GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V.
DOSIFICACION DE MORTEROS Y COSTO POR M3
MORTEROS
DOSIFICACION
CEMENTO
ARENA
AGUA
IMPORTE TOTAL
IMPORTE TOTAL
(TON)
(TON)
(M3)
1 M3
X BULTO
$ COSTO
$ COSTO
$ COSTO
2200
340
5
$ TOTAL
$ TOTAL
CEMENTO-ARENA
1-2
1,386.0000
340.0000
1.2825
1,727.28
137.09
CEMENTO-ARENA
1-3
1,188.0000
357.0000
1.2600
1,546.26
143.17
CEMENTO-ARENA
1-4
968.0000
374.0000
1.2510
1,343.25
152.64
CEMENTO-ARENA
1-5
836.0000
391.0000
1.2375
1,228.24
161.61
CEMENTO-ARENA
1-6
682.0000
397.8000
1.2375
1,081.04
174.36
CEMENTO
CALHIDRA
ARENA
AGUA
(TON)
(TON)
MORTEROS
DOSIFICACION
(TON)
(M3)
CEMENTO-ARENA
1-2
0.6300
1.0000
0.2850
CEMENTO-ARENA
1-3
0.5400
1.0500
0.2800
CEMENTO-ARENA
1-4
0.4400
1.1000
0.2780
CEMENTO-ARENA
1-5
0.3800
1.1500
0.2750
CEMENTO-ARENA
1-6
0.3100
1.1700
0.2750
UN BULTO CEMENTO GRIS + 1,5 CARRETILLAS ARENA = 4.50 Cubetas de 19lts. ( 0.0855m3 )
COSTO DE MATERIALES CEMENTO
ARENA
GRAVA
AGUA
PRECIO x TON:
PRECIO x CAMIÓN
PRECIO x CAMIÓN
PRECIO x PIPA
20 Bultos de 50 Kg.
DE 7M3
DE 7M3
DE 4000 LTS
$2,200.00
$2,450.00
$2,450.00
$18.00
DE 50 KG
PRECIO x M3:
PRECIO x M3:
PRECIO x M3:
$110.00
$350.00
$350.00
$4.50
DESPERDICIO:
DESPERDICIO:
DESPERDICIO:
DESPERDICIO:
PRECIO x BULTO:
F´C=
100kg/cm2 FIRMES Y PLANTILLAS
250kg/cm2 PISOS ESTRUTURAL ES, COLUMNAS, DADOS, ZAPATAS Y TRABES
1.30
$2,266.00
$378.00
$378.00
$5.85
ARENA
GRAVA
AGUA
$$$ x M3 CON
M3
M3
DESPERDICIO
0.680
0.195
$1,036.34
0.700
0.190
$1,018.94
0.500
0.680
0.215
$1,095.37
5.60
0.470
0.700
0.210
$1,077.97
0.323
6.46
0.480
0.670
0.210
$1,167.85
1 1/2"
0.308
6.16
0.450
0.700
0.200
$1,133.80
3/4"
0.354
7.08
0.480
0.670
0.230
$1,238.21
1 1/2"
0.338
6.76
0.450
0.700
0.220
$1,201.90
3/4"
0.355
7.10
0.470
0.650
0.195
$1,228.93
1 1/2"
0.337
6.74
0.440
0.680
0.185
$1,188.08
BULTOS
REVENIMIENTO
MÁXIMO
TONELADA
DE 50 KG
M3
8 A 10 CM
3/4"
0.260
5.20
0.500
1 1/2"
0.254
5.08
0.470
3/4"
0.286
5.72
1 1/2"
0.280
3/4"
12 A 15 CM
12 A 15 CM
12 A 15 CM
8 A 10 CM
12 A 15 CM
3/4"
0.391
7.82
0.470
0.650
0.215
$1,310.62
1 1/2"
0.373
7.46
0.440
0.680
0.205
$1,269.78
3/4"
0.423
8.46
0.465
0.640
0.190
$1,377.32
1 1/2"
0.400
8.00
0.435
0.670
0.180
$1,325.14
3/4"
0.467
9.34
0.465
0.640
0.210
$1,477.14
1 1/2"
0.445
8.90
0.435
0.670
0.200
$1,427.23
6
7
8
Area (cm2) Número de varillas
varilla # #/8
30%
CEMENTO
8 A 10 CM 200kg/cm2 LOSA DE ENTREPISO
8% 1.08
AGREGADO
8 A 10 CM 150kg/cm2 FIRMES, DALAS Y CASTILLOS
8% 1.08
COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.
DOSIFICACION DE CONCRETOS CLASIFICACIÓN
3% 1.03
1
2
3
4
5
Página 1
GRUPO CONSTRUCCION ARGREY S. DE R. L. DE C. V. 3 4 5 6 7 8 9 10
0.713 1.267 1.979 2.850 3.879 5.067 6.413 7.917
1.425 2.534 3.959 5.700 7.759 10.134 12.826 15.835
2.138 3.800 5.938 8.551 11.638 15.201 19.239 23.752
2.850 5.067 7.917 11.401 15.518 20.268 25.652 31.669
3.563 6.334 9.897 14.251 19.397 25.335 32.065 39.587
Página 2
4.275 7.601 11.876 17.101 23.277 30.402 38.478 47.504
4.988 8.867 13.855 19.952 27.156 35.470 44.891 55.421
5.700 10.134 15.835 22.802 31.036 40.537 51.304 63.338