GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V.

DOSIFICACION DE MORTEROS Y COSTO POR M3

MORTEROS

DOSIFICACION

CEMENTO

ARENA

AGUA

IMPORTE TOTAL

IMPORTE TOTAL

(TON)

(TON)

(M3)

1 M3

X BULTO

$ COSTO

$ COSTO

$ COSTO

2200

340

5

$ TOTAL

$ TOTAL

CEMENTO-ARENA

1-2

1,386.0000

340.0000

1.2825

1,727.28

137.09

CEMENTO-ARENA

1-3

1,188.0000

357.0000

1.2600

1,546.26

143.17

CEMENTO-ARENA

1-4

968.0000

374.0000

1.2510

1,343.25

152.64

CEMENTO-ARENA

1-5

836.0000

391.0000

1.2375

1,228.24

161.61

CEMENTO-ARENA

1-6

682.0000

397.8000

1.2375

1,081.04

174.36

CEMENTO

CALHIDRA

ARENA

AGUA

(TON)

(TON)

MORTEROS

DOSIFICACION

(TON)

(M3)

CEMENTO-ARENA

1-2

0.6300

1.0000

0.2850

CEMENTO-ARENA

1-3

0.5400

1.0500

0.2800

CEMENTO-ARENA

1-4

0.4400

1.1000

0.2780

CEMENTO-ARENA

1-5

0.3800

1.1500

0.2750

CEMENTO-ARENA

1-6

0.3100

1.1700

0.2750

UN BULTO CEMENTO GRIS + 1,5 CARRETILLAS ARENA = 4.50 Cubetas de 19lts. ( 0.0855m3 )

COSTO DE MATERIALES CEMENTO

ARENA

GRAVA

AGUA

PRECIO x TON:

PRECIO x CAMIÓN

PRECIO x CAMIÓN

PRECIO x PIPA

20 Bultos de 50 Kg.

DE 7M3

DE 7M3

DE 4000 LTS

$2,200.00

$2,450.00

$2,450.00

$18.00

DE 50 KG

PRECIO x M3:

PRECIO x M3:

PRECIO x M3:

$110.00

$350.00

$350.00

$4.50

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

PRECIO x BULTO:

F´C=

100kg/cm2 FIRMES Y PLANTILLAS

250kg/cm2 PISOS ESTRUTURAL ES, COLUMNAS, DADOS, ZAPATAS Y TRABES

1.30

$2,266.00

$378.00

$378.00

$5.85

ARENA

GRAVA

AGUA

$$$ x M3 CON

M3

M3

DESPERDICIO

0.680

0.195

$1,036.34

0.700

0.190

$1,018.94

0.500

0.680

0.215

$1,095.37

5.60

0.470

0.700

0.210

$1,077.97

0.323

6.46

0.480

0.670

0.210

$1,167.85

1 1/2"

0.308

6.16

0.450

0.700

0.200

$1,133.80

3/4"

0.354

7.08

0.480

0.670

0.230

$1,238.21

1 1/2"

0.338

6.76

0.450

0.700

0.220

$1,201.90

3/4"

0.355

7.10

0.470

0.650

0.195

$1,228.93

1 1/2"

0.337

6.74

0.440

0.680

0.185

$1,188.08

BULTOS

REVENIMIENTO

MÁXIMO

TONELADA

DE 50 KG

M3

8 A 10 CM

3/4"

0.260

5.20

0.500

1 1/2"

0.254

5.08

0.470

3/4"

0.286

5.72

1 1/2"

0.280

3/4"

12 A 15 CM

12 A 15 CM

12 A 15 CM

8 A 10 CM

12 A 15 CM

3/4"

0.391

7.82

0.470

0.650

0.215

$1,310.62

1 1/2"

0.373

7.46

0.440

0.680

0.205

$1,269.78

3/4"

0.423

8.46

0.465

0.640

0.190

$1,377.32

1 1/2"

0.400

8.00

0.435

0.670

0.180

$1,325.14

3/4"

0.467

9.34

0.465

0.640

0.210

$1,477.14

1 1/2"

0.445

8.90

0.435

0.670

0.200

$1,427.23

6

7

8

Area (cm2) Número de varillas

varilla # #/8

30%

CEMENTO

8 A 10 CM 200kg/cm2 LOSA DE ENTREPISO

8% 1.08

AGREGADO

8 A 10 CM 150kg/cm2 FIRMES, DALAS Y CASTILLOS

8% 1.08

COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.

DOSIFICACION DE CONCRETOS CLASIFICACIÓN

3% 1.03

1

2

3

4

5

Página 1

GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V. 3 4 5 6 7 8 9 10

0.713 1.267 1.979 2.850 3.879 5.067 6.413 7.917

1.425 2.534 3.959 5.700 7.759 10.134 12.826 15.835

2.138 3.800 5.938 8.551 11.638 15.201 19.239 23.752

2.850 5.067 7.917 11.401 15.518 20.268 25.652 31.669

3.563 6.334 9.897 14.251 19.397 25.335 32.065 39.587

Página 2

4.275 7.601 11.876 17.101 23.277 30.402 38.478 47.504

4.988 8.867 13.855 19.952 27.156 35.470 44.891 55.421

5.700 10.134 15.835 22.802 31.036 40.537 51.304 63.338