Doc. No.

TANGGUH LNG BPMIGAS

BP Berau Ltd.

87-IOM-PS-1201

Rev.

Author’s Org.

6A

Project

TLNG

KJP

KJP Doc. No.

S-087-1283-001

Date

27 Feb, 06

KJP Job Code

J-3400-20-0000

Sheet

1 of 21

3.8 MTPA TRAIN CAPACITY Operation Manual for Waste Water Treatment System

X

Core

Non-core

For Information

For Review

For Approval

X

Released

Date

Page

Prep’d

Chk’d

App’d

5A

9Jan’06

All

For Approval

M.Hatanaka

Y.Kakutani

Y.Kakutani

6A 27Feb’06

All

Release

M.Hatanaka

Y.Kakutani

Y.Kakutani

-2006

B 28-FE

PT. Brown & Root Indonesia

A

As-Built

Rev.

_ _ _ __ RA| D __| N I ||___

Description

Lifecycle Code

BP App’d

BP Berau Ltd. Tangguh LNG Project Operation Manual for Waste Water Treatment System

Doc. No. 87-IOM-PS-1201 KJP Doc. No. S-087-1283-001 Rev. 6A Sheet No. 2 of 21

CONTENTS 1. Introduction.................................................................................................................................4 2. Basis of Design.............................................................................................................................4 2.1 General ........................................................................................................................................4 2.2 Design Condition.........................................................................................................................4 2.3 Special Equipment ......................................................................................................................5 2.3.1 SANITARY TREATMENT PACKAGE (085-V-1001) ...................................................................... 5 2.3.2 CORRUGATED PLATE INTERCEPTOR (087-V-1001) ................................................................... 5 2.4 Process Description.....................................................................................................................5 2.4.1 NON-CONTAMINATED WATER ................................................................................................... 5 2.4.2 OILY WASTE WATER TREATMENT ............................................................................................ 6 2.4.3 CHEMICAL WASTE WATER ........................................................................................................ 7 2.4.4 SANITARY WASTE ...................................................................................................................... 7 3. Process Controls..........................................................................................................................8 3.1 Oily Waste Water Treatment ....................................................................................................8 3.2 Chemical Waste Water Treatment ...........................................................................................9 3.3 Sanitary Waste Water Treatment .............................................................................................9 4. Preparation for initial start-up ..................................................................................................9 5. Normal Start-up Procedure .......................................................................................................9 5.1 General ........................................................................................................................................9 5.2 Start up of the Corrugated Plate Interceptor (087-V-1001) .................................................10 5.3 Start up of the Sanitary Treatment Package (085-V-1001)...................................................10 6. Normal Operation.....................................................................................................................10 6.1 Neutralizing Activity in 087-A-1005........................................................................................10 6.2 Slop Oil Tank ............................................................................................................................11 6.3 Upset Condition of Produced Water Quality .........................................................................11 6.4 U016 ORF Shutdown................................................................................................................11 7. Normal Shutdown Procedure ..................................................................................................11 7.1 Corrugated Plate Interceptor ..................................................................................................11 7.2 Utility Neutralizing Pit .............................................................................................................12 7.3 Sanitary Treatment Package ...................................................................................................12 8. Emergency Shutdown Procedure ............................................................................................12 8.1 General ......................................................................................................................................12 8.2 Loss of Utilities..........................................................................................................................13 8.2.1 POWER FAILURE ...................................................................................................................... 13 8.2.2 INSTRUMENT AIR FAILURE ...................................................................................................... 13 9. Safety Procedure .......................................................................................................................13 9.1 General ......................................................................................................................................13 9.2 Emergency Fire Plan ................................................................................................................14 9.3 Fire Fighting and Protective Equipment ................................................................................14 9.4 Maintenance of Equipment and Housekeeping .....................................................................14 9.5 Repair Work .............................................................................................................................15 9.6 Withdrawal of Samples ............................................................................................................15 9.7 Safe Handling of Volatile and Toxic Materials ......................................................................15 9.8 Respiratory Protection .............................................................................................................16 9.9 Breathing Apparatus (B. A.)....................................................................................................16 9.9.1 CORROSIVE MATERIALS .......................................................................................................... 16 9.9.2 CHEMICALS .............................................................................................................................. 17 10. Isolation Procedure for Maintenance......................................................................................17 10.1 General ......................................................................................................................................17 10.2 Basic Procedures.......................................................................................................................17 10.2.1 TRAIN ISOLATION .................................................................................................................... 17 10.2.2 INDIVIDUAL EQUIPMENT / SYSTEM ISOLATION........................................................................ 18 10.2.2.1 Pumps.............................................................................................................................. 18 11. Maintenance Procedure............................................................................................................18 11.1 General ......................................................................................................................................18

_ _ _ __ RA| D __| N I ||___ -2006

B 28-FE

BP Berau Ltd. Tangguh LNG Project Operation Manual for Waste Water Treatment System

Doc. No. 87-IOM-PS-1201 KJP Doc. No. S-087-1283-001 Rev. 6A Sheet No. 3 of 21

11.1.1 ROUTINE/FIRST LINE/ MAINTENANCE ...................................................................................... 18 11.1.2 BREAKDOWN MAINTENANCE .................................................................................................. 18 11.1.3 PLANNED PREVENTIVE MAINTENANCE ................................................................................... 19 11.1.4 PREDICTIVE/CONDITION BASED MONITORING ........................................................................ 19 11.1.5 TURNAROUND /INSPECTION MAINTENANCE ............................................................................ 19 11.2 Precautions prior to Maintenance...........................................................................................19 11.3 Preparation for Maintenance ..................................................................................................19 11.3.1 LIQUID REMOVAL ..................................................................................................................... 20 11.3.2 INSTALLATION OF BLANK FLANGES OR SPADES ....................................................................... 20 11.3.3 AIR TEST .................................................................................................................................. 20 11.4 Typical isolation method ..........................................................................................................20 11.4.1 PITS .......................................................................................................................................... 20 11.4.2 PUMPS ...................................................................................................................................... 20 11.4.3 CLOSE OUT ............................................................................................................................... 20 12. Attachment List.........................................................................................................................21

_ _ _ __ RA| D __| N I ||___ -2006

B 28-FE

BP Berau Ltd. Tangguh LNG Project Operation Manual for Waste Water Treatment System

1.

Doc. No. 87-IOM-PS-1201 KJP Doc. No. S-087-1283-001 Rev. 6A Sheet No. 4 of 21

INTRODUCTION The Waste Water Treatment/Disposal System (Unit 087) and Sanitary Waste Treatment System (Unit 085) are provided to ensure that any liquid effluent leaving the plant will comply with the effluent standards. A segregated drain system is provided for the plant in order to separate the liquid effluent into non-contaminated and contaminated sources. For contaminated liquid effluent the segregation is further accomplished in the plant complex according to their contaminant characteristics.

2.

BASIS OF DESIGN

2.1

General The segregated waste water drainage system for Unit 087 Waste Water Treatment in the plant complex can be categorized as follows: -

Non-Contaminated/clean water sewer

-

Oily waste water sewer

-

Chemical contaminated waste water sewer

Sanitary Waste Treatment System (Unit 085) has a treatment capacity for total number of 340 persons into account. This capacity includes generated sanitary waste from the community area, administration area, upstream operation support area, etc. besides the sanitary waste from the plant area. 2.2

Design Condition Final water discharge requirements to sea (sample point 090-SCA-1002) specified in Project Design Data (900-DBS-EM-0001) are summarized below. Physical Temperature

45oC

Suspended Solid

400mg/l

Color

=3m

Turbidity

View more...