Review of vendor data and provision of same (Assupmtion-2)
100
100
Process description and Block flow diagram (Assupmtion-2)
80
80
Equipment (summary) list (Assupmtion-2)
60
60
Process Flow Diagrams (Assupmtion-5)
80
80
System descriptions (Assupmtion-2)
100
100
Utility Flow Diagrams (Assupmtion-6)
50
50
Material selection philosophy/report & material selection diagrams (Assupmtion-2)
60
60
P&ID Legends and Symbols (1 P&ID)
10
10
Process & Utility Studies (Assupmtion-2)
150
150
Process Engineering Flow Sheets (PEFS, P&IDs, UDDs, UEFS) etc (Assupmtion-12)
100
100
Drainage and Effluent Summary (Assupmtion-2)
60
60
Cause and Effect Matrix (Assupmtion-2)
50
50
Process Control Logic Diagrams (Assupmtion-2)
60
60
Interface Schedule (Assupmtion-2)
30
Battery limit conditions summary (Assupmtion-2)
40
40
Hydraulic Calcs, basic and overcapacity analysis, surge analysis (Assupmtion-2)
200
200
Utilities Summary (Assumption-6)
40
40
Pump calculation data sheets (Assupmtion-2)
20
20
Appropriate supporting calculations, line size, overpressure etc (Assupmtion-2)
60
60
Control valve and inline instrument data sheets (IPDS sheets) (Assupmtion-2)
40
40
Analyser data sheets (Residual Chlorine Analyzer)
20
20
Relief valve list/specifications (Assupmtion-11)
20
20
Relief load study (Assupmtion-11)
40
40
Process Sizing Criteria (Assupmtion-2)
30
30
Process Control and Instrumented Protection Function (IPF) Philosophy (Assupmtion-2)
80
80
Tie in' Isolation and Battery Limits Lists and philosophy (Assupmtion-2)
40
40
Emergency Shutdown Philosophy (Assumption-2)
60
60
Drainage and Effluent Philosophy (Assupmtion-2)
50
Sparing Philosophy (Assupmtion-2)
30
30
Operation Philosophies Start up, Shutdown and Upset philosophy (Assupmtion-2)
100
100
Relief valve sizing philosophy(Assupmtion-11)
50
50
Maintenance Philosophy, reliability and plant availability (Assupmtion-2)
60
60
Commissioning Manual input, commissioning systems definition
60
60
Operating manual with developed vendor data (Assupmtion-2)
80
80
Performance Test Procedures and acceptance criteria (Assupmtion2)
50
50
Process safety review
30
30
Selected DHSE reviews in DHSE section (HAZOP)
30
30
Plot Plan review
30
30
Final documentation dossier
40
40
FAT visits (02 Visits in Middle East,1 Engineer)
40
40
Visit to site for Kick Off Meeting (02 Visits)
20
20
30
50
Verification attendance and reports for:
Assumptions: 1 Only compliance with contract scope and specification/code requirements. 2. The system to be reviewed will only consisted of new pump station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with auxilliaries like chlorine injection points, flow meter & Air Release Valves) 3. Only potable water stream & chlorine feed is considered. 4. Only pumping station will be considered. No evaluation for perfomance of SWRO plant. 5. 4 PFDs are considered (2 for phase-I & 2 for phase-II). 6.Utilities required for new pumping station is considered. 7. Only two reviews ('for comment' and ‘for approval’) are considered. 8. Assume that the submittals received have the supporting information with them in order to undertake the review. 9. Assume that contractor has a basic level of engineering competence and no engineering will be done. 10. Assume that the submittals received have the supporting information with them in order to undertake the review. 11. Thermal/Pressure Relief Valves on the discharge lines of pumps are considrered. Relief valves on the Storage Tanks are not considered.
NON-DRAFTED DRAWINGS Total Hrs :--------------------> MAN-HOUR DISTRIBUTION
Hrs
MUHAMMAD TARIQ
800
BASSIM ALHAMOUD
500
HUSSAIN ALKHUDAIR
500
IMTINAN MOHSIN
710
Dwg. Size
New Qty
2510.0
2510.0
Yes P
CHECK LIST : Please Check all the following items are taken care or not. 1.All New Dwg. Covered 2.All Exsisting Dwg. Covered 3.Field Visit & Dwg. Search 4.Sub Contract 5.Requisitions 6.Data Sheets 7.Calculations 8.Materials Take Offs 9.Man-Hour Distribution 10. Misc.any other Items
No P
P P P P P P P P Exist Qty
New Eq "A"
Ext .Eq "A"
Total Eq "A"
SIZE "A" SIZE "B" SIZE "C"
Cross Check
SIZE "D"
OK
SIZE "E" TOTAL
2510 Total Man-Hours ( All Sheets) :-------------------> TOTAL AV. MHRS/ "A" SIZE DWG.-------------------------->