LAPORAN HASIL PENYELIDIKAN TANAH PROYEK : HOTEL EVERBRIGHT CIKOKOL LOKASI : JL. MH. THAMRIN TANGERANG, BANTEN
Kepada : PT. TANINDO CITRA LESTARI Jln. Manyar Kertoarjo I/43 Surabaya, Jawa Timur Oleh
PUTRA DWI MANDIRI Jl. Pahlawan Seribu Komplek Ruko Golden Boulevard Blok D 30 BSD City, Tangerang – Banten Telp. 021 5315 3232, Fax 021 5315 3233. email :
[email protected] :
[email protected]..
Tangerang, 22 Juli 2015
PUTRA DWI MANDIRI ENGINEERING CONSULTANTS SOIL INVESTIGATION, SURVEYING, DESIGN FOUNDATION, STRUCTURE, BUILDING AUDIT, CONTRACTOR
No. 37/07/L-ST/PD 37/07/L-ST/PDM/15 M/15
Tangerang, Tangeran g, 22 Ju li 2015
Kepada Yth. : PT. TANINDO CITRA LESTARI Jln. Manyar Kertoarjo I/43 Surabaya, Jawa Timur
Up : Bpk. Adi Sutanto Sutanto Hp. : 0815 5100 100 Email :
[email protected] [email protected] HAL : LAPORAN PENYELIDIKAN TANAH PROYEK PROYEK : GRAND EVERBRIGHT EVERBRIGHT CIKOKOL LOKA SI : JL. J L. MH. THAMRIN, TANGERANG
Dengan hormat, Berikut ini kami sampaikan Laporan Pekerjaan Penyelidikan Tanah pada Proyek GRAND EVERBRIGHT CIKOKOL di Jln. MH. Thamrin, Tangerang. Demikian kami sampaikan, mudah-mudahan laporan ini dapat berguna sebagai bahan pertimbangan dalam pengambilan keputusan. Atas perhatian dan kepercayaan yang telah diberikan, kami ucapkan terima kasih. Jika masih diperlukan keterangan-keterangan yang berhubungan dengan laporan ini kami selalu bersedia membantu.
Hormat kami,
License : No. SIBP : 0173/P/G-A/DPPB/II-2012 No. SKA : 0283/HATTI/SKA/G-1/IV/2011 HP : 0813 736 99 878
Jl. Pahlawan Seribu, Komplek Ruko Golden Boulevard Blok D 30, BSD City, Tangerang – Tangerang – Banten Telp. 021 5315 3232, Fax 021 594 93 269, email :
[email protected]
Laporan Penyelidikan Tanah Proyek GRAND EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
DAFTAR ISI
Daftar Isi ....................................................................................................................
i
1. PENDAHULUAN .................................................................................................. 1.1. Maksud dan Tujuan 1.2. Lingkup Pekerjaan ............................ ............................................................
1
II. PENYELIDIKAN TANAH .........................................................................................
2 ‐3
III. KONDISI TANAH DASAR ......................................................................................
4 ‐ 5
IV. REKOMENDASI ....................................................................................................
7
V. ANALISA PONDASI ...............................................................................................
1
9 ‐ 12
LAMPIRAN :
‐ ‐ ‐
DENAH DAN FOTO DOKUMENTASI DATA SONDIR DAN BORING TABLE BEARING CAPACITY
Halaman i
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
I.
PEND A HUL U A N 1.1. 1.1. Maksu Maksu d dan Tujuan Penyelidikan tanah ini dilaksanakan untuk perencanaan pondasi pada Proyek Hotel Everbright Cikokol di Jln. MH. Thamrin, Tangerang Maksud dan tujuan dari penyelidikan ini adalah untuk mengetahui data sifat-sifat karakteristik lapisan tanah, daya dukung dan kekuatan tanah yang bermanfaat bagi perencanaan pondasi yang tepat baik ditinjau dari segi teknis maupun ekonomis.
1.2. 1.2. Lin gku p Pekerjaan Pekerjaan Pekerjaan Pekerjaan Lapangan (Field Work ) Pekerjaan lapangan dimaksudkan untuk mendapatkan data jenis tanah dibawah permukaan, sifat-sifat teknis tanah dan daya dukung tanah secara langsung di lapangan. Pekerjaan lapangan ini terdiri dari : 2 (dua) titik deep boring sampai kedalaman 40 m yaitu DB1 & DB2 6 (enam) titik sondir kapasitas kapasitas 2.50 ton yaitu S1 S1 s/d S6
Halaman 1
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
II. PENYEL IDIK A N T A N A H 2.1. 2.1. Penyelidik an Lapangan 2.1.1. Sondir Test sondir telah dilaksanakan dengan mempergunakan alat sondir berat kapasitas 2.50 ton dilengkapi dengan Adhesion Jacket Cone type Begemann yang dapat mengukur nilai perlawanan konus (Cone Resistance) dan hambatan lekat (Local Friction) secara langsung di lapangan. Penyondiran ini dilaksanakan hingga mencapai lapisan tanah keras, dimana nilai perlawanan konus telah mencapai 250 2 kg/cm atau telah mencapai jumlah hambatan lekat 2.50 ton (kapasitas alat). Hasil penyondiran disajikan dalam bentuk diagram sondir yang memperlihatkan hubungan antara kedalaman sondir dibawah muka tanah dan besarnya nilai perlawanan konus (qc) serta jumlah hambatan pelekat (TF). 2.1.2. 2.1.2. Deep Deep Bor ing Deep boring dilaksanakan dengan mempergunakan mesin bor Hydraulic Merk Tone type UD 5 sedalam 40 m. Pemboran dilaksanakan dilaksanakan dengan sistem Rotary Drilling. Tabung inti (Core Barrel) yang dipergunakan adalah Single Core Barrel 73 mm, panjang 1.50 m. Bit yang dipergunakan adalah Tungsten Carbide Bit untuk mengangkut serbuk bor (sirkulasi) selama pemboran, dipergunakan Pompa Merk Nat II, dengan kapasitas 80 liter/menit 2 atau tekanan maksimum 10 kg/cm . Didalam pekerjaan deep boring dilaksanakan pula pekerjaan Standard Penetration Test dan sampling tanah terganggu
2.1.3. 2.1.3. Pengambilan Conto h Tanah Tanah Pengambilan contoh tanah terganggu (Disturbed Sample) dilaksanakan sepanjang kedalaman pemboran dan dimaksudkan untuk penentuan klasifikasi tanah. Hasilnya disajikan didalam bentuk log bor terlampir. Pengambilan contoh tanah asli (undisturbed) dilaksanakan untuk menjalani penyelidikan laboratoris guna penentuan sifat-sifat pengenal maupun sifat teknis dari tanah.
Halaman 2
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
2.1.4. 2.1.4. Standard Penetration Test (SPT) (SPT) Standard Penetration Test dilaksanakan didalam lubang bor setelah pengambilan pengambilan undisturbed undisturbed sample pada setiap setiap interval interval 2.00 m. Pengujian penetrasi standard ini dilaksanakan pada tanah dalam keadaan asli dengan mempergunakan Open Standard Split Barrel Sampler. Hammer yang dipergunakan mempunyai berat 63.50 kg dengan tinggi jatuh 75 cm. Pengujian dilaksanakan dengan mempergunakan Automatic Drop Hammer Device sehingga hammer dapat jatuh dengan bebas tanpa gesekan. Sampler dipukul hingga masuk (menembus) tanah sedalam 45 cm, dimana jumlah pukulan sepanjang masuk 15 cm pertama tidak diperhitungkan. diperhitungkan. Nilai SPT = N adalah sama dengan jumlah pukulan untuk penetrasi 30 cm berikutnya. Hasil SPT ini disajikan dalam bentuk diagram pada boring log terlampir. 2.1.4. 2.1.4. Pengukur an Muka Air Tanah Tanah Pengukuran muka air tanah dilaksanakan didalam lubang bor setelah 24 jam pemboran selesai dilaksanakan. Hasil pengukuran MAT dapat dilihat pada boring log terlampir. 2.2. 2.2. Penelitian Penelitian di laboratorium Penelitian dilaboratorium dilaksanakan berdasarkan ASTM Standard Method. Contoh tanah terganggu (Disturbed Sample) yang diperoleh sebagai hasil pemboran telah diteliti diteliti dilaboratoriu dilaboratorium m untuk mendapatkan mendapatkan parameterparameter dari Index dan Engineering Properties. Properties. Test-test laboratorium laboratorium yang telah dilaksanakan dilaksanakan terdiri terdiri dari : 2.2.1. 2.2.1.
Sifat-sif at Pengenal (Index Propert ies) - Berat Berat jenis butir (Gs ) - Berat Isi ( m) - Kadar air asli (Wn ) - Kadar pori ( e) - Porositas ( n) - Derajat kejenuhan ( Sr ) - Gradasi : melalui analisa tapis (sieve )
2.2.2. 2.2.2.
Sifat-Sifat Teknis (Engineering Propert ies) - Direct Shear Test - Unconfined - Konsolidasi Test Halaman 3
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
III. K ONDISI T A N A H D A S A R Kondisi tanah dasar terhadap elevasi penyelidikan tanah eksisting berdasarkan data Boring dan sondir adalah sbb. : 0.00 -
2.00 m :
2.00 -
8.00 m :
8.00 -
12.00 m :
12.00 -
18.00 m :
18.00 -
22.00 m :
22.00 -
32.00 m :
32.00 -
end bor :
Merupakan tanah lempung, konsistensi stiff to very stiff, warna merah kecoklatan dengan qc = 8 – 15 kg/cm2 Merupakan tanah lempung, konsistensi stiff to very stiff, warna merah kecoklatan dengan nilai N SPT = 14 - 22 blows/30 cm penetrasi dan qc = 20 – 50 kg/cm 2 Lapisan Lapi san lempung kelanauan, warna abu-abu kecoklatan dengan nilai N SPT = 18 - 42 blows/30 cm penetrasi dan qc = 50 - 150 kg/cm 2 Lapisan lanau kepasiran, konsistensi konsistens i hard berwarna abu-abu tua dengan nilai N SPT = 22 - 42 blows/30 cm penetrasi dan qc > 250 kg/cm 2 Lapisan pasir kasar, medium to dense, dense, berwarna berwarna abu-abu hitam dengan nilai N SPT 22 - 50 blows/30 cm penetrasi Lapisan lanau kepasiran, konsistensi konsistens i hard berwarna abu-abu kecoklatan dengan nilai N SPT = 33 - 54 blows/30 cm penetrasi Lapisan pasir kasar, very dense, berwarna hitam dengan nilai N SPT = 47 sd > 60 blows/30 cm penetrasi
Berdasarkan ketentuan lapisan tanah mulai keras dengan N > 30 blows/30 cm atau sondir dengan nilai (qc) 150 - 250 kg/cm² ditemui :
S o il Te s t
Kedalaman Tanah Cukup Keras (m )
S o i l Te s t
Kedalaman Tanah Cukup Keras (m )
S1
13. 00
DB1
17. 00
S2
14. 00
DB2
11. 00
S3
12. 00
S4
12. 80
S5
13. 40
S6
13. 40
Titik
Titik
Halaman 4
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
Pemil Pemil ihan Pondasi Dangkal Bila direncanakan menggunakan pondasi telapak atau menerus pada kedalaman -1.00 m maka daya dukung tanah ijin di kedalaman ini adalah sebesar 0.50 kg/cm2
Pemil Pemil ihan Pond asi Dalam Dalam Kontur lapisan tanah cukup keras untuk pondasi mini pile berdasarkan data penyelidikan tanah relative bervariasi kedalamannya, mulai ditemui pada kedalaman -12.00 m sd -18.00 m dengan nilai NSPT > 27 blows/30 cm penetrasi atau qc > 250 kg/cm2 sehingga dapat digunakan material tiang dengan section 6 m + 6 m + 6 m (Lp = 18 m) Apabila dipergunakan dipergunakan pondasi tiang besar berupa spun pile maupun square pile prestress maka penentuan kedalaman pemancangan tiang didasarkan pada nilai N SPT > 40 blows/30 cm penetrasi yang mana tiang akan terhenti pada kedalaman -16.00 m s/d -18.00 m (final set) pada lapisan lapisan pasir kepadatan sedang (dense) dengan NSPT = 30 - 50 blows/30 cm penetrasi Untuk pekerjaan pemancangan, untuk volume pekerjaan pemancangan yang cukup banyak maka untuk keperluan order material pancang kontraktor diwajibkan melakukan pamancangan awal (pile indicator) sehingga bisa dipastikan kedalaman tanah kerasnya. Jumlah pile indicator min 20 titik atau 5 % dari jumlah tiang Bila pondasi tiang bor ( bore pile) digunakan maka untuk bore pile ϕ 50 & ϕ 60 kedalaman tiang bor -18.00 m dari tanah permukaan atau Lp = 18.00 m & Lb = 17.00 m. Untuk bore pile ϕ 80 kedalaman tiang bor -22.00 m dari permukaan tanah eksisting atau Lp = 22.00 m & Lb = 21.00 m. Hal yang perlu diperhatikan dalam pelaksanaan bore pile adalah berhubungan dengan kualitas pengerjaan di lapangan sehubungan dengan kebersihan ujung tiang bor untuk memastikan daya dukung ujung tiang dapat bekerja. Apabila ditemui lapisan pasir di lapisan tanah atas maka dapat digunakan casing untuk mencegah terjadinya necking pada tubuh bor pile yang menyebabkan pekerjaan bore pile di tolak apabila rasio luas aktual / luas teoritis < 80 % serta pembesaran tubuh bor pile yang menyebabkan menyebabkan meningkatnya meningkatnya kebutuhan volume beton. Pemakaian jenis pondasi tiang sampai tanah keras sangat efektif untuk menghindari terjadinya efek penurunan dalam jangka panjang (long term settlement) namun apabila digunakan pondasi friksi dengan panjang terbatas maka potensi penurunan menjadi pertimbangan utama. Pemilihan jenis pondasi yang akan dipergunakan sangat tergantung pada situasi dan kondisi lingkungan sekitar area rencana proyek. Pelaksanaan pondasi tiang pancang akan beradampak getaran saat pemancangan terhadap kemungkinan kerusakan bangunan sekitar sedangkan pelaksanaan bore pile berkaitan dengan gangguan lingkungan akibat pembuangan lumpur
Halaman 5
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
Kontrol kualitas dan kuantitas pemancangan (sebagai end bearing pile) 1. Sebagai acuan acuan bagi kontrol kontrol kualitas pekerjaan pekerjaan pemancangan pemancangan disarankan disarankan agar dilakukan kalendering dengan section tinjauan setiap 50 cm 2. Sebagai kontrol pencapaian pencapaian kedalaman tanah keras maka disyaratkan pencapaian final set tidak boleh lebih dari 2.54 cm/10 blows Kontrol Kualitas Jacking Pile untuk mencegah ujung tiang yang telah di tekan secara continue terangkat (heaving) maka 1. Tiang di tekan tekan sebesar 250 250 % dari kapasitas kapasitas material material sedangkan sedangkan dalam desain diambil nilai daya dukung ijin tekan desain 2. Saat mencapai beban puncak perlu ditahan 10 detik setelah itu dilepas dan ditekan kembali sebanyak 3 kali Data GWL dari Bore Hole pada titik bor menunjukkan muka air pada level -5.00 m (bulan Mei 2015). Dalam desain struktur sub structure dapat diasumsi kedalaman GWL = ½ H (tinggi sub structure) sehinga tekanan hidrostatik yang menimbulkan gaya uplift pada dasar lantai perlu dipertimbangkan dalam pelaksanaan maupun desain struktur sebagai berikut : Merekayasa tebal slab beton yang diperlukan. Penggunaan Penggunaan pondasi / jangkar sebagai sebagai penahan gaya gaya tarik / gaya uplift.
Halaman 6
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
IV. REK OMEND A SI Berdasarkan hasil penyelidikan tanah yang telah dilakukan, untuk keperluan desain pondasi diusulkan sebagai berikut : Struktur Pondasi Pelat Pelat Pergunakan pondasi dangkal berupa telapak Type : Pondasi Telapak Kedalaman : -1.00 m (dari elevasi muka tanah eksisting) Tegangan ijin tanah ( σall) : 0.50 kg/cm2
Struktur dengan Pondasi Pondasi Tiang Instalasi sistim pancang (driving pile) & Instalasi sistim tekan (jacking pile) Pondasi Tipe
Mini Pile (K-450) Square Pile (K-500) Spun Pile (K-500)
Dimensi (cm) □ 20/20 □ 25/25 28/28/28 32/32/32 □ 40/40 □ 45/45 □ 50/50 Φ 40 Φ 45 Φ 50
Daya Dukung Tekan Pondasi (ton) Tip DB1 Tip DB2 Pile Pile (m) (Iton) (m) (Iton) 18 64.90 12 41.60 18 89.12 12 56.20 18 62.94 12 40.95 18 75.52 12 48.68 18 154.62 .62 16 139.52 .52 18 183.67 .67 16 165.06 .06 18 214.88 .88 16 192.40 .40 18 121.38 16 109.52 18 144.18 16 129.57 18 168.68 16 151.03
Desain Pondasi Tiang Kap. Material (ton) 30 45 30 35 120 150 180 100 120 150
Depth
Lpile
Section
Desain
(m) 12-18 12-18 12-18 12-18 16-18 16-18 16-18 16-18 16-18 16-18
(m) 18 18 18 18 18 18 18 18 18 18
(m) 6+6+6 6+6+6 6+6+6 6+6+6 8 + 10 8 + 10 8 + 10 8 + 10 8 + 10 8 + 10
(ton) 35 45 30 35 120 150 180 100 120 150
Instalasi sistim pancang (driving pile) & Instalasi sistim tekan (jacking pile) Pondasi Tipe
Mini Pile (K-450) Square Pile (K-500) Spun Pile (K-500)
Dimensi (cm) □ 20/20 □ 25/25 28/28/28 32/32/32 □ 40/40 □ 45/45 □ 50/50 Φ 40 Φ 45 Φ 50
Daya Dukung Tekan Pondasi (ton) Tip DB1 Tip DB2 Pile Pile (m) (Iton) (m) (Iton) 18 64.90 12 41.60 18 89.12 12 56.20 18 62.94 12 40.95 18 75.52 12 48.68 18 154.62 .62 16 139.52 .52 18 183.67 .67 16 165.06 .06 18 214.88 .88 16 192.40 .40 18 121.38 16 109.52 18 144.18 16 129.57 18 168.68 16 151.03
Desain Pondasi Tiang Kap. Material (ton) 30 45 30 35 120 150 180 100 120 150
Depth
Lpile
Section
Desain
(m) 12-18 12-18 12-18 12-18 16-18 16-18 16-18 16-18 16-18 16-18
(m) 18 18 18 18 18 18 18 18 18 18
(m) 6+6+6 6+6+6 6+6+6 6+6+6 8 + 10 8 + 10 8 + 10 8 + 10 8 + 10 8 + 10
(ton) 30 40 25 30 100 120 150 80 100 120
Halaman 7
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
Bore Pile Pondasi Tipe
Bore Pile (K-250)
Dimensi (cm) BP 50 BP 60 BP 80 BP 100
Tip Pile (m) 18 18 18 22 22 30
Daya Dukung Tekan Pondasi (ton) DB1 Tip DB2 Kap. Pile Material (Iton) (m) (Iton) (ton) 11 113.64 18 125.63 90 142.52 18 157.88 120 219.76 22 262.44 225 438.08 30 501.24 500
Desain Pondasi Tiang Depth
Lpile
Desain
(m) -18 -18 -22 -30
(m) 18 18 22 30
(ton) 90 120 220 450
Halaman 8
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
V. A N A L IS A POND A SI 1. Daya Dukung Pond Pond asi Pelat Pelat a. Daya Dukun g Tanah Tanah (Berdasarkan Data Data Sondi r dari Shempto n, Terzaghi Terzaghi ) Analisa daya dukung pondasi dangkal (shallow foundation), menggunakan menggunakan formula sebagai berikut : qa = 5,7 . Cu . D SF
dimana Cu
= qc (kg/cm²)
30 qc
= Tahanan ujung konus sondir (kg/cm²) di kedalaman yang ditinjau.
Dari data sondir yang ada, diperoleh nilai qc rata-rata dikedalaman -1,00 m (dari elevasi muka tanah eksisting) sebesar 8 - 15 kg/cm², maka : -3 qa = 5,7 . 0,33 0,50 .10 .100 3
= 0.65 kg/cm²
b. Daya Dukun g Pond Pond asi (Berdasark (Berdasark an Data Data Sondir dari Sangl Sangl erat) qa = qc (kg/cm²)
20
= 0.50 kg/cm2
c. Daya Dukun g Pondasi (Meyerhof, 1963) qa = qc B.
(1 D ) 40 B
dimana : qc = Tahanan ujung konus konus sondir (kg/cm²) di kedalaman kedalaman B atau 2B di alas pondasi Dari data sondir yang ada, diperoleh nilai qc rata-rata dikedalaman -1,00 m (dari elevasi muka tanah eksisting) eksisting) sebesar 8 - 15 kg/cm², maka : qa = 10.1,00. (1 1.0) 40(1,00)
= 0.50 kg/cm²
Halaman 9
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
2. Daya Dukung Tekan Tekan Pond Pond asi Dalam Dalam Analisa daya dukung dukung pondasi pondasi tiang mempergunakan mempergunakan formula formula sebagai berikut berikut : Daya dukung Tanah berdasarkan data N SPT (Meyerhof) a. Pondasi Bor e Pile lifixAs qdxAp P = + FK 1 FK 2 dimana : Daya Dukung Selimut - Daya dukung selimut tiang pada lapisan tanah pasir Qs = qs. Li. p dimana : qs = tahanan selimut pada lapisan pasir Pasir Sedang s/d Kasar (Reese and Wright, 1977) qs = 0.28 N (t/m2) qs =
N 53
450
untuk NSPT < 53 2
1.6 (t/ft )
qs ≤ qs all = 2.00 ton/ft2
untuk 53 < NSPT ≤ 100 (Metode Quiros & Reese, 1977)
Pasir Halus qs = 0.20 N (t/m2) (Nilai rata-rata rata-rata Reese and Wright, Wright, 1977 & Meyerhoff) Meyerhoff) - Daya dukung selimut tiang pada lapisan tanah kohesi Qs = qs. Li. p (ton) qs = α . Cu ≤ qs all = 1.00 kg/cm2
(Metode Alpha Tomlinson)
Daya Dukung Ujung Tiang - Pada Pasir Sangat Padat (Very Dense Sand) Qp = qd. Ap Bila ujung dari tiang direncanakan duduk di lapisan tanah pasir maka nilai tahanan ujung dari bore pile menggunakan persamaan sbb. : qd = 0.7 N (t/ft2) < 40 t/ft2 ≈ 450 t/m22 (Reese and Wright, 1988) - Pada Tanah Tanah Kohesif Kohesif vQp = qd. Ap Bila ujung dari tiang direncanakan direncanakan duduk di lapisan tanah kohesif maka nilai tahanan ujung dari bore pile menggunakan persamaan sbb. : qd = 9 cu (t/ft2) < 45 t/ft 2 = 500 t/m2 (Reese and O’Neil, 1988)
Halaman 10
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang
b.
Daya Dukun g Ijin Tiang Pancang Qall
=
Qs FK 1
Qp
FK 2
Daya Dukung Ijin Selimut : -
Daya dukung selimut tiang pada lapisan tanah pasir Qsall =
( 0.2 N Li ) p SF
dimana : 0.2 N = fs maks. = 10 t/m2 - Daya dukung selimut tiang pada lapisan tanah kohesi Qs = qs. Li. p (ton) qs
= α . Cu ≤ qs all = 1.00 kg/cm2
(Metode Alpha Tomlinson)
Daya Dukung Ijin Ujung Tiang : -
Pada Pasir Sangat Padat (Very Dense Sand) Qp = qd. Ap qd = 40 Nb Nbmax = 40 Qp Qpall = Fk 2
-
Pada Tanah Kohesi Qp = qd. Ap Bila ujung dari tiang direncanakan duduk di lapisan tanah kohesif maka nilai tahanan ujung menggunakan persamaan sbb. : qd = 20 Nb
Hasil analisa daya dukung ijin tekan tiang berdasarkan data-data N SPT disajikan dalam tabel.
c. Berdasarkan kekuatan material. Pa = b’ x Ap Dimana :
b’
Ap
= Tegangan ijin beton = Luas penampang penampang tiang
Misal untuk tiang bored pile 60 cm mutu beton K-250
Halaman 11
Laporan Penyelidikan Tanah HOTEL EVERBRIGHT CIKOKOL Jln. MH. Thamrin, Tangerang b’
= 225 225 kg/cm²
b’
= 0,17 0,17 x bk = 0,17 x 250 250 = 42,50 42,50 kg/cm2
Pa
= b’ x Ap = 42,50 kg/cm² x 2826 2826
Pa
= 120.105 kg = 120 ton
Dimensi Tiang (cm) 35 x 35 40 x 40 45 x 45 SP 35 SP 40 SP 45
BP 40 BP 60
Daya Dukun Dukun g Ijin Tekan Tekan Tiang Berdasarkan Kekuatan Material (ton) 90 120 150 80 100 120 60 120
3. Daya Dukung Ijin Tarik Tarik Pond Pond asi Dalam Dalam Berdasarkan data N SPT (Meyerhof). Ρ =
lifixAs x0,70 FK 2
+ Wp
Hasil analisa daya dukung ijin tiang tarik berdasarkan data-data N SPT disajikan dalam table. Hasil analisa daya dukung ijin tiang tarik berdasarkan data-data CPT disajikan dalam tabel
Halaman 12
LAMPIRAN – LAMPIRAN
DENAH & FOTO DOKUMENTASI
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
01
08
Deskripsi Pekerjaan : Boring DB1 & DB 2 @ 40 m
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
02
08
Deskri Deskri psi Pekerjaan Pekerjaan : Tes Sondir Tit ik S1 s/d S4
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
Halaman
Jumlah Lembar
03
08
DOKUMENTASI Deskri Deskri psi Pekerjaan Pekerjaan : Tes Sondir Tit ik S5 & S6
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
04
08
Deskri Deskri psi Pekerjaan Pekerjaan : UDS dan Distur bed Sample Sample Titi k Bo r DB1 & DB 2
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
05
08
Deskr Deskr ipsi Pekerjaan Pekerjaan : Grandsi Grandsi ze Analys is (Sieve Analysi s & Hidro meter)
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
06
08
Deskripsi Deskripsi Pekerja Pekerjaan an : At teberg teberg L imit (Liquid Li mit Test Test & Plastic Plastic Limit Test) Test)
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI Deskr Deskr ipsi Pekerjaan Pekerjaan : Kadar Air dan Gs
Halaman
Jumlah Lembar
07
08
Jl. Pahlawan Seribu Ruko Golden Boulevard Blok D30 BSD City, Tangerang – Banten Telp. (021) 5315 3232 Fax (021) 5315 3233 email :
[email protected] putra_dwiman
[email protected]
No. Proyek
Proyek Pro yek : HOTEL EVERBRIGHT EVERBRIGHT CIKOKOL Lokasi : Jln. MH. MH. Thamri Thamri n Tangerang, Tangerang, Banten
No. Pekerjaan
DOKUMENTASI
Halaman
Jumlah Lembar
08
08
Deskr Deskr ipsi Pekerjaan Pekerjaan : Swellin g Test & Uncon fin ed Test Test (UCT) (UCT)
DATA BORING & SONDIR
PUTRA DWI MANDIRI
CPT
Pr o y ek Po i n t L o c at i o n
E l ev . Tes t b y Dat e
: Ho t el Ev er b r i g h t Ci k o k o l : S1 : MH. Th am r i n , Tan g er an g
: : Tr i s n a : 02 Mei 2015
0
‐1
‐2
‐3
‐4
‐5
D ‐6 E P T ‐7 H
D E P T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2) TOTAL FRICTION (kg/cm) 0
100 1000 .
200
3 00
2000 .
3000 .
0.00
2.00
4.00
6.00
Friction Ratio (%)
PUTRA DWI MANDIRI
CPT
Pr o yek : Ho t el Ever b r i g h t Ci k o k o l Po i n t : S2 L o c at i o n : MH. Th am r i n , Tan g er an g
El ev. Tes t b y Dat e
: : Tr i s n a : 02 Mei 2015
0
‐1
‐2
‐3
‐4
‐5 D E ‐6 P T H ‐7
D E T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2)
100
200
300
TOTAL FRICTION (kg/cm) 0
1000
2000
3000
LOCAL FRICTION (kg/cm2) 0
1.00
2.00
3.00
0.00
2.00
4.00
Friction Ratio (%)
6.00
PUTRA DWI MANDIRI
CPT
Pr o y ek Po i n t L o c at i o n
E l ev . T es t b y Dat e
: Ho t el Ev er b r i g h t Ci k o k o l : S3 : MH. Th am r i n , Tan g er an g
: : Tr i s n a : 02 Mei 2015
0
‐1
‐2
‐3
‐4
‐5
D ‐6 E P T ‐7 H
D E T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2)
100
200
300
TOTAL FRICTION (kg/cm) 0
1000
2000
3000
LOCAL FRICTION (kg/cm2) 0
1.00
2.00
3.00
0.00
2.00
4.00
6.00
Friction Ratio (%)
PUTRA DWI MANDIRI
CPT
Pr o y ek Po i n t L o c at i o n
El ev . T es t b y Dat e
: Ho t el Ev er b r i g h t Ci k o k o l : S4 : MH. Th am r i n , Tan g er an g
: : Tr i s n a : 03 Mei 2015
0
‐1
‐2
‐3
‐4
‐5
D ‐6 E
D E
T ‐7 H
T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2)
100
20 0
30 0
TOTAL FRICTION (kg/cm) 0
1000
2000
3000
LOCAL FRICTION (kg/cm2) 0
1.00
2.00
3.00
0.00
2.00
4.00
6.00
PUTRA DWI MANDIRI
CPT
Pr o y ek Po i n t L o c at i o n
El ev . T es t b y Dat e
: Ho t el Ev er b r i g h t Ci k o k o l : S5 : MH. Th am r i n , Tan g er an g
: : Tr i s n a : 03 Mei 2015
0
‐1
‐2
‐3
‐4
‐5 D E ‐6 P
D E
H ‐7
T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2)
100
20 0
30 0
TOTAL FRICTION (kg/cm) 0
1000
2000
3000
LOCAL FRICTION (kg/cm2) 0
1.00
2.00
3.00
0.00
2.00
4.00
6.00
PUTRA DWI MANDIRI
CPT
Pr o y ek Po i n t L o c at i o n
El ev . T es t b y Dat e
: Ho t el Ev er b r i g h t Ci k o k o l : S6 : MH. Th am r i n , Tan g er an g
: : Tr i s n a : 04 Mei 2015
0
‐1
‐2
‐3
‐4
‐5
D ‐6 E
D E
T ‐7 H
T H
‐8
‐9
‐10
‐11
‐12
‐13
‐14
‐15 0 CONE RESISTANCE (kg/cm2)
100
20 0
30 0
TOTAL FRICTION (kg/cm) 0
1000
2000
3000
LOCAL FRICTION (kg/cm2) 0
1.00
2.00
3.00
0.00
2.00
4.00
6.00
TABEL DAYA DUKUNG TEKAN & TARIK PONDASI
AL LOWABL LOWA BL E BEA RING CAPACITY OF SINGLE PILE (BASED ON NSPT DATA) Proyek Proyek : Hotel Hotel Everbright Everbright Cikokol Cikokol Location: MH. Thamrin, Tangerang Meyerhof's Method
SFfriction =
DB .1
2.50
SFt i p = 2.50 faktor adhesi
cu
qd
Fi
L i Fi
LiFi
(t /m 2)
(t /m 2)
(t /m 2)
(t /m )
(t /m )
Spun Pile
Dep t h
Li
Des c
N
(m )
(m )
C/S
SPT
2.00
2.00
CLAY
14
0.50
9.33
187
4.67
9.33
9.33
11.28
14.07
17.14
20.51
4.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
24.00
21.83
26.79
32.22
38.10
6.00
2.00
CLAY
14
0.50
9.33
187
4.67
9.33
33.33
21.83
26.12
30.71
35.59
8.00
2.00
CLAY
18
0.50
12.00
240
6.00
12.00
45.33
29.16
34.83
40.88
47.31
10.00
2.00
CLAY
19
0.50
12.67
253
6.33
12.67
58.00
35.24
41.87
48.89
56.31
12.00
2.00
CLAY
25
0.50
16.67
333
8.33
16.67
74.67
45.65
54.26
63.40
73.06
14.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
89.33
50.55
59.62
69.14
79.13
16.00
2.00
CLAY
25
0.50
16.67
333
8.33
16.67
106.00
59.42
70.00
81.11
92.73
18.00
2.00 SAND
42
1600
8.40
16.80
122.80
115.53
142.08
171.14
202.72
20.00
2.00 SAND
27
1080
5.40
10.80
133.60
100.27
121.38
144.18
168.68
22.00
2.00 SAND
30
1200
6.00
12.00
145.60
110.16
133.44
158.60
185.64
24.00
2.00
CLAY
33
0.50
33.00
660
10.00
20.00
165.60
98.18
116.36
135.56
155.81
26.00
2.00
CLAY
34
0.50
34.00
680
10.00
20.00
185.60
107.75
127.41
148.14
169.94
28.00
2.00
CLAY
40
0.50
40.00
800
10.00
20.00
205.60
121.15
143.49
167.07
191.92
30.00
2.00
CLAY
43
0.50
43.00
860
10.00
20.00
225.60
132.25
156.55
182.19
209.19
32.00
2.00
CLAY
46
0.50
46.00
920
10.00
20.00
245.60
143.35
169.61
197.31
226.46
34.00
2.00 SAND
46
1600
9.20
18.40
264.00
177.60
213.02
250.95
291.39
36.00
2.00 SAND
55
1600
11.00
22.00
286.00
187.27
224.07
263.38
305.21
38.00
2.00 SAND
52
1600
10.40
20.80
306.80
196.41
234.52
275.14
318.27
40.00
2.00 SAND
60
1600
12.00
24.00
330.80
206.96
246.58
288.70
333.34
SP Ø 35
SP Ø 40
SP Ø 45
SP Ø 50
AL LOWABL LOWA BL E TENSION CAPA CAPA CITY OF SINGLE SINGLE PILE (BASED ON NSPT DATA) Proyek Proyek : Hotel Hotel Everbright Everbright Cikokol Cikokol Location: MH. Thamrin, Tangerang Meyerhof's Method SFfriction =
DB.1 Dep t h
Li
Des c
N SPT
faktor adhesi
cu
qd
Fi
(t /m 2)
(t /m 2)
L i Fi
(t /m 2)
(t /m )
(t /m )
3.00
Spun Pile
LiFi SP Ø 35
SP Ø 40
SP Ø 45
SP Ø 50
(m )
(m )
C/S
2.00
2.00
CLAY
14
0.50
9.33
187
4.67
9.33
9.33
2.7
3 .2
3.6
4.1
4.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
24.00
6.9
8 .1
9.2
10.4
6.00
2.00
CLAY
14
0.50
9.33
187
4.67
9.33
33.33
9.8
11.4
13.1
14.8
8.00
2.00
CLAY
18
0.50
12.00
240
6.00
12.00
45.33
13.3
15.5
17.8
20.1
10.00
2.00
CLAY
19
0.50
12.67
253
6.33
12.67
58.00
17.0
19.8
22.7
25.7
12.00
2.00
CLAY
25
0.50
16.67
333
8.33
16.67
74.67
21.8
25.3
29.0
32.7
14.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
89.33
26.0
30.2
34.6
39.0
16.00
2.00
CLAY
25
0.50
16.67
333
8.33
16.67
106.00
30.7
35.7
40.8
46.1
18.00
2.00 SAND
42
1600
8.40
16.80
122.80
35.5
41.2
47.1
53.2
20.00
2.00 SAND
27
1080
5.40
10.80
133.60
38.7
45.0
51.4
58.1
22.00
2.00 SAND
30
1200
6.00
12.00
145.60
42.3
49.1
56.2
63.4
24.00
2.00
CLAY
33
0.50
33.00
660
10.00
20.00
165.60
47.9
55.6
63.5
71.7
26.00
2.00
CLAY
34
0.50
34.00
680
10.00
20.00
185.60
53.5
62.0
70.9
80.0
28.00
2.00
CLAY
40
0.50
40.00
800
10.00
20.00
205.60
59.0
68.5
78.2
88.2
30.00
2.00
CLAY
43
0.50
43.00
860
10.00
20.00
225.60
64.6
75.0
85.6
96.5
32.00
2.00
CLAY
46
0.50
46.00
920
10.00
20.00
245.60
70.2
81.4
93.0
104.8
34.00
2.00 SAND
46
1600
9.20
18.40
264.00
75.4
87.4
99.8
112.4
36.00
2.00 SAND
55
1600
11 11.00
22.00
286.00
81.5
94.5
107.8
121.4
38.00
2.00 SAND
52
1600
1 0.40
20.80
306.80
87.3
101.2
115.4
130.0
40.00
2.00 SAND
60
1600
1 2.00
24.00
330.80
93.9
108.8
124.1
139.7
AL LOWABL LOWA BL E COMPRESSION BEARING BEA RING CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) Proye royek
: Hote Hotell Eve Everbrigh rbrightt Cikoko Cikokoll
Location : MH. Thamrin, Thamrin, Tangerang Tangerang SF(ujung) = 2.5 SF(selimut) = 2.5
DB 1 Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman
0
0 0
) m (
100
200
300
400
0
-5
-5
-10
-10
-15
200
400
600
800
-15 ) m (
n a -20 m a l a d e K
n a m a l a
-20
e K
-25
-30
-30
-35
-35
-40
-40 Pall (ton)
Pall (ton)
AL LOWABL LOWA BL E TENSION CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) SF(selimut) = 3
DB 1 Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman 0
) m (
100
200
Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman 300
0
-5
-5
-10
-10
-15
100
200
300
-15 ) m (
a -20 m a l a d -25 e K
n a m a l a d e K
-20 -25
-30
-30
-35
-35
-40
-40 Pall (ton) BP 40
BP 50
Pall (ton)
BP 60
BP 80
BP 100
400
AL LOWABL LOWA BL E COMPRESSION BEARING CA PACITY OF SINGL E PILE (BASED ON NSPT DATA) Proye royek
: Hote Hotel Eve Everbrigh rbrightt Cikoko Cikokoll
Location : MH. MH. Thamrin, Tangera Tangerang ng SF(ujung) = 2.5 SF(selimut) = 2.5
DB 1 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
0
0 0
) m (
100
200
300
400
0
-5
-5
-10
-10
-15
200
400
600
-15 ) m (
n a -20 m a l a d e K
-20
n a m l -25 a d e K
-30
-30
-35
-35
-40
-40
Pall (ton) SP 40
Pall (ton)
SP 45
SP 50
AL LOWA BL E TENSION CAPACITY CAPA CITY OF SINGLE PIL E (BASED ON NSPT DATA) DB 1 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 0
) m (
50
100
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 150
0
-5
-5
-10
-10
-15
50
100
150
200
-15 ) m
a -20 m a l a d -25 e K
n a m a l a d e K
-20 -25
-30
-30
-35
-35
-40
-40 Pall (ton) SP 40
SP 45
Pall (ton)
SP 50
SQ 40
SQ 45
SQ 50
AL LOWA BL E COMPRESSION BEARING CA PACITY OF SINGL E PILE (BASED ON NSPT DATA) Proye royek
: Hote Hotel Eve Everbrig rbright ht Cikok Cikokol ol
Location : MH. MH. Thamrin, Tangera Tangerang ng SF(ujung) = 2.5 SF(selimut) = 2.5
DB 1 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
0
0 0
50
100
150
200
0
-5
-5
-10
-10
) -15 m (
-15
50
100
150
200
) m (
n a -20 m a l a d -25 e K
-20
n a m a l a-25 d e K
-30
-30
-35
-35
-40
-40
Pall (ton)
Pall (ton)
AL LOWA BL E TENSION CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) DB 1 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 0
50
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 100
0
-5
-5
-10
-10
) -15 m (
50
100
-15
) m (
n a -20 m a l a d e -25 K
a -20 m a l a d -25 e K
-30
-30
-35
-35
-40
-40
Pall (ton) MP 28/28/28
Pall (ton) MP 32/32
MP 20/20
MP 25/25
AL LOWABL LOWA BL E BEA RING CAPACITY OF SINGLE PILE (BASED ON NSPT DATA) Proyek Proyek : Hotel Hotel Everbright Everbright Cikokol Cikokol Location: MH. Thamrin, Tangerang Meyerhof's Method
SFfriction =
DB .2
2.50
SFt i p = 2.50 faktor adhesi
cu
qd
Fi
L i Fi
LiFi
(t /m 2)
(t /m 2)
(t /m 2)
(t /m )
(t /m )
Spun Pile
Dep t h
Li
Des c
N
(m )
(m )
C/S
SPT
2.00
2.00
CLAY
16
0.50
10.67
213
5.33
10.67
10.67
12.89
16.08
19.59
23.45
4.00
2.00
CLAY
16
0.50
10.67
213
5.33
10.67
21.33
17.58
21.44
25.62
30.14
6.00
2.00
CLAY
18
0.50
12.00
240
6.00
12.00
33.33
23.88
28.80
34.10
39.77
8.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
48.00
32.38
38.85
45.78
53.17
10.00
2.00
CLAY
33
0.50
22.00
440
10.00
20.00
68.00
46.82
56.27
66.41
77.24
12.00
2.00
CLAY
42
0.50
42.00
840
10.00
20.00
88.00
71.00
86.41
103.15
121.20
14.00
2.00
CLAY
40
0.50
40.00
800
10.00
20.00
108.00
78.25
94.45
111.91
130.62
16.00
2.00
CLAY
45
0.50
45.00
900
10.00
20.00
128.00
90.89
109.52
129.57
151.03
18.00
2.00
CLAY
42
0.50
42.00
840
10.00
20.00
148.00
97.37
116.56
137.06
158.88
20.00
2.00 SAND
50
1600
10.00
20.00
168.00
135.40
164.79
196.69
231.10
22.00
2.00 SAND
38
1520
7.60
15.20
183.20
139.00
168.40
200.19
234.37
24.00
2.00
CLAY
44
0.50
44.00
880
10.00
20.00
203.20
123.18
146.30
170.80
26.00
2.00
CLAY
47
0.50
47.00
940
10.00
20.00
223.20
134.28
159.36
185.92
213.96
28.00
2.00
CLAY
50
0.50
50.00
1000
10.00
20.00
243.20
145.38
172.42
201.04
231.23
30.00
2.00
CLAY
52
0.50
52.00
1040
10.00
20.00
263.20
155.71
184.48
214.89
246.93
32.00
2.00
CLAY
52
0.50
52.00
1040
10.00
20.00
283.20
164.50
194.53
226.19
259.49
34.00
2.00
CLAY
54
0.50
54.00
1080
10.00
20.00
303.20
174.83
206.59
240.04
275.19
36.00
2.00 SAND
57
1600
11.40
22.80
326.00
204.85
244.17
285.99
330.33
38.00
2.00 SAND
60
1600
12.00
24.00
350.00
215.40
256.22
299.56
345.40
40.00
2.00 SAND
60
1600
12.00
24.00
374.00
225.95
268.28
313.12
360.47
SP Ø 35
SP Ø 40
SP Ø 45
SP Ø 50
196.69
AL LOWABL LOWA BL E TENSION CAPA CAPA CITY OF SINGLE SINGLE PILE (BASED ON NSPT DATA) Proyek Proyek : Hotel Hotel Everbright Everbright Cikokol Cikokol Location: MH. Thamrin, Tangerang Meyerhof's Method SFfriction =
DB.2 Dep t h
Li
Des c
N SPT
faktor adhesi
cu
qd
Fi
(t /m 2)
(t /m 2)
(t /m 2)
L i Fi
LiFi
(t /m )
(t /m )
3.00
Spun Pile SP Ø 35
SP Ø 40
SP Ø 45
SP Ø 50
(m )
(m )
C/S
2.00
2.00
CLAY
16
0.50
10.67
213
5.33
10.67
10.67
3.1
3 .5
4.1
4.00
2.00
CLAY
16
0.50
10.67
213
5.33
10.67
21.33
6.3
7 .3
8.3
9.4
6.00
2.00
CLAY
18
0.50
12.00
240
6.00
12.00
33.33
9.8
11.4
13.1
14.8
4.6
8.00
2.00
CLAY
22
0.50
14.67
293
7.33
14.67
48.00
14.0
16.3
18.6
21.1
10.00
2.00
CLAY
33
0.50
22.00
440
10.00
20.00
68.00
19.6
22.8
26.0
29.3
12.00
2.00
CLAY
42
0.50
42.00
840
10.00
20.00
88.00
25.2
29.2
33.4
37.6
14.00
2.00
CLAY
40
0.50
40.00
800
10.00
20.00
108.00
30.8
35.7
40.7
45.9
16.00
2.00
CLAY
45
0.50
45.00
900
10.00
20.00
128.00
36.4
42.2
48.1
54.1
18.00
2.00
CLAY
42
0.50
42.00
840
10.00
20.00
148.00
42.0
48.6
55.4
62.4
20.00
2.00 SAND
50
1600
10.00 10
20.00
168.00
47.6
55.1
62.8
70.7
22.00
2.00 SAND
38
1520
7.60
15.20
183.20
51.9
60.1
68.6
77.2
24.00
2.00
CLAY
44
0.50
44.00
880
10.00
20.00
203.20
57.5
66.6
75.9
26.00
2.00
CLAY
47
0.50
47.00
940
10.00
20.00
223.20
63.1
73.1
83.3
93.7
28.00
2.00
CLAY
50
0.50
50.00
1000
10.00
20.00
243.20
68.7
79.5
90.6
102.0
30.00
2.00
CLAY
52
0.50
52.00
1040
10.00
20.00
263.20
74.3
86.0
98.0
110.3
32.00
2.00
CLAY
52
0.50
52.00
1040
10.00
20.00
283.20
79.9
92.5
105.4
118.5
34.00
2.00
CLAY
54
0.50
54.00
1080
10.00
20.00
303.20
85.5
98.9
112.7
126.8
36.00
2.00 SAND
57
1600
1 1.40
22.80
326.00
91.8
106.2
121.0
136.1
38.00
2.00 SAND
60
1600
1 2.00
24.00
350.00
98.4
113.8
129.7
145.8
40.00
2.00 SAND
60
1600
1 2.00
24.00
374.00
105.0
121.5
138.3
155.6
85.5
AL LOWABL LOWA BL E COMPRESSION BEARING BEA RING CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) Proye royek
: Hote Hotell Eve Everbrigh rbrightt Cikoko Cikokoll
Location : MH. Thamrin, Thamrin, Tangerang Tangerang SF(ujung) = 2.5 SF(selimut) = 2.5
DB 2 Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman
0
0 0
) m (
100
200
300
400
0
-5
-5
-10
-10
-15
200
400
600
800
-15 ) m (
n a -20 m a l a d e K
n a m a l a
-20
e K
-25
-30
-30
-35
-35
-40
-40 Pall (ton)
Pall (ton)
AL LOWABL LOWA BL E TENSION CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) SF(selimut) = 3
DB 2 Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman 0
) m (
100
200
Daya Dukung Tanah Tiang Bore Pile vs K edalaman edalaman 300
0
-5
-5
-10
-10
-15
100
200
300
-15 ) m (
a -20 m a l a d -25 e K
n a m a l a d e K
-20 -25
-30
-30
-35
-35
-40
-40 Pall (ton) BP 40
BP 50
Pall (ton)
BP 60
BP 80
BP 100
400
AL LOWABL LOWA BL E COMPRESSION BEARING CA PACITY OF SINGL E PILE (BASED ON NSPT DATA) Proye royek
: Hote Hotel Eve Everbrigh rbrightt Cikoko Cikokoll
Location : MH. MH. Thamrin, Tangera Tangerang ng SF(ujung) = 2.5 SF(selimut) = 2.5
DB 2 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
0
0 0
) m (
100
200
300
400
0
-5
-5
-10
-10
-15
200
400
600
-15 ) m (
n a -20 m a l a d e K
-20
n a m l -25 a d e K
-30
-30
-35
-35
-40
-40
Pall (ton) SP 40
Pall (ton)
SP 45
SP 50
AL LOWA BL E TENSION CAPACITY CAPA CITY OF SINGLE PIL E (BASED ON NSPT DATA) DB 2 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 0
) m (
50
100
150
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 200
0
-5
-5
-10
-10
-15
100
200
300
-15 ) m
a -20 m a l a d -25 e K
n a m a l a d e K
-20 -25
-30
-30
-35
-35
-40
-40 Pall (ton) SP 40
SP 45
Pall (ton)
SP 50
SQ 40
SQ 45
SQ 50
AL LOWA BL E COMPRESSION BEARING CA PACITY OF SINGL E PILE (BASED ON NSPT DATA) Proye royek
: Hote Hotel Eve Everbrig rbright ht Cikok Cikokol ol
Location : MH. MH. Thamrin, Tangera Tangerang ng SF(ujung) = 2.5 SF(selimut) = 2.5
DB 2 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman
0
0 0
50
100
150
200
0
-5
-5
-10
-10
) -15 m (
-15
50
100
150
200
) m (
n a -20 m a l a d -25 e K
-20
n a m a l a-25 d e K
-30
-30
-35
-35
-40
-40
Pall (ton)
Pall (ton)
AL LOWA BL E TENSION CAPA CITY OF SINGLE PILE PIL E (BASED ON NSPT DATA) DB 2 Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 0
50
Daya Dukung Tanah Tiang Pancang Pile vs K edalaman edalaman 100
0
-5
-5
-10
-10
) -15 m (
50
100
-15
) m (
n a -20 m a l a d e -25 K
a -20 m a l a d -25 e K
-30
-30
-35
-35
-40
-40
Pall (ton) MP 28/28/28
Pall (ton) MP 32/32
MP 20/20
MP 25/25
DATA LABORATORIUM
WATER CONTENT & BULK DENSITY DETERMINATION PROJECT LOCATION Ring
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang Weight Diameter
41.71 gr 3.40 cm
TESTED BY : Agustinus DATE : 13/05/2015
height Volume
2.00 cm 18.15 cm3
DB I
Depth 1.50‐2.00 3.50‐4.00 5.50‐6.00 7.50‐8.00
CONT. NO. A27 C60 A34 A12 A22 C54 A6 C42
Wwet + C
Wdry + C
W cont
wn
Average
(gr)
(gr)
(gr)
(%)
(%)
38.51 39.88 35.28 32.14 37.75 38.13 37.76 37.00
2 9 .2 0 29 29.82 2 5 .6 9 22 22.60 2 6 .4 9 26 26.38 2 5 .9 4 24 24.79
6.00 6.26 5.79 5.56 5.62 6.35 6.37 6.01
4 0 .1 3 42.70 4 8 .1 9 55.99 5 3 .9 5 58.66 6 0 .4 0 65.02
41.41
52.09
56.31
62.71
Density (gr/cm3) γwet
1.79 1.85 1.62 1.46 1.77 1.75 1.73 1.71
γdry
1 .2 8 1 .3 0 1 .1 0 0 .9 4 1 .1 5 1 .1 0 1 .0 8 1 .0 3
DB 2
Depth 1.50‐2.00 3.50‐4.00 5.50‐6.00 7.50‐8.00
CONT. NO. A16 A22 A14 C48 A22 C47 A30 C53
Wwet + C
Wdry + C
W cont
wn
Average
(gr)
(gr)
(gr)
(%)
(%)
40.12 35.27 34.19 34.41 37.95 36.07 36.00 37.13
3 3 .8 9 29 29.95 2 5 .6 9 25 25.86 2 6 .3 4 24 24.89 2 4 .2 2 25 25.21
5.76 5.62 5.64 6.12 6.01 5.79 5.90 6.22
2 2 .1 5 21.87 4 2 .3 9 43.31 5 7 .1 1 58.53 6 4 .3 0 62.77
22.01
42.85
57.82
63.54
Density (gr/cm3) γwet
1.89 1.63 1.57 1.56 1.76 1.67 1.66 1.70
γdry
1 .5 5 1 .3 4 1 .1 0 1 .0 9 1 .1 2 1 .0 5 1 .0 1 1 .0 5
SPESIFIC GRAVITY (GS) PROJECT : Hotel Everbright Cikokol LOCA LOCAT TION ION : MH. Thamrin, Tangerang BOR NO. : DB DB 1 DEPTH
: 1.50 - 2.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata DEPTH
2
30 153.34 151.22 B30 15.98 12.50 3.48 0.9957 2.55 2.61
30 155.76 155.05 B33 19.25 18.12 1.13 0.9957 2.68
3
4
30 151.17 149.27 B9 18.53 15.49 3.04 0.9957 2.66 2.67
30 149.44 148.09 B7 19.27 17.12 2.15 0.9957 2.68
5
6
31 152.66 151.22 B13 21.00 19.04 1.96 0.9954 3.75 2.64
31 155.34 155.05 B12 20.37 19.53 0.84 0.9954 1.52
7
8
30 140.02 139.59 B12 19.93 19.24 0.69 0.9959 2.64 2.58
30 139.24 138.78 b14 19.38 18.62 0.76 0.9959 2.52
: 5.50 - 6.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata
DEPTH
1
: 3.50 - 4.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata DEPTH
TESTED BY BY : ROSNI DATE : 30/5/2015
: 7.50 - 8.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata
SPESIFIC GRAVITY (GS) PROJECT : Hotel Everbright Cikokol LOCAT OCATIO ION N : MH. Thamrin, Tangerang BOR NO. : DB DB 2 DEPTH
: 1.50 - 2.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata DEPTH
2
31 139.74 139.57 B11 18.79 18.52 0.27 0.9954 2.69 2.67
31 139.03 138.78 B12 19.11 18.71 0.40 0.9954 2.65
3
4
30 140.43 139.59 B2 18.86 17.50 1.36 0.9957 2.60 2.59
30 139.61 138.78 B8 19.10 17.75 1.35 0.9957 2.58
5
5
30 152.90 151.22 B5 21.34 18.59 2.75 0.9957 2.56 2.48
30 156.81 155.05 B7 22.01 19.00 3.01 0.9957 2.40
7
8
31 139.59 139.00 B22 15.32 14.40 0.92 0.9954 2.78 2.74
31 147.32 146.89 B32 15.43 14.75 0.68 0.9954 2.71
: 5.50 - 6.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata
DEPTH
1
: 3.50 - 4.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata DEPTH
TESTED BY BY : Agustinus DATE : 26/5/2015
: 7.50 - 8.00 m
Determination No Temperature, T in °C WT Flask + water + soil in g (W.1) WT. Flask + water in (W2) Evaporating Dish No. WT Dish + Dry Soil in gr WT Dish in gr WT Soil in gr (Ws) Spesific Gravity of Water (Gt) Spesific Gravity of Soil, Gs Gs rata-rata
HYDROMETER ANALYSIS PROJECT LOCATION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
D=
1 B33 22.41 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
1
A
: DB 1 : 1.50 ‐ 2.00 m
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
t
25.68 gr 22.41 gr 2.61
D
N
in mm
in %
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00
0.00 22.00 20.00 19.00 18.50 . 17.75 16.00 15.75 15.50
4.30 3.84 3.89 3.91 3.92 . 3.94 3.97 3.98 3.99
0.0000 2.0000 2. 1.4142 1. 1.0000 1. 0.7071 0. . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.14397 0.10180 0.07198 0.05090 . 0.02276 0.01610 0.01138 0.00914
0.67268 0.68032 0.68411 0.68600 . 0.68882 0.69536 0.69629 0.69722
0.0968 0.0693 0.0492 0.0349 . 0.0157 0.0112 0.0079 0.0064
86.40 78.55 74.62 72.66 . 69.71 62.84 61.86 60.87
115.00 180.00 1440.00 1524.00
15.00 14.75 13.50 13.00
4.00 4.00 4.03 4.04
0..0933 0 0.0745 0. 0.0264 0. 0.0256 0.
0.00671 0.00537 0.00190 0.00184
0.69907 0.70000 0.70460 0.70644
0.0047 0.0038 0.0013 0.0013
58.91 57.93 53.02 51.06
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
1.009
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1
a=
‐
B =
Zr
BOR NO. DEPTH
0.17496
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 1 : 1.50 ‐ 2.00 m
WT Cont + Wet Soil Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
36.6 gr B3 3 32.5 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2.000 0.840 0.425 0 .2 5 0 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 0.800 0.200 1.940 0.330
PERCENT RETAINED
0.00 3.12 0.78 7.55 1.29
19.02 gr 22.41 gr 2.61 gr CUM. PERCENT RETAINED
0.00 3.12 3.89 11.45 12.73
PERCENT FINER
1 0 0 .0 0 9 6 .8 8 9 6 .1 1 8 8 .5 5 8 7 .2 7
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM SAND
GRAVEL
: DB 1 : 1.50 ‐ 2.00 m
FINE SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 3 % Sand = 17 % Fine Finess = 80 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.006 mm = 6.00 Cc = 0.16
Silt C ay
= 40 % = 40 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: HOTEL : CIKOKOL TANGERANG
No. Hydro : Container : W Hydro (Ws) :
Time
2 B10 15.10 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00
15.00
14.00
13.75
13.25 .
11.75
11.50
11.25
115.00 180.00 1440.00 1524.00 D=
10.00
9.50
9.25
8.50 7.50
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
18.74 gr 15.10 gr 2.67
D
N
in mm
in %
4.30 4.00 4.02 4.02 4.03 . 4.06 4.07 4.07 4.10
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0. 0 .3162 0. 0 .2236 0. 0 .1581 0. 0 .1270
0.14169 0.10019 0.07085 0.05010 . 0.02240 0.01584 0.01120 0.00900
0.69907 0.70276 0.70368 0.70552 . 0.71100 0.71191 0.71281 0.71734
0.0991 0.0704 0.0499 0.0353 . 0.0159 0.0113 0.0080 0.0065
79.77 74.46 73.13 70.47 . 62.49 61.16 59.83 53.18
4.11 4.12 4.13 4.15
0. 0 .0933 0. 0 .0745 0.0264 0.0256
0.00661 0.00528 0.00187 0.00181
0.71914 0.72004 0.72272 0.72629
0.0048 0.0038 0.0013 0.0013
50.52 49.19 45.21 39.89
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
0.996
a=
‐
0.17496
A
: DB 1 : 3.50 ‐ 4.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
0.00
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: HOTEL : CIKOKOL TANGERANG
B OR N O. DEPTH
: DB 1 : 3.50 ‐ 4.00 m
WT Cont + Wet Soil Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
55.36 gr B1 0 47.7 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2 .0 0 0 0 .8 4 0 0 .4 2 5 0 .2 5 0 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 0.78 0.04 0.80 0.32 0.90 0 .0 0 0 .8 0
PERCENT RETAINED
0.00 3.04 0.16 3.12 1.25 3.50 0.00 3.12
19.08 gr 15.10 gr 2 .6 7 CUM. PERCENT RETAINED
0.00 3.04 3.19 6.31 7.55 11.06 11.06 14.17
PERCENT FINER
1 0 0 .0 0 9 6 .9 6 9 6 .8 1 9 3 .6 9 9 2 .4 5 8 8 .9 4 8 8 .9 4 8 5 .8 3
GRANSIZE DISTRIBUTION CURVE PROJECT : HOTEL LOCATI LOCATION ON : CIKOKO CIKOKOLL TANGERANG COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 1 : 3.50 ‐ 4.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 15 % Fine Finess = 85 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.01 mm = 10.00 Cc = 0.10
Silt Clay
= 40 % = 45 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
3 B18 20.26 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00 115.00 180.00 1440.00 1524.00 D=
20.00
18.75
18.50
17.00 . 16.25
15.50 15.25 14.50 14.25 13.50
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
22.25 gr 20.26 gr 2.64
D
N
in mm
in %
4.30 3.89 3.92 3.92 3.95 . 3.97 3.99 3.99 4.01
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.14297 0.10109 0.07148 0.05055 . 0.02260 0.01598 0.01130 0.00908
0.68032 0.68506 0.68600 0.69163 . 0.69443 0.69722 0.69815 0.70092
0.0973 0.0693 0.0490 0.0350 . 0.0157 0.0111 0.0079 0.0064
90.16 84.52 83.39 76.63 . 73.25 69.87 68.74 65.36
4.01 4.03 4.04 4.04
0..0933 0 0.0745 0. 0. 0 .0264 0.0256 0.
0.00667 0.00533 0.00188 0.00183
0.70184 0.70460 0.70644 0.70735
0.0047 0.0038 0.0013 0.0013
64.24 60.86 58.60 57.47
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
1.003
a=
‐
0.17496
A
: DB 1 : 5.50 ‐ 6.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
13.00 12.75
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 1 : 5.50 ‐ 6.00 m
Sample Weight Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
32 32.94 gr B2 2 28.72 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2 .0 0 0 0 .8 4 0 0 .4 2 5 0 .2 5 0 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 0.67 0.04 0.81 0.41 0.06
PERCENT RETAINED
0.00 3.01 0.18 3.64 1.84 0.27
18.94 gr 20.26 gr 2 .6 5 CUM. PERCENT RETAINED
0.00 3.01 3.19 6.83 8.67 8.94
PERCENT FINER
1 0 0 .0 0 9 6 .9 9 9 6 .8 1 9 3 .1 7 9 1 .3 3 9 1 .0 6
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 1 : 5.50 ‐ 6.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 12 % Fine Finess = 88 %
30 20 10
d10 Cu Silt Clay
= 0.001 mm d30 = 0.001 mm d60 = 0.003 mm = 3.00 Cc = 0.33 = 28 % = 60 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
4 B11 19.50 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00 115.00 180.00 1440.00 1524.00 D=
19.00
18.00
17.75
17.25 . 14.50
14.25 13.00 12.75 11.50 10.50
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
20.58 gr 19.50 gr 2.58
D
N
in mm
in %
4.30 3.91 3.93 3.94 3.95 . 4.01 4.01 4.04 4.04
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.14534 0.10277 0.07267 0.05139 . 0.02298 0.01625 0.01149 0.00923
0.68411 0.68788 0.68882 0.69070 . 0.70092 0.70184 0.70644 0.70735
0.0994 0.0707 0.0501 0.0355 . 0.0161 0.0114 0.0081 0.0065
93.81 88.88 87.64 85.17 . 71.59 70.36 64.19 62.95
4.07 4.09 4.10 4.11
0..0933 0 0.0745 0. 0. 0 .0264 0.0256
0.00678 0.00542 0.00192 0.00186
0.71191 0.71553 0.71734 0.71824
0.0048 0.0039 0.0014 0.0013
56.78 51.84 49.38 48.14
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
1.016
a=
‐
0.17496
A
: DB 1 : 7.50 ‐ 8.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
10.00 9.75
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 1 : 7.50 ‐ 8.00 m
Sample Weight Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
16 16.62 gr B1 1 16.00 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2.000 0.840 0 .4 2 5 0 .2 5 0 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 0.97 0.11
PERCENT RETAINED
0.00 4.71 0.53
8 . 1 3 gr 19.50 gr 2 .5 8 CUM. PERCENT RETAINED
0.00 4.71 5.25
PERCENT FINER
1 0 0 .0 0 9 5 .2 9 9 4 .7 5
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 1 : 7.50 ‐ 8.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 10 % Fine Finess = 90 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.006 mm = 6.00 Cc = 0.16
Silt Clay
= 40 % = 50 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
D=
1 B25 20.10 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
1
A
: DB 2 : 1.50 ‐ 2.00 m
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
t
25.95 gr 20.10 gr 2.67
D
N
in mm
in %
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00
0.00 20.00 19.75 19.50 19.00 . 17.75 17.50 16.25 16.25
4.30 3.89 3.89 3.90 3.91 . 3.94 3.94 3.97 3.97
0.0000 2.0000 2. 1.4142 1. 1.0000 1. 0.7071 0. . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.14146 0.10003 0.07073 0.05002 . 0.02237 0.01582 0.01118 0.00898
0.68032 0.68127 0.68222 0.68411 . 0.68882 0.68976 0.69443 0.69443
0.0962 0.0681 0.0483 0.0342 . 0.0154 0.0109 0.0078 0.0062
76.69 75.73 74.78 72.86 . 68.07 67.11 62.31 62.31
115.00 180.00 1440.00 1524.00
15.00 13.00 12.25 11.00
4.00 4.04 4.05 4.08
0..0933 0 0.0745 0. 0.0264 0. 0.0256 0.
0.00660 0.00527 0.00186 0.00181
0.69907 0.70644 0.70918 0.71372
0.0046 0.0037 0.0013 0.0013
57.52 49.85 46.97 42.18
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
0.995
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1
a=
‐
B =
Zr
BOR NO. DEPTH
0.17496
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 2 : 1.50 ‐ 2.00 m
WT Cont + Wet Soil Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
37.04 gr B2 5 14.98 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2.000 0.840 0.425 0.250 0.149 0.106 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.000 2.420 0.760 0.990 1.240 0.320 0.120
PERCENT RETAINED
0.00 9.32 2.93 3.81 4.78 1.23 0.46
14.98 gr 20.10 gr 2.67 gr CUM. PERCENT RETAINED
0.00 9.32 12.25 16.07 20.84 22.08 22.54
PERCENT FINER
1 0 0 .0 0 9 0 .6 8 8 7 .7 5 8 3 .9 3 7 9 .1 6 7 7 .9 2 7 7 .4 6
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM SAND
GRAVEL
: DB 2 : 1.50 ‐ 2.00 m
FINE SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 20 % Fine Finess = 80 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.005 mm = 5.00 Cc = 0.20
Silt C ay
= 30 % = 50 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: HOTEL : CIKOKOL TANGERANG
No. Hydro : Container : W Hydro (Ws) :
Time
2 B28 22.00 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00 115.00 180.00 1440.00 1524.00 D=
21.50
21.25
21.00
20.75 .
20.00
19.75
18.00
16.50
16.25
14.00
12.25 12.00
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
26.25 gr 22.00 gr 2.59
D
N
in mm
in %
4.30 3.86 3.86 3.87 3.87 . 3.89 3.89 3.93 3.96
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0. 0 .3162 0. 0 .2236 0. 0 .1581 0. 0 .1270
0.14481 0.10240 0.07241 0.05120 . 0.02290 0.01619 0.01145 0.00920
0.67460 0.67555 0.67651 0.67746 . 0.68032 0.68127 0.68788 0.69350
0.0977 0.0692 0.0490 0.0347 . 0.0156 0.0110 0.0079 0.0064
82.98 82.01 81.05 80.09 . 77.19 76.23 69.47 63.68
3.97 4.02 4.05 4.06
0. 0 .0933 0. 0 .0745 0.0264 0. 0.0256 0.
0.00675 0.00540 0.00191 0.00185
0.69443 0.70276 0.70918 0.71009
0.0047 0.0038 0.0014 0.0013
62.72 54.03 47.28 46.31
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
1.013
a=
‐
0.17496
A
: DB 2 : 3.50 ‐ 4.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
0.00
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: HOTEL : CIKOKOL TANGERANG
B OR N O. DEPTH
: DB 2 : 3.50 ‐ 4.00 m
WT Cont + Wet Soil Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
53.32 gr B2 8 64.58 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2.000 0.840 0.425 0.250 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0 1.33 0.89 0.06 0.35 0.81 0.50 0.21 0.10
PERCENT RETAINED
0.00 5.12 3.43 0.23 1.35 3.12 1.93 0.81 0.39
15.38 gr 22.00 gr 2 .5 9 CUM. PERCENT RETAINED
0.00 5.12 8.55 8.78 10.13 13.25 15.18 15.99 16.37
PERCENT FINER
100 . 00 9 4 .8 8 9 1 .4 5 9 1 .2 2 8 9 .8 7 8 6 .7 5 8 4 .8 2 8 4 .0 1 8 3 .6 3
GRANSIZE DISTRIBUTION CURVE PROJECT : HOTEL LOCATI LOCATION ON : CIKOKO CIKOKOLL TANGERANG COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 2 : 3.50 ‐ 4.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 5 % Sand = 15 % Fine Finess = 80 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.004 mm = 4.00 Cc = 0.25
Silt Clay
= 30 % = 50 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
3 B22 31.63 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00 115.00 180.00 1440.00 1524.00 D=
30.00
29.75
29.50
28.50 . 27.50
27.25 25.00 23.00 22.00 13.00
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
34.07 gr 31.63 gr 2.48
D
N
in mm
in %
4.30 3.66 3.67 3.68 3.70 . 3.72 3.73 3.78 3.82
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.15040 0.10635 0.07520 0.05317 . 0.02378 0.01682 0.01189 0.00955
0.64118 0.64218 0.64319 0.64720 . 0.65118 0.65217 0.66104 0.66882
0.0964 0.0683 0.0484 0.0344 . 0.0155 0.0110 0.0079 0.0064
91.92 91.15 90.39 87.32 . 84.26 83.49 76.60 70.47
3.84 4.04 4.09 4.10
0..0933 0 0.0745 0. 0. 0 .0264 0.0256 0.
0.00701 0.00561 0.00198 0.00193
0.67268 0.70644 0.71643 0.71734
0.0047 0.0040 0.0014 0.0014
67.41 39.83 31.41 30.64
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
1.044
a=
‐
0.17496
A
: DB 2 : 5.50 ‐ 6.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
10.25 10.00
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 2 : 5.50 ‐ 6.00 m
Sample Weight Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
15 156.4 gr B2 2 19.85 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4.760 2.000 0.840 0.425 0.250 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 1.35 0.66 0.24 0.11 0.08
PERCENT RETAINED
0.00 3.96 1.94 0.70 0.32 0.23
15.45 gr 31.63 gr 2 .6 5 CUM. PERCENT RETAINED
0.00 3.96 5.90 6.60 6.93 7.16
PERCENT FINER
1 0 0 .0 0 9 6 .0 4 9 4 .1 0 9 3 .4 0 9 3 .0 7 9 2 .8 4
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 2 : 5.50 ‐ 6.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 10 % Fine Finess = 90 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.004 mm = 4.00 Cc = 0.25
Silt Clay
= 55 % = 35 %
0 100
10
1
d (mm)
0.1
0.01
0.001
HYDROMETER ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
No. Hydro : Container : W Hydro (Ws) :
Time
4 B11 17.08 gr
Elapsed Time
Reading In
Temperatur
(min)
Suspension, R
in °C
0.00 0.25 0.50 1.00 2.00 . 10.00 20.00 40.00 62.00
17.25
17.00
16.75
16.50 . 15.50
14.00 13.00 12.75
115.00 180.00 1440.00 1524.00 D=
12.25 11.00
1
Ws + W Sieve (Wt) Ws + W Pan (W1) Gs
: : :
B
17.32 gr 17.08 gr 2.74
D
N
in mm
in %
4.30 3.95 3.95 3.96 3.96 . 3.99 4.02 4.04 4.04
0.0000 2. 2 .0000 1. 1 .4142 1. 1 .0000 0. 0 .7071 . 0.3162 0. 0.2236 0. 0.1581 0. 0.1270 0.
0.13858 0.09799 0.06929 0.04900 . 0.02191 0.01549 0.01096 0.00880
0.69070 0.69163 0.69257 0.69350 . 0.69722 0.70276 0.70644 0.70735
0.0957 0.0678 0.0480 0.0340 . 0.0153 0.0109 0.0077 0.0062
97.64 96.22 94.81 93.39 . 87.73 79.24 73.58 72.17
4.05 4.08 4.11 4.12
0..0933 0 0.0745 0. 0. 0 .0264 0.0256
0.00646 0.00516 0.00183 0.00177
0.70918 0.71372 0.71824 0.72004
0.0046 0.0037 0.0013 0.0013
69.34 62.26 55.19 52.36
Gs.1.65 (Gs‐1) 2.65 Ws = (R.a) + 1 % (R.a) N = R.C.10 R.C.100 0% = * (Ws*Wt)
0.980
a=
‐
0.17496
A
: DB 2 : 7.50 ‐ 8.00 m
t
30.μ
Zr 980 (Gs‐1) t = AxB μ A= 1 B =
9.75 9.25
Zr
BOR NO. DEPTH
Zr
if t ≤ 2 min z = ‐0.169 R + 18.5 if t ‐ . . μ= 0.00836
.
SIEVE ANALYSIS PROJECT LOCATION
: Hote Hotell Everbright Cikokol : MH. Thamrin, Tangerang
B OR N O. DEPTH
: DB 2 : 7.50 ‐ 8.00 m
Sample Weight Container No. WT Cont + Dry Soil
: : :
WT Container WT Dry Soil, Ws Gs
: : :
SIEVE NO. 1 1 /2 " 3/4" 1/ 2 " 4 10 20 40 60 10 0 14 0 20 0 an Percent Retained
42 42.03 gr B1 1 20.55 gr SIEVE OPENING (mm) 3 7 .5 0 0 1 9 .0 0 0 1 2 .5 0 0 4 .7 6 0 2 .0 0 0 0 .8 4 0 0 .4 2 5 0 .2 5 0 0 .1 4 9 0 .1 0 6 0 .0 7 4
: WT of Soil of Soil Retained Total Soil Weight
WT Sieve (g)
WT SIEVE + SOIL (g)
WT SOIL RETAINED (g)
0.00 0.08 0.09 0.00 0 .0 0 0 .0 7
PERCENT RETAINED
0.00 0.46 0.52 0.00 0.00 0.40
16.1 gr 17.08 gr 2 .7 4 CUM. PERCENT RETAINED
0.00 0.46 0.98 0.98 0.98 1.39
PERCENT FINER
1 0 0 .0 0 9 9 .5 4 9 9 .0 2 9 9 .0 2 9 9 .0 2 9 8 .6 1
GRANSIZE DISTRIBUTION CURVE PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang COARSE
BOR NO. DEPTH FINE
COARSE
MEDIUM
GRAVEL
: DB 2 : 7.50 ‐ 8.00 m
FINE
SAND
SILT
CLAY
100
80 70 ) % 60 ( N
50 40
Gravel = 0 % Sand = 5 % Fine Finess = 95 %
30 20 10
d10 Cu
= 0.001 mm d30 = 0.001 mm d60 = 0.003 mm = 3.00 Cc = 0.33
Silt Clay
= 40 % = 55 %
0 100
10
1
d (mm)
0.1
0.01
0.001
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 1.50 ‐ 2.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB1
Determination No.
1 50 D1 D2 16.79 . 14.30 14.13 10.02 9.94 4.28 4.19 2.49 1.99 58.18 47.49 52.84
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 D3 D4 16.17 . 13.87 14.05 10.01 10.01 3.8 6 4.04 2.3 0 2.39 59.59 59.16 59.37
3 30 D5 D6 15.37 . 13.37 14.8 4 9.9 3 10.32 3.44 4.5 2 2.00 2.8 9 58.14 63.94 61.0 4
4
5 14 D9 D10
24 D7 D8 18.78 . 15.16 14.33 9.95 10.02 5.21 4.31 3.62 2.99 69.48 69.3 7 69.43
14.96 . 12.26 14.50 8.82 8.74 3.4 4 5.7 6 2.7 0 4.5 0 78.49 78.13 78.3 1
90 80
) % ( n w , t n e t n o C r e t a W
70 60 50
30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 1.50 ‐ 2.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. MH. Thamrin, Tangerang BOR NO. : DB1
Determination No. Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont . Wt. of Moisture of Moisture Water Contents, wn verage Water Content, w
1 1 (kg) (kg) (kg)
4.74 4.24 2.68 . 0.50 32.0 5
(kg) (%) (%) (%) (%) (%) (%) (%)
LL PL wn IP IL
2 2
3 3
5.0 7 4.5 0 2.7 1 . 0.5 7 31.84
4
5
4.34 3.97 2.71 . 0.37 29.37 31.09
69.00 31.09 41.41 37.91 0.27
100 90 80
) % ( x e d n I y t i c i t a l P
70 60
CH 50 40 30
CL
20
OH or MH
10
CL‐ML
0 0
10
ML or OL
ML 20
30
40
50
60
70
80
90
100
11 1 10
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, High Plasticity
120
13 1 30
14 1 40
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 3,50 ‐ 4.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB1
Determination No.
1 50 F1 1 F2 18.40 19.2 6 15.47 16.1 2 9.95 8.95 5.52 . 2.93 3.14 53.08 43.7 9 48.44
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 D1 3 D14 18.45 16.38 15.15 13.71 9.14 8.80 6.01 . 3.30 2.67 54.91 54.38 54.64
3 30 D15 D16 18.4 7 17.90 14.92 14.59 8.79 8.85 6.1 3 . 3.5 5 3.31 57.9 1 57.67 57.7 9
4
5 15 D19 D20
25 D17 D18 19.90 17.76 15.61 14.19 8.80 8.80 6.81 . 4.29 3.5 7 63.00 66.23 64.61
19.63 23.80 15.29 17.92 8.80 8.73 6.49 . 4.34 5.88 66.8 7 63.98 65.4 3
80 70
) % ( n w , t n e t n o C r e t a W
60 50
30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 3,50 ‐ 4.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. MH. Thamrin, Tangerang BOR NO. : DB1
Determination No.
1 4
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn erage Water Content, w
(kg) (kg) (kg) (kg) (kg) (%) (%)
4.79 4.31 2.65 1.66 0.48 28.92
LL
(%)
wn IP IL
(%) (%) (%)
62.00 . 52.09 33.63 0.71
2 5
3 6
4.90 4.40 2.65 1.75 0.50 28.57
4
4.58 4.16 2.64 1.52 0.42 27.63 28.37
100
80
) % ( x e d n I y t i i t s a l P
70 60
CH
50
30
CL
20 10 0
OH or MH CL‐ML
ML
ML or OL
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, High Plasticity
5
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 5.50‐6.00
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB1
Determination No.
1 50 E1 E2 18.65 18.9 2 15.71 15.8 9 9.92 9.97 5.79 . 2.94 3.03 50.78 51.1 8 50.98
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 E3 E4 21.89 17.22 17.60 14.40 10.00 9.99 7.60 . 4.29 2.82 56.45 63.95 60.20
3 30 E5 E6 18.43 18.84 15.17 15.44 9.95 9.9 5 5.2 2 . 3.2 6 3.40 62.4 5 61.93 62.1 9
4
5 15 E9 E10
24 E7 E8 22.74 22.59 17.69 17.48 10.00 10.02 7.69 . 5.05 5.1 1 65.67 68.50 67.08
17.98 18.68 14.75 15.02 9.99 10.06 4.76 . 3.23 3.66 67.8 6 73.79 70.8 2
80 70
) % ( n w , t n e t n o C r e t a W
60 50
30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 5.50‐6.00
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. MH. Thamrin, Tangerang BOR NO. : DB1
Determination No.
1 7
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn erage Water Content, w
(kg) (kg) (kg) (kg) (kg) (%) (%)
5.19 4.55 2.71 1.84 0.64 34.78
LL
(%)
wn IP IL
(%) (%) (%)
66.00 . 56.31 31.14 0.69
2 8
3 9
4.89 4.30 2.69 1.61 0.59 36.65
4
5.11 4.51 2.70 1.81 0.60 33.15 34.86
100
80
) % ( x e d n I y t i i t s a l P
70 60
CH
50
30
CL
20 10 0
OH or MH CL‐ML
ML
ML or OL
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, High Plasticity
5
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 7.50 ‐ 8.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB 1
Determination No.
1 50 D1 1 D1 2 19.27 18.5 5 14.83 14.1 2 7.95 7.75 6.88 . 4.44 4.43 64.53 69.5 4 67.04
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 F3 F4 19.7 8 18.50 15.31 14.72 9.06 9.45 6.25 . 4.47 3.78 71.52 71.73 71.62
3 30 F5 F6 20.7 8 16.83 15.73 13.57 9.01 9.24 6.7 2 . 5.0 5 3.26 75.1 5 75.29 75.2 2
4
5 15 F9 F10
24 F7 F8 17.89 20.48 14.37 15.79 9.99 10.02 4.38 . 3.52 4.6 9 80.37 81.28 80.82
20.19 19.90 15.48 15.24 9.99 10.00 5.49 . 4.71 4.66 85.7 9 88.93 87.3 6
100 90
) % ( n w , t n e t n o C r e t a W
80 70 60
40 30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 28/5/2015 DEPTH : 7.50 ‐ 8.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. MH. Thamrin, Tangerang BOR NO. : DB 1
Determination No.
1 10
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn erage Water Content, w
(kg) (kg) (kg) (kg) (kg) (%) (%)
4.45 3.99 2.75 1.24 0.46 37.10
LL
(%)
wn IP IL
(%) (%) (%)
80.00 . 62.71 42.68 0.59
2 11
3 12
4.93 4.35 2.67 1.68 0.58 34.52
4
4.21 3.75 2.61 1.14 0.46 40.35 37.32
100
80
) % ( x e d n I y t i i t s a l P
70 60
CH
50
30
CL
20 10 0
OH or MH CL‐ML
ML
ML or OL
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, High Plasticity
5
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 13/05/2015 DEPTH : 1.50 ‐ 2.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB 2
Determination No.
1 50 F3 F10 18.88 . 16.60 17.90 10.04 9.99 6.56 7.91 2.28 2.74 34.76 34.64 34.70
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 E5 D12 18.52 . 16.21 15.25 9.9 3 8.75 6.2 8 6.50 2.3 1 2.29 36.78 35.23 36.01
3 27 F2 D7 19.77 . 16.88 15.9 4 9.9 4 9.9 5 6.94 5.9 9 2.89 2.6 1 41.64 43.57 42.6 1
4
5 16 CC DB
21 F12 D7 21.72 . 18.03 16.42 10.06 9.92 7.97 6.50 3.69 2.95 46.30 45.3 8 45.84
19.87 . 16.59 16.60 10.00 8.79 6.5 9 7.8 1 3.2 8 3.8 6 49.77 49.42 49.6 0
60 50
) % ( n 40 w , t n e 30 t n o C r e 20 t a W 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 13/05/2015 DEPTH : 1.50 ‐ 2.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. MH. Thamrin, Tangerang BOR NO. : DB 2
Determination No. Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont . Wt. of Moisture of Moisture Water Contents, wn verage Water Content, w
1 19 (kg) (kg) (kg)
7.95 7.14 4.32 . 0.81 28.7 2
(kg) (%) (%) (%) (%) (%) (%) (%)
LL PL wn IP IL
2 55
3 51
7.7 7 6.9 8 4.3 1 . 0.7 9 29.59
4
5
7.32 6.68 4.30 . 0.64 26.89 28.40
44.00 28.40 46.04 15.60 1.13
100 90 80
) % ( x e d n I y t i c i t a l P
70 60
CH
50 40 30
CL
20
OH or MH 10
CL‐ML
0 0
10
ML or OL
ML 20
30
40
50
60
70
80
90
100
11 1 10
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, Low Plasticity
120
13 1 30
14 1 40
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 3,50 ‐ 4.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB 2
Determination No.
1 50 D1 F1 18.18 17.3 2 15.6 8 15.0 7 10.0 3 9.95 5.65 . 2.50 2.25 44.2 1 43.9 5 44.0 8
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 33 D19 D 20 16.36 14.68 13.91 12.75 8.79 8.73 5.12 . 2.45 1.93 47.85 48.01 47.93
3 25 E8 D6 17.43 17.85 14.90 15.33 9.98 10.34 4.92 . 2.53 2.52 51.42 50.50 50.96
4
5 15 E14 E2
20 F9 F11 16.17 16.62 14.00 14.30 9.98 9.96 4.02 . 2.17 2.32 53.98 53.46 53.72
15.01 16.26 13.02 13.96 9.99 9.96 3.03 . 1.99 2.30 65.68 57.50 61.59
70 60 ) % ( n w , t n e t n o C r e t a W
50 40 30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 3,50 ‐ 4.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang BOR NO. : DB 2
Determination No.
1 16
2 58
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn verage Water Content,
(kg) (kg) (kg) (kg) (kg) (%) (%)
7.11 6.49 4.32 2.17 0.62 28.57
LL
(%)
wn IP IL
(%) (%) (%)
53.80 . 42.85 26.58 0.59
3 29
7.72 7.02 4.30 2.72 0.70 25.74
4
5
7.02 6.44 4.32 2.12 0.58 27.36 27.22
100 90 80 ) % ( x e d n I y t i c i t s a l P
70 60 CH
50 40 30 CL 20
OH or MH 10 CL‐ML
0 0
10
ML or OL
ML 20
30
40
50
60
70
80
90
100
1 10 11
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, Medium Plasticity
1 20 12
1 30 13
1 40 14
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 5,50 ‐ 6.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB 2
Determination No.
1 50 D11 D17 16.77 13.9 0 13.7 4 11.9 3 8.80 8.79 4.94 . 3.03 1.97 61.3 4 62.7 4 62.0 4
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 D3 D9 16.42 13.63 13.83 11.78 10.00 8.82 3.83 . 2.59 1.85 67.62 62.50 65.06
3 26 D10 D14 17.02 17.18 13.56 13.69 8.73 8.81 4.83 . 3.46 3.49 71.64 71.52 71.58
4
5 15 E9 E10
20 E3 E1 16.53 16.23 13.83 13.59 10.01 9.96 3.82 . 2.70 2.64 70.68 72.73 71.70
18.11 15.66 14.62 13.22 10.08 9.98 4.54 . 3.49 2.44 76.87 75.31 76.09
80 70 ) % ( n w , t n e t n o C r e t a W
60 50 40 30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 5,50 ‐ 6.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang BOR NO. : DB 2
Determination No.
1 31
2 28
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn verage Water Content,
(kg) (kg) (kg) (kg) (kg) (%) (%)
6.14 5.67 4.28 1.39 0.47 33.81
LL
(%)
wn IP IL
(%) (%) (%)
72.00 . 57.82 35.58 0.60
3 57
6.72 6.09 4.32 1.77 0.63 35.59
4
5
6.30 5.73 4.30 1.43 0.57 39.86 36.42
100 90 80 ) % ( x e d n I y t i c i t s a l P
70 60 CH
50 40 30
CL
20 OH or MH 10
CL‐ML
0 0
10
ML or OL
ML 20
30
40
50
60
70
80
90
100
1 10 11
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lanau kelempungan, Medium Plasticity
1 20 12
1 30 13
1 40 14
ATTERBERG LIMIT TEST PROJECT LOCATION BOR NO.
TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 7.50 ‐ 8.00 m
: Hotel Hotel Everbright Cikokol : MH. Thamrin, Tangerang : DB 2
Determination No.
1 50 AA AB 17.84 15.1 2 15.3 7 13.5 2 10.0 3 10.0 2 5.34 . 2.47 1.60 46.2 5 45.7 1 45.9 8
No. Of Blows Of Blows Container No. Wt. of Wet of Wet Soil + Cont
(kg)
Wt. of Dry of Dry Soil + Cont
(kg)
Wt. of Cont of Cont
(kg)
Wt. of Dry of Dry Soil
(kg)
Wt. of Moisture of Moisture
(kg)
Water Contents, wn
(%)
Average Water Content, wn
(%)
2 40 E12 F8 16.67 17.96 14.20 14.96 10.01 9.98 4.19 . 2.47 3.00 58.95 60.24 59.60
3 27 AC D4 16.55 17.28 14.02 14.50 9.99 10.00 4.03 . 2.53 2.78 62.78 61.78 62.28
4
5 15 F4 F5
20 E6 D15 16.26 13.19 13.80 11.46 10.00 8.79 3.80 . 2.46 1.73 64.74 64.79 64.77
18.14 17.00 14.90 14.08 9.95 10.02 4.95 . 3.24 2.92 65.45 71.92 68.69
80 70 ) % ( n w , t n e t n o C r e t a W
60 50 40 30 20 10 0 0
5
10
15
20
25
30
No. of Blows, of Blows, N
35
40
45
50
55
ATTERBERG LIMIT TEST TESTED BY : Agustinus DATE : 19/05/2015 DEPTH : 7.50 ‐ 8.00 m
PROJECT : Hote Hotell Everbright Cikokol LOCATI LOCATION ON : MH. Thamrin, Tangerang BOR NO. : DB 2
Determination No.
1 20
2 32
Container No. Wt. of Wet of Wet Soil + Cont Wt. of Dry of Dry Soil + Cont Wt. of Cont of Cont Wt. of Dry of Dry Soil Wt. of Moisture of Moisture Water Contents, wn verage Water Content,
(kg) (kg) (kg) (kg) (kg) (%) (%)
7.30 6.56 4.30 2.26 0.74 32.74
LL
(%)
wn IP IL
(%) (%) (%)
64.00 . 63.54 30.54 0.98
3 25
6.57 5.97 4.23 1.74 0.60 34.48
4
5
6.78 6.14 4.21 1.93 0.64 33.16 33.46
100 90 80 ) % ( x e d n I y t i c i t s a l P
70 60 CH
50 40 30
CL
20
OH or MH
10
CL‐ML
0 0
10
ML or OL
ML 20
30
40
50
60
70
80
90
100
1 10 11
Liquid Limits, LL (%) A line = 0.73 (WL‐20) UL = 0.90 (WL‐8)
Deskripsi Deskripsi : Lempung Lempung kelanauan, High Plasticity
1 20 12
1 30 13
1 40 14
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
STRAIN RATE (%)
: 1.43% Berat, W
1 Diameter, D
0.51 Tinggi, H
Time
Strain ,
min
10 mm
: :
6.78 cm
: DB1 : 1.50 ‐ 2.00 m : MERRY : 04/06/2015
Ao V
: :
γ
:
9.616 cm2 65.20 cm3 1.54 gr/cm3
CORRECTIE '
ε
‐4
PRESSURE
2
10 inch
2
7.50
0.0000 0.0037
9.6163 9.6518
(kg/cm ) 0.0000 0.3963
8.25
0.0074
9.6877
0.4343
9.00
0.0111 0.0147 0.0221 0.0295 0.0369 0.0442 0.0516 0.0590 . 0.0737 0.0885 0.1032 0.1180 0.1327 0.1475 0.1622 0.1770 0.1917
9.7238 9.7602 9.8338 9.9085 9.9844 10.0614 10.1397 10.2191 . 10.3819 10.5499 10.7234 10.9027 11.0881 11.2800 11.4786 11.6843 11.8975
0.4720 0.5487 0.5834 0.6176 0.6513 0.6843 0.7167 0.7486 . 0.8842 1.0152 1.0701 1.2630 1.4488 1.4920 1.3996 1.3095 1.2217
0.00 0.25
0 25
0.00
0.50
50
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
75 100 150 200 250 300 350 400
10.50
11.25
12.00
12.75
13.50 14.25
15.00
cm
.
500 600 700 800 900 1000 1100 1200 1300
3.50 cm
: 100.58 Gram
PR DIAL
‐2
BOR NO. DEPTH TESTED BY DATE
18.00
21.00
22.50
27.00
31.50
33.00
31.50
30.00
28.50
G
ε
= ΔH/H
ε MAX = 20 % H
A'
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
γdry
B OR N O. DEPTH TESTED BY DATE
UNDISTURBED
3
(gr/cm )
REMOLDED
: DB1 : 1.50 ‐ 2.00 m : MERRY : 04/06/2015
TYPE OF FAILURE
43.88
1.54
Undistur Undisturbed bed Remolded Remolded
1.07
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.492
D
14.75
0.75
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 1.60
1.40 ) 2 m 1.20 c / g k ( u 1.00 q , n a n a k 0.80 e T
0.60
0.40
0.20
0.00 0.00
0.05
0.10
0.15 Regangan,
Undisturbed
ε
0.20
0 .2 5
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
0.51 Tinggi, H
: :
STRAIN RATE (%)
: 1.43% Berat, W
:
ε
1 Diameter, D
Time
Strain ,
min
10 mm
= ΔH/H
ε MAX = 20 % H
PR DIAL
‐2
3.50 cm
5.57 cm 84.89 Gram
: DB 1 : 5.50‐6.00 : AGUSTINUS : 04/06/2015
Ao V
: :
γ
:
CORRECTIE '
ε
‐4
2
10 inch
9.616 cm2 53.56 cm3 1.58 gr/cm3 PRESSURE 2
3.00
0.0000 0.0045
9.6163 9.6596
(kg/cm ) 0.0000 0.1584
3.75
0.0090
9.7034
0.1971
5.25
6.00
8.25
9.00
0.0135 0.0180 0.0269 0.0359 0.0449 0.0539 0.0628 0.0718 . 0.0898 0.1077 0.1257 0.1436 0.1616 0.1795 0.1975 0.2154 0.2334 0.2513
9.7475 9.7920 9.8824 9.9744 10.0681 10.1637 10.2610 10.3603 . 10.5646 10.7772 10.9985 11.2290 11.4695 11.7205 11.9827 12.2569 12.5439 12.8447
0.2747 0.3125 0.4258 0.4602 0.5699 0.6021 0.6337 0.6646 . 0.7241 0.8518 0.9738 1.1582 1.2673 1.3054 1.4045 1.3107 1.2197 1.1018
0.00 0.25
0 25
0.00
0.50
50
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
75 100 150 200 250 300 350 400
11.25
12.00
12.75
13.50
cm
.
500 600 700 800 900 1000 1100 1200 1300 1400
BOR NO. DEPTH TESTED BY DATE
15.00
18.00
21.00
25.50
28.50
30.00
33.00
31.50
30.00
27.75
A'
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
UNDISTURBED
3
γdry
B OR N O. DEPTH TESTED BY DATE
(gr/cm )
REMOLDED
: DB 1 : 5.50‐6.00 : AGUSTINUS : 04/06/2015
TYPE OF FAILURE
46.76
1.58
Undistur Undisturbed bed Remolded Remolded
1.08
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.405
D
19.75
0.70
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 1.60
1.40 ) 2 m 1.20 c / g k ( u 1.00 q , n a n a k 0.80 e T
0.60
0.40
0.20
0.00 0.00
0.02
0.04
0.06
0.08
0.10 Regangan,
Undisturbed
0.12 ε
0.14
0.16
0.18
0 .2 0
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
0.51 Tinggi, H
: :
STRAIN RATE (%)
: 1.43% Berat, W
:
ε
1 Diameter, D
Time
Strain ,
min
10 mm
= ΔH/H
ε MAX = 20 % H
PR DIAL
‐2
3.26 cm
6.31 cm 89.87 Gram
: DB 1 : 7.50‐8.00 : AGUSTINUS : 04/06/2015
Ao V
: :
γ
:
CORRECTIE '
ε
‐4
2
10 inch
8.343 cm2 52.64 cm3 1.71 gr/cm3 PRESSURE 2
1.50
0.0000 0.0040
8.3427 8.3759
(kg/cm ) 0.0000 0.0913
2.25
0.0079
8.4093
0.1365
3.00
3.75
4.50
6.00
8.25
0.0119 0.0158 0.0238 0.0317 0.0396 0.0475 0.0555 0.0634 . 0.0792 0.0951 0.1109 0.1268 0.1426 0.1585
8.4430 8.4770 8.5458 8.6157 8.6868 8.7591 8.8326 8.9073 . 9.0606 9.2193 9.3836 9.5539 9.7305 9.9138
0.1812 0.2256 0.2686 0.3552 0.4844 0.6114 0.8661 1.0306 . 1.4353 1.4936 1.5490 1.4813 1.4151 1.3118
0.00 0.25
0 25
0.00
0.50
50
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00 10.00
75 100 150 200 250 300 350 400
10.50
15.00
18.00
cm
.
500 600 700 800 900 1000
BOR NO. DEPTH TESTED BY DATE
25.50
27.00
28.50
27.75
27.00
25.50
A'
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
UNDISTURBED
3
γdry
B OR N O. DEPTH TESTED BY DATE
(gr/cm )
REMOLDED
: DB 1 : 7.50‐8.00 : AGUSTINUS : 04/06/2015
TYPE OF FAILURE
48.05
1.71
Undistur Undisturbed bed Remolded Remolded
1.15
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.549
D
11.09
0.77
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 1.80 1.60 ) 2 1.40 m c / g k ( 1.20 u q , n a 1.00 n a k e T
0.80 0.60 0.40 0.20 0.00 0.00
0.02
0.04
0.06
0.08
0.10 Regangan,
Series1
0.12 ε
0.14
0.16
0.18
0 .2 0
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
0.51 Tinggi, H
: :
STRAIN RATE (%)
: 1.43% Berat, W
:
ε
1 Diameter, D
Time
Strain ,
min
10 mm
= ΔH/H
ε MAX = 20 % H
PR DIAL
‐2
4.84 cm
7.59 cm 226.5 Gram
: DB 2 : 1.50 ‐ 2.00 m : MERRY : 05/12/2015
Ao V
: :
γ
:
CORRECTIE '
ε
‐4
2
10 inch
18.389 cm2 139.57 cm3 1.62 gr/cm3 PRESSURE 2
11.00
0.0000 0.0033
18.3891 18.4499
(kg/cm ) 0.0000 0.3041
12.00
0.0066
18.5110
0.3306
14.00
19.00
20.00
22.00
24.00
25.00
27.00
30.00
0.0099 0.0132 0.0198 0.0264 0.0329 0.0395 0.0461 0.0527 . 0.0659 0.0791 0.0922 0.1054 0.1186 0.1318 0.1449 0.1581 0.1713
18.5726 18.6346 18.7598 18.8868 19.0154 19.1458 19.2781 19.4121 . 19.6859 19.9676 20.2574 20.5557 20.8630 21.1796 21.5059 21.8424 22.1897
0.3844 0.5200 0.5437 0.5941 0.6437 0.6659 0.7143 0.7882 . 0.9845 1.1621 1.2840 1.4018 1.4423 1.4448 1.4110 1.3659 1.3101
0.00 0.25
0 25
0.50
50
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
75 100 150 200 250 300 350 400
cm
0.00
.
500 600 700 800 900 1000 1100 1200 1300
BOR NO. DEPTH TESTED BY DATE
38.00
45.50
51.00
56.50
59.00
60.00
59.50
58.50
57.00
A'
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
UNDISTURBED
3
γdry
B OR N O. DEPTH TESTED BY DATE
(gr/cm )
REMOLDED
: DB 2 : 1.50 ‐ 2.00 m : MERRY : 05/12/2015
TYPE OF FAILURE
53.32
1.62
Undistur Undisturbed bed Remolded Remolded
1.06
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.445
D
13.18
0.72
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 1.60
1.40 ) 2 m 1.20 c / g k ( u 1.00 q , n a n a k 0.80 e T
0.60
0.40
0.20
0.00 0.00
0.02
0.04
0.06
0.08
0.10 Regangan,
Undisturbed
0.12 ε
0.14
0.16
0.18
0 .2 0
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
STRAIN RATE (%)
: 1.43% Berat, W
ε
1 Diameter, D 0.51 Tinggi, H
Time
Strain ,
min
10 mm
= ΔH/H
ε MAX = 20 % H
: :
: 139.01 Gram
PR DIAL
‐2
3.55 cm 7.58 cm
BOR NO. DEPTH TESTED BY DATE
: DB 2 : 3.50 ‐ 4.00 m : Merry : 05/12/2015
Ao V
: :
γ
:
CORRECTIE '
ε
‐4
2
9.893 cm2 74.99 cm3 1.85 gr/cm3 PRESSURE 2
0.00 0.25
0 25
10 inch 0.00 8.25
cm
0.50
50
10.50
0.0066
9.9587
0.5377
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
75 100 150 200 250 300 350 400
500 600 700 800 900 1000 1100 1200 1300 1400
12.00 14.25 16.50 18.75 21.00 23.25 24.75 26.25 . 28.50 30.00 31.50 33.00 34.50 35.25 36.00 35.25 34.50 33.75
0.0099 0.0132 0.0198 0.0264 0.0330 0.0396 0.0462 0.0528 . 0.0660 0.0792 0.0923 0.1055 0.1187 0.1319 0.1451 0.1583 0.1715 0.1847
9.9918 10.0252 10.0927 10.1611 10.2304 10.3006 10.3719 10.4441 . 10.5916 10.7434 10.8995 11.0603 11.2258 11.3965 11.5723 11.7537 11.9409 12.1341
0.6125 0.7249 0.8338 0.9411 1.0469 1.1511 1.2170 1.2818 . 1.3723 1.4241 1.4739 1.5217 1.5674 1.5775 1.5865 1.5295 1.4735 1.4185
A'
0.0000 0.0033
9.8930 9.9257
(kg/cm ) 0.0000 0.4239
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
UNDISTURBED 56.89
3
γdry
B OR N O. DEPTH TESTED BY DATE
(gr/cm )
REMOLDED
: DB 2 : 3.50 ‐ 4.00 m : Merry : 05/12/2015
TYPE OF FAILURE
1.85
Undistur Undisturbed bed Remolded Remolded
1.18
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.587 D
14.51
0.79
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 1.80 1.60 ) 2 1.40 m c / g k ( 1.20 u q , n a 1.00 n a k e T
0.80 0.60 0.40 0.20 0.00 0.00
0.02
0.04
0.06
0.08
0.10 Regangan,
Undisturbed
0.12 ε
0.14
0.16
0.18
0 .2 0
UNCONFIEND COMPRESSION TEST PROJECT LOCATION DISCRIPTION
: Hotel Everbright Cikokol : MH. Thamrin, Tangerang : LEMPUNG KELANAUAN, MERAH
PROVING RING NO. CALIBRATION (kg/div)
: :
STRAIN RATE (%)
: 1.43% Berat, W
ε
1 Diameter, D 0.51 Tinggi, H
Time
Strain ,
min
10 mm
= ΔH/H
ε MAX = 20 % H
: :
: 211.08 Gram
PR DIAL
‐2
4.82 cm 7.43 cm
BOR NO. DEPTH TESTED BY DATE
: DB 2 : 7.50 ‐ 8.00 m : Merry : 12/05/2015
Ao V
: :
γ
:
CORRECTIE '
ε
‐4
2
18.237 cm2 135.50 cm3 1.56 gr/cm3 PRESSURE 2
0.00 0.25
0 25
10 inch 0.00 10.00
cm
0.50
50
16.00
0.0067
18.3610
0.4444
0.75 1.00 1.50 2.00 2.50 3.00 3.50 4.00 . 5.00 6.00 7.00 8.00 9.00
75 100 150 200 250 300 350 400
500 600 700 800 900
24.00 28.00 40.00 48.00 56.00 60.00 64.00 66.00 . 72.00 74.00 70.00 68.00 66.00
0.0101 0.0135 0.0202 0.0269 0.0336 0.0404 0.0471 0.0538 . 0.0673 0.0808 0.0942 0.1077 0.1211
18.4234 18.4862 18.6132 18.7419 18.8724 19.0048 19.1390 19.2751 . 19.5533 19.8396 20.1343 20.4380 20.7510
0.6644 0.7725 1.0960 1.3062 1.5133 1.6101 1.7054 1.7463 . 1.8779 1.9023 1.7731 1.6968 1.6221
A'
0.0000 0.0034
18.2374 18.2990
(kg/cm ) 0.0000 0.2787
= Ao . (1‐ε)
Press = PR x Cal / A'
UNCONFIEND COMPRESSION TEST PROJECT : Hote Hotell Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DISCRI DISCRIPTI PTION ON : LEMPUN LEMPUNG G KELANAUAN, MERAH
SPECIMENT RECORD Kadar Air, wn (%) 3 (gr/cm ) γwet
UNDISTURBED 48.95
3
γdry
B OR N O. DEPTH TESTED BY DATE
(gr/cm )
REMOLDED
: DB 2 : 7.50 ‐ 8.00 m : Merry : 12/05/2015
TYPE OF FAILURE
1.56
Undistur Undisturbed bed Remolded Remolded
1.05
Spec Specim imen en
Spec Specim imen en
Gs Sr
% H
UNCONFINED COMPRESSION STRENGTH UNDISTURBED
(kg/cm2)
quu
REMOLDED STRAIN AT FAILURE UNDISTURBED REMOLDED SENSITIVITY KOHESI
(kg/cm2)
qur
(%) (%)
εu
1.902 D
8.08
0.95
D
εr
Sr cu
(kg/cm2)
Grafik Tekanan vs Regangan 2.00 1.80 ) 1.60 2 m c / 1.40 g k ( u q , 1.20 n a n a k 1.00 e T
0.80 0.60 0.40 0.20 0.00 0.00
0.02
0.04
0.06
0.08
0.10 Regangan,
Series1
0.12 ε
0.14
0.16
0.18
0 .2 0
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 04/06/2015
BOR NO. : DB1 DEPTH : 3.50‐4.00 TESTED BY : AGUSTINUS
Lingkaran Mohr Triaksial UU Test (Total Stress)
Kurva Deviator Stress
5.00 4.50
3.50
4.00 3.00 )
3.50 ) 2 m c / g k ( s s e r t S r a e h S
.
m c / g k ( 2.00 s e r t S r o 1.50 t a i v e D
1.00
3.00 2.50 2.00 1.50 1.00
0.50
0.50
0.00
0.00 0
1
2
3
4
5
6
0.00
Strain, ε % Sampel 0.50 kg/cm2
1.00
2.00
3.00
Normal Stres (kg/cm2) Sampel 0.50 kg/cm2
Sampel 1.00 kg/cm2
Total Stress c (kg/cm2) ϕ (°)
Sampel 1.00 kg/cm2
STRENGTH PARAMETER Efective Stress 1.10 c' (kg/cm2) 4° 34" ϕ' (°)
4.00
5.00
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 04/06/2015 PROVING RING NO. : CALIBRATION (kg/div) : STRAIN RATE (mm/min) : Teg. Keliling, σ3 (kg/cm2) : Deformasi
1.13
0.50
PR DIAL
(mm)
(mm) 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.00 4.25
ε ε MAX
= ΔH/H = 20 % H
0.5
2.50
4.00
4.50
7.00
8.50
10.00
11.00
12.50
15.00
17.00
19.00
20.52
22.00
24.50
23.50
23.00
22.00
1
BOR NO. : DB1 DEPTH : 3.50‐4.00 TESTED BY : AGUSTINUS
Diameter, D : Tinggi, H : Luas, A : Volume, V :
CORR CORRE ECTIE CTIE AREA (A')
ε
2
0.00 0.33 0.65 0.98 1.30 1.63 1.95 2.28 2.60 2.93 3.26 3.58 3.91 4.23 4.56 4.88 5.21 5.53
9.343 9.374 9.405 9.436 9.467 9.498 9.530 9.561 9.593 9.625 9.658 9.690 9.723 9.756 9.790 9.823 9.857 9.891
A'
3.45
Deviat viator or Stress
= Ao . (1‐ε)
Dev = PR x Cal / A'
σ1
Δσ 2
(cm )
(%)
cm 7.68 cm 9.343 cm2 71.76 cm3
(kg/cm ) 0.0605 0.3014 0.4806 0.5389 0.8356 1.0113 1.1858 1.3000 1.4724 1.7610 1.9891 2.2156 2.3848 2.5481 2.8280 2.7033 2.6367 2.5134
(kg/cm2) 0 .5 6 0 .8 0 0 .9 8 1 .0 4 1 .3 4 1 .5 1 1 .6 9 1 .8 0 1 .9 7 2 .2 6 2 .4 9 2 .7 2 2 .8 8 3 .0 5 3 .3 3 3 .2 0 3 .1 4 3 .0 1
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 04/06/2015 PROVING RING NO. : CALIBRATION (kg/div) : STRAIN RATE (mm/min) : Teg. Keliling, σ3 (kg/cm2) : Deformasi
1.13
1.00
PR DIAL
(mm)
(mm) 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50
ε ε MAX
= ΔH/H = 20 % H
1
1.00
6.40
10.00
12.40
13.20
13.60
14.40
16.00
17.60
20.00
22.40
25.60
23.20
21.60
20.80
BOR NO. : DB1 DEPTH : 3.50‐4.00 TESTED BY : AGUSTINUS Diameter, D : Tinggi, H : Luas, A : Volume, V :
CORR CORRE ECTIE CTIE AREA (A')
ε
2
0.00 0.37 0.73 1.10 1.46 1.83 2.20 2.56 2.93 3.29 3.66 4.03 4.39 4.76 5.12
9.616 9.652 9.687 9.723 9.759 9.796 9.832 9.869 9.906 9.944 9.982 10.020 10.058 10.097 10.136
A'
3.50
Deviat viator or Stress
= Ao . (1‐ε)
Dev = PR x Cal / A'
σ1
Δσ 2
(cm )
(%)
cm 6.83 cm 9.616 cm2 65.68 cm3
(kg/cm ) 0.1175 0.7493 1.1665 1.4411 1.5284 1.5689 1.6550 1.8320 2.0076 2.2728 2.5359 2.8871 2.6065 2.4174 2.3189
(kg/cm2) 1 .1 2 1 .7 5 2 .1 7 2 .4 4 2 .5 3 2 .5 7 2 .6 5 2 .8 3 3 .0 1 3 .2 7 3 .5 4 3 .8 9 3 .6 1 3 .4 2 3 .3 2
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 12/05/2015 PROVING RING NO. : CALIBRATION g v : STRAIN RATE (mm/min) : Teg. Keliling, σ3 (kg/cm2) : Deformasi
1.13
0.50
PR DIAL
(mm)
ε ε MAX
= ΔH/H = 20 % H
Diameter, D : T ngg , H : Luas, A : Volume, V :
CORRECTI CTIE AREA (A')
ε
(mm) . 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00
1
2
6.00
8.00
12.00
16.00
20.00
24.00
26.00
28.00
30.00
31.00
30.00
27.00
32.00
33.00
34.00
35.00
36.00
34.00
33.00
32.00
. 0 .2 8 0 .5 7 0 .8 5 1 .1 4 1 .4 2 1 .7 1 1 .9 9 2 .2 8 2 .5 6 2 .8 4 3 .1 3 3 .4 1 3 .7 0 3 .9 8 4 .2 7 4 .5 5 4 .8 4 5 .1 2 5 .4 0 5 .6 9
. 17.538 17.589 17.639 17.690 17.741 17.792 17.844 17.896 17.948 18.001 18.053 18.107 18.160 18.214 18.268 18.322 18.377 18.432 18.488 18.543
A'
cm 8.79 cm 17.489 cm2 153.72 cm3 4.72
Deviat iator Stress
= Ao . (1‐ε)
Dev = PR x Cal / A'
σ1
Δσ 2
(cm )
(%) .
BOR NO. : DB2 DEPTH : 5.50‐6.00 TESTED BY : MERRY
(kg/cm ) . 0.3866 0.5140 0.7687 1.0221 1.2739 1.5243 1.6465 1.7680 1.8888 1.9461 1.8778 1.6850 1.9912 2.0474 2.1031 2.1586 2.2136 2.0844 2.0170 1.9500
(kg/cm2) . 0 .8 9 1 .0 1 1 .2 7 1 .5 2 1 .7 7 2 .0 2 2 .1 5 2 .2 7 2 .3 9 2 .4 5 2 .3 8 2 .1 9 2 .4 9 2 .5 5 2 .6 0 2 .6 6 2 .7 1 2 .5 8 2 .5 2 2 .4 5
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 12/05/2015 PROVING RING NO. :
BOR NO. : DB2 DEPTH : 5.50‐6.00 TESTED BY : MERRY
1
Diameter, D : , Luas, A : Volume, V :
.
STRAIN RATE (mm/min) : Teg. Keliling, σ3 (kg/cm2) : Deformasi
PR DIAL
(mm)
(mm) . 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 . 4.00 4.25 4.50 4.75 5.00 5.25 5.50
ε ε MAX
= ΔH/H = 20 % H
1.00
.
12.00
18.00
24.00
28.50
30.00
31.50
32.63
33.75
34.50
35.63
36.38
36.75
38.25
38.63 .
39.38
40.13
40.50
41.25
42.00
41.25
40.50
COR CORRECTI CTIE AREA (A')
ε
2
. 0 .2 6 0 .5 2 0 .7 8 1 .0 4 1 .3 0 1 .5 6 1 .8 2 2 .0 9 2 .3 5 2 .6 1 2 .8 7 3 .1 3 3 .3 9 3 .6 5 . 4 .1 7 4 .4 3 4 .6 9 4 .9 5 5 .2 1 5 .4 7 5 .7 4
. 18.058 18.106 18.153 18.201 18.249 18.297 18.346 18.395 18.444 18.493 18.543 18.593 18.643 18.693 . 18.795 18.846 18.898 18.950 19.002 19.054 19.107
A'
4.79
= Ao . (1‐ε)
Dev = PR x Cal / A'
cm
.
18.011 cm2 172.73 cm3 Deviat iator Stress
σ1
Δσ 2
(cm )
(%)
(kg/cm ) . 0.7509 1.1234 1.4940 1.7694 1.8576 1.9454 2.0095 2.0733 2.1137 2.1768 2.2167 2.2335 2.3184 2.3349 . 2.3673 2.4058 2.4217 2.4598 2.4977 2.4463 2.3952
(kg/cm2) . 1 .7 5 2 .1 2 2 .4 9 2 .7 7 2 .8 6 2 .9 5 3 .0 1 3 .0 7 3 .1 1 3 .1 8 3 .2 2 3 .2 3 3 .3 2 3 .3 3 . 3 .3 7 3 .4 1 3 .4 2 3 .4 6 3 .5 0 3 .4 5 3 .4 0
TRIAXIAL UU TEST PROJECT : Hotel Everbright Cikokol LOCATION : MH. Thamrin, Tangerang DATE : 12/05/2015
BOR NO. : DB2 DEPTH : 5.50‐6.00 TESTED BY : MERRY
Lingkaran Mohr Triaksial UU Test (Total Stress)
Kurva Deviator Stress
4.00
3.00
3.50
2.50
3.00
)
) 2 m c / g k ( s s e r t S r a e h S
m c 2.00 / g k ( s e r t 1.50 S r o t a i v e 1.00 D
2.50 2.00 1.50 1.00
0.50
0.50
0.00
0.00 0
1
2
3
4
5
6
7
0.00
Strain, ε % Sampel 0.50 kg/cm2
1.00
2.00
3.00
Normal Stres (kg/cm2) Sampel 0.50 kg/cm2
Sampel 1.00 kg/cm2
Total Stress c (kg/cm2) ϕ (°)
Sampel 1.00 kg/cm2
STRENGTH PARAMETER Efective Stress 0.80 c' (kg/cm2) 12° 40" ϕ' (°)
4.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 28/5/2015
BORING DEPTH
: DB 1 : 1.50 ‐ 2.00 m TESTED BY : AGUS
1.30
1.25
1.20
1.15
e , o i t a R 1.10 d i o V 1.05
1.00
0.95
Pc 0.90 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
1.50 1.83 0.13 1.40
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.250 0.040 1.274
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
4.17E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 28/5/2015
BORING DEPTH
: DB 1 : 3.50 ‐ 4.00 m TESTED BY : Merry
1.05
1.00
0.95
0.90
e , o . i t a R d i 0.80 o V 0.75
0.70
0.65
Pc 0.60 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
3.50 1.90 0.32 1.20
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.240 0.080 1.007
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.77E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 28/5/2015
BORING DEPTH
: DB 1 : 5.50 ‐ 6.00 m TESTED BY : AGUSTINUS
1.15
1.10
1.05
1.00
e , o . i t a R d i 0.90 o V 0.85
0.80
0.75
Pc 0.70 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
5.50 1.85 0.47 2.05
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.230 0.065 1.116
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.59E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 28/5/2015
BORING DEPTH
: DB1 : 7.50 ‐ 8.00 m TESTED BY : Agustinus
1.60
1.55
1.50
1.45
e 1.40 , o i t a R 1.35 d i o V 1.30
1.25
1.20
1.15
Pc
1.10 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
7.50 1.83 0.62 1.70
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.350 0.075 1.567
5.E‐02 4.E‐02
c e s / 2 m c v C
4.E‐02 3.E‐02 3.E‐02 2.E‐02 2.E‐02 1.E‐02 5.E‐03 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.27E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 12/05/2015
BORING DEPTH
: DB2 : 1.50 ‐ 2.00 m TESTED BY : Merry
1.10
1.05
1.00
0.95
e 0.90 , o i t a R 0.85 d i o V 0.80
0.75
0.70
0.65
Pc
0.60 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
1.50 1.66 0.10 1.70
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.265 0.110 1.053
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
2.94E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 12/05/2015
BORING DEPTH
: DB2 : 3.50 ‐ 4.00 m TESTED BY : Merry
0.60
0.55
e 0.50 , o i t a R d i o V 0.45
0.40
Pc 0.35 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
3.50 1.97 0.34 2.20
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.190 0.250 0.576
5.E‐02 4.E‐02
c e s / 2 m c v C
4.E‐02 3.E‐02 3.E‐02 2.E‐02 2.E‐02 1.E‐02 5.E‐03 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.10E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 12/05/2015
BORING DEPTH
: DB2 : 5.50 ‐ 6.00 m TESTED BY : Merry
1.40
1.35
1.30
1.25
e , o i t a R 1.20 d i o V 1.15
1.10
1.05
Pc
1.00 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
5.50 1.66 0.37 1.80
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.320 0.060 1.371
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.63E ‐02 cm2/sec
100.00
CONSOLIDATION TEST ‐ e log p curve PROJECT : Hote Hotell Everbright Cikokol LOCA LOCATI TION ON : MH. Thamrin, Tangerang DATE : 12/05/2015
BORING DEPTH
: DB2 : 7.50 ‐ 8.00 m TESTED BY : Merry
1.90
1.80
1.70
1.60
e , o i t a R 1.50 d i o V 1.40
1.30
1.20
Pc 1.10 0
1
10
100
Pressure (kg/cm2)
Depth
: : : :
γsat
Po' Pc
7.50 1.64 0.48 1.80
m t/m3 kg/cm2 kg/cm2
Cc Cr eo
: : :
0.440 0.140 1.768
7.E‐02 .
‐
c 5.E‐02 e s / 2 4.E‐02 m c 3.E‐02 v C 2.E‐02 1.E‐02 0.E+00 0.10
1.00
10.00
Pressure (kg/cm2)
Cv
:
3.66E ‐02 cm2/sec
100.00