Mantenimiento Plantas de Chancado GMIN - Cambio de Cóncavos Chancador Giratorio Allis Chalmers 54 Inch 74 Inch
Short Description
Descripción: Mantenimiento Plantas de Chancado....
Description
Mant Mantenim enimient iento o Plantas de Chanc Chancado ado GMIN GMIN Cambi o de Cóncavos Chancador Cambi Giratorio Alli s Chalmers 54" 54" 74 74""
Abri Ab ri l 2012
Print document Mantenimien Manten imiento to Chancado Primario Prim ario- SMM
Identi Ide ntific ficaci ación ón del
In order to print this document from Scribd, you'll first Equipo Equ iponeed to download it.
Tipo de chancador: Fabricante: Modelo: Transmisión: Motor: C an t id ad :
GirCancel atorio Download And Print Allis Ch Chalmers M2, 54"74" Motor- eje flotante- contraeje 50 0 H P 2 u n i d a d es .
Camp Ca mpañ añas as Có Cónca ncavo vos s del ch chan anca cado dor r
Cambio de Cóncavas:
7.500 Mtons (campaña 6 meses aproximadamente)
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Reservados. | Copyrights © 2011 2011 by CODELCO-CHILE. CODELCO-CHILE. All Rights Reserved Reserved..
El Teniente |
Print document
FLOW SHEET In orderCHANCADO to print this document from Scribd,RIMARIO you'll first need to download it. TENIENTE 8
Download And Print
Cancel
BUZON MINERAL GRUESO CHANCADO PRIMARIO 4.000 TONS.
APRON 120’’
APRON 72’’
APRON 120’’
APRON 72’’ SACAPALOS 2
SACAPALOS 1
COLECTORA T-1
CHANCADO SECUNDARIO
T-3
CAPACIDAD UTIL 2.500 TONS.
T-2
C315
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved. SAG
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
La planta de Chancado Primario Colón tiene como objetivo •Alimentar en su totalidad a la Planta SAG, y un 60 % a la Planta de Chancado Secundario. •Una meta diaria de 62.500 toneladas. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document Mantenimiento Chancado Primario - SMM
Desarrollo en el
In order to print this document from Scribd, you'll first need to download it. Tiempo Cancel
Download And Print
Instalación de Cajones.
Instalación de Anillo (Cerco).
Instalación de segundo Anillo.
Cadenas Navales.
Carrusel.
Plataformas.
Calefactores.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
•
Print document CAMBIO DE CONCAVAS
In order to print this document from Scribd, you'll first need to download it.
Unificación de plataforma de bandeja para extraer las cóncavas.
Cancel Download Anden Print Instalación de Sistema de Calefactor de Resina el Foso del Chancador.
Mejora en el sistema de acceso al Foso.
Corte equidistante de Lainas Cóncavas (Oxiflame).
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document - SMM Mejoras Implementadas
In order to print this document from Scribd, you'll first need to download it.
1. Preparativos previos Cancel
Download And Print
•
Cheklist s umin istro s, puente grúa, repuestos.
•
Carrusel port a cóncavos.
•
Plataformas interior chancador.
•
Pin fijación cón cavos.
•
Preparativo s de resina, 1 día previo.
•
Revisión previa de martil lo p icador.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document
1. Ejecución
In order to print this document from Scribd, you'll first need to download it.
•
Realizar Lim pieza Cancel Anillo
•
Cadenas Navales
•
Corte de Cóncavas
•
Instalación de
Download And Print
Cóncavas.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document - SMM Mejoras implementadas
Resultado:
In order to print this document from Scribd, you'll first need to download it.
Disminución significativa de los tiempos de mantención. Desde 54 horas iniciales a Download And Print 24 horas en la actualidad. Cancel
Análisis del procedimiento de trabajo Modificación del Sello de Anillo (6). Unificación de plataforma de bandeja para extraer las cóncavas. Instalación de Sistema de Calefactor de Resina en el Foso del Chancador. Mejora en el sistema de acceso al Foso. Corte equidistante de Lainas Cóncavas (Oxiflame)
Difusión procedimiento
en los distintos grupos de mantención Estandarización de todas las actividades de la mantención en los grupos ejecutores del trabajo.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Carta Gantt
Print document
In order to print this document from Scribd, you'll first need it. 12 13 14 15 16 17 18 19 20 4 5to 6 download 7 8 9 10 11 TAREA 1 CAMBIO CONCAVAS 2 BLOQUEO APRON'S 120 3 LIMPIAR AP RON'S 120 4 LIMPIAR FOSO CHAP 5 BLOQUEO INTERMITENTE CHAP 6 SOLTAR PERNOS ARAÑA 7 SACAR TAPA DE ARAÑA Y ACEITE 8 SACAR LAINA SELLO ARAÑA 9 SACAR ARAÑA 10 REPARAR ARAÑA 11 SACAR POSTE 12 INSTALAR TAPA EXC. Y BANDEJA 13 SACAR PRIMERA CORRIDA 14 SACAR SEGUNDA CORRIDA 15 SACAR TERCERA CORRIDA 16 SACAR CUARTA CORRIDA 17 ASEO GENERAL M ARCO 18 MEDICION DE EXENTRICA 19 CAMBIO DE MONTURAS 20 INSTALAR ANILLO DE SELLO 21 INSTALA R CUARTA CORRIDA 22 INSTALAR TERCERA CORRIDA 23 INSTALA R SEGUNDA CORRIDA 24 INSTALA R PRIMERA CORRIDA 25 ASEO GRAL. CONCAVA 26 INSTALACION POSTE 27 INSTALACION ARAÑA 28 LUBRICAR Y TAPAR ARAÑA 29 INSTALAR LAINAS SELLO 30 RETIRAR BLOQUEO Y PROBAR 31 ASEO GENERAL AREA
21 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12
DURACION 0.93 DÍAS 10 MIN. 40 MIN. 145 MIN. 145 MIN. 96 MIN. 60 MIN. 20 MIN. 30 MIN. 948 MIN. 30 MIN. 30 MIN. 40 MIN. 30 MIN. 50 MIN. 60 MIN. 30 MIN. 15 MIN. 60 MIN. 85 MIN. 225 MIN. 60 MIN. 80 MIN. 60 MIN. 60 MIN. 40 MIN. 60 MIN. 40 MIN. 40 MIN. 30 MIN. 70 MIN.
Cancel
Download And Print
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Limpieza con Retro Fuera de Foso
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Limpieza con Retro en el Foso
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Sistema de Suspensión de Retro
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Limpieza Final
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Cadenas Navales
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Anillo (Cerco).
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Instalación de Anillo (Cerco).
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Corte de Cóncavas (Oxiflame).
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Instalación de Cóncavas
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document
In order to print this document from Scribd, you'll first need to download it.
Mantenimiento Plantas de Chancado GMIN Cancel
Download And Print
Cambio de corazas ch ancadores MINA SMM
Abri l 2012
Print document Mantenimiento Chancado Primario- SMM
Identificación del
Tipo de chancador: Fabricante: Modelo: Transmisión: Motor: Cantidad:
In order to print this document from Scribd, you'll first need to download it. Equipo Cancel Download And Print Mandíbula ThyssenKrupp EB 20- 15/H Correas en V 500 HP 3 unidades operando, 1 unidad en puesta en marcha
Campañas corazas del chancador
Giro/ cambio:
650.000 tons (ciclo de aproximadamente 45-50 días)
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Comentarios DR
Print document
In order to print this document from Scribd, you'll DR II first need to download it. Cancel
Download And Print
A Planta Colón Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
Print document Mantenimiento Chancado Primario - SMM
Descripción general
1. 2. 3. 4. 5. 6.
In order to print this document from Scribd, you'll first proceso need to download del de it.cambio de corazas
Retiro plataforma superior y tolvas. Cancel de cuñas Download And Print Desarme del chancador. Retiro y corazas. Limpieza del chancador. Montaje de corazas y cuñas. Apriete chancador. Montaje tolvas y plataforma. ESTÁNDAR INICIAL MANTENCIÓN: 72 HORAS 72
h o r a s
Planificación
x 64 x 56 x
Mejoras
Ejecución
Trabajo en equipo
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document - SMM Mejoras implementadas
Planificación
In order to print this document from Scribd, you'll first need to download it.
1. Registro de setting y tonelaje semanal de chancadores Cancel Download And Print de repuestos. - Proyección anual de cambios y giros, programación
2. Reunión de coordinación Operaciones- Mantención- Planificación en todas las mantenciones. 3. Control del performance de las mantenciones. Postmortem en cada mantención.
4. Cartas gantt detalladas de los trabajos, instaladas en terreno para su control de avance. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document - SMM Mejoras implementadas
Planificación
In order to print this document from Scribd, you'll first need to download it.
5. Preparativos:
And Print Checklist previoCancelde Download repuestos, herramientas, equipos y logística. - Inspección previa de puente grúa principal. - Coordinación apoyo especialistas equipos de izaje en la planta las 24 horas durante la mantención.
6. Coordinador de cada mantención. Apoyo a la supervisión de primera línea en eventos no planificados.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document - SMM Mejoras implementadas
Ejecución
In order to print this document from Scribd, you'll first need to download it.
1. Disminución tiempo en retiro cuñas superiores Cancel Download Print 12 horas. Se diseñó y Inicialmente se torchaban, proceso And duraba fabricó machina para retirar estas cuñas bajando tiempo del proceso a 4 horas. Cuñas superiores
Machina para retir o cuñ as
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document - SMM Mejoras implementadas
Ejecución
In order to print this document from Scribd, you'll first need to download it.
2. Optimización del procedimiento de trabajo Cancel del Download Print - Se cambia secuencia desarmeAnddel chancador, se sueltan cuñas intermedias antes de retiro de cuñas superiores, facilitando este proceso. - Retiro cuñas superior paralelo a soltar pernos cuñas laterales. - Apriete completo del chancador en una etapa, cuñas en paralelo. 3. Difusión procedimiento en los distintos grupos de mantención - Estandarización de todas las actividades de la mantención en los 4 grupos ejecutores del trabajo. - Estandarización del uso de machina de retiro de cuñas superiores en los 4 grupos ejecutores del trabajo.
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Print document Resultados y nuevas metas - SMM In order to print this document from Scribd, you'll first need to download it.
Download And Print Resultado
Cancel
Se logra disminuir los tiempos de cambio y giro de corazas de 72 a 56 horas
NUEVO DESAFÍO Lograr realizar esta mantención en 48 horas y encontrar una aleación de la coraza con una mayor duración
Desafió Teniente El Futuro está en la Tierra Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
Backup – SMMPrint document
In order to print this document from Scribd, you'll first need to download it. Cancel
Download And Print
Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.
El Teniente |
View more...
Comments