lgmultiviiipresentation-140122121332-phpapp02
Short Description
HVAC...
Description
Lets Go Green Life’s Good When it’s Green
LG Green Building Jebel Ali - Dubai
• 21.5% Savings on Energy Use • 31.8% Savings on Potable Water Use • 30 KW on-grid Solar PV system • 3.91% Offset by On-Site Renewable Energy
• 91.7% Diversion from Landfill of Construction Waste • 30.6% Use of Materials with Recycled Content • 45.2% Use of Materials Regionally Available
3/60
Global Sales LGE Consolidated Basis, IFRS Unit : USD Billion Total does not equal 100 percent as divisional sales pertain solely to LG Electronics Korea and overseas subsidiaries and include internal transactions, other subsidiaries’ earnings, etc.
USD 48.97 USD 48.2 USD 45 USD 44
USD 43.4
HE 41%
USD 39 MC 22%
HA 20%
AE 8%
2006
2007
2008
2009
2010
2011
AE Company (Air Conditioning & Energy Solution) Residential
1st company to sell 100 million units
Manufactured Korea’s
1st air conditioner Air Conditioning & Energy Solution
World’s Top selling air conditioning manufacture for 8years
AE Company (Air Conditioning & Energy Solution) HVAC Solution
LG VRF
Full line-up of comprehensive air conditioning solutions
Multi V Systems (VRF)
Heating(Residential)
Heating(Commercial)
Indoor Units
Single Systems
Multi Split Systems
Rooftop
AE Company (Air Conditioning & Energy Solution) HVAC Solution
LG Chiller
Full line-up of comprehensive air conditioning solutions
Chiller System
AHU
CTHU
NPP(Nuclear Power Plant)
Control Systems
Ventilation Systems
Building Management Systems
AE Company (Air Conditioning & Energy Solution) Vertical Solution
Office Buildings Multi V III
Hotels
High-Rise Buildings
Multi V Water II
DX AHU
Multi V Space III eco V
Low Static Duct Low Static Duct DX AHU Art-1 Way Chiller LED PLS eco V Multi V Water BMS
Hotel Solutions Multi V Geo Chiller
ART COOL Home Energy Management System
AE Company (Air Conditioning & Energy Solution) Vertical Solution Hospitals
Shopping Malls
4-Way Cassette 1-Way Cassette
Multi V Geo Multi V Water
Chiller BMS DX AHU
BMS
LG Multi V System
Contents
What is VRF System ?
Variable Refrigerant Flow The Variable Refrigerant Flow System has the ability to control the amount of refrigerant flowing through the system Simply, each FCU/AHU unit receives only the required amount of refrigerant in order to meet the cooling load of the conditioned space The Inverter Unit will Gradually Increases or Decreases its Capacity based on the load by increasing or decreasing the rotation speed of the motor.
World Best COP Tech. V Scroll Inverter compressor
Ventilation with AHU Convectional AHU
Cyclone sub-cooling circuit
High static propeller fan
Features - No individual control
Low energy consumption (Inverter compressor)
- Freeze & burst (chilled & hot water type)
BLDC Inverter Fan Motor Uniform (refrigerant) distributor Wide Louver fin in Heat Exchanger
Sine wave inverter control
VRF Indoor Unit
- Low air volume, static
Big air volume, high static pressure
- No ventilation & humidification
- Low installation space - Big energy consumption (pump & fan) Ventilation & humidification- Inverter compressor
IAQ control Easy Installation
Contents
How it works? Control of the refrigerant flow by inverter compressor
100%
Load
Indoor Units
INV
ST1
P
INV INV
14% 10% Comp. capacity control
14/60
100%
ST1
Contents
Technical Innovation Innovation 1 – V scroll V Scroll inverter compressor is LG Compressor Brand name. The compressor is manufactured by LG Korean factory using state of the art techniques. The adoption of the BLDC motor makes the system more efficient and powerful. V Scroll inverter compressor Steel Plates
Scroll type
Reluctance torque
Bigger performance
N
BLDC motor
i
More efficient
T S
Rotor
Magnetic torque Inverter driver
ND Magnetic
※ Multi V is made in Korean factory as well major components like compressor.
15/60
Contents
Technical Innovation Innovation 2 – Cyclone SCC Sub-cooling is one of the most important technologies in VRF system. LG Multi V use more efficient cyclone type. By cyclone sub-cooling circuit, Best effect can be achieved.
More efficient Less pressure loss
Cyclone Larger heatexchange area
Sub-cooling Expansion
Sub-cooling circuit
Theory and Effects Pressure
Cyclone sub-cooling circuit
Condenser
Evaporator
Enthalpy
1st effect : Refrigerant pressure loss reduce Long and high rising piping 2nd effect : Cooling capacity gets improved In a thermodynamic point of view
16/60
Contents
Inverter Technology of Multi V III Inverter Technology Controls the Refrigerant Flow by Varying the Compressor Revolution as per the Cooling load.
Ambient Temp : 46℃ All rooms cooling
Micro processor & Inverter logic
Inverter Scroll compressor EEV 120Hz High
Full load Sensor less Control
Revolution
PWM
Cooling load
●
U
●
Full load Variable Refrigerant Flow
Cooling Capacity
V W
Partial load
●
50Hz
20Hz
Low
Partial capacity EEV
Ambient Temp : 35℃ Only 1 room cooling
17/60
Contents
How it works? Control by remote controller of users
P INV
ST1
CPU
18/60
CPU
CPU
CPU
18
Contents
How it works? Control of the refrigerant Flow by Electronic Expansion Valve
T1 = Set temperature from Remote controller air temperature T2 = Suction air temperature sensor T3 = Inlet refrigerant temperature sensor (liquid) T4 = Outlet refrigerant temperature sensor (gas)
Blower speed
Control Box
Gas T4
Suction
Discharge
Blower
T3 EEV
T2
Liquid
T1 Electronic expansion valve (0~1350 pulses)
19/60
Contents
How it works? Multi V control low pressure of system in case of cooling operation
Component
Cooling Mode
Compressor
Low Pressure
Cooling
SC EEV Fan
High Pressure
Indoor EEV
Superheat control
SC EEV
Superheat of Sub Cooling
Fan
comp Indoor EEV
Pressure
Fan control ( speed up by inverter )
Target high pressure
Compressor control ( speed up by inverter ) Target low pressure
Start 20/60
Time
Contents
What is LG Multi V? Owing to VRF Technology, Multi V is the Brand Name of LG.
Multi V is the LG VRF system: Compared to the Common On-Off Controlled Compressor,
the Inverter Controlled Compressor is able to run the proper revolution (Hz) in order to provide the best efficiency (power Consumption), Exceptional dehumidification& Temp Control. On-Off system
21/60
Inverter system
Contents
Multi V System Layout Combination of Maximum 64 Indoor Units
■ Multi V III – Tropical Model
IDU combination Rate Multi V III : 130 %
Max. 48HP
1Way CST
2Way CST Refrigerant Pipes
Y Branch
Low static duct High static duct
4Way CST
ARTCOOL Mirror
ARTCOOL Gallery
Console
22/60
Contents
Product Roadmap – Multi V Outdoor Single unit max 16Hp, 3 Unit combination is possible (Max 48Hp)
Single unit max 16Hp
Medium 8 &10HP
23/60
Large 12 , 14 & 16HP
Combination 48Hp
Max 48HP
Product Roadmap – Multi V Indoor kW
1.6
2.2
2.8
3.6
4.2
5.6
7.1
8.2
10.6
12.3
14.1
23.9
30.2
Btu/h
5k
7k
9k
12k
15k
18k
24k
28k
36k
42k
48k
76k
96k
ART COOL Series
Gallery
SRAC
Wall Mounted
Mirror
1Way (Art) Ceiling Cassette
2Way 4Way
Ceiling & Floor Ceiling Suspended Ceiling Concealed Duct
High Static Low Static Built-in
Floor Standing
With Case
Without Case
Console
Fresh air Intake
Multi V & AHU Large capacity with No BMS) Temp. Senor / RA, SA(essential), OA, Mix(optional) Humid. Senor / RA, SA, OA(optional)
RA
EA
OA
SA
Outdoor Unit
Expansion Kit
Damper Actuator / EA, OA, Mix(optional) Differential Pressure switch(optional) Valve for Humidifier(optional) CO2 Sensor(optional) Smoke Detector(optional)
AHU
Expansion Kit
Control Kit Wired remote controller Optional
Connection Pipe Communication wire
Thermistor Signal (On/Off)
Signal (DC0~10V)
Multi V & AHU Large capacity with Communication Kit & BMS
RA
EA
OA
SA
Expansion Kit
AHU Room air Temp Sensor (should be installed into the return air part)
Outdoor Unit
Expansion Kit
Comm. Kit
Wired remote controller
Optional
Connection Pipe Communication wire Thermistor Signal(On/Off)
Contents
Introduction of Multi V III Tropical Outstanding Performance LG Multi V is the most strong VRF system. TUV certification for continuous operation under 54℃ during 24 hours.
27/60
Contents
Introduction of Multi V III Tropical Outstanding Performance LG Multi V is the most efficient VRF system. COP Max 4.3 at rated condition COP comparison Heat pump model (8HP), T1 condition
4.3
26%
BLDC Inverter Fan Motor
High static propeller fan
[ Average value]
3.4
-. kW / Ton = 0.87 @ T1 -. kW / Ton = 1.10 @ T3
Cyclone sub-cool circuit
Wide Louver fin in Heat Exchanger Sine wave inverter control
New refrigerant distributor
BLDC inverter compressor
conventional Cooling capability Coefficient of Performance (COP) = Energy consumption
28/60
COP data
Contents
Introduction of Multi V III Tropical Outstanding Performance Extending pipe length and elevation
Level Difference Between ODU and IDU
Max110m
Total piping length
1000m
Actual longest Piping length (Eqvlnt)
200m (225m)
Longest piping length after 1st branch (Conditional application)
40m (90m)
Level difference between ODU and IDU 110m Level difference between IDU and IDU
Longest piping length
Max 225m
Level difference between ODU and ODU Test building Project R&D Center Building Location Seoul. Korea
31/60
Const.
Dim 5,619.14 m²
TTL Dim. 84,307.09 m²
Type
R&D Building
Scale
5F ~ 20F
15m 5m
Contents
Introduction of Multi V III Tropical Outstanding Performance Design & installation degree of freedom increase ( Fan External static pressure - Max 8mmAq)
Conventional
32/60
Contents
Introduction of Multi V III Tropical Smart Functions
8 Stages of night silence operation are possible during the night time. It can give comfort to owner and a neighbor. Night silence operation
Capacity
100
Ambient temp ↓ Load Sound level
day
night
day
Mode start Mode end 8:00
33/60
12:00
4:00
8:00
12:00
4:00
8:00 Time (am)
Contents
Introduction of Multi V III Tropical Smart Functions
Minimizing any inconvenience that may occur in an emergency situation Back-up operation _Compressor
Back-up operation _Unit
Malfunction
Malfunction
Back-up operation
All single unit of Multi V III tropical has more 2 compressors. 35/60
Back-up operation
Contents
Introduction of Multi V III Tropical Smart Functions
To make life span of compressor even, alternative operation is possible. Alternative operation
ON
36/60
OFF
Contents
Introduction of Multi V III Tropical Smart Functions
Automatic test run, refrigerant amount check, real-time inspection and back-up operation for parts and sensors, maximizing reliability of the product & minimizing installation and maintenance time. Fault Detection and Diagnosis (FDD)
01
Automatic test run
02
Refrigerant amount check
03
Real time diagnosis (refrigerant and parts)
04
Real time back-up (compressor and sensors) Refrigerant recovery function
05
37/60
Contents
Introduction of Multi V III Tropical Smart Functions
Easy and fast test run. Auto test run function help you to save the checking time during the final stage of installation Automatic test run _ FDD
Conventional test run Setting
LGMV
PC
100% operation
Time Save Auto Test Run Start
1Unit operation
Report
60%
Report
Report by HTLM Auto test run check list Sensors Operating cycle Electric status Refrigerant amount
38/60
Contents
Introduction of Multi V III Tropical Smart Functions
This kind of mistake can happen in site. However problem is that it is very hard to find the reason because it is not commonsense mistake. But Multi V can check it automatically for the best installation. Incorrect piping notice _ FDD
Incorrect communication line notice _ FDD
Incorrect piping (liquid line + gas line) Refrigerant piping
communication line
Incorrect communication line
39/60
Contents
Introduction of Multi V III Tropical Smart Functions Real-time automatic fault prediction function
Multi V III allows you to check the current status for the sensors and the EEV, which are the major components for system control, through a test run
Sensor
Sensor
EEV
Outdoor unit
40/60
Indoor unit
Temperature sensor
8
3
Pressure sensor
2
0
Contents
Introduction of Multi V III Tropical Smart Functions Pump down and out function can reduce the refrigerant discharge.
Pump down
When an indoor unit malfunctions, this function collects the refrigerant remaining in the piping line or that unit to an outdoor unit Transfers refrigerant
Malfunction
Pump out
When an outdoor unit malfunctions, this function collects the refrigerant in another indoor unit or a piping line Transfers refrigerant
Malfunction
41/60
Contents
Introduction of Multi V III Tropical Smart Functions
4way piping provides a different installation method. So It can reduce installation cost. 4way piping
Piping cover needed Not good looking
Right
Left Front Installation of bottom piping is available. LG provide accessory for easy installation. Bottom
Bottom direction 42/60
Contents
Introduction of Multi V III Tropical Smart Functions Easy to install refrigerant pipe & Easy maintenance (Standing SVC) Service area reduction and Easy standing service and maintenance
Conventional
50% Front SVC Area
900 C/Box Open area 43/60
500 SVC Area Standing service available
Contents
Introduction of Multi V III Tropical Smart Functions Quick and right service is necessary. Black Box built in Multi V records operation data for 3 minutes. SVC engineer can analysis the problem and take quick and right action owing to operation history. Black Box for data acquisition ② Record operation data • Ambient temp. • High pressure • Low pressure • Sensor status • Operation data etc. ③ Error occurred
④ SVC -. Analysis with recorded data & -. Quick and right service ※ SD memory module : 3 months data recording 44/60
① 3 minutes
Green Building Initiative
LEED Regulations
The LEED® green building certification program is an initiative by The U.S. Green Building Council, Inc. (USGBC®) to positively impact our natural environment, economy, health, and productivity through well designed buildings, energy efficient equipment, and high quality material. Today, there are many breakthroughs in building science, technology, and operations that are available for designers and building owners to maximize both economic and environmental performance of their buildings. The green building movement offers an unprecedented opportunity to respond to the most important challenges of our time, including global climate change, dependence on non sustainable and expensive sources of energy. LEED 2009 for New Construction and Major Renovations 100 base points; 6 possible Innovation in Design and 4 Regional Priority points • Certified 40–49 points • Silver 50–59 points • Gold 60–79 points • Platinum 80 points and above
Green Building Initiative
LEED Regulations
1.
Sustainable site (26 Pts)
2.
Water Efficiency (10 Pts)
3.
Energy & Atmosphere (35 Pts) 31 Pts LG can address
4.
Material & Resources (14 Pts)
5.
Indoor Environmental Quality (15 Pts) 4 Pts LG can address
6.
Innovation in Design (6 Pts) 5 Pts LG can address
Land Mark Multi V Project Project Name
Brighton College
Building Type
School
Project owner
Bloom Properties
Consultant Name
Implement Consultant
Contractor Name
Emirates Link Maltauro
Place/ City
UAE – Abu Dhabi
Completion Date
September 2011
Type Of Units
Multi V& AHU Units
Total Capacity
1,200_Ton
Total Project Value
1,100,000_$
Important requirement of the client • BMS compatible AC system
• The minimum Operating cost • Higher emphasis on Indoor air quality (IAQ) • Reliable operation, at 54 deg C Ambient
49
Educational
Land Mark Multi V Project Project Name
GEMS American Academy
Building Type
School
Project owner
GEMS Education
Consultant Name
National Engineering Bearu
Contractor Name
Trinity Engineering Services
Place/ City
UAE – Abu Dhabi
Completion Date
September 2011
Type Of Units
Multi V& AHU Units.
Total Capacity
1,112_Ton.
Total PJT Value
1,136,000_$.
Important requirement of the client • BMS compatible AC system. • The minimum Operating cost. • Higher emphasis on Indoor air quality (IAQ). • Reliable operation, at 54 deg C Ambient. • Note: LG award extended to other Products.
50
Educational
Land Mark Multi V Project Project Name
Refurbishment of 8 Schools
Building Type
School
Project owner
Abu Dhabi Education Council
Consultant Name
Conseco International
Contractor Name
Different Contractors
Place/ City
UAE – Abu Dhabi
Completion Date
September 2010
Type Of Units
Multi V
Total Capacity
2,105_Ton
Total Project Value
2,000,000_$
Notes • 3 Schools Awarded to LG out of 8.
• Electricity Bill is a Major Concern of Government, as such they remove old units and adopt the VRF system
Educational
Land Mark Multi V Project Project Name
Refurbishment of 10 Schools
Building Type
School
Project owner
Abu Dhabi Education Council
Consultant Name
Ian Banham and Associates
Contractor Name
Different Contractors
Place/ City
UAE – Abu Dhabi
Completion Date
September 2011
Type Of Units
Multi V & FAHU/ AHU Units
Total Capacity
2,500_Ton
Total Project Value
2,500,000_$
Notes • LG for the 2nd Year in a row awarded a part of these Schools ( Five Schools Awarded to LG out of 10) • LG delivered 26 FAHU/ AHU along with the Multi V • Electricity Bill is a Major Concern of Government, as such they remove old units and adopt the VRF system
Educational
Land Mark Multi V Project Project Name
Khaitan Police HQ
Building Type
Government
Project owner
Ministry of Public Works
No Of Floors
G+M+2 Building
Consultant Name
Ministry of Public Works
Contractor Name Place/ City
Kuwait
Completion Date
November 2011
Type Of Units
Multi V
Total Capacity
200_Ton
Total Project Value
240,000_$
Client requirements • Centrally control the AC units from one location,
• MEW (Ministry of Electricity & Water) Approval • Capability of Working in ambient temperature of 54 °C without tripping.
53
Government
Land Mark Multi V Project Project Name
Korean Embassy
Building Type
Government
Project owner
South Korea
No Of Floors
G+6 Building
Consultant Name
Ministry Of Interior
Contractor Name
M/s Imtiyaz
Place/ City
Kuwait
Completion Date
October 2011
Type Of Units
Multi V
Total Capacity
250_Ton
Total Project Value
375,000_$
Client requirements • Centrally control the AC units from one location,
• Group control multiple units serving the same zone. • Capability of Working in ambient temperature of 54 °C without tripping.
54
Government
Land Mark Multi V Project Project Name
Oman Botanic Garden
Building Type
Commercial Building
Project owner
OBG
No Of Floors
G+1 Building
Consultant Name
ALATAC
Contractor Name
Mercury
Place/ City
Oman Muscat
Completion Date
June, 2012
Type Of Units
Multi V
Total Capacity
520_Ton
Total Project Value
550,000_$
Notes •Project for cultivating rare plants. •Client insisted for eco friendly and energy saving techn ology.
Government
Land Mark Multi V Project Project Name
Arabian Horse Stud
Building Type
Lab & Care Center - 10 Horse Stable to His Highness
Project owner
Sheikh Mohammed Bin Rashid Al Maktoum
Consultant Name
Engineer’s Office
Place/ City
UAE – Dubai
Completion Date
December 2009
Type Of Units
Multi V, (40 ODU, 400 FCU)
Total Capacity
800_Ton
Total Project Value
1,120,000_$
Client requirements • Sustainable design with green Refrigerant.
• The lesser the better power consumption. • Capability of Monitoring& Controlling the AC units, and auto back up operation.
56
Government
Land Mark Multi V Project Project Name
Al Gurum Resort
Building Type
Residential Development
Project owner
Al Dar Properties
No Of Villas
70 Villas – Phase I
Contractor Name
Six Construct
Place/ City
UAE – Abu Dhabi
Completion Date
October 2008
Type Of Units
Multi V
Total Capacity
1,750_Ton
Total Project Value
2,400,000_$
Notes: • Super Premium Villas, the Selling price of each villa is around 25 Million AED
• BMS compatible AC system. • Compatible to Home Net. • Reliable operation, at 54 deg C Ambient
Residential
Land Mark Multi V Project Project Name
Abu Dhabi International Shooting Club
Building Type
Residential Development
Project owner
IMCC
No Of Villas
385 Villas
Contractor Name
Fibrex, Thermo
Place/ City
UAE – Abu Dhabi
Completion Date
June 2011
Type Of Units
Multi V, (385 ODU/ 4,000 FCU)
Total Capacity
5,361_Ton
Total PJT Value
6,800,000_$
Notes • Estidama Compliance Pearl 1 • Electricity Bill for the owners/ Tenants of the Villa • Reliable operation, at 54 deg C Ambient.
Residential
Land Mark Multi V Project Project Name
Adearest Owner’s Villa
Building Type
Residential
Project owner
Adearest
No Of Villas
3 Big Premium Villa
Contractor Name
Adearest
Place/ City
UAE – Sharjah
Completion Date
Aug 2008
Type Of Units
Multi V
Total Capacity
173_Ton
Total PJT Value
250,000_$
Notes • Project originally designed with Daikin VRV • Fast delivery & Commissioning support , help LG to win the PJT
Residential
Land Mark Multi V Project Project Name
Laya Orchid Hotel
Building Type
Hospitality
Project owner
Laya hospitality
No Of Floors
G+7 Building
Contractor Name
Envicon Emirates
Place/ City
UAE – Dubai
Completion Date
January 2012
Type Of Units
Multi V
Total Capacity
400_Ton
Total Project Value
400,000_$
Notes • Compatibility with BMS system. • Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the Electric power consumption. •LG solution extended to include HA& Hotel TV.
60
Hospitality
Land Mark Multi V Project Project Name
Dhalak Resort
Building Type
Resort for Qatar Emir’s Family
Project owner
Qatar Dair
Consultant Name
W S Atkins
Contractor Name
QDVC
Place/ City
Dhalak, Eritrea
Completion Date
Sept 2010
Type Of Units
Multi V
Total Capacity
275_Ton.
Total PJT Value
370,000_$.
Notes • Less Outdoor space available • LG provided full support from design, installation, SVC
Hospitality
Land Mark Multi V Project Project Name
Savanah Flamingo Resort
Building Type
Hospitality
Project owner
TDIC (Tourism Development & Invest. Co) (Abu Dhabi Gov)
Consultant Name
W.S. Atkins
Contractor Name
Al Shafar Contracting
Place/ City
UAE – Abu Dhabi
Completion Date
June 2011
Type Of Units
Multi V & AHU
Total Capacity
800_Ton
Total Project Value
1,600,000_$
Notes • Estidama Pearl 2 Compliance.
• Electric Power source is Diesel Generator, so it’s a mus t to reduce the power consumption ASAP. • Capability of working up to 54 of ambient temperature
62
Hospitality
Land Mark Multi V Project Project Name
ZUMA Restaurant
Building Type
Restaurant
Project owner
ZUMA/DIFC
Consultant Name
Design & Build - Penguin
Contractor Name
Penguin Engineering
Place/ City
UAE – Dubai
Completion Date
July 2008
Type Of Units
Multi V
Total Capacity
150_Ton
Total Project Value
200,000_$
Notes • District cooling connection was not enough
• Operating cost was also a concern. • Limited condensing unit space at the parking area
63
Hospitality
Land Mark Multi V Project Project Name
Belhoul Hospital
Building Type
Hospital
Project owner
Belhoul Life care
No Of Floors
G+5 Building
Consultant Name
Nutek
Contractor Name
ARJ
Place/ City
UAE – Dubai
Completion Date
January 2010
Type Of Units
Multi V
Total Capacity
250_Ton
Total Project Value
300,000_$
Notes •Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, •Offered with Central Controller.
64
Hospital
Land Mark Multi V Project Project Name
Al Jazi Tower
Building Type
Commercial Offices
Project owner
Al Khaliji HQ Bank
No Of Floors
G+18 Building, 2nd, 3rd7 4th Floor Only
Place/ City
Qatar
Completion Date
December 2008
Type Of Units
Multi V
Total Capacity
162_Ton
Total Project Value
200,000_$
Notes •Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the connecting load •Client required individual billing for the offices • Premium AC which is capable of handling high elevation building
65
Commercial
Land Mark Multi V Project Project Name
Ajman Bank
Building Type
Bank
Project owner
EDARA
No Of Floors
G+2 Building
Consultant Name
Mac Nally Consultant
Contractor Name Place/ City
UAE – Ajman
Completion Date
December 2008
Type Of Units
Multi V
Total Capacity
220_Ton
Total Project Value
250,000_$
Notes • Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the power consumption, • Client required individual billing for offices.
66
Commercial
Land Mark Multi V Project Project Name
Dubai Bank
Building Type
Bank
Project owner
Dubai Bank
No Of Floors
G+2 Building
Consultant Name
Engineer’s Office
Contractor Name
SS. Lootha Constructions
Place/ City
UAE – Dubai
Completion Date
July 2009
Type Of Units
Multi V
Total Capacity
159_Ton
Total Project Value
200,000_$
Notes •Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, •Offered with Central Controller.
67
Commercial
Land Mark Multi V Project Project Name
Al Meraas Sales Center
Building Type
Office Bldg
Project owner
Al MERAAS
No Of Floors
G+M Building
Consultant Name
SPW Consultant
Contractor Name Place/ City
UAE – Dubai
Completion Date
Nov 2009
Type Of Units
Multi V
Total Capacity
120_Ton
Total Project Value
150,000_$
Notes • Project Demands for less operational cost, as client need to pay the electricity bill • Offered with Central Controller.
68
Commercial
Land Mark Multi V Project Project Name
Airport Heights ECGA
Building Type
Commercial Building
Project owner
ECGA
Commercial
No Of Floors
Consultant Name
IBN Khaldoun
Contractor Name
HJB
Place/ City
Oman Muscat
Completion Date
Under Commissioning
Type Of Units
Multi V
Total Capacity
200_Ton
Total Project Value
225,000_$
Notes • It’s a Ministry of Finance PJT • Green Technology • Installation Flexibility and Network solution
PROJECT UNDER COMMISSIONING
Land Mark Multi V Project Project Name
Yahya Group Holding Building
Building Type
Office Building
Project owner
Yahya Group Holding
No Of Floors
G+1 Building
Consultant Name
Al Abraj
Contractor Name
OGE
Place/ City
Oman - SOHAR
Completion Date
December 2011
Type Of Units
Multi V
Total Capacity
135_Ton
Total Project Value
160,000_$
Notes •Project owner looking for energy saving technology in o rder to reduce annual electrical cost.
•LG proposed Multi V and highlighted annual savings
Commercial
Land Mark Multi V Project Project Name
British Council Building
Building Type
Office Building
Project owner
British Council
No Of Floors
G+1 Building
Consultant Name
Majaan
Contractor Name
Cemec
Place/ City
Oman - Muscat
Completion Date
January 2012
Type Of Units
Multi V
Total Capacity
20_Ton
Total Project Value
30,000_$
Notes •Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, •Offered with Central Controller.
Commercial
Land Mark Multi V Project Project Name
Hubara Bird Culture
Building Type
Laboratory Center
Project owner
Abu Dhabi Authority For Culture& Heritage (ADACH)
Consultant Name
Lab Design
Contractor Name
Adearest
Place/ City
UAE – Al Ain
Completion Date
August 2008
Type Of Units
Multi V
Total Capacity
527_Ton
Total Project Value
685,000_$
Client Requirements • Sustainable design with green Refrigerant
• The lesser the better power consumption • Capability of Monitoring& Controlling the AC units
72
Miscellaneous
View more...
Comments