SCAFFOLDING STUDY GUIDE TABLE OF CONTENTS

Scope of the Scaffold Certification Tests Purpose of the Certification Tests Purpose of the Study Guide Scaffold Certification Tests Certification Performance Tests Types of Performance Tests Test Durations Example of Performance Inspection Sheet

Scope of the Scaffold Certification Tests The Scaffold Certification Tests cover the certification of employees/contractors as defined in GI 8.001 – Safety Requirements for Scaffolds. • • • •

Scaffold Supervisor I (S-I) Scaffold Supervisor II-T (S-IIT) Scaffold Supervisor II-S (S-IIS) Scaffold Inspector (INSP.)

Purpose of the Certification Tests To determine if an employee/contractor can demonstrate the theoretical and practical knowledge, as defined in GI 8.001 – Safety Requirements for Scaffolds and the Saudi Aramco Scaffold Safety Handbook (SSH), to perform at the worksite as a Scaffold Supervisor or Inspector.

Purpose of the Study Guide This study guide is designed to prepare candidates for the written and performance Scaffold Certification Tests. Specifically the study guide specifies •

Which topics are covered in each of the Scaffold Certification Written Tests



The types of questions in the Scaffold Certification Written Tests



What is required of the candidate in the Scaffold Certification Performance Tests

Scaffold Certification Written Tests Questions in the Certification Written Test will be consistent with: •

GI 8.001 - Safety Requirements for Scaffolds



Saudi Aramco Scaffold Safety Handbook (SSH)



Current working procedures and practices for the safe erection, alteration and dismantling of scaffolding.

The written test is in two parts. Part 1 requires the candidate to answer questions, without the aid of any reference material, on •

The safe erection, alteration and dismantling of scaffolding (S-I, S-IIT, & S-IIS)



The duties and responsibilities of a Scaffold Supervisor/Inspector (S-I, S-IIT, S-IIS, & INSP.)



The inspection and tagging procedures of the Saudi Aramco scaffold tagging system (S-I, S-IIT, S-IIS, & INSP.)



Interpreting scaffold plans (S-I, & INSP.)



Fall protection for scaffold crews (S-I, S-IIT & S-IIS)



Conditions and installation of portable ladders (S-I, S-IIT, S-IIS, & INSP.)



Usage and storage of scaffold components (S-I, S-IIT, S-IIS, & INSP.)



Load duty ratings of scaffolds (S-I, S-IIT, S-IIS, & INSP.)



Conditions for safe scaffold foundations (S-I, S-IIT, S-IIS, & INSP.)



Configurations of bracing for system and fabricated tubular frame scaffolds (S-I, S-IIS, & INSP.)



Installation of ties, rakers, anchors and outriggers (S-I, S-IIT, S-IIS, & INSP.)



Scaffold working platform construction (S-I, S-IIT, S-IIS, & INSP.)



Scaffold landing construction (S-I, S-IIT, S-IIS, & INSP.)



Installation of tube and coupler scaffold components (S-I, S-IIT & INSP.)



Installation of system and fabricated tubular frame scaffold components (S-I, S-IIS & INSP.)



Construction of mobile and tower scaffolds (S-I, S-IIT, S-IIS, & INSP.)



Construction of underhung scaffolds (S-I, S-IIT & INSP.)



Construction of bracket scaffolds (S-I & INSP.)

Part 2 requires the candidate to locate specifications/information using the Scaffold Safety Handbook (SSH) and Loss Prevention/Manufactures documentation, including: •

Procedures for special hazards associated with high winds, work over water, hot surfaces and unstable structures (S-I, S-IIT & S-IIS)



Safe scaffold access and egress (including job-made ladders, ramps, stairways) specifications (S-I, S-IIT, S-IIS & INSP.)



Safe clearances between scaffolds and power lines and excavations (S-I, S-IIT, S-IIS & S)



Acceptable post (standard) spacing for light- and medium-duty tube and coupler (S-I, S-IIT & INSP.), system (S-I, S-IIS & INSP.), underhung (S-I, S-IIT & INSP.), and bracket scaffolds (S-I & INSP.)



Allowable maximum number of working levels and additional planked levels required for light- and medium-duty tube and coupler (S-I, S-IIT & INSP.) and system scaffolds (S-I, S-IIS & INSP.)

The performance test will be administered only to candidates who have successfully passed the written certification test.

Certification Performance Tests For the performance test, scaffolds will be constructed with built-in faults. The candidates will be required to inspect and document which parts of the constructions are acceptable and document all the faults and their corrective actions. (Attached is an example of Performance Inspection Sheet for Supervisor II-T)

Types of Performance Tests Supervisor I and Inspector – Base supported tube and coupler, system and underhung scaffolds. Supervisor II-T – Base supported tube and coupler and underhung scaffolds. Supervisor II-S – System scaffold.

Test Durations The duration of the written tests will be Supervisor I – 2 hours Supervisors II-T, II-S, and Inspector 1 1/2 hours Twenty (20) minutes will be allowed for the inspection and documentation of each of the scaffold constructions. For any further information, contact the Program Supervisor of your area Job Skills Training Division. PHONE # Northern Area: Supervisor, Metals Skills Training 673-1680 Southern Area: Supervisor, Metals Skills Training

577-1038

Riyadh Area: Supervisor, Maintenance Skills Unit

285-2536

Yanbu Area: Supervisor, Yanbu Metals / Mechanical Unit

397-8171

Jeddah/Rabigh Area: Supervisor, Rabigh Jobs Skills Training Unit

425-1381

SCAFFOLDING CERTIFICATION PERFORMANCE INSPECTION SHEET TUBE AND COUPLER SCAFFOLDS SUPERVISOR II-T BASES (SILLS, BASE PLATES ETC)

Description of fault(s)

Required corrective action(s)

None

POSTS (STANDARDS)

Description of fault(s)

Required corrective action(s)

None

RUNNERS (LEDGERS)

Description of fault(s)

Required corrective action(s)

Swivel couplers used to connect runners to posts on second lift

Remove swivel couplers and replace with 90-degree couplers.

BEARERS (TRANSOMS)

Description of fault(s)

Required corrective action(s)

None

BRACING

Description of fault(s)

Required corrective action(s) Replace bracing to the full height

Bracing not installed to full height of the scaffold

of the scaffold on all four sides

OUTRIGGERS AND TIES

Description of fault(s)

Required corrective action(s)

None

GUARDRAILS

Description of fault(s)

Required corrective action(s)

Guardrail installed at a height of 30”

Remove guardrail and reinstall at correct height min 38” max 45”

PLANKS (BOARDS) AND TOEBOARDS

Description of fault(s)

Required corrective action(s)

Planks on end bearer installed with only 2” overlap

Replace planks to overlap max 12” min 6”

LADDERS AND ACCESS

Description of fault(s)

Required corrective action(s)

Sloping ladder installed at incorrect ratio

Remove and replace ladder at correct ratio of 4:1

TOTAL NUMBER OF FAULTS __________. Candidate’s Badge # __________.

Name _____________________.

Company ___________________.

Job Title____________________.

Monitor’s Badge # ____________.