155 156

6

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

NORSOK R-CR-001

SHALE SHAKER DATA SHEET

RDS-027 MARCH 25, 2009

163

FABRICATION, INSPECTION & TESTING

164

Heat Treatment of Heads After Forming

N/A

165

Post Weld Heat Treatment

N/A

166

Radiographic Inspection of Butt Welds

%

N/A

167

Ultrasonic Inspection of Butt Welds

%

N/A

168

Ultrasonic Inspection of Nozzle/Shell Connector

%

N/A

169

MPI or DPI of Nozzle/Shell Connector

%

N/A

170

Dye Penetrant

%

171

Hydrotest

N/A

172

Production Test

Factory Acceptance Test (F.A.T)

177

NOTES:

N/A

178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

7

NOTES:

8

MD-3 Shale Shaker Document Title: Equipment Data Sheets Section 2.05

Section 2.06

Supplier Logo

Equipment: MD-3 Shale Shaker Document Title: Data Sheets –Induction Motors

Total No. of Pages 8

1

THIS PAGE INTENTIONALLY LEFT BLANK

2

MD-3 Shale Shaker Document Title: Data Sheets-Induction Motors Section 2.06

TABLE 1. INDUCTION MOTORS 220-240/440-480V, 60 Hz

NORSOK E-001

INDUCTION MOTOR DATA SHEET

EDS-004 MARCH 25, 2009

FUNCTIONAL REQUIREMENTS ELECTRICAL 1.01 Rated System Voltage 1.02 Rated System Frequency 1.03 Winding Connection 1.04 Duty Type 1.05 Starting Method 1.06 Winding Temperature Sensors 1.07 Bearing Temperature Sensors CONSTRUCTION 1.08 Gas Group 1.09 Temperature Class 1.10 Vibration Det. Motor >1000kW, Anti Friction Bearing 1.11 Vibration Det. Motor >1000kW, Sleeve Bearing 1.12 Vibration Det. 30kW
View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF