Bauerfeld Internaonal Airport - Runway Improvement Improvement Project Bill o Quanes - Summary

Item

Descripon

1. 1.0 0

Preliminary an and Ge General

2.0

Airside Con Construcon

3.0

Site Clearance

4.0

Aggregate Su Supply

5. 5.0 0

Milling & Texturising

6.0 6.0

New New Pavemen ementt Cons Constr truc uco on n

7.0

Asphalt Works

8. 8.0 0

Li Ligh ghn ng g and and Mi Misc scel ella lane neou ouss Wor orkks

9.0

Paint Marking

10.0

Drainage Wo Works

11.0 11. 0

Qual Qualit ityy Ass Assur uran ance ce / Qua Quali lity ty Cont Contro roll

12.0 12.0

Day Day W Wor orkk Item Itemss (Pro (Provi visi sion onal al)) Total Project Cost:

Amount (US$)

 

Bauerfeld Internaonal Airport - Runway Improvement Project Bill o Quanes Item 1.0 PRELIMINAR PRELIMINARY Y & GENERAL

Descripon

In Indi dica cate tess chan change gess ma made de ro rom m Cl Clar arif ifca ca Unit

Quanty

LS

1

LS

1

LS

1

LS

1

d) Tack Coat Supply - Mobilise, supply and unloading return shipping o empty containers. Supply o material contained within rate or material placed / sprayed - below

LS

1

e) Mobilisaon Mobilisaon o Plant and Materials to Site (cost o aggregate aggregate and bitumen separate below)

LS

1

) Demobilis Demobilisaon aon o Plant and excess materials rom site

LS

1

g) Disposal o Contractor's Solid Waste Waste (reer to PC GC Clause 11.11)

LS

1

h) Other fxed charges & obligaons obligaons (Contractor to speciy)

LS

1

Rate (US$)

1.1 INSURANCE INSURANCES S a) Provide all specifed specifed Insurances ESTABLISHMENTS 1.2 FIXED CHA CHARGES RGES a) Mobilise, supply and establish establish plant and acilies on site and dy up on compleon compleon o Works b) Bitumen Supply - Mobilise, supply and unloading return shipping o empty standard iso-containers; Bitumen or binder is included in materials below. below. c) Kerosene Supply - Mobilise, supply and unloading return shipping o empty iso-cont iso-containers. ainers. Supply o material contained within rate or material sprayed - below

1.3 TIME RELATED ITEMS (Osite - includes contractor's general business expenses, including, admin, fnancial, overhead, incurred at Contractor's Head Oce or other oces, direcon and supervision by Contractor's Principal Ocers and others not assigned on site, proft and overhead, fxed and me-related o-site expenses or running the business.). (Onsite - includes temporary oces, workshops, all equipment not in other rates or specifcally menoned (survey, tesng, sampling, oce) below. All management acvies not noted here or below are included in the rates.

a) Contractual requiremen requirements ts in compliance with Secon VII, VIII & XI during mobilisaon mobilisaon phase

WK

12

b) Contractual requirements requirements in compliance compliance with Secons VII, VIII & IX during construcon phase

WK

36

c) Contract Contractors ors site oce including oce equipment, messing, meeng rooms, power and telephone, abluons, workshops, stores, sewerage and connecons, access, encing

WK

36

d) Contractors Contractors Sta Accommodaon, transport, vitualing, health care, etc.

WK

30

e) Provide, service and maintain Engineers Oce with 4 desks and chairs, 4 draw fling cabinet, meeng room with suitable air condioning, power supply, telephone and internet connecon, table, chairs and tea acilies; abluon, hand basin and saety gear locker

WK

40

) Provide Engine Engineers ers vehicle transport transport

WK

40

g) Other me related notes (contractor/employe (contractor/employerr to state)

LS

1

LS

1

b) Comply with the HIV/AIDS, GBV and CP training requirements requirements - PROVISIONAL

PS

1

$50,000.00

c) Prepare/sub Prepare/submit mit and implement all aspects o the occupaonal occupaonal health & saety plan and training in accordance with Secon 6.7 o Parcular Condions o Contract or sta and personnel - PROVISIONAL

PS

1

$375,000.00

1.4 OCCUPATIONAL HEALTH & SAFETY in accordance with Secon 6.7 o the Parcular Condions o Contract (Update as required) a) Prepare/sub Prepare/submit mit and maintain OHS plan that is consistent consistent with Secon 6.7 o the Parcular Condions o Contract including all briefng to site personnel and non-escorted visitors. visitors. Implement, manage, revise plan or the duraon o the Works

1.5 CONSTRUCTION MANAGEMENT (Update as required) a) Monthly Progress Progress Reports (All Phases) (Record and Submit)

Month

10

b) Daily Works Record & Aendance at weekly coordinaon meengs (Site Phase) (Record and Submit)

WK

36

c) Prepare and submit Contract Work Workss Quality Plan. Implement Implement,, manage and revise plan as required.

LS

1

d) Update dra/prepare and submit Contractors Environmental and Social Management Plan. Implement, manage and revise plan as required.

LS

1

e) Prepare and submit Trac Management Plan and access road condion survey, beore and aer. (Record and Submit; to cover roads within airport, land and airside, used by Contracto Contractor) r)

LS

1

) Prepare submit and update Contractor Contractorss Construcon Programme Programme as required (min req 1/month)

LS

1

LS

1

LS

1

2.1 Allow or all other  costs   costs associated with Specifcaon Secon 2.0 Airside Construcon (contractor to provide breakdown), if costs not included with or associated with any of items 2.2-2.6 below .

LS

1

2.2 Upli dra Method o Works Plan, update, issue, implement and comply with all requirements or duraon o physical works onsite

LS

1

2.3 Coordinaon with AVL, CAAV, ATC, ATC, AVSec, Airlines, Airport Manager or duraon o the works

LS

1

2.4 Proteco Protecon n o lighng cabling and runway / taxiway lighng eatures eatures

LS

1

wks

24

hrs

24

g) Prepare and Submit "As Built" Construcon Records, including including surace fnished level or all airside pavemen pavements ts h) Maintain all haul roads used or the duraon o the project and reinstate all AVL land side and air-side roads and suracing to match condion prior to project commencement Total Cost or 1.0 Preliminary & General (copy total to summary page) 2.0 AIRSIDE CONS CONSTRUCTION TRUCTION

2.5 FOD protecon or the duraon o the airside works, including contractor airside work saety supervisor, inspecons, end o shi handover to AVL and provision o labour and operaon o necessary plant and emergency callout works as required 2.6 Unschedule Unscheduled d ight requiring stand down o paving operaon

Total Cost or 2.0 Airside Construcon (copy total to summary page) 3.0 SITE CLE CLEARANCE ARANCE

Amount (US$)

 

Item

Unit

Quanty

3.1 Removal o topsoil rom exisng and new shoulders on apron, runway runway,, exisng and uture taxiways, turning circles to stockpile or reuse as directed. Remove to 1 m past plan dimension.

Descripon

m2

30,000

3.2 Removal o topsoil rom new taxiway & apron perimeter perimeter,, to stockpile or reuse as directed

m2

25,000

m2

25,000

3.4 Clearance o exisng vegetaon to topsoil rom Contractors Works area (nominal 50% o area), to waste, as directed

m2

16,000

3.5 Remove all exisng concrete patches and other patches rom emergency repairs on exisng runway taxiway and apron (contractor to state quanty), to hardfll stockpile

m2

75

aggregate materials to site or suitable asphalt construcon (Contra (Contractor ctor to 4.1 Crush screen and transport all aggregate demonstrate demonstrat e quality and to confrm and agree the required quanty beore transport)

m3 Solid

44,000

4.2 Crush screen and transport all aggregate aggregate materials (M/4 base course) or new pavement construcon suitable to meet the specifcaon (Contractor to demonstrate demonstrate quality and confrm required quanty beore transport)

m3 Solid

15,000

4.3 Crush screen and transport all aggregate aggregate materials (M/3 sub base) or new pavement construcon suitable to meet the specifcaon (Contractor to demonstrate demonstrate quality and confrm required quanty beore transport)

m3 Solid

18,000

a) 0-25mm (Texturising) (Texturising)

m2

25,000

b) 26-50mm 26-50mm

m2

20,000

c) 51-75mm 51-75mm

m2

15,000

d) 76-100mm 76-100mm

m2

15,000

e) 101-125mm 101-125mm

m2

15,000

) 126-150m 126-150mm m

m2

15,000

g) 151-200m 151-200mm m

m2

5,000

h) >201mm >201mm

m2

3.3 Clearance o exisng vegetaon rom new taxiways, exisng apron taxiway, tug lane, to waste, as directed

Total Cost or 3.0 Site Clearance (copy total to summary page) 4.0 AGGREGATE AGGREGATE SUPPL SUPPLY Y Aggregate supply rate to include all costs or shipping all asphalt aggregate, all M/4 base course aggregate and all M/3 sub base aggregate or new pavement construcon to Vanuatu. Inclusive o all customs, quaranne and bioseurity requirements.

Total Cost or 4.0 Aggregate Supply (copy total to summary page) 5.0 MILLING & TEXTURISING 5.1.1 Mill/Texturise all operaonal areas with exisng asphalt to specifed depth, prior to asphalt work, dispose to nominated stockpile or shoulders (lead < 4 km)  Allow to achieve achieve design surfac surface e levels, as shown on the drawings

Total Cost or 5.0 Milling and Texturising

1,000 111,000

6.0 NEW PAVEMENT PAVEMENT CONSTRUCTION 6.1 Survey, Survey, test strip and subbase design 6.1.1 Upli design and exisng survey inormaon and provide set out data survey or the works

LS

1

aggregate test strip gradaon and compact subbase & basecourse suitable to meet specifcaon aggregate 6.1.2 Construct requirements

LS

1

Undertake trials to determine suitable subbase material design using asphalt millings, coronous and coral 6.1.3 aggregat aggregates, es, and (possibly) bituminous emulsion binder (compact in trial strip - included above)

LS

1

m2

incl @ at Item 3

m2

incl @ at Item 3

m2

incl @ at Item 3

6.2 SHOULDER and TAXIWA TAXIWAY Y CONSTRUCTION 6.2.1 Excavate and remove to nominated stockpile exisng soil materials rom exisng grassed shoulders a) Runway b) Taxiways c) Apron 6.2.2 Place and compact granular M/4 basecourse and M/3 and millings subbase a) Exisng Runway Runway (as directed - digout and replace, as directed)

m2

2,000

b) New T Taxiway axiway Alpha at 11 En End d (Area J, Drawing No 21) 21)

m2

9,000

c) Exisng Taxiway Taxiway Bravo (Apron) (Note - specifc methodology methodology and MWOP will be required or this area to enable daily operaons) (Area I, Drawing No 21)

m2

3,100

d) New T Taxiway axiway Charlie (29 End, Area K, Drawing 28)

m2

7,250

e) New Apron Area (Area (Area L - Drawing 21)) ) Tug lane to apron (Are (Area a P Drawing 21)

m2 m2

8,000 2,500

g) Shoulders to Runway rom 00 to 2000 and taxiways (Area M, Drawing 21)

m2

36,000

h) Provisional - General Aviaon Area (exisng, allow or up to 100mm rip and remake with basecourse)

m2

2,500

m2

7,000

i) Provisional - General Aviaon Area (new, subbase and basecourse) Allow at 200 mm on CBR 4% Total Cost or 6.2.2 Place, compact base & sub- base 6.2.3 Two coat chipseal with sand overspray a) Runway Runway

m2

1,000

b) Taxiway (Alpha only)

m2

250

c) Apron Apron

m2

500

m2

5,000

Total Cost or 6.2.3 Two Coat chipseal, sand overspray

6.2.4 Spread materials excavated as required, required, nominal 25 mm topsoil rom stockpile, apply and propagate grass grass seed Total Cost or 5.1.4 Topsoil and grass seed(copy total to summary page) 6.3 SUBSOIL DRAIN - PROVISIONAL PROVISIONAL ITEM

Rate (US$)

Amount (US$)

 

Item

Descripon

Unit

Quanty

6.3.1 Supply NZTA F/1 subsoil pipe, excavate and dispose to waste onsite, place granular flter material within subsoil trench - PROVISIONAL a) Runw Runway ay

m

500

b) Taxiway

m

200

c) Apron Apron

m

100

m

5

6.3.2 Supply & install ouall pipe, verman proo grill and concrete apron at outlet - PROVISIONAL Total Cost or 6.3 Subsoil drain

6.4 GRASSED BERM REINSTATEMENT REINSTATEMENT 6.4.1 Supply topsoil, place and shap shape e to edge o paved area, apply & propagate grass seed a) Runw Runway ay

m2

7,500

b) Taxiway

m2

500

c) Apron Apron

m2 Total Cost or 6.4 Grass Berm Reinstatement

500 8,500

6.5 GRANULAR PA PAVEMENT VEMENT RECONSTRUCTION WITHIN EXISTING EXIST ING PA PAVEMENT VEMENT AREA 6.5.1 Excavate and remove to nominated stockpile stockpile (digout up to 400mm and replace) a) Runw Runway ay

m2

1,000

b) Taxiway (Alpha only) only)

m2

500

c) Apron Apron

m2 Total Cost or 6.5 Gr Granular anular Pavement reconstrucon (digout)

500 2,000

Total Cost or 6.0 New Pavement Construcon (copy total to summary page) 7.0 ASPHAL ASPHALT T WORKS 7.1 Prior to Full Scale Produ Producon con a) Bitumen Supply allow or mix variability plus 0.5% on target content and any addive or PMB required. Contractor to nominate quanty, addives and PMB, or approval beore transport to site, see specifcaon or details. (Mulgrade bitumen will be considered)

tonnes

5,350

b) Prepare and submit a complying Asphalt Mix Design (Target (Target Bitumen Content %), as directed

Each

2

c) Prepare and lay Asphalt trial strips, strips, as directed

Each

2

d) Prepare revised revised Asphalc Mix Design and prepare prepare and lay addional trial strip

Each

2

e) Provide digital GPS paving contro controll with experienced operaves and technicians

LS

1

incl below

-

a) Full scale producon ull width AC20mm asphalt (Area A, Dwg 21, thicknesses shown in drawings)

m2

b) Supply & apply bitumen tack coat under all areas receiving receiving new asphalt

m2

19,550 19,550

m2

38,205

m2

38,205

a) Full scale producon ull width AC20mm asphalt (Area C, Dwg 21, thicknesses shown in drawings)

m2

27,000

b) Supply & apply bitumen tack coat under all areas receiving receiving new asphalt

m2

27,000

Total Cost or 7.1 Prior to Full Scale Producon 7.2 Full Scale Pr Producon oducon 7.2.1 Turni Turning ng Area Included below (see Drawing 21) 7.2.20-400

7.2.3 400-1250 a) Full scale producon ull width AC20mm asphalt (Area B, Dwg 21, thicknesses shown in drawings drawings)) b) Supply & apply bitumen tack coat under all areas receiving receiving new asphalt 7.2.4 1250-185 1250-1850 0

7.2.5 1850-200 1850-2000 0 a) Full scale producon ull width AC20mm asphalt (Area D, Dwg 21, thicknesses shown in drawin drawings) gs) b) Supply & apply bitumen tack coat under all areas receiving new asphalt 7.2.6 2000-260 2000-2600 0 a) Full scale producon ull width AC20mm asphalt (Area E, Dwg 21, thicknesses shown in drawings drawings))

m2

8,526

m2

8,226

m2

28,837

m2

28,837

m2

3,075

m2

3,075

a) Full scale producon ull width AC20mm asphalt (Area J, Dwg 21, thicknesses shown in drawings drawings))

m2

9,254

b) Supply & apply bitumen membrane seal on all new basecour basecourse se under all areas receiving new asphalt 7.2.9 Taxiway Charlie Charlie

m2

9,254

b) Supply & apply bitumen tack coat under all areas receiving new asphalt 7.2.7 Taxiway Bravo Bravo a) Full scale producon ull width AC20mm asphalt (Area I, Dwg 21, thicknesses shown in drawings) b) Supply & apply bitumen tack coat under all areas receiving new asphalt, with membrane on new basecourse 7.2.8 Taxiway Alpha Alpha

a) Full scale producon ull width AC20mm asphalt (Area K, Dwg 21, thicknesses shown in drawings drawings))

m2

7,142

b) Supply & apply bitumen membrane seal on all new basecour basecourse se under all areas receiving new asphalt

m2

7,142

7.2.10 Apron New, including shoulde shoulders rs / tug lane (Area L & P, Dwg 21, thicknesses shown on drawings) a) Full scale producon ull width AC20mm asphalt (Area L& P P,, Dwg 21, thicknesses shown in drawings)

m2

10,440

b) Supply & apply bitumen membrane seal on all new basecour basecourse se under all areas receiving new asphalt

m2

10,440

a) Full scale producon ull width AC20mm asphalt (Area I, H & G, Dwg 21, thicknesses shown in drawings) drawings)

m2

11,282

b) Supply & apply bitumen tack coat under all areas receiving receiving new asphalt

m2

11,282

7.2.11 Apron Exisng Exisng (Area I, H & G, Dwg 21, thicknesses shown on drawing drawings) s)

7.2.12 General General Aviaon Area (west o apron) - (Provisional) a) Full scale producon ull width AC20mm asphalt (Area west o apron), nominal 60 mm thick

m2

9,100

b) Supply & apply bitumen membrane seal on all new basecour basecourse se under all areas receiving new asphalt

m2

9,100

7.2.13 Shoulders (New 0-2000 & Alpha, Area M; Exisng, Area E, New Charlie) Dwg 21, thicknesses shown in drawings); a) Full scale producon ull width AC20mm asphalt (Area west o apron), nominal 60 mm thick

m2

44,000

b) Supply & apply bitumen membrane seal on all new base course under all areas receiving new asphalt

m2

44,000

m2

39,000

7.2.14 0-2600 Addional Pavement Pavement Thickness (Central (Central 15m width) - (Provisional) a) Provisional Provisional  - addional streng strengthening thening along the central secon; not on drawings drawings.. Allow 25 mm thickness or 7.5m either side o centreline or ull length

Rate (US$)

Amount (US$)

 

Item

Descripon

Unit

Quanty

m2

1,600

ea

6

ea

2

PS

1

Rate (US$)

Amount (US$)

Total Cost or 7.2 Full Scale Producon 7.3 Apron Jet Fuel Sea Sealant lant a) Apply uel resistant coang, as directed, directed, to 4 stands Total Cost or 7.3 Jet Fuel Sealant

7.4 Li exisng uel h hydrants, ydrants, as directed (details to be confrmed) - PROVISIONAL 7.5 Install new hydrants and pipe line to new stands on eastern extension (details to be confrmed) PROVISIONAL PROVISI ONAL 7.6 Undertake milling and AC20mm asphalt patch repairs and crack sealing on exisng operaonal pavements as instructed (locaons and details to be instructed by the Engineer in wring) PROVISIONAL SUM

Total Cost or 7.0 Asphalt Works (copy total to summary page) 8.0 LIGHTING AND MISCELLANE MISCELLANEOUS OUS WORKS Allow to supply, install and commission all lighng as described below and in the specifcaon. AGL, PAPI and Apron lighng shall be unconal at all mes when the airfeld is in use. All ducts to be in trench and reinstated as specifed. Pits to be heavy duty with similar lids.

8.1 Runway Edge Lighng Replacement (Runway lights to remain operaonal) a) Supply, Supply, install and commission new AGL lights including bases cable connecon to new lighng cabling

ea

110

b) Remove redundan redundantt lights, bases and oundaon and dispose o site.

ea

110

c) Supply and Install new Runway, Taxiway and Apron Edge lighng cabling or new edge lighng as described and connect to power supply(s)

m

6,500

a) Supply, Supply, install and commission new lights including light bases and connecon to runway lighng cabling

ea

90

c) Remove redundant lights, bases and oundaon and dispose o site. Reinstate Reinstate disturbed area

ea

30

8.2 Taxiway & Apron Edge Lighng Replacement (by other contract)

8.3 Lighng Ducts a) Supply, Supply, install and reinstate lighng and cabling ducts in trench, 100mm dia including Tees Tees and Spur Ducts

m

6,500

b) Supply and Install draw ccables ables to the ducts and pits, including tails

m

8,000

c) HD Large Pits (Power distribuon), as described above and in specifcaon

No

6

d) HD Series Isolang Tr Transormer ansormer (SIT) supply and install, as described and in specifcaon

No

20

1,000

8.4 Data Duc Ducts ts a) Supply, Supply, install in trench and reinstate in trench, 65mm dia ducng inclu including ding tees and bends

m

b) Addional 65 mm ducng as directed (tower to terminal and wind socks and as directed)

m

1,500

c) Draw Cables including including tails

m

2,000

Each

6

Each

6

Each

3

Each

1

Each

1

Each

1

m

1,500

8.5 Apron Flood Li Lighng ghng a) Remove exisng cyclone cyclone damaged towers and dispose o site. Install new tower bases, rangible pole to suit & ducng or tower installaon b) Switched Flood Light Units, as specifed, fed and commissioned commissioned 8.6 Illuminated Wind Dir Direcon econ Indicator (IWDI) a) allow or base, rangible mast and all fngs and connecon to control tower tower.. 8.7 Constan Constantt Curren Currentt Regulator(CCR) Supply and install CCR units (PAPI, taxiway and AGL) in tower (details to be provided on site) 8.8 Lighng Cont Control rol Panel Supply and install control panel or airfeld lighng in control tower 8.9 Airport Beacon Provide and install 1 beacon or control tower; visibility range 30 naucal mile

Total Cost or 8.0 Miscellaneous Works (copy total to summary page) 9.0 PAINT MARKINGS (all in accordance with ICAO AC139-6 requirement) requirement) 9.1 Install Te Temporary mporary Paint markings a) Runway centreline centreline marking (30m each x 450mm) 50 No. 9.2 Runway Mar Markings: kings: White a) Transvers Transverse e stripe indicang displaced threshold, as directed

m2

180

b) Threshold mark markings ings 2 sets x 12 stripes x (30 x 1.8m) (permanent)

m2

1,300 4

c) Displaced threshold arrows, arrows, as directed

Sets

d) Aiming Point markings (AC139-5, T Table able 5-1)

Sets

2

e) Distance Markers Markers

Sets

4

) Runway centre centreline line marking (450mm width x 30m long)

each

88

g) Runway ID Numbers Numbers - 11

No

1

h) Runway ID Numb Numbers ers - 29

No

1

a) Survey exisng apron markings and provide setout or replacement and new lines (Yellow (Yellow,, white and red) b) Runway turn pad centre centreline line markings 11 and

m

incl below 850

c) Runway turn pad centreline centreline marking 29 and

m

675

9.3 Runway / T Taxiway axiway Markings: Yellow

$200,000.00

$200,000.00

 

Item d) 150mm wide lead lead in lines

Descripon

Unit

Quanty

m

550

e) Runway/T Runway/Taxiway axiway Holding markings

No

3

) Ta Taxiway xiway edge marking marking

m

1,300

g) Ta Taxiway xiway side stripes (0.9m wide x 9m long)

m

90

a) Ground Service Equipment Equipment (GSE) lines (red/white lines) lines)

m

1,500

b) Apron edge marking marking

m

550

c) 150mm wide lead lead in lines

m

800

d) Apron Turn Point Arrows Arrows

No

5

e) Apron Stand Numbering (3m High number per NZCAA 139-6)

No.

4

No

1

10.2 Concrete RCRRJ class 8(minimum) pipe including reinorced concrete surro surround und a) 600mm diameter b) 825mm diameter (connected to reducer or increased inleng capacity rom CP) c) Concrete RCRRJ class 4 pipe 1050mm diameter

m m m

97 2 27

10.3 Pre cast heavy heavy duty head wall a) 1 x 1050 pipe headwall b) 1 x 600 pipe headwall c) Factory reducer 825mm to 600mm (or 600 inleng rom catchpit)

No No No

1 1 1

10.4 Grassed Swale Swale 3:1 side slopes a) up to 1m depth with 1m wide base b) up to 1m depth with 2m wide base c) up to 2m depth with 1m wide base

m m m

195 90 55

10.5 Rock rip rap protecon with weak binding mortor (including geoabric) geoabric) a) La Cole River outlet b) Within swale at 600mm culvert outlet

m2 m2

40 60

10.6 Removal and and disposal o site a) Exisng Catchpit b) Exisng 1050 corrugated iron culvert with concrete surround c) Localised earthworks to grade central node area to low point at catchpit d) topsoiling and grassing o swale

No m LS m2

1 13 1 2140

m2 m2

350 350

m3 m3 m m

51 130 97 97

No

1

m m

65 2

10.10 Pre cast heavy heavy duty head wall a) 1 x 600 pipe headwall b) Factory reducer 825mm to 600mm (or 600 inleng rom catchpit)

No No

1 1

10.11 Grassed Swale Swale 3:1 side slopes a) deepening o exisng swale b) up to 1m depth with 1m wide base c) up to 2.5m depth with 1m wide base

m m m

150 365 175

10.12 Rock rip rap protecon with weak binding mortor (including g geoabric) eoabric) a) Within swale at 600mm culvert outlet b) Localised earthworks to grade central node area to low point at catchpit c) Extension and shaping o swale to invert o new headwall

m2 LS m

50 1 30

9.4 Apron Marking Yellow To confrm

To Total tal Cost or 9.0 Paint Markings (copy total to summary page)

10.0 Drainage Works

10.1 Runway 11 end, as per detailed design design drawings Incl. supply and installaon, excavaon, cut to waste, bedding, conc. surround, saw cung, reinorcing, backflling and reinstatement a) 1. 1.4 x 0.8m Catchpit (including high capacity inlet grate bolted to chamber)

Realigning the perimeter road to suit the new node and swale alignment (remove topsoil, shape and e) compact), as specifed and shown on d rawings ) Realignment o ence around node 11 works to align with legal boundary 10.7 Pavement Pavement interace as per drawing 317 a) Ad Addional sub base thickening or length o 600mm dia culvert under taxi way b) N o fne concrete backfll (5 MPa) c) Geotexle or pavement integraon/interace (length o culvert) d) Geoabric or pavement integraon/interace (length o culvert) 10.8 Runway 29 end, as per detailed design design drawings including supply and installaon, excavaon, cut to waste, bedding, concrete surround, saw cung, reinorcing, backflling and reinstatement a) 1.4 x 0.8m Catchpit (including high capacity inlet grate bolted to chamber) 10.9 Concrete RCRRJ class 8(minimum) pipe including reinorced concrete surro surround und a) 600mm diameter b) 825mm diameter (connected to reducer or increased inleng capacity rom CP)

Rate (US$)

Amount (US$)

 

Item

Unit

Quanty

d) topsoiling and grassing o swale

Descripon

m2

15000

Realigning the perimeter road to suit the new node and swale alignment (remove topsoil, topsoil, place 300 mm aggregate, shape and compact), as specifed and shown on drawings e) local limestone aggregate,

m

300

m3 m3 m m

34 90 65 65

No No No

1 1 4

10.15 Concrete RCRRJ Class 8 Bypass/outlet Pipes with reinorce concrete surround a) 2 x 375mm dia (P.060 bypass) b) 1 x 300mm dia (P.060 outlet) c) 1 x 300mm dia (P.030 bypass) d) 1 x 300mm dia (P.030 outlet)

m m m m

11 11 13 13

10.16 Heavy duty concret concrete e headwalls a) to suit 2 x 375mm dia pipes b) to suit 1 x 300mm dia pipe

No No

1 3

10.13 Pave Pavement ment integraon integraon as per drawing 317 a) A Ad ddional sub base thickening or length o 600mm dia culvert under taxi way b) Sup upp ply and and plac place e no fn fne e con onccrete ba bacckf kflll (5 MP MPa) a) c) Geotexle or pavement integraon (length o culvert) d) Geoabric or pavement integraon (length o culvert) 10.14 Apron Drainag Drainage e Works, as per detailed design drawings Oil and Water Separators: and installaon including anchor straps, reinorced concrete protecon, bedding, backfll, trenchingSupply and reinstatement a) P.060 Spel Puraceptor or approved equivalent b) P.030 Spel Puraceptor or approved equivalent c) He Heavy Duty inlet/outlet/bypass Manholes 1050mm dia either side o SPEL Puraceptors

10.17 Concret Concrete e RCRRJ class 8 Inlet pipes rom slot drain conneco connecons ns a) 450mm dia

m

10

b) 300mm dia c) Power connecons to Purceptor or approved equivalent unit d) Installaon and setup o alarm moduals within tanks e) Installaon o receiving module (AVL building) ) Se Setup and programming g) Tesng and commissioning (including handover and manual)

m No No LS LS LS

25 2 2 1 1 1

m m m No

150 15 0 5

m m m No m

60 66 87 9 22

No m m

2 375 125

10.18.4 Rock rip rap protecon with weak binding mortar (including geoabric) a) at at inlet headwall b) at at outlet headwall

m2 m2

75 75

10.18.5 Pave Pavement/Dra ment/Drainage inage Interace) Interace) a) Ad Addional basecourse thickening or length o 600mm dia culvert under taxiway b) A Ad ddional sub base thickening or length o 600mm dia culvert under taxiway c) N o fnes concrete backfll (5 MPa) d) Geotexle or pavement integraon (length o culvert) e) Geoabric or pavement integraon (length o culvert)

m3 m3 m3 m m

108 223 353 125 125

10.19 West Western ern Apron Swale: including excavaon, cut to waste, bedding, backflling and reinstatement/topsoil and grassing 10.19.1 Deepening o exisng swale to suit the new stormwater outlet headwalls headwalls

m

440

m2 LS No m2

225 1 1 25

10.18 Slot Drains (400m tota totall length): including supply and installaon, excavaon, cut to waste, bedding, concrete surround, saw cung, reinorcing, backflling and reinstatement 10.18.1 Slot drains installed in exisng apron are area a (western side o apron) a) 300mm Slot Drains, (90m+24m+36m) b) 400mm Slot Drains c) 600mm Slot Drains d) Juncon Pits - heavy duty F900 rated 10.18.2 Slot drains installed in exisng apron are area a (eastern side o apron) a) b) c) d) e)

300mm Slot Drains, (21m+18m+21m) 400mm Slot Drains, (39m+27m) 600mm Slot Drains, (57m+15m+15m) Juncon Pits - heavy duty F900 rated Concrete strip drain with no slot drain or surace drainage areas unable to be serviced with slots

10.18.3 Culvert unde underr apron: including supply and installaon, excavaon, cut to waste, bedding, backflling and reinstatement a) H ea eadwall or 3 x 800mm concrete pipes - customised bell mouth entry and exits as per drawings b) 800mm concrete RCRRJ class 8 pipe, (3 x 125m) c) Concrete surround and reinorcing o 3 x 800mm concrete pipes (including staged concrete pour or oataon)

10.20 Easte Eastern rn Apron Swale: including excavaon, cut to waste, bedding, backflling and reinstatement/topsoil and grassing a) R Re ealignment o the exisng swale to suit the new stormwater outlet headwalls b) Shortening o o th the ex exisng 1 10 050 ga galvanised ccu ulvert rru unning u un nder tth he ru runway to to su suit tth he ne new al alignment c) S u up pply an and installaon o n ne ew h he eavy du duty h he eadwall at exisng culvert (to su suit 1 x 1050mm dia pi pipe) d) Rock rip rap protecon with weak binding mortor (including geoabric)

Rate (US$)

Amount (US$)

 

Item

Descripon

Unit

Quanty

11.1 Provide a ully accredited on site laboratory suitable to conduct all required site tesng

LS

1

11.2 Addional sampling and tesng during Construcon as instructed by the Engineer

LS

1

11.3 Provide aggregate samples as specifed

LS

1

11.4 Provide calibraon and asphalt plant cerfcaon in accordanc accordance e with the specifcaon and wrien stateme statement nt o compliance as specifed

LS

2

11.5 Producon Tesng Tesng - provide daily AC producon tests as specifed or plant produced material & feld placed material. Issue daily QA pass/ail compliance report. Tesng in accordance with NZTA M/10

LS

1

11.6 Producon Tesng - provide daily AC Marshall producon tests as specifed or plant produced material & feld placed material. Issue daily QA pass/ail complianc compliance e report

LS

1

11.7 Producon Tesng - Provide daily tesng o Asphalt cores

LS

1

Visit

2

LS

1

Total Cost or 10.0 Drainage Works (copy total to summary page) 11.0 QUALITY ASSURANCE ASSURANCE/QUALITY /QUALITY CONTROL

11.8 Supply and operate Griptester or equivalent device or Fricon Tesng o Runway at compleon o physical works and at the end o DLP 11.9 Provide as-built drawings showing levels, including surface nished levels for all airside pavements Total Cost or 11.0 Quality Assurance / Quality Control (copy total to summary page)

12.0 DAY DAYWORKS WORKS ITEMS (PROVISIONAL SUMS) 12.1Labour 12.1.1 Labourers, gen general eral

Hrs

24

12.1.2 Tradesman Tradesman (Mechanic, electrician, carpenter, carpenter, etc.)

Hrs

24

12.1.3 Foreman, Machine operator operatorss

Hrs

24

12.1.4 Asphalt Paving Cr Crew ew

Hrs

24

12.1.5 Site Saety Super Supervisor visor

Hrs

24

12.1.6 Register Registered ed Surveyor & Chairperson

Hrs

24

12.1.7 Pavemen Pavementt Saw Cung Crew

Hrs

24

12.1.8 Laboratory Tech Technician nician

Hrs

24

12.1.9 Engineer

Hrs

24

Hrs

24

12.2.1 AC Paving Plant & Ro Rollers llers 12.2.2 AC Batching Plant

Hrs

24

Hrs

24

12.2.3 AC delivery Truc Trucks ks

Hrs

24

12.2.4 Milling M Machine achine

Hrs

24

12.2.5 Bitumen Spra Sprayer yer

Hrs

24

12.2.6 Shule Buggy or pa paving ving

Hrs

24

12.2.7 Grip tester and Vehic Vehicle le

Hrs

24

12.2.8 4-Wheel Drive car

Day

1

12.3.1 AC20 Patch Repairs Compl Complete ete (Mill, fll, compact and seal)

m2

1

12.3.2 Crack Sealing R Repairs epairs

m

1

12.1.10 Contract Manager 12.1.11 Other - Contractor tto o List 12.2Plant

12.2.9 Other - Contractor tto o List 12.3 Temporary Airfeld Pavement Repairs (inclusive o labour, plant and materials)

Total Cost or 12.0 Dayworks Items (copy total to summary page)

SUB TOTAL

TOTAL

B5.12 Bill o Quanes Schedule A – Main Work Items, carried orward to B5.11 Tenderer’s Summary Bill o Quanes

Rate (US$)

Amount (US$)

View more...