STANDARD ELECTRIC SDN. BHD. (KINGSGATE SDN. BHD.) Doc. No.: SOP 7.3 QP Page No.: 2 of 5
Items to check
Metal Grinding/ Welded Joints/ Edges
Metal PreTreatment Deruster Treatment
Rev. No.: 1 Eff. Date: 1 Dec. 2010
Monitoring
Materials
Cut & Bend Metal & Fiber Sheet
QC Plan Work In-Progress for Metal Fabrication
Frequency
Responsibility
Mark on the sheet Before & after Supervisor & Dimension cut or bend Modular (Tolerance ±2mm) Fabricators Thickness Quantity Calculation of required number of cut metal pieces Loose/ tightness After grinding / Supervisor & welded joint welded the cut/ Storekeeper Angle for welded bend metal structure pieces Quantity Smoothness of joint (after grinding/ welding) Dimension (Tolerance +/- 2mm Knock off welding Before deruster Treatment/ laxity treatment Painting/ Oven Wash off dirt, Operators welding laxity and Final check by oil using water supervisor After PreTreatment/ Dip in De-ruster treatment Painting/ Oven solution Operators Duration/ time of submerge of metal piece Concentration of chemical solution
Inspection/ Test method
Location At cutting machine/ Cutting/ bending area
Metal grinding area & welding Area
Visual check Measuring tape
-Visual - measuring tape
Treatment/ Painting/ Oven area
Visual
Visual Clock Litmus paper
Treatment/ Painting/ Oven area
Reference Document
SOP 7.3 WI-001Modular fabrication
SOP 7.3 W.I-002Carta aliran welding
SOP 7.3 W.I-003- Carta aliran kerja rawatan besi dengan bahan kimia SOP 7.3 W.I –003Carta aliran kerja rawatn besi dengan bahan kimia
Pre-Rust Inhibitor Treatment
After deruster Wash metal sheet treatment thoroughly after derust treatment Dip in rust inhibitor (duration/ After pre rust concentration) Inhibitor Duration of treatment chemical submerge Correct dilution factor
Treatment/ Painting/ Oven Operators
Treatment/ Painting/ Oven area
Visual
SOP 7.3
W.I –003Carta aliran kerja rawatn besi dengan bahan kimia
STANDARD ELECTRIC SDN. BHD. (KINGSGATE SDN. BHD.) Doc. No.: SOP 7.3-QP Page No.: 3 of 5
Items to check
Paint Spraying
Ovening
Rev. No.: 1 Eff. Date: 1 Dec 2010
Monitoring
Materials
Pre-Painting Washing & Drying
Quality Plan: Work In-Progress for Metal Fabrication works
Frequency
Responsibility
Location
Inspection/ Test method Visual
After Rust Wash metal plate of Inhibitor acid with water Treatment Dry water using air blower
Treatment/ Painting/ Oven Operators
Treatment/ Painting/ Oven area
After pre painting washing & Drying
Treatment/ Painting/ Oven Operators
Treatment/ Painting/ Oven area
Visual
After painting
Treatment/ Painting/ Oven Operators
Treatment/ Painting/ Oven area
Visual
Paint layers evenness and equal Edges/ welded/ joints/ sides must be fully covered by paints Paints stickiness
Set oven temperature and ovening time according to paint powder spec Arrangement of sprayed metal sheet (until it fully occupied oven) Baking of paints Visual paint & crack test
Reference Document SOP 7.3
Operating Instructions & spare Parts list Manual Powder system with powder gun W.I-004- Carta aliran bagi kerja-kerja mengecat dan ovening SOP 7.3 W.I-004- Carta aliran kerja mengecat dan ovening
STANDARD ELECTRIC SDN. BHD. (KINGSGATE SDN. BHD.) Doc. No.: SOP 7.3- QP Page No.: 4 of 5
Items to check
Wiring Work Components Fitting
Rev. No.: 1 Eff. Date: 1 Dec 2010
Monitoring
Materials
Modular Installation
Quality Plan: Work In-Progress for Modular Installation, components fitting & Wiring work
Dimension of modular Tightness nut/ bolts Right angle at corners Evenness of modular setting Firmness of frame structure Wire labelling Size of cables Correct wiring according to CAD drawing Continuity check by using multimeter Tightness of terminal Neatness of cable way Wash metal plate of acid with water Dry water using air blower