SHR NOM Required No. of lamp fittings in Length wise Required No. of lamp fittings in width wise
(N)
150
C.W / ACW PH-3
Required Flourcent Lamp fittings
150
m m
22 15
22 15
22 15
35 25
35 25
35 25
35 25
15 10
m m2 lux
4 330 150
4 330 150
4 330 150
4 875 150
4 875 150
4 875 150
4 875 150
4
lux
4900
4900
4900
4900
4900
4900
4900
0.6 0.5
0.6 0.5
0.6 0.5
0.6 0.5
0.6 0.5
0.6 0.5
0.6 0.5
2.23
2.23
2.23
3.65
3.65
3.65
3.65
34
34
34
90
90
90
90
1.04
1.04
1.04
1.04
1.04
1.04
1.04
No.
7.06
7.06
7.06
11.22
11.22
11.22
11.22
No.
4.81
4.81
4.81
8.02
8.02
8.02
8.02
(L x W)/ ( Hm (L+W)) (E x A)/ (F x uF x LLF)
(K)
150
C.W / ACW PH-2
Room Index
100
Unit
C.W / ACW PH-1
Length (L) Width (W) Mounting Height of Fitting (from working plane) (Hm) Area (A) (A) Required Lux (E) Individual Lamp fitting flux (F) Utilization or Maintenance Factor (uF) Light Loss Factor (L.L.F)
Outfall PH
LIGHTING CALCULATION -66MW IPP @ JAMSHEDPUR
SHR
D.GANESH
DG building & Compresor Unit
6.6 kv Switchgear Room
Water System C&R
Air Washer Room
Elevator M/C Room
Enviromental & Chemical Lab
DM Plant Building
Area of diff. Dist. Boards of stack
FGD
Occupational Health Centre
Cement Store
Simulation and training Complex
Cooling tower Electrical Buildings
Canteen
Workshop
Fire Station building
Ware house
Service Building
Permanent Store
Gate Complex
Admin Building
ETP MCC room
STP MCC room
Parking lot
20 15
20 10
14.33 13.05
17 17
20 10
20 10
10 10
25 10
15 10
15 10
50 10
15 15
15 15
15 10
50 10
20 30
20 15
50 10
50 10
10 5
25 10
20 15
20 15
25 40
3.5 300 150
3.5 200 200
3.5 186.94 200
3.5 289 150
3.5 200 200
3.5 200 300
3.5 100 150
3.5 250 150
3.5 150 30
3.5 150 300
3.5 500 200
3.5 225 300
4 225 200
3.5 150 150
3.5 500 250
4 600 150
4 300 150
4 500 150
3.5 500 200
3.5 50 30
3.5 250 300
3.5 300 200
3.5 300 200
3.5 1000 50
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
4900
0.6 0.5
0.7 0.7
0.7 0.7
0.6 0.5
0.7 0.7
0.7 0.7
0.6 0.5
0.6 0.5
0.5 0.3
0.75 0.7
0.6 0.5
0.7 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.6 0.7
0.75 0.7
0.7 0.7
0.7 0.7
0.6 0.6
2.45
1.9
1.95
2.43
1.9
1.9
1.43
2.04
1.71
1.71
2.38
2.14
1.88
1.71
2.38
3
2.14
2.08
2.38
0.95
2.04
2.45
2.45
4.4
31
17
16
30
17
25
11
26
7
18
69
29
22
11
61
44
22
37
49
1
30
25
25
29
1.18
1.18
1.18
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
No.
6.43
5.83
4.19
5.48
5.83
7.07
3.32
8.06
3.24
5.2
18.57
5.39
4.69
4.06
17.46
5.42
5.42
13.6
15.65
1.41
8.66
5.77
5.77
4.26
No.
4.82
2.92
3.82
5.48
2.92
3.54
3.32
3.22
2.16
3.46
3.71
5.39
4.69
2.71
3.49
8.12
4.06
2.72
3.13
0.71
3.46
4.33
4.33
6.81
Unit Length (L) Width (W) Mounting Height of Fitting (from working plane) (Hm) Area (A) (A) Required Lux (E) Individual Lamp fitting flux (F) Utilization or Maintenance Factor (uF) Light Loss Factor (L.L.F) Room Index Required Flourcent Lamp fittings SHR NOM Required No. of lamp fittings in Length wise Required No. of lamp fittings in width wise PREPARED BY
m m
m m2 lux
(N)
100
lux 0.7 0.5 (L x W)/ ( Hm (L+W)) (E x A)/ (F x uF x LLF)
(K)
Passage, Indoor Stair, Catwalk Tunnel, Toilet etc.
LIGHTING CALCULATION -66MW IPP @ JAMSHEDPUR
SHR
D.GANESH
LIGHTING CALCULATION -66MW IPP @ JAMSHEDPUR
PREPARED BY
Toilet-Ladies
SHR NOM Required No. of lamp fittings in Length wise Required No. of lamp fittings in width wise
Toilet-mens
Required Flourcent Lamp fittings
Shift Engineer Room ( false Ceiling)
Room Index
Unit m m
Battery Room
Length (L) Width (W) Mounting Height of Fitting (from working plane) (Hm) Area (A) (A) Required Lux (E) Individual Lamp fitting flux (F) Utilization or Maintenance Factor (uF) Light Loss Factor (L.L.F)
Switchgear Room
TG Building
30 10
10 9
5 5
2.5 2.5
2.5 2.5
m m2 lux
3.5 300 300
3.5 90 200
3.5 25 250
3.5 6.25
3.5 6.25
lux
4900
4900
4900
4900
4900
0.75 0.7
0.6 0.7
0.7 0.7
0.7 0.7
0.7 0.7
2.14
1.35
0.71
0
0
35
9
3
1
1
1.18
0.81
0.57
0.57
0.57
No.
10.25
3.16
1.73
1
1
No.
3.42
2.85
1.73
1
1
(L x W)/ ( Hm (L+W)) (E x A)/ (F x uF x LLF)
(K) (N) SHR
D.GANESH
LIGHTING CALCULATION -66MW IPP @ JAMSHEDPUR
(6.1M level)
(12.2 M level)
Battery Charger & DCDB Room
Switch gear Room
Battery Room
Toilet-mens
Toilet-Ladies
Switch gear Room
Switch gear Room
Shift Engineer Room ( false Ceiling)
Central Control Room
Other Control Room (false Sealing)
Other Control Room (w/o false Sealing)
Air Conditioning Plant Room
Power House General indoor (Aux. Equip Room)
Cable Spreader Area
TG Building
22 11
35 11
10 9
2.5 2.5
2.5 2.5
35 11
35 11
5 5
50 10
7.5 5
30 2.5
7.5 5
7.5 5
50 10
m m2 lux
3.5 242 200
3.5 385 200
3.5 90 200
3.5 6.25
3.5 6.25
3.5 385 200
3.5 385 200
3.5 25 250
3.5 500 350
3.5 37.5 300
3.5 75 300
3.5 37.5 150
3.5 37.5 150
3.5 500 100
lux
4900
4900
4900
4900
4900
4900
4900
5800
4900
4900
4900
4900
4900
5800
0.75 0.7
0.75 0.7
0.6 0.7
0.7 0.7
0.7 0.7
0.75 0.7
0.75 0.7
0.7 0.7
0.8 0.7
0.8 0.7
0.75 0.7
0.6 0.5
0.6 0.5
0.5 0.3
2.1
2.39
1.35
0
0
2.39
2.39
0.71
2.38
0.86
0.66
0.86
0.86
2.38
19
30
9
1
1
30
30
3
64
5
9
4
4
58
0.57
0.57
0.81
0.57
0.57
0.57
0.57
0.57
1.18
1.18
1.18
0.81
1.18
0.57
No.
6.16
9.77
3.16
1
1
9.77
9.77
1.73
17.89
2.74
10.39
2.45
2.45
17.03
No.
3.08
3.07
2.85
1
1
3.07
3.07
1.73
3.58
1.83
0.87
1.63
1.63
3.41
TG Building Ground Floor(0M level)
Length (L) Width (W) Mounting Height of Fitting (from working plane) (Hm) Area (A) (A) Required Lux (E) Individual Lamp fitting flux (F) Utilization or Maintenance Factor (uF) Light Loss Factor (L.L.F) Room Index Required Flourcent Lamp fittings SHR NOM Required No. of lamp fittings in Length wise Required No. of lamp fittings in width wise PREPARED BY