LAPORAN SKRIPSI

September 26, 2017 | Author: Fantry DeadlyFive Gahau | Category: N/A
Share Embed Donate


Short Description

Judul: Perhitungan Sumberdaya Bijih Besi menggunakan Block Model dengan Estimasi Inverse Distance Square dan Inverse Dis...

Description

PERHITUNGAN SUMBERDAYA BIJIH BESI DENGAN BLOCK MODEL REGULAR DAN BLOCK MODEL NON REGULAR MENGGUNAKAN ESTIMASI INVERSE DISTANCE WEIGHTING PT KOTABESI IRON MINING KECAMATAN TELAWANG KABUPATEN KOTAWARINGIN TIMUR PROPINSI KALIMANTAN TENGAH

SKRIPSI Untuk Memenuhi Persyaratan Guna Memperoleh Gelar Sarjana Teknik Pada Program Studi Teknik Pertambangan

Oleh: FANTRY ABDI ANDREANO NIM. H1C108066

PROGRAM STUDI PERTAMBANGAN FAKULTAS TEKNIK UNIVERSITAS LAMBUNG MANGKURAT BANJARBARU 2014

SKRIPSI PERHITUNGAN SUMBERDAYA BIJIH BESI DENGAN BLOCK MODEL REGULAR DAN BLOCK MODEL NON REGULAR MENGGUNAKAN ESTIMASI INVERSE DISTANCE WEIGHTING PT KOTABESI IRON MINING KECAMATAN TELAWANG KABUPATEN KOTAWARINGIN TIMUR PROPINSI KALIMANTAN TENGAH Oleh: Fantry Abdi Andreano NIM. H1C108066 Telah dipertahankan didepan Dewan Penguji pada Hari Rabu tanggal 10 Mei 2014 dan dinyatakan Lulus Pembimbing I,

Susunan Dewan Penguji 1. Uyu Saismana, MT NIP. 19731013 200312 1 001

Nurhakim, MT

2. Selvy Haryati, ST

NIP. 19730615 200003 1 002

NIP. 3. Hafidz Noor Fikri, MT

Pembimbing II,

NIP.

Riswan, MT NIP. 19731231 200812 1 008 Banjarbaru,

Mei 2014

Ketua Program Studi

Fakultas Teknik Unlam

Teknik Pertambangan,

Pembantu Dekan I

Riswan, MT

Dr. Ir. Syahril Taufik MSc Eng

NIP. 19731231 200812 1 008

NIP. 19660328 199103 1 001

ii

LEMBAR PENGESAHAN

PERHITUNGAN SUMBERDAYA BIJIH BESI DENGAN BLOCK MODEL REGULAR DAN BLOCK MODEL NON REGULAR MENGGUNAKAN ESTIMASI INVERSE DISTANCE WEIGHTING PT KOTABESI IRON MINING KECAMATAN TELAWANG KABUPATEN KOTAWARINGIN TIMUR KALIMANTAN TENGAH Oleh : FANTRY ABDI ANDREANO NIM. H1C108066 Telah dipertahankan di depan Tim Penguji Skripsi dan dinyatakan LULUS pada tanggal : 10 Mei 2014 Tim Penguji Nama 1. Ketua

Tanda Tangan

: Nurhakim, MT

1. _________

2. Sekretaris : Riswan, MT

2. _________

3. Anggota

: Uyu Saismana, MT

3. _________

4. Anggota

: Selvy Haryati, ST

4. _________

5. Anggota

: Hafidz Noor Fikri, MT

5. _________

Program Studi Teknik Pertambangan Ketua,

RISWAN, MT NIP. 19731231 200812 1 008

iii

LEMBAR PERNYATAAN

Dengan ini saya menyatakan bahwa skripsi ini benar-benar karya saya sendiri. Sepanjang pengetahuan saya tidak terdapat karya atau pendapat yang ditulis atau diterbitkan orang lain kecuali sebagai acuan atau kutipan dengan mengikuti tata penulisan karya ilmiah yang lazim.

Banjarbaru, 10 Mei 2014 Yang menyatakan,

Fantry Abdi Andreano

iv

HALAMAN PERSEMBAHAN Puji Syukur kepada Yesus Kristus Telah menjadi Sahabat, Guru dan Juru Selamat Selalu menuntunku sejak dulu, sekarang sampai selamanya. Kepada Pak Berman dan Bu Dare Terima kasih telah menjadi Orang Tua yang baik, sangat baik Dengan sabar menanti kelulusanku, selama 6 Tahun Begitu pula Saudaraku Ari Bayu Suryadinata Maaf karena masa SMP – SMAmu tidak sebaik temanmu yang lain Karena sebagian hakmu kurenggut untuk biaya kuliah selama ini Bagiku, Ayah adalah motivator, Ibu adalah cambuk, Adik adalah penguatku. Khusus untuk Filla dan Yosep Terima kasih kalian menjadi teman yang setia dalam menjalani usaha Meski sering merugi kalian tetap bertahan, semoga usaha kita terus berlanjut. Terima kasih untuk Jossi, Jonedi, Bahrurrusyidi, Ijay_AZ, Bernadez Audric, Rudi Frianto, Hana Muslimah, Mitha Afryana, Mas Lukman. Kalian orang dekat bagiku, selalu mau mendengar panjangnya ceritaku. Terima kasih kepada Ka Hafidz dan Dimas Aditya, telah membantu banyak dalam menyelesaikan laporan TA ini. Begitu pula Pak Nurhakim, Pak Riswan, Pak Untung, Bu Anisa, Pak Uyu, Pak Adip, Pak Romla, Bu Selvy, Pak Agus, Ka Sarmel, Ka Sigit, Ka Mukhlis dan semua yang membantu saya dalam kuliah. Terima kasih kepada Pak Jacky Wang dan Pak Nono yang menanamkan rasa percaya diri untukku masuk ke dalam dunia kerja. Serta semua kawan-kawan angkatan semasa Kuliah dan SMA. Terima kasih kawan, meski tidak kusebutkan satu per satu percayalah bahwa kaliah mendapat posisi terhormat dalam setiap catatan hidupku sampai masa yang akan datang.

v

ABSTRAK

Fantry Abdi A. : Perhitungan Sumberdaya Bijih Besi dengan Block Model Regular dan Block Model Non Regular Menggunakan Estimasi Inverse Distance Weighting PT Kotabesi Iron Mining Kecamatan Telawang, Kabupaten Kotawaringin Timur, Kalimantan Tengah.

Blok II pada PT Kotabesi Iron Mining memiliki luas area sebesar 699.3 hektar yang sebelumnya telah dilakukan kegiatan eksplorasi lanjutan, yaitu pemboran inti batuan. Sebagai rumusan dalam menghitung sumberdaya pada blok ini, perusahaan menggunakan metode perhitungan “luas area × tebal ratarata”, yaitu luas area pada Blok II dan tebal rata-rata dari hasil pemboran. Hal ini menjadi latar belakang penulis untuk membuat perhitungan sumberdaya dengan metode lain sebagai pembanding perhitungan sebelumnya. Penelitian ini yaitu melakukan perhitungan sumberdaya dengan model menggunakan metode Block Regular berukuran 100×100 meter. Dilakukan juga permodelan Block Non Regular dengan membuat variasi ukuran blok 100×100 meter, 100×50 meter dan 100×25 meter. Kemudian masing-masing diestimasi dengan metode IDS dan IDC. Hasil perhitungan sumberdaya pada lapisan gravel berkisar 1,957,920 ton sampai 1,988,640 ton dengan 52% kadar Fe, sedangkan pada lapisan boulder berkisar dari 14,365,800 ton sampai 14,388,480 ton dengan 42% kadar Fe. Berdasarkan hasil penelitian diketahui nilai estimasi masih mendekati data aktualnya. Namun pada beberapa titik terlihat selisih cukup signifikan yang memperlihatkan nilai estimasi lebih tinggi dari data aktualnya. Hal ini akan mempengaruhi jumlah sumberdaya bijih besi yang dihitung. Terlihat dari deviasi antara Block Regular dengan Block Non Regular yang menunjukan deviasi pada Lapisan Gravel lebih besar dibandingkan pada Lapisan Boulder. Namun nilai deviasi masih cukup kecil, sehingga permodelan dengan Block Model yang diestimasi dengan metode IDS dan IDC masih cukup baik untuk digunakan pada penelitian ini.

Kata Kunci : sumberdaya bijih besi, block begular, block non regular, inverse distance weighting, ids, idc.

vi

KATA PENGANTAR

Puji dan syukur dipanjatkan kehadirat Tuhan Yang Maha Esa atas Berkat Kasih dan Karunia-Nya sehingga penulis dapat menyelesaikan laporan Tugas Akhir ini untuk memenuhi tugas yang telah diberikan. Penyusunan Laporan Tugas Akhir ini tidak dapat tersusun dengan baik apabila tidak didukung dan dibantu oleh banyak pihak yang telah memberikan dorongan, bimbingan dan arahannya. Oleh karena itu, penulis mengucapkan terima kasih yang sebesar-besarnya kepada : 1. Bapak Dr. Ing. Yulian Firmana Arifin, MT selaku Dekan Fakultas Teknik Universitas Lambung Mangkurat 2. Bapak Riswan, MT selaku Ketua Program Studi S1 Teknik Pertambangan Fakultas Teknik Universitas Lambung Mangkurat dan Dosen Pembimbing Laporan Tugas Akhir. 3. Bapak Nurhakim, MT selaku Dosen Pembimbing Laporan Tugas Akhir dan Pembantu Dekan III

Fakultas

Teknik Universitas Lambung

Mangkurat. 4. Bapak Ir. Dindin Hasanudin, selaku Kepala Teknik Tambang PT Kotabesi Iron Mining. 5. Semua pihak yang telah membantu hingga selesainya kegiatan Tugas Akhir Mahasiswa Universitas Lambung Mangkurat 2013/2014. Penulis menyadari akan ketidaksempurnaan Laporan Tugas Akhir yang telah disusun ini. Hal ini dikarenakan oleh keterbatasan waktu, kemampuan, pengetahuan, pengalaman. Oleh karena itu, kritik dan saran yang bersifat membangun dari semua pihak sangat diharapkan. Akhir kata, penulis mengharapkan agar Laporan Tugas Akhir Mahasiswa Universitas Lambung Mangkurat 2014 ini bermanfaat bagi kita semua. Amin. Banjarbaru,

Januari 2014

Penyusun

vii

DAFTAR ISI

Halaman COVER.......................................................................................................

i

SKRIPSI .....................................................................................................

ii

LEMBAR PENGESAHAN ...........................................................................

iii

LEMBAR PERNYATAAN............................................................................

iv

HALAMAN PERSEMBAHAN ......................................................................

v

ABSTRAK...................................................................................................

vi

KATA PENGANTAR ...................................................................................

vii

DAFTAR ISI................................................................................................

viii

DAFTAR GAMBAR.....................................................................................

xi

DAFTAR TABEL.........................................................................................

xii

BAB I. PENDAHULUAN .............................................................................

1-1

1.1. Latar Belakang ..................................................................................

1-1

1.2. Rumusan Masalah.............................................................................

1-2

1.3. Batasan Masalah...............................................................................

1-2

1.4. Tujuan Penelitian...............................................................................

1-2

1.5. Manfaat Penelitian.............................................................................

1-2

BAB II. TINJAUAN UMUM..........................................................................

2-1

2.1. Lokasi dan Kesampaian Daerah........................................................

2-1

2.2. Sejarah dan Struktur Organisasi........................................................

2-3

2.2.1. Sejarah PT Kotabesi Iron Mining .....................................................

2-3

2.2.2. Struktur Organisasi PT Kotabesi Iron Mining ...................................

2-3

2.3. Iklim dan Cuaca.................................................................................

2-4

2.4. Keadaan Geologi...............................................................................

2-4

2.4.1. Geologi Regional.............................................................................

2-4

2.4.2. Geologi Lokal ..................................................................................

2-8

2.5. Sistem Penambangan dan Peralatan yang Digunakan...................... 2-11 BAB III. KAJIAN PUSTAKA ........................................................................

3-1

3.1. Sumberdaya dan Cadangan..............................................................

3-1

3.2. Endapan Bijih Besi ............................................................................

3-3

viii

3.3. Bauksit ..............................................................................................

3-5

3.4. Penaksiran Cadangan .......................................................................

3-6

3.5. Model Blok Teratur (Regular Block Model) ........................................

3-7

3.6. Estimasi dengan Inverse Distance Weighted (IDW)...........................

3-8

BAB IV. METODOLOGI PENELITIAN ........................................................

4-1

4.1. Diagram Alir Penelitian ......................................................................

4-1

4.2. Teknik Pengumpulan Data ................................................................

4-2

4.3. Teknik Analisa Data...........................................................................

4-2

BAB V. HASIL PENELITIAN DAN PEMBAHASAN .....................................

5-1

5.1. Data Penelitian ..................................................................................

5-1

5.1.1. Data Penelitian................................................................................

5-2

5.1.2. Statistik Data...................................................................................

5-2

5.2. Permodelan dan Perhitungan ............................................................

5-2

5.2.1. Penentuan Block Model ..................................................................

5-2

5.2.2. Estimasi Inverse Distance Weighting (IDW) ....................................

5-3

5.2.3. Cross Validation Data Aktual Kadar dengan Hasil Estimasi ............

5-3

5.2.4. Hasil Perhitungan Sumberdaya .......................................................

5-5

5.2.5. Deviasi Sumberdaya pada Block Regular terhadap Block Non Regular5-6 5.3. Pembahasan ....................................................................................

5-6

BAB VI. PENUTUP .....................................................................................

6-1

6.1. Kesimpulan........................................................................................

6-1

6.2. Saran.................................................................................................

6-1

DAFTAR PUSTAKA LAMPIRAN A. HASIL PENGAMATAN AKTUAL LAMPIRAN B. DATA BOR LAMPIRAN C. STATISTIK DATA LAMPIRAN D. PLOTTING PETA LAMPIRAN E. BLOCK MODEL REGULAR LAMPIRAN F. BLOCK MODEL NON REGULAR LAMPIRAN G. DATA HASIL PERMODELAN LAMPIRAN H. ESTIMASI TEBAL MENGGUNAKAN ESTIMASI IDS LAMPIRAN I. ESTIMASI KADAR MENGGUNAKAN ESTIMASI IDS LAMPIRAN J. ESTIMASI TEBAL MENGGUNAKAN ESTIMASI IDC LAMPIRAN K. ESTIMASI KADAR MENGGUNAKAN ESTIMASI IDC

ix

LAMPIRAN L. PERBANDINGAN TEBAL DAN KADAR AKTUAL DENGAN HASIL ESTIMASI LAMPIRAN M. HASIL PERHITUNGAN SUMBERDAYA

x

DAFTAR GAMBAR

Halaman Gambar 2.1 Peta Kesampaian Daerah .......................................................

2-2

Gambar 2.2 Struktur Organisasi PT Kotabesi Iron Mining...........................

2-4

Gambar 2.3 Peta Geologi Regional PT Kotabesi Iron Mining......................

2-5

Gambar 2.4 Korelasi Satuan Peta Geologi .................................................

2-6

Gambar 2.5 Penampang A-A’.....................................................................

2-7

Gambar 2.6 Keadaan Morfologi WIUP PT Kotabesi Iron Mining .................

2-8

Gambar 2.7 Keadaan Morfologi WIUP PT Kotabesi Iron Mining .................

2-9

Gambar 3.1 Model Endapan Blok...............................................................

3-7

Gambar 3.2 Metode Pembobotan dengan Jarak Terbalik...........................

3-7

Gambar 5.1 Grafik Cross Validation terhadap Estimasi IDS .......................

5-4

Gambar 5.2 Grafik Cross Validation terhadap Estimasi IDC .......................

5-5

xi

DAFTAR TABEL

Halaman Tabel 2.1 Koordinat Ijin Usaha Pertambangan PT Kotabesi Iron Mining .....

2-1

Tabel 2.2 Kolom Litologi pada PT Kotabesi Iron Mining.............................. 2-10 Tabel 3.1 Klasifikasi Sumberdaya Mineral dan Cadangan ..........................

3-2

Tabel 3.2 Mineral-mineral Bijih Bernilai Ekonomis ......................................

3-5

Tabel 5.1 Statistik Data dengan Parameter Tebal dan Kadar .....................

5-2

Tabel 5.2 Hasil Estimasi Inverse Distance Square (IDS) ............................

5-3

Tabel 5.3 Hasil Estimasi Inverse Distance Cubic (IDC)...............................

5-3

Tabel 5.4 Hasil Perhitungan Sumberdaya Berdasarkan Estimasi IDS .......

5-5

Tabel 5.5 Hasil Perhitungan Sumberdaya Berdasarkan Estimasi IDC ........

5-6

Tabel 5.6 Deviasi Sumberdaya pada BR terhadap BNR.............................

5-8

xii

BAB I PENDAHULUAN

1.1. Latar Belakang Perhitungan sumberdaya berperan penting dalam mengurangi resiko dalam penentuan jumlah dan memberi kemudahan dalam eksploitasi secara komersial dari suatu endapan. Perhitungan sumberdaya yang baik dapat membantu menentukan investasi yang akan ditanam investor, penentuan sasaran produksi, cara penambangan yang akan dilakukan bahkan dalam memperkirakan waktu yang dibutuhkan oleh perusahaan dalam melaksanakan usaha penambangannya. Dalam

penaksiran

kadar

dan

perhitungan

sumberdaya

telah

dikembangkan berbagai metode. Secara garis besar, metode penaksiran kadar dan perhitungan sumberdaya dapat dikelompokkan menjadi metode klasik (konvensional) dan metode yang lebih modern berbasis geostatistika. Kegiatan penambangan pada Blok I PT KIM hampir selesai ditambang, sehingga perlu direncanakan kegiatan penambangan pada lokasi yang baru. Hal ini menjadi latar belakang penulis untuk melakukan perhitungan sumberdaya bijih besi di Blok II PT Kotabesi Iron Mining, Kecamatan Telawang, Kabupaten Kotawaringin Timur, Kalimantan Tengah. Permodelan dan perhitungan sumberdaya bijih besi pada area penelitian, yaitu Blok II menggunakan Metode Blok Regular dan Blok Non Regular untuk permodelan, Metode Estimasi yang digunakan adalah Metode Estimasi Inverse Distance Square dan Inverse Distance Cubic untuk tebal dan kadar Fe bijih besi. 1.2. Rumusan Masalah Rumusan masalah dalam penentuan perhitungan sumberdaya bijih besi sebagai judul skripsi adalah sebagai berikut: 1)

Endapan bijih besi di Blok II terdiri dari dua lapisan dengan karakteristik yang berbeda.

1-1

2)

Perhitungan sumberdaya yang dilakukan perusahaan sangat konvensional. yaitu dengan mengalikan luas area pengamatan dengan ketebalan rata-rata bijih

besi.

Sehingga

perlu

dilakukan

permodelan

dan

perhitungan

sumberdaya yang lebih modern agar didapatkan hasil yang lebih akurat. 1.3. Batasan Masalah Batasan masalah penelitian ini adalah: 1)

Perhitungan sumberdaya dilakukan di Blok II pada batas IUP PT Kotabesi Iron Mining.

2)

Berat jenis rata-rata yang digunakan adalah 4.8 ton/m3, berdasarkan informasi yang diberikan oleh pihak perusahaan.

3)

Lapisan terbagi menjadi 2 bagian, yaitu lapisan 1 (gravel) dan lapisan 2 (boulder).

4)

Menghitung sumberdaya menggunakan model blok regular dan blok non regular dengan metode estimasi IDS dan IDC.

1.4. Tujuan Penelitian Tujuan dilakukannya perhitungan sumberdaya bijih besi di lokasi ini adalah sebagai berikut: 1)

Mengetahui karakteristik bijih besi yang terdapat di Blok II.

2)

Menghitung statistik data titik bor blok II untuk menentukan nilai minimum, maksimum, rata-rata dan standar deviasi dari tebal dan kadar setiap lapisan.

3)

Memodelkan endapan bijih besi di Blok II.

4)

Mengestimasi tebal dan kadar lapisan bijih besi di Blok II.

5)

Menentukan jumlah sumberdaya di Blok II.

1.5. Manfaat Penelitian Penelitian

ini

diharapkan

dapat

menjadi

gambaran

dan

bahan

pertimbangan perhitungan sumberdaya di PT Kotabesi Iron Mining. Serta dapat menjadi literatur yang bermanfaat bagi pembaca, baik itu untuk Mahasiswa maupun sebagai referensi umum.

1-2

BAB II TINJAUAN UMUM

2.1. Lokasi dan Kesampaian Daerah Wilayah IUP PT Kotabesi Iron Mining secara administratif terletak di Desa Kenyala

Kecamatan

Kotabesi

Kabupaten

Kotawaringin

Timur

Provinsi

0

Kalimantan Tengah. Secara geografis wilayah ini dibatasi oleh 02 18’07,0”LS sampai

02021’10,0”LS

dengan

dan

112036’30,1”BT

sampai

dengan

0

112 38’40,1”BT, (Tabel 2.1) seluas ± 1380Ha. Tabel 2.1 Koordinat Ijin Usaha Pertambangan PT Kotabesi Iron Mining Titik

0

KIM1 KIM2 KIM3 KIM4 KIM5 KIM6 KIM7 KIM8 KIM9 KIM10 KIM11 KIM12 KIM13 KIM14

112 112 112 112 112 112 112 112 112 112 112 112 112 112

BUJUR TIMUR ‘ 37 38 38 37 37 36 36 36 36 36 36 36 36 37

“ 40,1 40,0 40,1 40,1 40,1 51,1 51,1 43,1 43,1 36,1 36,1 30,1 30,1 40,1

LINTANG SELATAN ‘ “ 02 18 07,0 02 18 07,0 02 20 10,0 02 20 10,0 02 21 10,0 02 21 10,0 02 20 31,0 02 20 31,0 02 19 58,0 02 19 58,0 02 19 19,0 02 19 19,0 02 19 07,0 02 19 07,0 0

Sumber: PT Kotabesi Iron Mining

Untuk mencapai PT Kotabesi Iron Mining ditempuh dengan jarak sekitar 253 km dari Kota Palangkaraya (Ibukota Kalimantan Tengah), melalui jalan darat sejauh 196 km ke Kecamatan Kotabesi, kemudian dilanjutkan dengan melalui Sungai Sampit menggunakan speed boat menuju Desa Palangan sejauh 44 km. Dari Desa Palangan, perjalanan dilanjutkan sejauh 13 km untuk mencapai lokasi penelitian. Informasi lebih lanjut mengenai peta kesampain daerah penelitian tersaji pada Gambar 2.1.

2-1

2-2

2.2. Sejarah dan Struktur Organisasi 2.2.1. Sejarah PT Kotabesi Iron Mining PT Kotabesi Iron Mining adalah perusahaan tambang yang bergerak dibidang pembongkaran, penggalian dan penjualan bijih besi. Sedangkan untuk pengangkutan bijih besi itu sendiri dikerjakan oleh tiga kontraktor yang menyediakan jasa pengangkutan bijih besi dari pit menuju ke port. Ketiga kontraktor tersebut antara lain AJK, JBL dan NJR. Meskipun begitu, PT Kotabesi Iron

Mining

juga

memiliki

ijin

pengangkutan

dengan

memegang

Ijin

Pengangkutan Nomor: 366 Tahun 2007 Tanggal 4 September 2007. PT Kotabesi Iron Mining sudah melakukan kegiatan produksi bijih besi pada tahun 2004 dengan Ijin Eksploitasi Nomor: 188. 4/92/III.1/Distamben. Tanggal 15 Mei 2004. Kemudian memperpanjang kontraknya pada Tahun 2007 dengan ijin KP Eksploitasi Nomor: 337 Tahun 2007. Tanggal 31 Juli 2007. Sejak PT Kotabesi Iron Mining memiliki Ijin Penjualan Nomor: 367 Tahun 2007. Tanggal 4 September 2007, penjualan bijih besi ditujukan untuk PT Billy yang kemudian dikirim ke Taiwan. Dengan target produksi 400.000 ton/bulan, PT Kotabesi Iron Mining harus mengirimkan 3 tongkang bermuatan bijih besi per harinya yang kemudian dipindahkan ke vessel dengan muatan 50.000 ton saat berada di lepas pantai. Pada Tahun 2008, PT Kotabesi Iron Mining tidak melakukan produksi bijih besi di Desa Kenyala karena ijin produksi belum diperpanjang dari Dinas terkait, dalam hal ini Dinas Pertambangan. Baru pada awal tahun 2013, PT Kotabesi Iron Mining kembali melakukan produksi bahan galian bijih besi setelah Ijin Penambangannya diperbarui. 2.2.2. Struktur Organisasi PT Kotabesi Iron Mining Berikut ini bagan yang memperlihatkan struktur organisasi di PT Kotabesi Iron Mining, tersaji pada gambar 2.2.

2-3

Kepala Teknik Tambang Ir. Dindin Hasanudin

Site Manager Feri Andrian

Personalia Edy Sasongko, SE

Accounting Toni

Produksi Heri

Gambar 2.2 Struktur Organisasi PT Kotabesi Iron Mining 2.3. Iklim dan Cuaca Iklim adalah cuaca rata-rata dari suatu daerah atau tempat selama bertahun-tahun, dimana iklim dipengaruhi oleh letak lintang, letak ketinggian relief terhadap benua dan samudera, kondisi geografis lokal. Cuaca adalah keadaan atmosfer pada waktu tertentu atau dalam periode pendek ditandai dengan berbagai fenomena meteoris yaitu tekanan udara, suhu, kelembaban dan curah hujan. Lokasi penambangan bijih besi PT Kotabesi Iron Mining beriklim tropis dengan suhu rata-rata 280 – 340 C, dengan 2 kali pergantian musim yaitu musim penghujan dan musim kemarau. Keadaan iklim dan cuaca ini sangat berpengaruh pada aktivitas kerja, baik di daerah penambangan maupun di jetty. 2.4. Keadaan Geologi 2.4.1. Geologi regional Pada peta ini terlihat hasil plotting batas Ijin Usaha Pertambangan PT Kotabesi Iron Mining di Desa Kenyala. Kawasan IUP perusahaan ini dengan luas 1.380Ha terletak pada Formasi Dahor (TQd), seperti terlihat pada Gambar 2.3, Peta Geologi Regional daerah penelitan.

2-4

2-5

Sumber: Peta Geologi Lembar Palangkaraya, 1995

Gambar 2.4 Korelasi Satuan Peta Geologi Formasi Dahor (TQd) dengan posisi di antara Batuan Gunungapi (Trv) yang kaya akan bijih besi, memungkinkan adanya keterdapatan bijih besi di daerah ini. Hal ini disebabkan karena erosi yang terjadi pada Batuan Gunungapi (Trv) mengalami transportasi ke daerah yang lebih rendah dan terendapkan, sehingga membentuk Formasi Dahor (TQd) yang berumur Miosen Tengah hingga Pliosen. Pada lembar peta geologi, stratigrafi dinyatakan dalam korelasi satuan peta seperti yang ditunjukan pada gambar 2.4. Korelasi satuan peta ini merupakan tabel yang terdiri dari masa, zaman, kala, satuan tahun dan jenis batuan. Gambar 2.4 adalah korelasi satuan peta yang terdapat pada peta geologi lembar Palangkaraya yang digunakan untuk plotting batas IUP PT Kotabesi Iron Mining. Penjelasan rinci mengenai stratigrafi kawasan IUP perusahaan ini meliputi Formasi Dahor (TQd) dan Batuan Gunungapi (Trv), karena kedua bagian ini memiliki hubungan dengan keterdapatan bijih besi di daerah tersebut, seperti yang dijelaskan pada anak sub-bab peta geologi sebelumnya.

2-6

Berikut merupakan penjelasan Sumintadipura (1976) mengenai Formasi Batuan pada daerah ini.  Endapan aluvium (Qa): terbentuk selama jaman Holosen (±10.000 tahunsekarang). Satuan ini tersusun atas campuran tak terpilahkan antara kerikil, pasir, lanau, lempung dan lumpur, yang terbentang meluas di sepanjang dataran rendah dan wilayah pesisir di seluruh wilayah kajian.  Formasi Dahor (TQd): Konglomerat, coklat kehitaman, agak padat, komponen terdiri dari fragmen kuarsit dan basal, berukuran 1 sampai 3 cm, kemas terbuka dengan matriks berukuran pasir. Konglomerat berselingan dengan batupasir, berwarna kekuningan sampai kelabu, berbutir sedang sampai kasar, setempat berstruktur sedimen silang siur. Batulempung warna kelabu, agak lunak, karbonan setempat mengandung lignit, tersingkap sebagai sisipan dalam batupasir dengan ketebalan 20-60 cm. Umur formasi ini diperkirakan Miosen Tengah sampai Plistosen, berdasarkan korelasi dengan Formasi Dahor di Lembar Tewah (Sumintadipura, 1976); tebalnya diperkirakan 300 m, diendapkan di lingkungan paralik.  Basal (Tb): dibeberapa tempat memperlihatkan struktur diabas dan ada juga berstruktur andesit piroksen. Gejala ubahan tampak adanya klorit dan mineral lempung.  Batuan Gunungapi (Trv): Breksi gunungapi, kelabu kehijauan, sangat kompak, komponen terdiri atas andesit, basal dan rijang, berdiameter 2-3 cm, setempat kaya akan bijih besi dan limonit. Emmichoven (1939) mengelompokan satuan ini ke dalam Kompleks Matan yang berumur Trias.

Sumber: Peta Geologi Lembar Palangkaraya, 1995

Gambar 2.5 Penampang A – A’ Pada penampang A – A’, tergambar bahwa di bagian Barat Laut dan Tenggara peta daerah ini merupakan Batuan Gunungapi (Trv) yang terbentuk

2-7

pada kala Trias (Triassic). Batuan Gunungapi (Trv) di daerah ini memperlihatkan adanya keterdapatan bijih besi yang dinyatakan dengan simbol (B) pada peta geologi regional. 2.4.2. Geologi Lokal a.

Morfologi Keadaan morfologi wilayah pengamatan pada PT Kotabesi Iron Mining yaitu terdiri dari dua satuan morfologi diantaranya ; satuan morfologi dataran yang mencagkup lebih kurang dari 10% daerah pengamatan yang dicirikan dengan kemiringan lereng rata-rata antara 0o-3o, serta terdapat rawa pada daerah ini. Satuan morfologi perbukitan bergelombang rendah mencangkup lebih kurang 90% dari seluruh daerah pengamatan yang dicirikan oleh kemiringan lereng berkisar antara 5o-10o dapat dilihat pada Gambar.

Sumber: Dokumentasi Penulis, 2013

Gambar 2.6 Keadaan Morfologi WIUP PT Kotabesi Iron Mining

2-8

Sumber: Dokumentasi Penulis, 2013

Gambar 2.7 Keadaan Morfologi WIUP PT Kotabesi Iron Mining b.

Litologi Berdasarkan pengamatan geologi lokal di batas IUP PT Kotabesi Iron Mining, diperkirakan terdapat beberapa satuan batuan, yaitu sebagai berikut: 1) Satuan endapan Sedimentasi, terdiri dari gradasi bijih besi yang terdapat adanya perselingan batu lempung.  Bijih besi kerikil, berwarna abu-abu sampai hitam, bersifat kompak karena tersemenkan dan sebagian lagi merupakan material lepas. Ukuran butir sekitar 0.3 – 3 cm dengan bentuk membundar tanggung.  Bijih besi bongkahan, berwarna abu-abu kecoklatan, terlihat masif namun cukup rapuh dengan tekstur berpori sampai membentuk rongga pada beberapa bagian.

2-9

 Lempung, berwarna coklat kekuningan, bersifat agak keras, kompak, jika basah akan bersifat liat dan plastis, pada beberapa bagian terlihat pengkayaan mineral yang diperlihatkan dengan variasi warna merah, hijau dan abu-abu.  Batu pasir, berselingan dengan batu lanau, struktur perlapisan sejajar dan masif, berwarna abu-abu muda sampai abu-abu keputihan, berbutir halus sedang, membulat tanggung, mudah hancur, berlapis. 2) Satuan batuan terobosan  Batuan Gunung Api, terbentuk dari hasil kegiatan vulkanik. Tabel 2.2 Kolom Litologi pada PT Kotabesi Iron Mining Simbol oooooo

Satuan Batuan Bijih Besi Kerikil

oooooo 000000 000000 000000

Bijih Besi Bongkahan

000000 000000 _-_-_-_-_ _-_-_-_-_ _-_-_-_-_ ‘-‘-‘-‘-‘-‘-‘‘-‘-‘-‘-‘-‘-‘-

Batu Lempung

perselingan antara batu lanau, batu pasir dan batu lempung

::::::: ::::::: _-_-_-_-_ _-_-_-_-_ vvvvvv vvvvv vvvvvv vvvvv Batuan Terobosan xxxxxx xxxxx xxxxxx xxxxx xxxxxx Sumber: PT Kotabesi Iron Mining

Diskripsi 1. Bijih besi kerikil, berwarna abu-abu sampai hitam, bersifat kompak karena tersemenkan dan sebagian lagi merupakan material lepas

2. Bijih besi bongkahan, berwarna abu-abu kecoklatan, terlihat masif namun cukup rapuh dengan tekstur berpori sampai membentuk rongga pada beberapa bagian. 3. Batu lempung, berwarna coklat kekuningan, bersifat agak keras, kompak, jika basah akan bersifat liat dan plastis.

4. Batu pasir berselingan dengan batu lanau dan batu lempung, struktur perlapisan sejajar dan masif.

5. Batuan terobosan yang merupakan hasil dari kegiatan vulkanik.

2-10

2.5. Sistem Penambangan dan Peralatan yang Digunakan Kegiatan penambangan PT Kotabesi Iron Mining saat ini dilakukan pada Blok I Pit 3. Area penambangan pada batas konsesi PT Kotabesi Iron Mining dibagi menjadi tiga, antara lain sebagai berikut: 1)

Blok I terbagi menjadi tiga pit yaitu Pit 1, Pit 2 dan Pit 3 yang saat ini sedang dilakukan kegiatan penambangan.

2)

Blok II merupakan area yang menjadi objek penelitian dalam perhitungan sumberdaya.

3)

Blok III belum bisa dilakukan eksplorasi dan penambangan, karena kawasan ini masuh berada dalam status izin perkebunan sawit. Penambangan bijih besi di PT Kotabesi Iron Mining dilakukan dengan

tahapan sebagai berikut: 1)

Land Clearing Kegiatan

land

clearing

menggunakan

excavator

dan

dozer

untuk

membersihkan lahan dari pepohonan dan semak belukar. Kemudian dilanjutkan oleh 6 orang pekerja harian untuk membuang akar dan rumputrumput yang masih tersisa. 2)

Pembongkaran dan Pemberaian Kegiatan pembongkaran dan pemberaian menggunakan breaker agar penggalian material bijih besi lebih mudah dilakukan.

3)

Penggalian dan Pemuatan Kegiatan penggalian dan pemuatan menggunakan backhoe yang terbagi dalam 3 fleet.

4)

Pengangkutan Kegiatan pengangkutan bijih besi menggunakan dump truck dengan muatan sekitar 23 ton yang mengangkut material sejauh 15 km dari pit menuju jetty.

5)

Dumping Bijih Besi Kegiatan dumping bijih besi dilakukan di dalam tongkang yang memiliki kapasitas muatan sekitar 5000 ton.

2-11

BAB III KAJIAN PUSTAKA

3.1. Sumberdaya dan Cadangan Sumberdaya mineral (mineral resource) adalah endapan mineral yang diharapkan dapat dimanfaatkan secara nyata. Sumberdaya mineral dengan keyakinan geologi tertentu dapat berubah menjadi cadangan setelah dilakukan pengkajian kelayakan tambang dan memenuhi kriteria layak ditambang. Cadangan (reserve) adalah endapan mineral yang telah diketahui ukuran, bentuk, sebaran, kuantitas dan kualitasnya dan secara ekonomis, teknis, hukum, lingkungan dan sosial dapat ditambang pada saat perhitungan dilakukan. (Anonim, 1998: 2) Istilah resource (sumberdaya) diartikan sebagai komoditi mineral potensial yang dapat dieksploitasi. Reserve (cadangan) didefinisikan sebagai jumlah kuantitas terhitung dari bijih yang ekonomis untuk ditambang berdasarkan segi teknologi dan kondisi ekonomi dan aspek lingkungan saat ini. Jika kita menggunakan istilah cadangan berarti endapan mineral tersebut harus sudah ‘mineable’ (baik tambang terbuka atau tambang bawah tanah) dan ‘bankable’ (berdasarkan potensi kekayaan yang dimiliki untuk mencari modal dari bank). (Idrus, 2007: 55) Klasifikasi sumberdaya mineral dan cadangan berdasarkan 2 kriteria, yaitu tingkat keyakinan geologi dan pengkajian layak tambang. Tingkat keyakinan geologi ditentukan oleh 4 tahap eksplorasi, yaitu survei tinjau, prospeksi, eksplorasi umum dan eksplorasi rinci. Kegiatan dari survei tinjau sampai eksplorasi rinci menunjukan semakin rincinya penyelidikan, sehingga tingkat keyakinan geologinya makin tinggi dan tingkat kesalahannya makin rendah. Sedangkan pengkajian layak tambang meliputi faktor-faktor ekonomi, penambangan,

pemasaran,

lingkungan,

sosial

dan

hukum/

perundang-

undangan. Menentukan apakah sumberdaya mineral akan berubah menjadi cadangan atau tidak. Berdasarkan pengkajian ini, bagian sumberdaya mineral

3-1

yang layak tambang berubah statusnya menjadi cadangan sedangkan yang belum layak tambang tetap menjadi sumberdaya mineral. Tabel 3.1 Klasifikasi Sumberdaya Mineral dan Cadangan

Sumber: Badan Standarisasi Nasional, 1998

Tingkat

klas

sumberdaya

mineral

dan

cadangan

dikelompokkan

berdasarkan kedua kriteria yang menjadi dasar klasifikasi. Berdasarkan kriteria itu, jenis/klas sumberdaya mineral dan cadangan tertera dalam tabel 3.1. 1)

Sumberdaya mineral Sumberdaya mineral terdiri dari: a)

Sumberdaya mineral hipotetik Sumberdaya mineral hipotetik (hypothetical mineral resource) adalah sumberdaya

mineral

yang

kuantitas

dan

kualitasnya

diperoleh

berdasarkan perkiraan pada survei tinjau. b)

Sumberdaya mineral tereka Sumberdaya mineral tereka (inferred mineral resource) adalah sumber daya mineral yang kuantitas dan kualitasnya diperoleh berdasarkan hasil tahap prospeksi.

c)

Sumberdaya mineral terunjuk Sumberdaya mineral terunjuk (indicated mineral resource) adalah sumberdaya

mineral

yang

kuantitas

dan

kualitasnya

diperoleh

berdasarkan hasil tahap eksplorasi umum.

3-2

d)

Sumberdaya mineral terukur Sumberdaya mineral terukur (measured mineral resource) adalah sumberdaya

mineral

yang

kuantitas

dan

kualitasnya

diperoleh

berdasarkan hasil tahap eksplorasi rinci. 2)

Cadangan Cadangan dibagi menjadi dua, yaitu: a)

Cadangan terkira Cadangan terkira (probable reserve) adalah sumberdaya mineral terunjuk dan sebagian sumberdaya mineral terukur yang tingkat keyakinan geologinya masih lebih rendah, yang berdasarkan studi kelayakan tambang semua faktor yang terkait telah terpenuhi, sehingga penambangan dapat dilakukan secara ekonomik.

b)

Cadangan terbukti Cadangan terbukti (proved reserve) adalah sumberdaya mineral terukur yang berdasarkan studi kelayakan tambang semua faktor yang terkait telah terpenuhi, sehingga penambangan dapat dilakukan secara ekonomik.

(Anonim, 1998: 6-8) 3.2. Endapan Bijih Besi Istilah endapan (deposit) mempunyai definisi yang lebih luas dalam ilmu geologi. Istilah tersebut dapat berarti turunnya material di dalam air (karena gravitasi), atau prespitasi dari larutan karena perubahan kondisi kimia. Beberapa ahli menyebut istilah cebakan, karena menganggap istilah endapan lebih berkonotasi pada sedimentasi. Dalam konteks “endapan mineral”, endapan diartikan sebagai konsentrasi mineral oleh proses-proses magmatik atau hidrotermal. Kata endapan juga mempunyai arti materi menjadi padat, oleh karena itu minyak, gas, dan panas bumi tidak termasuk ke dalam endapan mineral. Walaupun batubara juga bersifat padat, umumnya tidak dibahas sebagai endapan mineral, tetapi termasuk ke dalam sumber energi. Secara umum definisi bijih (ore) adalah suatu batuan atau kumpulan mineral, yang mengandung mineral-mineral yang bernilai ekonomis, dan dapat diekstrak. Bijih terdiri dari mineral-mineral yang bernilai ekonomis (biasanya

3-3

mengandung logam) yang disebut sebagai mineral bijih (ore mineral, mengandung logam) serta termasuk mineral industri (industrial mineral, nonlogam) dan mineral yang tidak bernilai ekonomis yang disebut sebagai mineral penyerta (gangue mineral). (Hartosuwarno, ----: 4) Kriteria geologi merupakan gejala yang mengendalikan terdapatnya endapan mineral dan pengetahuan ini bertujuan melokalisir daerah yang mempunyai indikasi kuat akan terdapatnya mineral. Kriteria geologi meliputi kriteria stratigrafi, litologi, struktur, magmatogenik, geomorfologi, paleogeografi, paleoklimat, dan historis. Kriteria stratigrafi digunakan jika suatu endapan mineral ditemukan dalam lapisan stratigrafi. Tugas utama dalam tahap prospeksi yaitu menentukan secara stratigrafi kedudukan endapan mineral, seperti determinasi singkapan dan menentukan luas horison (singkapan horison diikuti sepanjang strike dan dip), kemudian dipetakan secara detail. Kriteria stratigrafi penting artinya untuk mencari endapan sedimen dan endapan hipogene yang berasosiasi dengan lapisan sedimen, seperti batubara, bijih tembaga sedimen, uranium, bauksit, endapan placer, lempung, karbonat dan garam. Kriteria litologi terbagi menjadi dua, pada endapan primer dan pada endapan sekunder. Pada endapan primer, dilihat secara genetik dari komposisi endapan mineral yang terbentuk. Pada endapan sekunder, contohnya seperti endapan placer, litologi batuan sangat penting karena variasi litologi awal yang tererosi akan mempengaruhi produk/akumulasi mineral berat yang terbentuk. (Idrus, 2007: 6-7) Proses terbentuknya bijih sangatlah kompleks. Sering lebih dari satu proses bekerja bersama-sama. Meskipun dari satu jenis bijih, apabila terbentuk oleh proses yang berbeda-beda, maka akan menghasilkan tipe endapan yang berbeda-beda

pula.

Berikut

ini

berbagai

tipe

endapan

dari

proses

pembentukannya. 1)

Konsentrasi magmatik > deposit magmatik

2)

Sublimasi > sublimat

3)

Kontak metasomatisme > deposit kontak metasomatik

4)

Konsentrasi hidrotermal > pengisian celah-celah terbuka (pertukaran ion pada batuan)

5)

Sedimentasi lapisan sedimenter > evaporit

3-4

6)

Pelapukan konsentrasi residual > endapan residual

7)

Metamorfisme > deposit metamorfik

8)

Hidrologi > air tanah Dalam pengendapan bijih besi, ada beberapa macam proses seperti

diferensiasi magmatik, larutan hidrotermal, proses sedimentasi dan proses pelapukan. Kemudian kategorisasi endapan bijih besi didasarkan atas mutu, besar cadangan dan jenis mineral ikutannya. (Nugroho, 2010: 21-22) Dari mineral-mineral bijih besi, magnetit adalah mineral dengan kandungan Fe paling tinggi, tetapi terdapat dalam jumlah kecil. Sementara hematit merupakan mineral bijih utama yang dibutuhkan dalam industri besi. Mineral-mineral pembawa besi dengan nilai ekonomis dengan susunan kimia, kandungan Fe dan klasifikasi komersil dapat dilihat pada Tabel 3.2. Tabel 3.2 Mineral-mineral Bijih Bernilai Ekonomis Mineral

Susunan Kimia

Magnetit

FeO, Fe2O3

Hematit

Fe2O3

Limonit

Fe2O3.nH2O

Siderit

FeCO3

Kandungan Fe

Klasifikasi Komersil

72,4 %

Magnetik atau bijih hitam

70 %

Bijih merah

59 – 63 %

Bijih coklat

48,2 %

Spathic, black band, clay ironstone

Sumber: Nugroho, 2010

3.3. Bauksit Bauksit merupakan kelompok mineral aluminium hidroksida seperti gibsit, boehmit, diaspor. Mempunyai warna putih atau kekuningan dalam keadaan murni, merah atau coklat apabila terkontaminasi oleh besi oksida atau bitumen. Bauksit relatif sangat lunak (kekerasan 1-3), relatif ringan dengan berat jenis 2.32.7, mudah patah, tidak larut dalam air dan tidak terbakar. Bahan galian ini terjadi dari proses pelapukan (laterisasi) batuan induk, erat kitannya dengan persebaran granit. Boehmit didapatkan juga dalam rekahan pada batuan nepelin syenit pegmatit, sebagai hasil proses alterasi hidrotermal dari nepelin atau feldspar. Bijih bauksit laterit terjadi di daerah tropis dan subtropis, serta membentuk perbukitan landai, yang memungkinkan terjadinya pelapukan yang cukup kuat. Bauksit dapat terbentuk dari batuan yang mempunyai kadar aluminium relatif

3-5

tinggi, kadar Fe rendah dan sedikit kadar kuarsa (SiO2) bebas. Batuan yang memenuhi persyaratan itu antara lain nepelin syenit dan sejenisnya yang berasal dari batuan beku, batuan lempung/serpih. Batuan di atas akan mengalami proses laterisasi yaitu proses yang terjadi karena pertukaran suhu secara terus menerus sehingga batuan mengalami pelapukan. Pada musim hujan air memasuki rekahan-rekahan dan menghanyutkan unsur yang mudah larut, sementara unsur yang sukar larut/tidak larut tertinggal dalam batuan induk. Setelah unsur-unsur yang mudah larut seperti Na dan K, Mg dan Ca, dihanyutkan oleh air, residu yang tertinggal (disebut laterit) menjadi kaya akan hidroksida alumina Al(OH)3 yang kemudian oleh proses dehidrasi akan mengeras menjadi bauksit. (Sukandarrumidi, 1998; 152-153) 3.4. Penaksiran Cadangan Pentingnya penaksiran cadangan dalam suatu industri pertambangan ditunjukkan dalam beberapa alasan, yaitu sebagai berikut: 1)

Memberikan hasil perhitungan kuantitas maupun kualitas (kadar) endapan.

2)

Memberikan perkiraan geometri 3 dimensi dari endapan serta distribusi ruang (spasial) dari nilainya. Hal ini penting untuk menentukan urutan/ tahapan penambangan, yang pada gilirannya akan mempengaruhi pemilihan peralatan dan NPV (Net Present Value) dari tambang.

3)

Jumlah cadangan menentukan umur tambang, hal ini penting dalam kaitannya

dengan

perancangan

pabrik

pengolahan

dan

kebutuhan

infrastruktur yang lain. 4)

Batas-batas kegiatan penambangan (pit limit) dibuat berdasarkan taksiran cadangan. Faktor ini harus diperhatikan dalam menentukan lokasi pembuangan tanah/ batuan penutup dan tailing (waste dump dan tailing impoundment), pabrik pengolahan bijih, bengkel dan fasilitas lainnya. Karena semua keputusan teknis di atas sangat tergantung padanya,

penaksiran cadangan merupakan salah satu tugas terpenting dan berat tanggung jawabnya dalam mengevaluasi suatu proyek pertambangan. Harus pula diingat bahwa penaksiran cadangan menghasilkan suatu taksiran. Model cadangan yang dibuat adalah pendekatan dari suatu realistis, berdasarkan data/ informasi yang dimiliki dan masih mengandung ketidakpastian. (Nurhakim, 2008: 2-1)

3-6

3.5. Model Blok Teratur (Regular Block Model) Model cadangan adalah cara dan sistematika estimasi cadangan suatu endapan mineral berdasarkan metode penaksiran yang sesuai, tergantung pada kompleksitas geometri dan penyebaran kadar. Output-nya adalah cadangan endapan (probable atau proven reserve). Model cadangan ini dapat dilakukan secara komputerisasi (model komputer), salah satunya model blok teratur. Model blok teratur (regular block model), cebakan dibagi dalam blok-blok dengan dimensi tertentu. Tiap blok memiliki atribut jenis batuan, alterasi, mineralisasi, kadar, kode topografi dan sebagainya. (Idrus, 2007: 17) Pemilihan model blok teratur (regular block model) sebagai metode dalam permodelan endapan bijih didasarkan atas beberapa hal, yaitu: 1)

Cebakan bijih dan daerah sekitarnya dibagi menjadi unit-unit yang lebih kecil atau blok-blok, yang memiliki ukuran (panjang, lebar dan tinggi) tertentu. Tinggi blok biasanya disesuaikan dengan tinggi jenjang penambangan.

2)

Tiap-tiap blok memiliki atribut-atribut seperti jenis batuan

Gambar 3.1 Model Endapan Blok

3-7

3.6. Estimasi dengan Inverse Distance Weighted (IDW) Metode ini membagi daerah yang akan dihitung cadangannya atas blokblok yang sama luasnya. Blok umumnya berbentuk bujur sangkar dengan panjang sisi sekitar 1/2 - 1/3 jarak lubang bor. Cadangan dihitung dengan menjumlahkan tonase masing-masing blok dan kadar rata-rata blok diperoleh dengan cara perhitungan kadar dengan pembobotan tonase. (Idrus, 2007: 69) Kadar dan ketebalan setiap blok dihitung berdasarkan data lubang bor disekitarnya yang terdekat dengan cara pembobotan jarak terbalik (inverse distance) atau kriging (cara geostatistik). Sebaran data yang tidak teratur umumnya memberikan persoalan dalam meramal suatu blok yang tidak mempunyai data yang terletak di antara blok-blok yang mempunyai data seperti yang ditunjukkan dalam Gambar 3.2.

Gambar 3.2 Metode Pembobotan dengan Jarak Terbalik Untuk memecahkan persoalan ini digunakan suatu metode penaksiran yang didasarkan atas jarak conto terhadap blk tersebut. Pembobotan berdasarkan jarak yang biasa dipakai, yaitu inverse distance (ID), inverse distance square (IDS), inverse distance cubed (IDC).

3-8

Formula pembobotan jarak (distance weighting) adalah: ( )

Dimana:

l =

=

l =1

( )l



Z(v)

= kadar blok yang diestimasi

Z(xi)

= kadar titik/ blok pada jarak xi

i

= nilai pembobotan jarak

di

= jarak blok yang diestimasi dengan titik bor tertentu

(Idrus, 2007: 69-70)

3-9

BAB IV METODE PENELITIAN

4.1. Diagram Alir Penelitian Diagram Alir penelitian yang dilakukan adalah sebagai berikut: Mulai

Studi Literatur dan Identifikasi Masalah

Pengumpulan Data

  

Data Primer Kesampaian daerah penelitian Conto batuan Data eksplorasi (test pit)

  

     

Data Sekunder Peta dasar daerah penelitian Peta geologi daerah penelitian Topografi daerah penelitian Koordinat batas IUP PT KIM Data bor Data kadar

Pengolahan Data Menghitung statistik data tebal dan kadar bijih besi Memodelkan lapisan bijih besi dengan metode blok regular Memodelkan lapisan bijih besi dengan metode blok non regular

Tidak Analisa Data  Mengestimasi tebal dan kadar bijih besi dengan metode IDS.  Mengestimasi tebal dan kadar bijih besi dengan metode IDC.  Menghitung jumlah sumberdaya pada setiap metode yang digunakan.

Ya 1

4-1

1

 

Hasil yang dicapai Beberapa rekomendasi model dan estimasi yang digunakan untuk perhitungan sumberdaya bijih besi di PT Kotabesi Iron Mining. Jumlah sumberdaya bijih besi pada area Blok II di PT Kotabesi Iron Mining.

Selesai

4.2. Teknik Pengumpulan Data Pada penelitian ini penulis melakukan teknik pengumpulan data dengan beberapa metode sebagai berikut: 1.

Pengambilan data lapangan yang meliputi metode deskriptif melalui studi lapangan dan observasi dengan membuat beberapa test pit di lokasi penelitian.

2.

Metode korelasional dengan mengolah data bor yang sebelumnya telah dikerjakan, kemudian disusun secara sistematis, faktual dan cermat.

3.

Wawancara dengan mengadakan dialog langsung dengan pihak perusahaan dan beberapa warga yang pernah terlibat langung dengan kegiatan pemboran di lokasi ini.

4.

Studi kepustakaan yaitu berdasarkan studi literatur, dimana data diperoleh dari literatur dan hasil laporan yang sudah ada.

4.3. Teknik Analisa Data Pada penelitian ini pengolahan data yang ada menggunakan perangkat lunak untuk menghitung angka, membuat peta dan memodelkan block. Sedangkan penulisan laporan menggunakan perangkat lunak untuk menulis dan menyajikan data.

4-2

BAB V HASIL PENELITIAN DAN PEMBAHASAN

5.1. Data Penelitian Kegiatan eksplorasi dilakukan pada beberapa titik dalam batas IUP PT Kotabesi Iron Mining. Kegiatan ini bertujuan untuk mengetahui karakteristik batuan pada setiap lapisan. Oleh karena itu, penelitan di lapangan dilakukan dengan mengamati sungai, tebing, paritan maupun bekas galian, dan membuat test pit berukuran 2×2 meter pada lokasi yang terindikasi terdapat endapan bijih besi. Daerah ini secara umum memiliki lapisan bijih besi yang mulai terdapat pada permukaan topografi wilayah ini. Dari hasil pengamatan lapangan, dikatahui bahwa batuan pada lapisan pertama berukuran kerikil – kerakal, kemudian pada lapisan kedua ditandai dengan ukuran butir yang lebih besar dari lapisan pertama, yaitu berukuran berangkal – bongkah. Semakin ke bawah, ukuran butir semakin kasar (semakin besar) sehingga menunjukan struktur gradasi yang dicirikan oleh perubahan tekstur batuan secara perlahan-lahan dari atas ke bawah. Lapisan pertama yaitu lapisan teratas dinamai dengan gravel dan lapisan kedua dinamai dengan boulder. Seperti pada lampiran A, mengenai deskripsi batuan. Diketahui bahwa lapisan gravel dan boulder memiliki ukuran butir yang berbeda. Gravel menunjukan gradasi bijih besi berukuran kerikil – kerakal yang materialnya kompak dan padat, tampak seperti jenis hematit – magnetit namun kadarnya terlampau kecil untuk jenis bijih besi ini. Sedangkan boulder memperlihatkan gradasi bijih besi berukuran berangkal – bongkah, namun batuanya sangat rapuh dan banyak ditemukan material berukuran lempung pada lapisan ini, tampak seperti jenis bijih besi sulfat apabila melihat karakteristik dan nilai kadarnya. Sehingga ditentukan nilai berat jenis bijih besi sulfat yang berkisar antara 4.8 – 5.1 ton/m3.

5-1

5.1.1. Data Penelitian Data yang digunakan dalam penelitian ini adalah data bor perusahaan pada Blok II daerah penelitian. Data bor ini terdiri koordinat titik bor, elevasi titik bor, tebal lapisan, kadar serta tipe batuan pada setiap titik bor. Data penelitian ini disajikan pada Lampiran B. 5.1.2. Statistik Data Statistik data dilakukan pada parameter tebal dan kadar dari data titik bor di Blok II dengan beberapa metode perhitungan seperti nilai rata-rata, minimum, maksimum dan standar deviasi dari parameter tersebut. Hasil perhitungan statistik data digunakan sebagai batas dan acuan dalam pembuatan blok model regular dan blok model non regular. Hasil perhitungan statistik data disajikan pada tabel 5.1. Tabel 5.1 Statistik Data dengan Parameter Tebal dan Kadar Gravel

Boulder

Bedrock

Tebal (m)

Kadar (%)

Tebal (m)

Kadar (%)

Tebal (m)

Minimum

0.33

48.10

3.02

38.9

1.16

Maksimum

0.55

54.60

3.43

47.2

1.46

Rata-rata

0.44

52.39

3.25

44.8

1.31

Standar Deviasi

0.06

1.63

0.11

2.21

0.09

Sumber: Lampiran C

5.2. Permodelan dan Perhitungan 5.2.1. Penentuan Block Model 1. Block model regular Block model regular adalah model yang ukuran bloknya dibuat teratur pada permukaan lapisan. Berdasaran ketentuan ukuran blok yang dibuat 1/3 – 1/2 jarak lubang bor dengan jarak rata-rata 250 meter. Oleh karena itu, permodelan block regular pada lapisan bijih besi berukuran 100×100 meter. Model disajikan pada Lampiran E. 2. Block model non regular Block model non regular adalah model yang ukuran bloknya dibuat tidak beraturan. Variasi ukuran block yaitu 100×100 meter, 100×50 meter dan 100×25 meter. Model disajikan pada lampiran F.

5-2

5.2.2. Estimasi Inverse Distance Weighting (IDW) 1. Estimasi Inverse Distance Square (IDS) Berdasarkan permodelan blok regular dan blok non regular didapatkan hasil estimasi IDS dari tebal dan kadar pada lapisan gravel dan boulder. Berikut data estimasi IDS pada masing-masing lapisan yang disajikan pada tabel 5.2. Tabel 5.2 Hasil Rata-rata Estimasi Inverse Distance Square Lapisan Gravel Lapisan Boulder Estimasi Jumlah Tebal Kadar Jumlah Tebal Kadar Blok (m) (%Fe) Blok (m) (%Fe) Block Regular 100x100 92.00 0.44 53 92.00 3.26 45 Block Regular 100x50 184.00 0.44 52 183.00 3.26 45 Block Regular 100x25 375.00 0.44 52 365.00 3.28 45 Block Non Regular 331.00 0.44 52 198.00 3.26 45 Sumber: Lampiran H dan Lampiran I

2. Estimasi Inverse Distance Cubic (IDC) Berdasarkan permodelan blok regular dan blok non regular didapatkan hasil estimasi IDC dari tebal dan kadar pada lapisan gravel dan boulder Berikut data estimasi IDC pada masing-masing lapisan yang disajikan pada tabel 5.3. Tabel 5.3 Hasil Rata-rata Estimasi Inverse Distance Cubic Lapisan Gravel Lapisan Boulder Estimasi Jumlah Tebal Kadar Jumlah Tebal Kadar Blok (m) (%Fe) Blok (m) (%Fe) Block Regular 100x100 92.00 0.45 53 92.00 3.25 45 Block Regular 100x50 184.00 0.44 52 183.00 3.25 45 Block Regular 100x25 375.00 0.44 52 365.00 3.28 45 Block Non Regular 331.00 0.44 52 198.00 3.25 45 Sumber: Lampiran J dan Lampiran K

5.2.3. Cross Validation Data Aktual Kadar dengan Hasil Estimasi IDS dan IDS Cross Validation disajikan untuk mengetahui distribusi data antara nilai aktual dengan hasil estimasinya. Data yang dimaksud adalah data kadar Fe aktual dengan hasil estimasi kadar Fe menggunakan IDS dan IDC.

5-3

Cross Validation Kadar Aktual dengan Hasil Estimasi IDS 60%

Kadar Aktual (%Fe)

55% 50% 45% 40% 35% 35%

40%

45%

50%

55%

60%

Kadar Estimasi IDS (%Fe) Kadar Lapisan Gravel

Kadar Lapisan Boulder

Sumber: Lampiran H, Lampiran I dan Lampiran L

Gambar 5.1 Grafik Cross Validation Hasil Estimasi IDS

Cross Validation Kadar Aktual dengan Hasil Estimasi IDC

Kadar Aktual (%Fe)

60% 55% 50% 45% 40% 35% 35%

40%

45%

50%

55%

60%

Kadar Estimasi IDC (%Fe) Kadar Lapisan Gravel

Kadar Lapisan Boulder

Sumber: Lampiran J, Lampiran K dan Lampiran L

Gambar 5.2 Grafik Cross Validation Hasil Estimasi IDC

5-4

5.2.4. Hasil Perhitungan Sumberdaya Berdasarkan permodelan block regular dan block non regular didapatkan sumberdaya masing-masing lapisan yang ditentukan dari perhitungan luas model blok dikali total tebal estimasi IDS dan total tebal estimasi IDC. Untuk mengetahui berat sumberdaya bijih besi yang terdapat di area Blok II, maka perlu dihitung tonase batuan tersebut. Adapun berat jenis yang digunakan dalam penentuan tonase material adalah 4.8 ton/m3. Tabel 5.4 Hasil Perhitungan Sumberdaya Berdasarkan Estimasi IDS Sumberdaya

Lapisan Gravel 3

Lapisan Boulder 3

Volume (m )

Tonase (Ton)

Kadar (%Fe)

Volume (m )

Tonase (Ton)

Kadar (%Fe)

Block Regular

407,900

1,957,920

53

2,997,600

14,388,480

45

Block Non Regular

413,625

1,985,400

52

2,997,325

14,387,160

45

Sumber: Lampiran M

Tabel 5.5 Hasil Perhitungan Sumberdaya Berdasarkan Estimasi IDC Sumberdaya

Lapisan Gravel 3

Lapisan Boulder 3

Volume (m )

Tonase (Ton)

Kadar (%Fe)

Volume (m )

Tonase (Ton)

Kadar (%Fe)

Block Regular

409,500

1,965,600

53

2,993,100

14,366,880

45

Block Non Regular

414,300

1,988,640

52

2,992,875

14,365,800

45

Sumber: Lampiran M

5.2.5. Deviasi Sumberdaya pada Block Regular terhadap Block Non Regular Berdasarkan hasil perhitungan sumberdaya, perlu diketahui deviasi masing-masing model, agar didapatkan permodelan yang ideal untuk digunakan pada daerah ini. Berikut ini merupakan deviasi dari perhitungan sumberdaya. Tabel 5.6 Deviasi Sumberdaya pada Block Regular terhadap Block Non Regular Estimasi IDS pada Lapisan Gravel IDC pada Lapisan Gravel IDS pada Lapisan Boulder IDC pada Lapisan Boulder Sumber: Lampiran M

Block Regular

Deviasi

100×100 100×100 100×100 100×100

-0.01384 -0.01159 0.00009 0.00008

5-5

5.3. Pembahasan Penggunaan metode block regular pada area pemboran di Blok II, diharapkan dapat mewakali daerah pengaruh sebaran bijih besi di lokasi ini. Hal ini dengan mempertimbangkan sebaran bijih besi yang diamati secara aktual serta litologi batuan yang menunjukan lapisan bahan galian tersebut. Penentuan ukuran block regular yaitu 100×100 meter, dibuat berdasarkan 1/2 - 1/3 jarak antar titik bor. Jarak rata-rata antar titik bor dalam luasan area penelitan adalah sekitar 250 meter. Sedangkan ukuran block non regular menggunakan ukuran blok 100×100 meter, 100×50 meter, 100×25 meter. Pembuatan model block non regular bertujuan untuk meminimalisir terjadinya efek salting dan dilusi yang tidak dapat diatasi oleh model block regular. Metode estimasi digunakan untuk memperhitungkan daerah pengaruh lubang bor yang diperkirakan terdapat endapan bijih besi namun tidak diketahui besaran tebal dan kadar yang ada pada daerah pengaruh tersebut. Pada penelitian ini dugunakan metode estimasi inverse distance square (IDS) dan inverse distance cubic (IDC). Metode ini mempertimbangkan data titik disekitarnya, dengan asumsi nilai blok akan lebih mirip dengan data titik bor yang lebih dekat daripada yang jaraknya lebih jauh. Nilai pangkat pada estimasi inverse distance ditunjukan dengan “square”, “cubic” dan seterusnya yang merupakan nilai power. Semakin tinggi power pada estimasi ini maka nilai blok yang didapat akan semakin mendekati nilai titik bor yang ada didekatnya. Sehingga pemilihan nilai power harus dilakukan dengan cermat, karena sangat mempengaruhi hasil interpolasinya. Berdasarkan cross validation dapat dilihat bahwa nilai estimasi masih mendekati data aktualnya. Namun pada beberapa titik terlihat selisih cukup signifikan yang memperlihatkan nilai estimasi lebih tinggi dari data aktualnya. Hal ini akan mempengaruhi jumlah sumberdaya bijih besi yang dihitung. Terlihat dari deviasi antara Block Regular dengan Block Non Regular yang menunjukan deviasi pada Lapisan Gravel lebih besar dibandingkan pada Lapisan Boulder. Namun nilai deviasi masih cukup kecil, sehingga permodelan dengan Block Model yang diestimasi dengan metode IDS dan IDC masih cukup baik untuk digunakan pada penelitian ini.

5-6

BAB VI PENUTUP

6.1. Kesimpulan Kesimpulan yang dihasilkan dari penelitian ini adalah: 1.

Lapisan bijih besi yang terdapat pada lapisan pertama tersusun atas fragmen berukuran kerikil sampai kerakal yang tersementasi oleh oksida besi, lapisan ini dinamakan lapisan Gravel. Lapisan berikutnya berukuran berangkal – bongkah yang dinamakan dengan lapisan boulder.

2.

Pada lapisan gravel didapatkan nilai rata-rata tebal sebesar 0.44 meter dan kadar 52.39%. Sedangkan pada lapisan boulder nilai rata-rata tebal sebesar 3.25 meter dan kadar 44.8%.

3.

Permodelan yang digunakan pada penelitian ini yaitu Model Block Regular dan Model Block Non Regular.

4.

Estimasi tebal dan kadar bijih besi pada Block Model menggunakan metode Inverse Distance Square dan Inverse Distance Cubic.

5.

Berdasarkan hasil permodelan menggunakan block model regular dan block model non regular, yang diestimasi dengan metode IDS dan IDC, maka didapatkan jumlah sumberdaya pada lapisan gravel berkisar 1,957,920 ton sampai 1,988,640 ton dengan 52% kadar Fe, sedangkan pada lapisan boulder berkisar dari 14,365,800 ton sampai 14,388,480 ton dengan 42% kadar Fe.

6.2. Saran Saran yang dapat penulis sampaikan adalah sebagai berikut: 1.

Permodelan dengan Block Model Regular dan Block Model Non Regular yang diestimasi dengan metode IDS dan IDC di PT Kotabesi Iron Mining dapat

dijadikan

bahan

lanjutan

untuk

perhitungan

sumberdaya

menggunakan metode Geostatistika. 2.

Perlu dilakukan perhitungan sumberdaya dengan metode lain pada lokasi ini yang dapat menjadi bahan pembanding dengan hasil penelitan ini. 6-1

DAFTAR PUSTAKA

Anonim. 1998. Klasifikasi Sumberdaya Mineral dan Cadangan. Standarisasi Nasional: Indonesia

Badan

Hartosuwarno, Sutarto. ----. Endapan Mineral. Universitas Pembangunan Nasional “Veteran”: Yogyakarta Idrus, Arifudin. 2007. Eksplorasi Sumberdaya Mineral. Universitas Gadjah Mada: Yogyakarta Nugroho, Aris. 2010. Laterit dan Endapan Bijih. Scribd: Indonesia Nurhakim. 2008. Bahan Kuliah Perencanaan dan Permodelan Tambang. Universitas Lambung Mangkurat: Banjarbaru Sukandarrumidi. 1998. Bahan Galian Industri. Universitas Gadjah Mada University Press: Yogyakarta

LAMPIRAN A HASIL PENGAMATAN AKTUAL A.1. Lokasi Pengamatan Tabel A.1 Data Lokasi Pengamatan Aktual Titik Informasi

Easting

Northing

Elevasi

S01

681801

9742633

18

S01

681801

9742633

18

S02

681490

9742626

19

S02

681490

9742626

19

S03

681044

9741877

21

S03

681044

9741877

S04

680956

9741857

S04

680956

S05 S05

From (m)

To (m)

Lapisan

0

0.35

Pertama

Paritan

Blok I

0.35

17.65

Kedua

Paritan

Blok I

0

0.42

Pertama

Tebing

Blok I

0.42

18.58

Kedua

Tebing

Blok I

0

0.38

Pertama

Paritan

Blok I

21

0.38

20.62

Kedua

Paritan

Blok I

25

0

0.44

Pertama

Bekas Galian

Blok I

9741857

25

0.44

24.56

Kedua

Bekas Galian

Blok I

679657

9741115

38

0

0.37

Pertama

Bekas Galian

Blok I

679657

9741115

38

0.37

37.63

Kedua

Bekas Galian

Blok I

S06

681058

9741698

23

0

0.42

Pertama

Paritan

Blok I

S06

681058

9741698

23

0.42

22.58

Kedua

Paritan

Blok I

S07

681146

9741658

27

0.39

0.36

Pertama

Sumur Uji

Blok I

S07

681146

9741658

27

0.36

26.64

Kedua

Sumur Uji

Blok I

S08

680795

9741763

44

0

0.44

Pertama

Bekas Galian

Blok I

S08

680795

9741763

44

0.44

43.56

Kedua

Bekas Galian

Blok I

S09

680914

9741787

42

0

0.46

Pertama

Paritan

Blok I

S09

680914

9741787

42

0.46

41.54

Kedua

Paritan

Blok I

S10

680508

9742550

27

0.57

0.35

Pertama

Sumur Uji

Blok I

S10

680508

9742550

27

0.35

26.65

Kedua

Sumur Uji

Blok I

S11

680523

9742605

30

2.18

0.43

Pertama

Trenching

Blok I

S11

680523

9742605

30

0.43

29.57

Kedua

Trenching

Blok I

S12

682200

9745067

24

0

0.33

Pertama

Bekas Galian

Blok III

S12

682200

9745067

24

0.33

23.67

Kedua

Bekas Galian

Blok III

S13

682243

9744578

36

0

0.35

Pertama

Tebing

Blok III

S13

682243

9744578

36

0.35

35.65

Kedua

Tebing

Blok III

S14

681546

9742932

44

0

0.47

Pertama

Tebing

Blok II

S14

681546

9742932

44

0.47

43.53

Kedua

Tebing

Blok II

S15

681754

9743881

31

0

0.45

Pertama

Sumur Uji

Blok II

S15

681754

9743881

31

0.45

30.55

Kedua

Sumur Uji

Blok II

S16

681767

9743922

29

0

0.38

Pertama

Sumur Uji

Blok II

S16

681767

9743922

29

0.38

28.62

Kedua

Sumur Uji

Blok II

Objek

Lokasi

A-1

A.2. Deskripsi Batuan Lapisan 1 Deskripsi 1.

Nomor Batuan

2.

Warna Batuan

: 01

a. Warna lapuk

: Hitam - kecokelatan

b. Warna segar

: Hitam

3.

Struktur

: Gradasi normal

4.

Tekstur

5.

a. Ukuran butir

: Kerikil – Kerakal (0.3 – 3.0 sentimeter)

b. Sortasi

: medium sorted (pemilihan sedang)

c. Kemas

: terbuka

d. Porositas

: baik

e. Kebundaran

: sub rounded (membulat tanggung)

Komposisi Batuan a. Fragmen

: Kerakal (30%)

b. Matrik

: Kerikil (50%)

c. Semen

: Oksida besi (20%)

6.

Jenis Batuan

: Sedimen klastik

7.

Nama Batuan

: Konglomerat Bijih besi

8.

Gambar

:

A-2

A.3. Deskripsi Batuan Lapisan 2 Deskripsi 9.

Nomor Batuan

: 02

10. Warna Batuan c. Warna lapuk

: Cokelat - kekuningan

d. Warna segar

: Abu-abu - kecokelatan

11. Struktur

: Gradasi normal berpori

12. Tekstur f. Ukuran butir

: Berangkal - bongkah (10 – 250 sentimeter)

g. Sortasi

: poorly sorted (pemilihan buruk)

h. Kemas

: terbuka

i. Porositas

: baik

j. Kebundaran

: sub angular (menyudut tanggung)

13. Komposisi Batuan d. Fragmen

: Bongkah (25%)

e. Matrik

: Berangkal (45%)

f. Semen

: Oksida besi (30%)

14. Jenis Batuan

: Sedimen klastik

15. Nama Batuan

: Breksi Bijih besi

16. Gambar

:

A-3

LAMPIRAN B DATA BOR

Data bor yang digunakan pada penelitian ini adalah hasil kegiatan pemboran di area Blok II PT Kotabesi Iron Mining. Data ini meliputi koordinat lubang bor, tebal batuan hasil pemboran serta kadar Fe. Berikut adalah data bor yang disajikan pada tabel Lampiran B.1. Tabel B.1 Data Bor Blok II PT Kotabesi Iron Mining DRILL NAME

Easting

Northing

Elevasi

From

To

Assay (%)

Rock Type

DH01

681902

9744228

14

0

0.46

48.8

Gravel

DH01

681902

9744228

14

0.46

3.61

39.5

Boulder

DH01

681902

9744228

14

3.61

5

-

Bedrock

DH02

682097

9744128

15

0

0.43

51.2

Gravel

DH02

682097

9744128

15

0.43

3.69

41.2

Boulder

DH02

682097

9744128

15

3.69

5

-

Bedrock

DH03

681717

9744084

15

0

0.55

48.1

Gravel

DH03

681717

9744084

15

0.55

3.78

38.9

Boulder

DH03

681717

9744084

15

3.78

5

-

Bedrock

DH04

681892

9743989

17

0

0.43

53.4

Gravel

DH04

681892

9743989

17

0.43

3.54

44.1

Boulder

DH04

681892

9743989

17

3.54

5

-

Bedrock

DH05

681701

9743885

16

0

0.46

49.8

Gravel

DH05

681701

9743885

16

0.46

3.71

44.2

Boulder

DH05

681701

9743885

16

3.71

5

-

Bedrock

DH06

681841

9743796

19

0

0.39

52.6

Gravel

DH06

681841

9743796

19

0.39

3.81

46.7

Boulder

DH06

681841

9743796

19

3.81

5

-

Bedrock

DH07

682257

9744029

9

0

0.44

50.2

Gravel

DH07

682257

9744029

9

0.44

3.76

43.9

Boulder

DH07

682257

9744029

9

3.76

5

-

Bedrock

DH08

682036

9743910

23

0

0.52

53.5

Gravel

DH08

682036

9743910

23

0.52

3.54

41.6

Boulder

DH08

682036

9743910

23

3.54

5

-

Bedrock

DH09

681947

9743742

16

0

0.37

53.9

Gravel

DH09

681947

9743742

16

0.37

3.62

46.2

Boulder

B-1

DRILL NAME

Easting

Northing

Elevasi

From

To

Assay (%)

Rock Type

DH09

681947

9743742

16

3.62

5

-

Bedrock

DH10

681907

9743543

19

0

0.53

53.2

Gravel

DH10

681907

9743543

19

0.53

3.79

41.9

Boulder

DH10

681907

9743543

19

3.79

5

-

Bedrock

DH11

681776

9743607

22

0

0.38

52.8

Gravel

DH11

681776

9743607

22

0.38

3.78

45.5

Boulder

DH11

681776

9743607

22

3.78

5

-

Bedrock

DH12

681651

9743706

18

0

0.45

53.4

Gravel

DH12

681651

9743706

18

0.45

3.62

46.4

Boulder

DH12

681651

9743706

18

3.62

5

-

Bedrock

DH13

681497

9743544

14

0

0.42

53.2

Gravel

DH13

681497

9743544

14

0.42

3.59

44.2

Boulder

DH13

681497

9743544

14

3.59

5

-

Bedrock

DH14

681607

9743479

24

0

0.33

52.6

Gravel

DH14

681607

9743479

24

0.33

3.75

43.2

Boulder

DH14

681607

9743479

24

3.75

5

-

Bedrock

DH15

681707

9743394

31

0

0.37

53.6

Gravel

DH15

681707

9743394

31

0.37

3.56

46.2

Boulder

DH15

681707

9743394

31

3.56

5

-

Bedrock

DH16

681817

9743280

30

0

0.36

52.3

Gravel

DH16

681817

9743280

30

0.36

3.79

43.7

Boulder

DH16

681817

9743280

30

3.79

5

-

Bedrock

DH17

681781

9743057

27

0

0.48

52.7

Gravel

DH17

681781

9743057

27

0.48

3.71

46.8

Boulder

DH17

681781

9743057

27

3.71

5

-

Bedrock

DH18

681696

9743130

34

0

0.41

49.5

Gravel

DH18

681696

9743130

34

0.41

3.55

44.8

Boulder

DH18

681696

9743130

34

3.55

5

-

Bedrock

DH19

681566

9743245

29

0

0.42

53.1

Gravel

DH19

681566

9743245

29

0.42

3.83

47.1

Boulder

DH19

681566

9743245

29

3.83

5

-

Bedrock

DH20

681426

9743319

16

0

0.53

49.1

Gravel

DH20

681426

9743319

16

0.53

3.68

42.1

Boulder

DH20

681426

9743319

16

3.68

5

-

Bedrock

DH21

681391

9743165

19

0

0.47

52.9

Gravel

DH21

681391

9743165

19

0.47

3.68

46.7

Boulder

DH21

681391

9743165

19

3.68

5

-

Bedrock

DH22

681536

9743066

33

0

0.35

52.1

Gravel

DH22

681536

9743066

33

0.35

3.78

46.5

Boulder

B-2

DRILL NAME

Easting

Northing

Elevasi

From

To

Assay (%)

Rock Type

DH22

681536

9743066

33

3.78

5

-

Bedrock

DH23

681685

9742946

31

0

0.48

52.8

Gravel

DH23

681685

9742946

31

0.48

3.84

45.6

Boulder

DH23

681685

9742946

31

3.84

5

-

Bedrock

DH24

681520

9742847

33

0

0.38

53.6

Gravel

DH24

681520

9742847

33

0.38

3.63

46.9

Boulder

DH24

681520

9742847

33

3.63

5

-

Bedrock

DH25

681619

9742659

27

0

0.52

52.3

Gravel

DH25

681619

9742659

27

0.52

3.76

46.1

Boulder

DH25

681619

9742659

27

3.76

5

-

Bedrock

DH26

681489

9742729

32

0

0.48

52.9

Gravel

DH26

681489

9742729

32

0.48

3.72

45.5

Boulder

DH26

681489

9742729

32

3.72

5

-

Bedrock

DH27

681335

9742823

37

0

0.41

52.5

Gravel

DH27

681335

9742823

37

0.41

3.54

43.9

Boulder

DH27

681335

9742823

37

3.54

5

-

Bedrock

DH28

681355

9742982

30

0

0.53

53.5

Gravel

DH28

681355

9742982

30

0.53

3.62

47.2

Boulder

DH28

681355

9742982

30

3.62

5

-

Bedrock

DH29

681201

9743066

23

0

0.45

54.6

Gravel

DH29

681201

9743066

23

0.45

3.56

45.4

Boulder

DH29

681201

9743066

23

3.56

5

-

Bedrock

DH30

681175

9742892

32

0

0.44

53.3

Gravel

DH30

681175

9742892

32

0.44

3.72

45.2

Boulder

DH30

681175

9742892

32

3.72

5

-

Bedrock

DH31

681010

9742818

25

0

0.52

54.3

Gravel

DH31

681010

9742818

25

0.52

3.65

45.8

Boulder

DH31

681010

9742818

25

3.65

5

-

Bedrock

DH32

681195

9742723

41

0

0.43

53.1

Gravel

DH32

681195

9742723

41

0.43

3.82

46.6

Boulder

DH32

681195

9742723

41

3.82

5

-

Bedrock

DH33

681365

9742644

40

0

0.52

52.9

Gravel

DH33

681365

9742644

40

0.52

3.75

46.9

Boulder

DH33

681365

9742644

40

3.75

5

-

Bedrock

DH34

681488

9742555

34

0

0.38

53.4

Gravel

DH34

681488

9742555

34

0.38

3.68

46.8

Boulder

DH34

681488

9742555

34

3.68

5

-

Bedrock

B-3

LAMPIRAN C STATISTIK DATA

Statistik data data dilakukan pada parameter tebal dan kadar dari data bor di Blok II dengan beberapa metode perhitungan seperti nilai rata-rata, minimum, maksimum dan standar deviasi dari parameter tersebut. Berikut adalah data yang digunakan dalam perhitungan statistik. Tabel Lampiran C.1 Statistik Data Gravel Kadar (%) 48.80

Boulder Tebal Kadar (m) (%) 3.15 39.50

Bedrock Tebal Kadar (m) (%) 1.39 -

DH01

Tebal (m) 0.46

DH02

0.43

51.20

3.26

41.20

1.31

-

DH03

0.55

48.10

3.23

38.90

1.22

-

DH04

0.43

53.40

3.11

44.10

1.46

-

DH05

0.46

49.80

3.25

44.20

1.29

-

DH06

0.39

52.60

3.42

46.70

1.19

-

DH07

0.44

50.20

3.32

43.90

1.24

-

DH08

0.52

53.50

3.02

41.60

1.46

-

DH09

0.37

53.90

3.25

46.20

1.38

-

DH10

0.53

53.20

3.26

41.90

1.21

-

DH11

0.38

52.80

3.4

45.50

1.22

-

DH12

0.45

53.40

3.17

46.40

1.38

-

DH13

0.42

53.20

3.17

44.20

1.41

-

DH14

0.33

52.60

3.42

43.20

1.25

-

DH15

0.37

53.60

3.19

46.20

1.44

-

DH16

0.36

52.30

3.43

43.70

1.21

-

DH17

0.48

52.70

3.23

46.80

1.29

-

DH18

0.41

49.50

3.14

44.80

1.45

-

DH19

0.42

53.10

3.41

47.10

1.17

-

DH20

0.53

49.10

3.15

42.10

1.32

-

DH21

0.47

52.90

3.21

46.70

1.32

-

DH22

0.35

52.10

3.43

46.50

1.22

-

DH23

0.48

52.80

3.36

45.60

1.16

-

DH24

0.38

53.60

3.25

46.90

1.37

-

DH25

0.52

52.30

3.24

46.10

1.24

-

DH26

0.48

52.90

3.24

45.50

1.28

-

C-1

Gravel Kadar (%) 52.50

Boulder Tebal Kadar (m) (%) 3.13 43.90

Bedrock Tebal Kadar (m) (%) 1.46 -

DH27

Tebal (m) 0.41

DH28

0.53

53.50

3.09

47.20

1.38

-

DH29

0.45

54.60

3.11

45.40

1.44

-

DH30

0.44

53.30

3.28

45.20

1.28

-

DH31

0.52

54.30

3.13

45.80

1.35

-

DH32

0.43

53.10

3.39

46.60

1.18

-

DH33

0.52

52.90

3.23

46.90

1.25

-

DH34

0.38

53.40

3.3

46.80

1.32

-

Minimum

0.33

48.1

3.02

38.9

1.16

-

Maksimum

0.55

54.6

3.43

47.2

1.46

-

Rata-rata

0.44

52.39

3.25

44.80

1.31

-

Standar Deviasi

0.06

1.63

0.11

2.21

0.09

-

C-2

LAMPIRAN D PLOTTING PETA

D.1. Peta Topografi

D-1

D.2. Peta Tracking Pengamatan Lapangan

D-2

D.3. Peta Sebaran Titik Bor

D-3

LAMPIRAN E BLOCK MODEL REGULAR

E.1. Lapisan Gravel

E-1

E-2

E-3

E-4

E.2. Lapisan Boulder

E-5

E-6

E-7

E-8

LAMPIRAN F BLOCK MODEL NON REGULAR

F.1. Lapisan Gravel

F-1

F-2

F-3

F-4

F.2. Lapisan Boulder

F-5

F-6

F-7

F-8

LAMPIRAN G DATA HASIL PERMODELAN

G.1. Block Regular  Lapisan Gravel Tabel G.1 Data Output Model Block Regular pada Lapisan Gravel No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Koordinat Easting 681460 681460 681560 681560 681660 681660 681760 681760 682160 682060 682060 682160 681860 681960 682060 682160 681360 681360 681460 681260 681360 681260 681460 681460 681660 681760 681760 681760 681360 681560 681660 681560 681760 681860 681860 681960 681960

Northing 9743405 9743505 9743705 9743605 9743905 9743805 9744105 9744005 9743905 9743705 9743805 9744005 9744105 9744105 9744105 9744005 9743205 9743305 9743305 9743105 9743105 9743205 9743205 9743605 9743705 9743705 9743905 9743805 9743405 9743505 9743605 9743405 9743605 9743205 9743305 9743705 9743605

Elevasi 15.38 15.82 14.5 15.82 14.94 15.82 14.5 15.38 11.42 14.94 13.62 14.06 14.94 15.38 14.94 14.5 18.46 18.02 18.9 21.54 21.98 21.54 22.42 18.46 18.02 19.34 16.26 17.58 20.22 19.78 20.66 22.86 21.54 22.42 22.42 16.26 17.14

Ukuran Blok

IDS

X (m)

Y (m)

Z (m)

Kadar (%)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

0.52 0.53 0.53 0.53 0.51 0.52 0.49 0.51 0.52 0.53 0.53 0.51 0.51 0.51 0.51 0.51 0.52 0.51 0.51 0.54 0.53 0.53 0.52 0.53 0.53 0.53 0.51 0.52 0.52 0.53 0.53 0.52 0.53 0.52 0.52 0.53 0.53

IDC Tebal (m) 0.45 0.42 0.43 0.42 0.46 0.44 0.51 0.48 0.46 0.43 0.45 0.45 0.46 0.45 0.44 0.45 0.46 0.48 0.49 0.46 0.46 0.46 0.45 0.42 0.44 0.42 0.45 0.43 0.46 0.38 0.41 0.4 0.4 0.41 0.39 0.4 0.46

Kadar (%) 0.51 0.53 0.53 0.53 0.5 0.52 0.49 0.5 0.52 0.53 0.53 0.51 0.51 0.51 0.51 0.51 0.52 0.5 0.5 0.54 0.53 0.53 0.52 0.53 0.53 0.53 0.51 0.52 0.51 0.53 0.53 0.52 0.53 0.52 0.52 0.54 0.53

G-1

Tebal (m) 0.47 0.42 0.44 0.41 0.46 0.45 0.53 0.5 0.47 0.41 0.46 0.45 0.47 0.45 0.43 0.45 0.47 0.51 0.51 0.46 0.47 0.46 0.46 0.42 0.45 0.41 0.45 0.42 0.48 0.37 0.41 0.38 0.38 0.39 0.37 0.38 0.48

No 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89

Koordinat Easting 681960 681960 681960 681860 681860 681860 681960 681960 681860 682060 682060 681860 681960 681060 681160 681460 681560 681060 681160 681260 681360 681360 681660 681560 681560 681760 681560 681760 681760 681760 681760 681860 681260 681360 681460 681560 681660 681660 681560 681460 681460 681660 681660 681760 681560 681560 681660 681160 681360 681260 681460 681460

Northing 9743605 9743405 9743505 9743605 9743905 9744005 9744005 9743805 9743805 9743905 9744005 9743505 9743905 9742905 9743005 9743105 9743305 9742805 9742905 9743005 9743005 9743005 9742805 9742705 9742705 9743005 9743205 9743105 9743305 9743505 9743405 9743405 9742905 9742905 9742905 9742805 9742905 9742905 9742905 9742805 9743005 9743005 9743205 9743205 9743005 9743105 9743105 9742805 9742805 9742805 9742705 9742605

Elevasi 17.58 18.46 18.9 19.34 17.58 16.26 17.58 18.46 18.9 19.34 19.34 21.54 20.66 24.18 23.74 26.38 26.38 28.58 29.9 26.82 28.14 28.58 28.14 29.02 29.46 26.82 29.9 29.02 29.9 25.5 28.58 24.62 32.1 32.98 31.66 31.22 30.34 30.78 32.54 33.42 31.66 31.66 30.78 31.66 32.54 32.1 33.42 34.74 36.06 36.94 33.86 34.74

Ukuran Blok

IDS

X (m)

Y (m)

Z (m)

Kadar (%)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

0.53 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.52 0.53 0.53 0.54 0.54 0.53 0.52 0.54 0.53 0.54 0.53 0.53 0.53 0.53 0.53 0.52 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.52 0.52 0.52 0.51 0.53 0.53 0.53 0.53 0.53

IDC Tebal (m) 0.46 0.44 0.48 0.44 0.43 0.44 0.45 0.41 0.4 0.5 0.46 0.47 0.46 0.47 0.45 0.43 0.43 0.49 0.45 0.46 0.5 0.5 0.45 0.48 0.48 0.46 0.42 0.44 0.39 0.41 0.39 0.42 0.45 0.46 0.43 0.43 0.46 0.46 0.42 0.44 0.44 0.45 0.42 0.41 0.41 0.39 0.42 0.45 0.43 0.44 0.47 0.43

Kadar (%) 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.54 0.53 0.53 0.52 0.53 0.53 0.54 0.54 0.53 0.53 0.54 0.53 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.51 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.51 0.51 0.52 0.52 0.5 0.53 0.53 0.53 0.53 0.53

G-2

Tebal (m) 0.48 0.45 0.51 0.45 0.43 0.44 0.45 0.4 0.39 0.51 0.47 0.49 0.47 0.48 0.45 0.42 0.43 0.5 0.44 0.47 0.52 0.52 0.46 0.49 0.49 0.47 0.42 0.45 0.37 0.4 0.38 0.42 0.45 0.47 0.42 0.42 0.47 0.47 0.41 0.43 0.43 0.45 0.41 0.4 0.39 0.37 0.41 0.44 0.42 0.43 0.48 0.43

No 90 91 92

Koordinat Easting 681360 681360 681260

Elevasi

X (m) Northing 9742705 38.26 100 9742705 38.7 100 9742705 40.02 100 TEBAL TOTAL (m) KADAR RATA-RATA (%)

Ukuran Blok

IDS

Y (m)

Z (m)

Kadar (%)

100 100 100

0.44 0.44 0.44

0.53 0.53 0.53 0.5255435

IDC Tebal (m) 0.47 0.47 0.45 40.79

Kadar (%) 0.53 0.53 0.53 0.525

G-3

Tebal (m) 0.49 0.49 0.45 40.95

 Lapisan Boulder Tabel G.2 Data Output Model Block Regular pada Lapisan Boulder No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Koordinat Easting 681060 681060 681160 681160 681260 681360 681360 681260 681360 681260 681360 681360 681160 681260 681360 681560 681460 681460 681460 681460 681560 681560 681660 681660 681460 681460 681460 681460 681560 681560 681560 681560 681760 681760 681660 681660 681660 681760 681660 681760 681760 681260 681360 681260 681360 681460 681460 681560

Northing 9742805 9742905 9742805 9742905 9742905 9742805 9742905 9743105 9743105 9743205 9743205 9743305 9743005 9743005 9743005 9742705 9742605 9742705 9742805 9742905 9742805 9742905 9742805 9742905 9743205 9743305 9743105 9743005 9743005 9743105 9743205 9743305 9743005 9743105 9743005 9743105 9743305 9743305 9743205 9743205 9743305 9742705 9742705 9742805 9743405 9743405 9743505 9743405

Elevasi 26.435 23.185 32.935 29.685 29.685 32.935 29.685 19.935 19.935 19.935 16.685 16.685 23.185 26.435 26.435 26.435 32.935 32.935 32.935 29.685 29.685 29.685 26.435 29.685 19.935 16.685 23.185 29.685 29.685 29.685 26.435 23.185 26.435 26.435 29.685 32.935 26.435 26.435 29.685 29.685 29.685 39.435 36.185 36.185 16.685 13.435 13.435 19.935

Ukuran Blok

IDS

X (m)

Y (m)

Z (m)

Kadar (%)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25

0.46 0.46 0.46 0.45 0.46 0.45 0.46 0.46 0.46 0.46 0.46 0.44 0.46 0.46 0.47 0.46 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.44 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.45 0.46 0.45 0.46 0.45 0.45 0.46 0.46 0.45 0.44 0.44 0.44 0.44

IDC Tebal (m) 3.19 3.21 3.28 3.26 3.22 3.18 3.18 3.17 3.22 3.22 3.22 3.21 3.18 3.17 3.14 3.25 3.27 3.24 3.24 3.24 3.26 3.28 3.28 3.33 3.27 3.22 3.3 3.27 3.34 3.36 3.36 3.34 3.27 3.23 3.31 3.23 3.31 3.35 3.28 3.3 3.35 3.3 3.24 3.24 3.23 3.25 3.22 3.32

Kadar (%) 0.46 0.46 0.46 0.45 0.45 0.44 0.46 0.46 0.47 0.46 0.46 0.43 0.45 0.46 0.47 0.46 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.43 0.46 0.47 0.46 0.46 0.47 0.46 0.46 0.46 0.46 0.45 0.46 0.44 0.46 0.45 0.44 0.46 0.46 0.45 0.43 0.43 0.44 0.44

G-4

Tebal (m) 3.17 3.2 3.31 3.27 3.21 3.15 3.14 3.14 3.2 3.19 3.21 3.18 3.17 3.14 3.11 3.24 3.28 3.24 3.23 3.23 3.25 3.28 3.28 3.34 3.27 3.2 3.31 3.28 3.38 3.39 3.39 3.36 3.27 3.21 3.33 3.21 3.31 3.36 3.28 3.3 3.36 3.33 3.23 3.24 3.2 3.22 3.2 3.34

No 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92

Koordinat Easting 681560 681560 681560 681460 681660 681660 681760 681760 681660 681660 681760 681760 681660 681660 681760 681760 681760 681760 681860 681860 681860 681960 681960 681960 681860 681860 681960 682060 681860 681860 681860 681960 681960 681860 681860 681960 681960 682060 682160 682060 682060 682160 682160 682060

Elevasi

X (m) Northing 9743505 16.685 100 9743605 13.435 100 9743705 13.435 100 9743605 16.685 100 9743605 19.935 100 9743705 16.685 100 9743605 19.935 100 9743705 16.685 100 9743405 26.435 100 9743505 23.185 100 9743405 26.435 100 9743505 23.185 100 9743805 13.435 100 9743905 13.435 100 9743905 13.435 100 9743805 16.685 100 9744005 13.435 100 9744105 13.435 100 9743205 19.935 100 9743305 19.935 100 9743505 19.935 100 9743405 16.685 100 9743505 16.685 100 9743705 13.435 100 9743605 16.685 100 9743705 16.685 100 9743605 16.685 100 9743705 13.435 100 9743405 23.185 100 9743805 16.685 100 9743905 16.685 100 9743805 16.685 100 9743905 19.935 100 9744005 13.435 100 9744105 13.435 100 9744105 13.435 100 9744005 16.685 100 9743805 13.435 100 9743905 10.185 100 9743905 16.685 100 9744105 13.435 100 9744005 10.185 100 9744005 13.435 100 9744005 16.685 100 TEBAL TOTAL (m) KADAR RATA-RATA (%)

Ukuran Blok

IDS

Y (m)

Z (m)

Kadar (%)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25

0.44 0.45 0.45 0.44 0.45 0.46 0.45 0.45 0.45 0.44 0.45 0.45 0.45 0.44 0.44 0.45 0.42 0.4 0.45 0.44 0.44 0.44 0.43 0.46 0.44 0.45 0.44 0.45 0.44 0.46 0.44 0.45 0.43 0.44 0.42 0.42 0.43 0.44 0.43 0.42 0.42 0.43 0.43 0.43 0.4484783

IDC Tebal (m) 3.32 3.26 3.24 3.23 3.3 3.21 3.37 3.31 3.28 3.35 3.27 3.32 3.25 3.25 3.26 3.31 3.23 3.22 3.34 3.38 3.29 3.31 3.28 3.26 3.31 3.32 3.28 3.25 3.32 3.37 3.24 3.25 3.16 3.15 3.19 3.2 3.16 3.2 3.2 3.08 3.24 3.25 3.25 3.17 299.76

Kadar (%) 0.44 0.45 0.46 0.44 0.45 0.46 0.45 0.46 0.45 0.44 0.46 0.45 0.45 0.44 0.44 0.46 0.42 0.39 0.44 0.44 0.43 0.44 0.42 0.46 0.44 0.46 0.43 0.45 0.44 0.46 0.45 0.45 0.43 0.44 0.42 0.42 0.43 0.44 0.43 0.42 0.41 0.43 0.43 0.42 0.4477174

G-5

Tebal (m) 3.33 3.24 3.21 3.2 3.3 3.18 3.39 3.33 3.27 3.37 3.24 3.33 3.23 3.25 3.26 3.33 3.22 3.22 3.37 3.41 3.29 3.31 3.27 3.26 3.32 3.34 3.27 3.25 3.33 3.39 3.24 3.24 3.11 3.13 3.17 3.18 3.12 3.16 3.17 3.04 3.25 3.26 3.26 3.14 299.31

G.2. Block Non Regular  Lapisan Gravel Model Block Non Regular merupakan Model Blok yang tidak teratur ukurannya. Tabel G.3 Data Output Model Block Non Regular pada Lapisan Gravel Koordinat No 1 2

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Easting

Northing

Ukuran Blok Elevasi

X (m)

Y (m)

IDS Z (m)

681960 681760

9744105 15.38 100 100 0.44 9743305 29.9 100 100 0.44 TEBAL TOTAL (m) KADAR RATA-RATA (%) Koordinat Ukuran Blok Elevasi Easting Northing X (m) Y (m) Z (m) 681785 681735 681785 681985 682085 682035 682035 681835 681885 682085 681185 681785 681735 681885 681985 681935 682035 681935 681835 681885 681885 681885 681135 681335 681685 681835 681285 681385 681335 681635 681635 681685 681735 681585 681535 681635

9744105 9744005 9744005 9743705 9743705 9743705 9743805 9744105 9744105 9744105 9743105 9743805 9743605 9743305 9743605 9743605 9743605 9743505 9744005 9744005 9743805 9744205 9743005 9743005 9743305 9743205 9742905 9742905 9742905 9743005 9743205 9743205 9743205 9743005 9743005 9743105

14.94 15.38 15.82 15.82 14.94 15.38 14.06 14.94 15.38 15.38 22.42 18.02 21.54 22.42 17.14 17.58 16.7 18.9 16.26 16.7 18.9 14.06 23.3 28.14 29.9 24.18 32.54 32.54 32.98 31.66 30.78 31.22 31.66 32.1 32.54 33.42

50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.51 0.53

IDC Tebal (m) 0.45 0.39 0.84

0.52

Kadar (%) 0.51 0.53 0.52

IDS Kadar (%) 0.49 0.51 0.51 0.53 0.53 0.53 0.53 0.51 0.51 0.51 0.54 0.52 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.5 0.54 0.53 0.53 0.52 0.53 0.53 0.53 0.52 0.52 0.52 0.52 0.52 0.52 0.51

Tebal (m) 0.45 0.37 0.82 IDC

Tebal (m) 0.51 0.48 0.48 0.4 0.43 0.43 0.45 0.46 0.46 0.44 0.45 0.43 0.4 0.39 0.46 0.46 0.44 0.48 0.44 0.44 0.4 0.46 0.45 0.5 0.41 0.41 0.45 0.46 0.46 0.45 0.42 0.42 0.41 0.41 0.41 0.42

Kadar (%) 0.49 0.5 0.5 0.54 0.53 0.53 0.53 0.51 0.51 0.51 0.54 0.52 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.49 0.54 0.53 0.53 0.52 0.53 0.53 0.53 0.52 0.51 0.51 0.51 0.52 0.52 0.5

Tebal (m) 0.53 0.5 0.5 0.38 0.41 0.41 0.46 0.47 0.47 0.43 0.45 0.42 0.38 0.37 0.48 0.48 0.45 0.51 0.44 0.44 0.39 0.46 0.45 0.52 0.4 0.39 0.45 0.47 0.47 0.45 0.41 0.41 0.4 0.39 0.39 0.41

G-6

Koordinat No 37 38

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Easting

Northing

Ukuran Blok Elevasi

X (m)

Y (m)

IDS Z (m)

681235 681285

9742805 36.94 50 100 0.44 9742805 37.38 50 100 0.44 TEBAL TOTAL (m) KADAR RATA-RATA (%) Koordinat Ukuran Blok Elevasi Easting Northing X (m) Y (m) Z (m) 681422.5 681522.5 681572.5 681472.5 681497.5 681447.5 681422.5 681547.5 681572.5 681597.5 681547.5 681597.5 681622.5 681647.5 681672.5 681647.5 681697.5 681722.5 681697.5 681747.5 681772.5 682197.5 682147.5 682172.5 682122.5 682197.5 682222.5 682097.5 682147.5 682122.5 682072.5 682172.5 682122.5 682097.5 682047.5 682147.5 682022.5 681397.5 681372.5 681397.5 681347.5 681372.5 681347.5 681322.5 681422.5

9743305 9743605 9743705 9743505 9743505 9743405 9743405 9743605 9743705 9743705 9743705 9743805 9743805 9743905 9743905 9743805 9743905 9743905 9744005 9744105 9744105 9743905 9743905 9743905 9743905 9744005 9744005 9743805 9743805 9743805 9743805 9744005 9744105 9743905 9744105 9744005 9744105 9743305 9743305 9743205 9743205 9743205 9743305 9743205 9743305

15.82 14.06 14.06 14.5 14.94 15.38 15.82 14.94 14.5 14.94 15.38 14.94 14.5 14.5 14.94 15.38 15.38 15.82 14.94 14.5 14.5 10.98 11.42 11.42 11.86 12.3 10.54 13.18 12.74 13.18 13.62 13.62 14.06 14.94 14.94 14.94 15.38 16.7 17.58 18.02 18.46 18.46 18.46 18.9 16.26

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.53 0.53 0.52316 IDS Kadar (%) 0.51 0.53 0.53 0.53 0.53 0.52 0.52 0.53 0.53 0.53 0.53 0.52 0.52 0.51 0.51 0.52 0.51 0.51 0.5 0.49 0.49 0.52 0.52 0.52 0.52 0.51 0.5 0.53 0.52 0.52 0.53 0.51 0.51 0.53 0.51 0.51 0.51 0.51 0.51 0.52 0.52 0.52 0.51 0.52 0.51

IDC Tebal (m) 0.44 0.44 16.75

Tebal (m) 0.49 0.42 0.43 0.42 0.42 0.45 0.45 0.42 0.43 0.43 0.43 0.44 0.44 0.46 0.46 0.44 0.46 0.45 0.48 0.51 0.51 0.46 0.46 0.46 0.46 0.45 0.44 0.45 0.45 0.45 0.45 0.45 0.44 0.5 0.44 0.45 0.44 0.48 0.48 0.46 0.46 0.46 0.48 0.46 0.49

Kadar (%) 0.53 0.53

Tebal (m) 0.43 0.43 16.7

0.52158 IDC Kadar (%) 0.5 0.53 0.53 0.53 0.53 0.51 0.51 0.53 0.53 0.53 0.53 0.52 0.52 0.5 0.5 0.52 0.5 0.51 0.49 0.49 0.49 0.52 0.52 0.52 0.52 0.51 0.5 0.53 0.53 0.53 0.53 0.51 0.51 0.53 0.51 0.51 0.51 0.5 0.5 0.52 0.52 0.52 0.5 0.52 0.5

Tebal (m) 0.51 0.41 0.44 0.42 0.42 0.47 0.47 0.41 0.44 0.44 0.44 0.44 0.45 0.46 0.46 0.45 0.46 0.45 0.5 0.53 0.53 0.47 0.47 0.47 0.47 0.45 0.44 0.46 0.46 0.46 0.46 0.45 0.43 0.51 0.43 0.45 0.43 0.51 0.51 0.47 0.47 0.47 0.51 0.47 0.51

G-7

Koordinat No 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

Easting

Northing

681447.5 681272.5 681297.5 681297.5 681297.5 681322.5 681247.5 681297.5 681322.5 681347.5 681222.5 681372.5 681247.5 681272.5 681422.5 681472.5 681447.5 681497.5 681397.5 681397.5 681472.5 681522.5 681447.5 681497.5 681522.5 681622.5 681647.5 681497.5 681422.5 681472.5 681597.5 681672.5 681697.5 681722.5 681747.5 681572.5 681572.5 681672.5 681697.5 681622.5 681747.5 681772.5 681797.5 681722.5 681747.5 681347.5 681372.5 681522.5 681622.5 681772.5 681797.5 681647.5

9743305 9743105 9743205 9743305 9743305 9743305 9743105 9743105 9743105 9743105 9743105 9743105 9743205 9743205 9743205 9743305 9743205 9743305 9743405 9743505 9743405 9743505 9743505 9743605 9743705 9743705 9743705 9743405 9743505 9743605 9743605 9743705 9743705 9743705 9743705 9743805 9743805 9743805 9743805 9743905 9743905 9743905 9743905 9743805 9743805 9743405 9743405 9743405 9743605 9743705 9743705 9743605

Ukuran Blok Elevasi 18.02 21.1 19.78 20.66 21.1 20.66 21.54 21.54 21.54 21.98 22.42 22.42 21.54 21.54 19.78 19.78 21.54 21.54 17.58 19.34 16.26 16.7 17.14 16.26 17.58 16.26 17.58 18.02 19.34 18.46 18.02 18.02 18.46 18.9 19.34 16.7 17.14 16.26 16.7 16.26 16.26 16.26 16.7 17.14 17.58 20.22 20.22 20.22 19.78 19.78 20.22 20.66

IDS

X (m)

Y (m)

Z (m)

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.51 0.54 0.53 0.52 0.52 0.51 0.54 0.54 0.53 0.53 0.54 0.53 0.53 0.53 0.52 0.51 0.52 0.51 0.52 0.52 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.52 0.52 0.51 0.51 0.51 0.51 0.52 0.52 0.52 0.52 0.52 0.53 0.53 0.53 0.53

IDC Tebal (m) 0.49 0.46 0.46 0.46 0.46 0.48 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.45 0.49 0.45 0.49 0.46 0.44 0.45 0.38 0.42 0.42 0.43 0.44 0.44 0.45 0.42 0.42 0.42 0.44 0.44 0.42 0.42 0.44 0.44 0.44 0.44 0.46 0.45 0.45 0.45 0.43 0.43 0.46 0.46 0.4 0.41 0.42 0.42 0.41

Kadar (%) 0.5 0.54 0.53 0.52 0.52 0.5 0.54 0.54 0.53 0.53 0.54 0.53 0.53 0.53 0.52 0.5 0.52 0.5 0.51 0.52 0.51 0.53 0.53 0.53 0.53 0.53 0.53 0.51 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.52 0.52 0.5 0.51 0.51 0.51 0.52 0.52 0.51 0.51 0.52 0.53 0.53 0.53 0.53

Tebal (m) 0.51 0.46 0.46 0.47 0.47 0.51 0.46 0.46 0.47 0.47 0.46 0.47 0.46 0.46 0.46 0.51 0.46 0.51 0.48 0.44 0.47 0.37 0.42 0.42 0.44 0.45 0.45 0.47 0.42 0.42 0.41 0.45 0.45 0.41 0.41 0.44 0.44 0.45 0.45 0.46 0.45 0.45 0.45 0.42 0.42 0.48 0.48 0.38 0.41 0.41 0.41 0.41

G-8

Koordinat No 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149

Easting

Northing

681697.5 681797.5 681547.5 681772.5 681872.5 681822.5 681897.5 681847.5 681847.5 681947.5 681922.5 681897.5 681997.5 681897.5 681972.5 681922.5 681897.5 681872.5 681922.5 681872.5 681847.5 681997.5 681822.5 681847.5 681872.5 681922.5 681947.5 681972.5 682122.5 682097.5 681822.5 681897.5 681947.5 681972.5 681847.5 681922.5 681922.5 681997.5 682072.5 682022.5 682047.5 682072.5 681947.5 681897.5 681872.5 681872.5 681922.5 681847.5 681822.5 681822.5 681847.5 681947.5

9743605 9743605 9743405 9743605 9743205 9743105 9743305 9743305 9743305 9743705 9743705 9743705 9743505 9743505 9743505 9743505 9743605 9743705 9743605 9743605 9743705 9743805 9743905 9743905 9743905 9744005 9744005 9744005 9744005 9744005 9743805 9743905 9743805 9743805 9743805 9743805 9743905 9744005 9743905 9744005 9744005 9744005 9743405 9743405 9743405 9743505 9743405 9743605 9743705 9743605 9743505 9743905

Ukuran Blok Elevasi 21.1 21.1 21.98 21.98 19.78 21.98 21.98 22.42 22.86 16.26 16.7 17.58 18.46 19.34 18.9 19.34 18.46 18.46 18.02 19.34 18.9 16.26 17.14 17.58 17.58 16.7 17.14 17.58 16.26 17.58 18.46 18.46 18.46 18.46 18.9 18.9 19.34 18.02 18.02 18.46 18.9 18.9 20.22 20.66 21.1 21.1 20.66 19.78 19.78 20.66 21.98 20.22

IDS

X (m)

Y (m)

Z (m)

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.53 0.53 0.52 0.53 0.52 0.52 0.52 0.52 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.52 0.53 0.53 0.53 0.51 0.52 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

IDC Tebal (m) 0.41 0.4 0.4 0.4 0.41 0.44 0.39 0.39 0.39 0.4 0.4 0.41 0.48 0.47 0.48 0.48 0.44 0.41 0.46 0.44 0.41 0.41 0.43 0.43 0.43 0.45 0.45 0.45 0.45 0.46 0.4 0.43 0.41 0.41 0.4 0.41 0.46 0.45 0.5 0.46 0.46 0.46 0.44 0.42 0.42 0.47 0.44 0.44 0.41 0.44 0.47 0.46

Kadar (%) 0.53 0.53 0.52 0.53 0.52 0.52 0.52 0.52 0.52 0.54 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.51 0.52 0.53 0.53 0.54 0.54 0.53 0.54 0.53 0.53 0.53 0.52 0.52 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

Tebal (m) 0.41 0.38 0.38 0.38 0.39 0.45 0.37 0.37 0.37 0.38 0.38 0.4 0.51 0.49 0.51 0.51 0.45 0.4 0.48 0.45 0.4 0.4 0.43 0.43 0.43 0.45 0.45 0.45 0.45 0.47 0.39 0.43 0.4 0.4 0.39 0.4 0.47 0.45 0.51 0.47 0.47 0.47 0.45 0.42 0.42 0.49 0.45 0.45 0.4 0.45 0.49 0.47

G-9

Koordinat No 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201

Easting

Northing

681972.5 682047.5 681997.5 682022.5 681922.5 681072.5 681097.5 681172.5 681397.5 681197.5 681222.5 681722.5 681422.5 681472.5 681522.5 681772.5 681447.5 681497.5 681547.5 681797.5 681122.5 681047.5 681147.5 681072.5 681247.5 681272.5 681297.5 681322.5 681372.5 681597.5 681622.5 681672.5 681572.5 681547.5 681597.5 681647.5 681697.5 681622.5 681472.5 681522.5 681572.5 681747.5 681497.5 681547.5 681597.5 681572.5 681772.5 681722.5 681747.5 681622.5 681572.5 681622.5

9743905 9743905 9743905 9743905 9744205 9742905 9742905 9743005 9743105 9743005 9743005 9742905 9743105 9743205 9743305 9743005 9743105 9743205 9743305 9743105 9742905 9742805 9742905 9742805 9743005 9743005 9743005 9743005 9743005 9742705 9742705 9742805 9742705 9742705 9742805 9742805 9742905 9742805 9743105 9743205 9743305 9743005 9743105 9743205 9743305 9743205 9743105 9743005 9743105 9743305 9743405 9743505

Ukuran Blok Elevasi 20.66 20.66 21.54 22.42 14.06 24.18 25.5 24.62 23.3 25.94 26.38 25.94 24.62 23.3 23.3 23.74 25.94 25.06 25.5 25.94 27.26 27.7 29.02 29.46 26.82 27.26 27.7 27.7 29.02 28.14 27.7 27.26 29.02 29.46 29.9 29.02 28.58 29.46 26.82 26.82 27.26 27.7 28.58 29.02 28.58 29.9 28.58 29.46 29.9 29.46 23.74 23.3

IDS

X (m)

Y (m)

Z (m)

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.53 0.53 0.53 0.53 0.5 0.54 0.54 0.54 0.53 0.54 0.54 0.53 0.53 0.52 0.52 0.52 0.53 0.52 0.52 0.52 0.53 0.54 0.53 0.54 0.54 0.54 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.52 0.53 0.53 0.52 0.53 0.52 0.52 0.52 0.53 0.52 0.53

IDC Tebal (m) 0.46 0.5 0.46 0.5 0.46 0.47 0.47 0.45 0.46 0.45 0.46 0.46 0.43 0.45 0.43 0.46 0.43 0.45 0.43 0.44 0.45 0.49 0.45 0.49 0.46 0.46 0.46 0.5 0.5 0.48 0.49 0.45 0.48 0.48 0.43 0.45 0.46 0.45 0.43 0.42 0.43 0.46 0.43 0.42 0.43 0.42 0.44 0.46 0.44 0.41 0.4 0.38

Kadar (%) 0.53 0.53 0.53 0.53 0.49 0.54 0.54 0.54 0.53 0.54 0.54 0.53 0.53 0.52 0.53 0.53 0.53 0.52 0.53 0.51 0.53 0.54 0.53 0.54 0.54 0.54 0.54 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.51 0.53 0.51 0.53 0.52 0.53

Tebal (m) 0.47 0.51 0.47 0.51 0.46 0.48 0.48 0.45 0.47 0.45 0.47 0.47 0.42 0.46 0.43 0.47 0.42 0.46 0.43 0.45 0.44 0.5 0.44 0.5 0.47 0.47 0.47 0.52 0.52 0.49 0.5 0.46 0.49 0.49 0.42 0.46 0.47 0.46 0.42 0.42 0.43 0.47 0.42 0.42 0.43 0.42 0.45 0.47 0.45 0.4 0.38 0.35

G-10

Koordinat No 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253

Easting

Northing

681647.5 681672.5 681797.5 681597.5 681697.5 681772.5 681722.5 681747.5 681622.5 681797.5 681647.5 681772.5 681672.5 681747.5 681697.5 681722.5 681822.5 681822.5 681847.5 681822.5 681097.5 681172.5 681197.5 681222.5 681122.5 681397.5 681247.5 681272.5 681397.5 681397.5 681547.5 681522.5 681497.5 681522.5 681597.5 681572.5 681447.5 681547.5 681597.5 681672.5 681647.5 681622.5 681497.5 681472.5 681497.5 681422.5 681472.5 681497.5 681522.5 681572.5 681547.5 681472.5

9743505 9743505 9743505 9743405 9743505 9743505 9743505 9743505 9743405 9743405 9743405 9743405 9743405 9743405 9743405 9743405 9743305 9743505 9743405 9743405 9742805 9742905 9742905 9742905 9742805 9742605 9742905 9742905 9742905 9743005 9742605 9742705 9742705 9742605 9742805 9742805 9742905 9742805 9742905 9742905 9742905 9742905 9742605 9742705 9742805 9742905 9742905 9742905 9742805 9742905 9742905 9742805

Ukuran Blok Elevasi 23.74 24.18 24.18 25.5 25.06 25.06 25.5 25.94 26.82 26.82 27.7 28.14 29.02 29.02 29.9 29.9 29.02 23.3 25.06 25.94 30.78 30.78 31.22 31.66 32.54 32.54 32.1 32.1 32.1 30.34 30.78 30.34 31.66 31.66 30.34 30.78 31.66 31.22 31.66 30.34 30.78 31.66 32.98 32.98 32.54 32.1 32.1 32.54 32.1 32.1 32.54 33.42

IDS

X (m)

Y (m)

Z (m)

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

IDC Tebal (m) 0.38 0.38 0.41 0.4 0.38 0.41 0.41 0.41 0.38 0.39 0.38 0.39 0.38 0.39 0.38 0.39 0.39 0.47 0.42 0.42 0.49 0.45 0.45 0.45 0.45 0.49 0.45 0.45 0.46 0.5 0.46 0.48 0.47 0.46 0.43 0.43 0.43 0.43 0.42 0.46 0.46 0.46 0.43 0.47 0.44 0.43 0.43 0.43 0.43 0.42 0.42 0.44

Kadar (%) 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52 0.53 0.53 0.53 0.54 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

Tebal (m) 0.35 0.35 0.4 0.38 0.35 0.4 0.4 0.4 0.37 0.38 0.37 0.38 0.37 0.38 0.37 0.38 0.37 0.49 0.42 0.42 0.5 0.44 0.44 0.45 0.44 0.5 0.45 0.45 0.47 0.52 0.46 0.49 0.48 0.46 0.42 0.42 0.42 0.42 0.41 0.47 0.47 0.47 0.43 0.48 0.43 0.42 0.42 0.42 0.42 0.41 0.41 0.43

G-11

Koordinat No 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291

Ukuran Blok Elevasi

Easting

Northing

X (m)

681422.5 681522.5 681447.5 681472.5 681597.5 681697.5 681672.5 681722.5 681772.5 681497.5 681547.5 681572.5 681597.5 681697.5 681672.5 681147.5 681397.5 681172.5 681197.5 681222.5 681397.5 681397.5 681372.5 681347.5 681472.5 681447.5 681447.5 681422.5 681447.5 681422.5 681422.5 681372.5 681347.5 681322.5 681297.5 681322.5 681272.5 681247.5

9743005 30.78 25 9743105 30.34 25 9743005 31.22 25 9743005 31.66 25 9743205 30.34 25 9743005 31.22 25 9743005 31.66 25 9743105 31.66 25 9743205 30.78 25 9743005 32.1 25 9743105 32.1 25 9743105 32.54 25 9743105 32.98 25 9743105 32.98 25 9743105 33.42 25 9742805 33.86 25 9742805 35.18 25 9742805 35.62 25 9742805 36.5 25 9742705 36.06 25 9742705 36.5 25 9742705 36.94 25 9742805 35.62 25 9742805 36.5 25 9742605 34.3 25 9742705 34.3 25 9742805 33.86 25 9742805 34.3 25 9742605 35.62 25 9742705 35.62 25 9742605 36.94 25 9742705 37.82 25 9742705 38.7 25 9742805 37.38 25 9742705 39.58 25 9742705 39.14 25 9742705 40.02 25 9742705 40.46 25 TEBAL TOTAL (m) KADAR RATA-RATA (%)

IDS

Y (m)

Z (m)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44

Kadar (%) 0.53 0.52 0.53 0.53 0.53 0.52 0.52 0.52 0.52 0.53 0.52 0.52 0.52 0.51 0.51 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.52577

IDC Tebal (m) 0.44 0.39 0.44 0.44 0.42 0.45 0.45 0.44 0.41 0.44 0.39 0.39 0.39 0.42 0.42 0.45 0.43 0.45 0.45 0.45 0.47 0.47 0.43 0.43 0.43 0.47 0.44 0.44 0.43 0.47 0.43 0.47 0.47 0.43 0.45 0.47 0.45 0.45 128.59

Kadar (%) 0.53 0.52 0.53 0.53 0.53 0.52 0.52 0.51 0.51 0.53 0.52 0.52 0.52 0.5 0.5 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

Tebal (m) 0.43 0.37 0.43 0.43 0.42 0.45 0.45 0.45 0.4 0.43 0.37 0.37 0.37 0.41 0.41 0.44 0.42 0.44 0.44 0.45 0.49 0.49 0.42 0.42 0.43 0.48 0.43 0.43 0.43 0.48 0.43 0.49 0.49 0.42 0.45 0.49 0.45 0.45 129.04

0.5254

G-12

 Lapisan Boulder Tabel G.4 Data Output Model Block Non Regular pada Lapisan Boulder Koordinat No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

No 1 2 3 4 5

Easting

Northing

Ukuran Blok Elevasi

X (m)

Y (m)

IDS Z (m)

681260 681260 681360 681360 681460 681560 681560 681460 681560 681560 681660 681660 681660 681760 681660 681360 681260 681760 681760 681760 681660 681760 681760 681760 681960 681960 681860 681960 682060 681860 681860 681860 681860 681960 682160 682060 682060

9742905 29.685 100 100 3.25 9743105 19.935 100 100 3.25 9743105 19.935 100 100 3.25 9743205 16.685 100 100 3.25 9742905 29.685 100 100 3.25 9742805 29.685 100 100 3.25 9742905 29.685 100 100 3.25 9743005 29.685 100 100 3.25 9743005 29.685 100 100 3.25 9743105 29.685 100 100 3.25 9743005 29.685 100 100 3.25 9743105 32.935 100 100 3.25 9743305 26.435 100 100 3.25 9743305 26.435 100 100 3.25 9743205 29.685 100 100 3.25 9742705 36.185 100 100 3.25 9742805 36.185 100 100 3.25 9743605 19.935 100 100 3.25 9743705 16.685 100 100 3.25 9743505 23.185 100 100 3.25 9743905 13.435 100 100 3.25 9743905 13.435 100 100 3.25 9743805 16.685 100 100 3.25 9744005 13.435 100 100 3.25 9743505 16.685 100 100 3.25 9743705 13.435 100 100 3.25 9743705 16.685 100 100 3.25 9743605 16.685 100 100 3.25 9743705 13.435 100 100 3.25 9743805 16.685 100 100 3.25 9743905 16.685 100 100 3.25 9744005 13.435 100 100 3.25 9744105 13.435 100 100 3.25 9744105 13.435 100 100 3.25 9743905 10.185 100 100 3.25 9744105 13.435 100 100 3.25 9744005 16.685 100 100 3.25 TEBAL TOTAL (m) KADAR RATA_RATA (%) Koordinat Ukuran Blok Elevasi Easting Northing X (m) Y (m) Z (m) 681085 681135 681185 681385 681385

9742905 9742905 9742905 9742805 9742905

23.185 26.435 29.685 32.935 29.685

50 50 50 50 50

100 100 100 100 100

3.25 3.25 3.25 3.25 3.25

Kadar (%) 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.45 0.46 0.45 0.46 0.46 0.45 0.45 0.45 0.45 0.44 0.44 0.45 0.42 0.43 0.46 0.45 0.44 0.45 0.46 0.44 0.44 0.42 0.42 0.43 0.42 0.43 0.44811 IDS Kadar (%) 0.46 0.45 0.45 0.45 0.46

IDC Tebal (m) 3.22 3.17 3.22 3.22 3.24 3.26 3.28 3.27 3.34 3.36 3.31 3.23 3.31 3.35 3.28 3.24 3.24 3.37 3.31 3.32 3.25 3.26 3.31 3.23 3.28 3.26 3.32 3.28 3.25 3.37 3.24 3.15 3.19 3.2 3.2 3.24 3.17 120.74

Tebal (m) 3.21 3.26 3.26 3.18 3.18

Kadar (%) 0.45 0.46 0.47 0.46 0.46 0.46 0.46 0.47 0.46 0.46 0.46 0.45 0.46 0.44 0.46 0.46 0.45 0.45 0.46 0.45 0.44 0.44 0.46 0.42 0.42 0.46 0.46 0.43 0.45 0.46 0.45 0.44 0.42 0.42 0.43 0.41 0.42

Tebal (m) 3.21 3.14 3.2 3.21 3.23 3.25 3.28 3.28 3.38 3.39 3.33 3.21 3.31 3.36 3.28 3.23 3.24 3.39 3.33 3.33 3.25 3.26 3.33 3.22 3.27 3.26 3.34 3.27 3.25 3.39 3.24 3.13 3.17 3.18 3.17 3.25 3.14 120.7

0.44811 IDC Kadar (%) 0.46 0.45 0.45 0.44 0.46

Tebal (m) 3.2 3.27 3.27 3.15 3.14

G-13

Koordinat No 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

Easting

Northing

681135 681185 681185 681285 681335 681585 681485 681435 681535 681435 681635 681635 681435 681485 681535 681535 681585 681585 681735 681735 681735 681335 681435 681485 681435 681585 681535 681585 681685 681685 681585 681635 681685 681785 681635 681785 681885 681835 681885 681835 681935 681885 682035 681835 681935 681985 681985 682085 682035 682135 682035 682185

9743005 9743105 9743005 9743005 9743005 9742705 9742705 9742705 9742605 9742805 9742805 9742905 9743105 9743105 9743205 9743305 9743305 9743205 9743005 9743105 9743205 9742805 9743405 9743505 9743505 9743505 9743605 9743705 9743605 9743705 9743405 9743405 9743505 9743405 9743805 9744105 9743305 9743205 9743405 9743505 9743405 9743605 9743605 9743405 9743805 9743905 9744005 9743805 9743805 9743805 9743905 9744005

Ukuran Blok Elevasi 19.935 19.935 23.185 26.435 26.435 26.435 29.685 32.935 29.685 32.935 26.435 29.685 23.185 26.435 26.435 23.185 26.435 29.685 26.435 29.685 29.685 36.185 13.435 13.435 16.685 19.935 13.435 13.435 19.935 16.685 23.185 26.435 23.185 26.435 13.435 13.435 19.935 23.185 19.935 19.935 19.935 16.685 13.435 23.185 16.685 19.935 16.685 10.185 13.435 10.185 19.935 10.185

IDS

X (m)

Y (m)

Z (m)

50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25

Kadar (%) 0.46 0.46 0.46 0.46 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.45 0.45 0.44 0.44 0.44 0.44 0.45 0.45 0.45 0.46 0.44 0.45 0.44 0.45 0.45 0.4 0.44 0.45 0.44 0.44 0.44 0.44 0.44 0.44 0.45 0.43 0.43 0.44 0.44 0.44 0.42 0.43

IDC Tebal (m) 3.18 3.16 3.18 3.17 3.14 3.25 3.24 3.24 3.26 3.24 3.28 3.33 3.3 3.3 3.36 3.34 3.34 3.36 3.27 3.23 3.3 3.18 3.25 3.22 3.23 3.32 3.26 3.24 3.3 3.21 3.32 3.28 3.35 3.27 3.25 3.22 3.38 3.34 3.32 3.29 3.31 3.31 3.27 3.32 3.25 3.16 3.16 3.2 3.2 3.22 3.08 3.25

Kadar (%) 0.45 0.45 0.45 0.46 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.47 0.46 0.46 0.47 0.46 0.46 0.45 0.44 0.43 0.44 0.44 0.44 0.45 0.46 0.45 0.46 0.44 0.45 0.44 0.46 0.45 0.39 0.44 0.44 0.44 0.43 0.44 0.44 0.44 0.44 0.45 0.43 0.43 0.44 0.44 0.43 0.42 0.43

Tebal (m) 3.17 3.13 3.17 3.14 3.11 3.24 3.24 3.24 3.27 3.23 3.28 3.34 3.31 3.31 3.39 3.36 3.36 3.39 3.27 3.21 3.3 3.15 3.22 3.2 3.2 3.33 3.24 3.21 3.3 3.18 3.34 3.27 3.37 3.24 3.23 3.22 3.41 3.37 3.33 3.29 3.31 3.32 3.27 3.33 3.24 3.11 3.12 3.16 3.16 3.18 3.04 3.26

G-14

Koordinat No 58 59

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Easting

Northing

Ukuran Blok Elevasi

X (m)

Y (m)

IDS Z (m)

682135 681885

9744005 13.435 50 100 3.25 9744205 13.435 50 100 3.25 TEBAL TOTAL (m) KADAR RATA_RATA (%) Koordinat Ukuran Blok Elevasi Easting Northing X (m) Y (m) Z (m) 681047.5 681072.5 681097.5 681122.5 681147.5 681172.5 681222.5 681397.5 681322.5 681397.5 681297.5 681247.5 681272.5 681297.5 681347.5 681372.5 681322.5 681222.5 681247.5 681372.5 681397.5 681547.5 681497.5 681447.5 681472.5 681522.5 681497.5 681472.5 681622.5 681672.5 681697.5 681722.5 681672.5 681422.5 681422.5 681447.5 681472.5 681447.5 681472.5 681497.5 681522.5 681497.5 681572.5 681772.5 681797.5

9742805 9742805 9742805 9742805 9742805 9742805 9742705 9742605 9742905 9743305 9743205 9743205 9743205 9743305 9743305 9743305 9743305 9743005 9743005 9743005 9743005 9742705 9742605 9742605 9742605 9742705 9742805 9742805 9742705 9742805 9742905 9742905 9742905 9743305 9743205 9743205 9743205 9743305 9743305 9743305 9743305 9743205 9743205 9743005 9743105

26.435 26.435 29.685 29.685 32.935 32.935 32.935 29.685 29.685 13.435 16.685 19.935 19.935 19.935 16.685 16.685 19.935 23.185 26.435 26.435 29.685 26.435 29.685 32.935 32.935 29.685 29.685 32.935 26.435 26.435 26.435 23.185 29.685 13.435 16.685 19.935 19.935 16.685 16.685 19.935 19.935 23.185 26.435 23.185 23.185

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25

Kadar (%) 0.43 0.4 0.4478 IDS Kadar (%) 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.47 0.46 0.44 0.46 0.46 0.46 0.45 0.44 0.44 0.44 0.46 0.46 0.47 0.47 0.46 0.47 0.47 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.44 0.46 0.46 0.46 0.44 0.44 0.44 0.46 0.46 0.46 0.46 0.46

IDC Tebal (m) 3.25 3.17 191.94

Tebal (m) 3.19 3.19 3.19 3.28 3.28 3.28 3.3 3.25 3.18 3.21 3.22 3.22 3.22 3.23 3.21 3.21 3.21 3.17 3.17 3.14 3.15 3.25 3.27 3.27 3.27 3.25 3.24 3.24 3.25 3.28 3.33 3.31 3.33 3.22 3.27 3.27 3.27 3.22 3.22 3.22 3.34 3.27 3.36 3.27 3.23

Kadar (%) 0.43 0.4

Tebal (m) 3.26 3.16 191.51

0.44678 IDC Kadar (%) 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.47 0.46 0.43 0.46 0.46 0.46 0.45 0.43 0.43 0.43 0.46 0.46 0.47 0.47 0.46 0.47 0.47 0.47 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.43 0.46 0.46 0.46 0.43 0.43 0.43 0.46 0.46 0.47 0.46 0.46

Tebal (m) 3.17 3.17 3.17 3.31 3.31 3.31 3.33 3.24 3.14 3.18 3.19 3.19 3.19 3.21 3.18 3.18 3.18 3.14 3.14 3.11 3.11 3.24 3.28 3.28 3.28 3.24 3.23 3.23 3.25 3.28 3.34 3.33 3.34 3.2 3.27 3.27 3.27 3.2 3.2 3.2 3.36 3.27 3.39 3.27 3.21

G-15

Koordinat No 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

Easting

Northing

681772.5 681797.5 681772.5 681747.5 681772.5 681197.5 681297.5 681247.5 681272.5 681422.5 681347.5 681397.5 681397.5 681472.5 681522.5 681497.5 681522.5 681547.5 681547.5 681497.5 681572.5 681547.5 681472.5 681597.5 681522.5 681622.5 681622.5 681622.5 681647.5 681647.5 681622.5 681672.5 681647.5 681747.5 681697.5 681722.5 681597.5 681672.5 681697.5 681747.5 681822.5 681872.5 681847.5 681822.5 681897.5 681872.5 681847.5 681822.5 681997.5 681972.5 681922.5 681922.5

9743105 9743205 9743205 9743305 9743305 9742805 9742705 9742705 9742705 9742605 9743405 9743405 9743505 9743405 9743505 9743405 9743405 9743405 9743505 9743605 9743605 9743705 9743605 9743605 9743705 9743505 9743705 9743605 9743605 9743705 9743405 9743405 9743505 9743405 9743405 9743405 9743805 9743805 9744005 9744105 9743105 9743205 9743305 9743305 9743505 9743505 9743605 9743605 9743805 9743805 9743905 9744005

Ukuran Blok Elevasi 26.435 26.435 29.685 29.685 29.685 36.185 36.185 39.435 39.435 36.185 16.685 16.685 16.685 13.435 13.435 16.685 16.685 19.935 16.685 13.435 13.435 13.435 16.685 16.685 16.685 19.935 13.435 16.685 19.935 16.685 23.185 26.435 23.185 26.435 29.685 29.685 13.435 13.435 13.435 13.435 19.935 16.685 19.935 26.435 16.685 19.935 16.685 19.935 13.435 16.685 16.685 13.435

IDS

X (m)

Y (m)

Z (m)

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25

Kadar (%) 0.46 0.45 0.45 0.45 0.45 0.46 0.46 0.46 0.46 0.47 0.44 0.44 0.45 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.45 0.45 0.44 0.45 0.45 0.44 0.46 0.45 0.45 0.46 0.45 0.45 0.44 0.45 0.45 0.45 0.45 0.45 0.42 0.4 0.46 0.45 0.44 0.44 0.44 0.44 0.44 0.44 0.45 0.45 0.43 0.43

IDC Tebal (m) 3.23 3.3 3.3 3.35 3.35 3.29 3.3 3.3 3.3 3.27 3.23 3.23 3.25 3.25 3.32 3.25 3.32 3.32 3.32 3.23 3.26 3.24 3.23 3.26 3.24 3.35 3.21 3.29 3.3 3.21 3.28 3.28 3.35 3.27 3.28 3.27 3.25 3.25 3.24 3.22 3.27 3.34 3.38 3.38 3.29 3.29 3.31 3.31 3.25 3.25 3.16 3.16

Kadar (%) 0.46 0.45 0.45 0.44 0.44 0.46 0.46 0.46 0.46 0.47 0.43 0.43 0.44 0.43 0.44 0.43 0.44 0.44 0.44 0.44 0.45 0.46 0.44 0.45 0.46 0.44 0.46 0.45 0.45 0.46 0.45 0.45 0.44 0.46 0.45 0.46 0.45 0.45 0.41 0.39 0.46 0.44 0.44 0.44 0.43 0.43 0.44 0.44 0.45 0.45 0.43 0.43

Tebal (m) 3.21 3.3 3.3 3.36 3.36 3.31 3.33 3.33 3.33 3.28 3.2 3.2 3.22 3.22 3.33 3.22 3.34 3.34 3.33 3.2 3.24 3.21 3.2 3.24 3.21 3.37 3.18 3.3 3.3 3.18 3.27 3.27 3.37 3.24 3.27 3.24 3.23 3.23 3.24 3.22 3.26 3.37 3.41 3.41 3.29 3.29 3.32 3.33 3.24 3.24 3.11 3.12

G-16

Koordinat No 98 99 100 101 102

Ukuran Blok Elevasi

Easting

Northing

X (m)

681947.5 682097.5 682072.5 682122.5 681922.5

9744005 16.685 25 9743905 13.435 25 9743905 16.685 25 9744105 13.435 25 9744205 13.435 25 TEBAL TOTAL (m) KADAR RATA_RATA (%)

IDS

Y (m)

Z (m)

100 100 100 100 100

3.25 3.25 3.25 3.25 3.25

Kadar (%) 0.43 0.42 0.42 0.42 0.41 0.4499

IDC Tebal (m) 3.16 3.08 3.08 3.26 3.18 332.09

Kadar (%) 0.43 0.42 0.42 0.42 0.4

Tebal (m) 3.12 3.04 3.04 3.27 3.17 331.33

0.44833

G-17

LAMPIRAN H ESTIMASI TEBAL MENGGUNAKAN METODE IDS

H.1. Estimasi Titik DH1 ESTIMASI TITIK

DH1

TERHADAP TITIK DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 234.438 239.209 397.555 436.285 406.972 345.08 488.079 685.018 633.654 579.211 794.909 805.001 856.493 951.803 1177.23 1117.16 1038.84 1026.09 1179.44 1218.28 1300.24 1432.86 1594.32 1554.85 1515.1 1360.78 1357.07 1520.99 1668.46 1662.79 1672.55 1723.46

2.1E-05 1.8E-05 1.7E-05 6.3E-06 5.3E-06 6E-06 8.4E-06 4.2E-06 2.1E-06 2.5E-06 3E-06 1.6E-06 1.5E-06 1.4E-06 1.1E-06 7.2E-07 8E-07 9.3E-07 9.5E-07 7.2E-07 6.7E-07 5.9E-07 4.9E-07 3.9E-07 4.1E-07 4.4E-07 5.4E-07 5.4E-07 4.3E-07 3.6E-07 3.6E-07 3.6E-07 3.4E-07 0.00011

0.18939 0.16549 0.15895 0.05755 0.04778 0.05492 0.07638 0.03818 0.01938 0.02265 0.02711 0.01439 0.01404 0.0124 0.01004 0.00656 0.00729 0.00843 0.00864 0.00654 0.00613 0.00538 0.00443 0.00358 0.00376 0.00396 0.00491 0.00494 0.00393 0.00327 0.00329 0.00325 0.00306 1

43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.08144 0.09102 0.06835 0.02647 0.01864 0.02416 0.03972 0.01413 0.01027 0.00861 0.0122 0.00605 0.00463 0.00459 0.00361 0.00315 0.00299 0.00354 0.00458 0.00307 0.00214 0.00258 0.00168 0.00186 0.00181 0.00162 0.0026 0.00222 0.00173 0.0017 0.00141 0.00169 0.00116 0.45543

326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.61741 0.53453 0.49434 0.18703 0.16342 0.18232 0.23067 0.12409 0.06319 0.07702 0.08594 0.04563 0.048 0.03955 0.03444 0.0212 0.02288 0.02874 0.02721 0.02099 0.02102 0.01808 0.0144 0.01159 0.01219 0.0124 0.01518 0.01536 0.0129 0.01023 0.01115 0.0105 0.0101 3.22368

H-1

H.2. Estimasi Titik DH2 ESTIMASI TITIK

DH2

TERHADAP TITIK DH1 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 382.539 247.681 464.613 419.237 188.152 226.374 414.121 615.081 611.949 614.003 837.291 813.204 831.177 893.031 1116.65 1075.55 1030.36 1051.06 1194.07 1201.07 1251.75 1404.95 1544.81 1525.41 1511.18 1365.24 1389.48 1542.01 1702.25 1669.62 1654.71 1686.78

2.1E-05 6.8E-06 1.6E-05 4.6E-06 5.7E-06 2.8E-05 2E-05 5.8E-06 2.6E-06 2.7E-06 2.7E-06 1.4E-06 1.5E-06 1.4E-06 1.3E-06 8E-07 8.6E-07 9.4E-07 9.1E-07 7E-07 6.9E-07 6.4E-07 5.1E-07 4.2E-07 4.3E-07 4.4E-07 5.4E-07 5.2E-07 4.2E-07 3.5E-07 3.6E-07 3.7E-07 3.5E-07 0.00013

0.15809 0.05188 0.12376 0.03517 0.0432 0.21446 0.14816 0.04427 0.02007 0.02027 0.02014 0.01083 0.01148 0.01099 0.00952 0.00609 0.00656 0.00715 0.00687 0.00532 0.00526 0.00485 0.00385 0.00318 0.00326 0.00332 0.00407 0.00393 0.00319 0.00262 0.00272 0.00277 0.00267 1

46.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.07272 0.02854 0.05322 0.01618 0.01685 0.09436 0.07704 0.01638 0.01064 0.0077 0.00906 0.00455 0.00379 0.00407 0.00343 0.00292 0.00269 0.003 0.00364 0.0025 0.00184 0.00233 0.00146 0.00165 0.00157 0.00136 0.00216 0.00177 0.0014 0.00136 0.00117 0.00144 0.00101 0.45382

315.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.49798 0.16758 0.3849 0.11431 0.14773 0.71202 0.44743 0.14388 0.06542 0.06893 0.06384 0.03433 0.03926 0.03506 0.03265 0.01967 0.02061 0.02439 0.02165 0.01709 0.01805 0.01628 0.0125 0.01031 0.01057 0.01041 0.01259 0.01223 0.01047 0.0082 0.00923 0.00896 0.00881 3.20733

H-2

H.3. Estimasi Titik DH3 ESTIMASI TITIK

DH3

TERHADAP TITIK DH1 DH2 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

234.438 382.539 199.123 199.642 313.56 542.794 363.369 412.146 573.394 480.635 383.719 583.095 614.919 690.072 810.195 1028.99 954.231 852.48 818.478 975.109 1033.97 1138.45 1252.59 1428.37 1374.05 1317.59 1159.93 1141.31 1309.44 1450.04 1457.67 1482.4 1546.05

1.8E-05 6.8E-06 2.5E-05 2.5E-05 1E-05 3.4E-06 7.6E-06 5.9E-06 3E-06 4.3E-06 6.8E-06 2.9E-06 2.6E-06 2.1E-06 1.5E-06 9.4E-07 1.1E-06 1.4E-06 1.5E-06 1.1E-06 9.4E-07 7.7E-07 6.4E-07 4.9E-07 5.3E-07 5.8E-07 7.4E-07 7.7E-07 5.8E-07 4.8E-07 4.7E-07 4.6E-07 4.2E-07 0.00014

0.13038 0.04897 0.18073 0.17979 0.07288 0.02432 0.05427 0.04219 0.02179 0.03102 0.04867 0.02108 0.01895 0.01505 0.01092 0.00677 0.00787 0.00986 0.0107 0.00754 0.0067 0.00553 0.00457 0.00351 0.0038 0.00413 0.00533 0.0055 0.00418 0.00341 0.00337 0.00326 0.003 1

46.0% 43.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.05997 0.02106 0.07771 0.0827 0.02842 0.0107 0.02822 0.01561 0.01155 0.01179 0.0219 0.00885 0.00625 0.00557 0.00393 0.00325 0.00323 0.00414 0.00567 0.00354 0.00235 0.00265 0.00174 0.00183 0.00182 0.00169 0.00282 0.00248 0.00184 0.00177 0.00145 0.0017 0.00114 0.43934

315.0% 326.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.41069 0.15964 0.56206 0.58431 0.24926 0.08075 0.1639 0.1371 0.07105 0.10547 0.15427 0.06681 0.06481 0.048 0.03744 0.02186 0.02471 0.03362 0.03369 0.02419 0.02299 0.01858 0.01484 0.01138 0.0123 0.01292 0.01646 0.01711 0.01371 0.01067 0.01143 0.01053 0.00989 3.21644

H-3

H.4. Estimasi Titik DH4 ESTIMASI TITIK

DH4

TERHADAP TITIK DH1 DH2 DH3 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

239.209 247.681 199.123 217.479 199.625 367.185 164.247 253.049 446.252 399.224 371.712 595.021 584.23 623.097 712.956 938.587 881.077 812.288 816.123 964.353 989.275 1063.34 1201.06 1357.73 1322.88 1292.21 1141.24 1153 1310.53 1466 1445.19 1444.56 1489.82

1.7E-05 1.6E-05 2.5E-05 2.1E-05 2.5E-05 7.4E-06 3.7E-05 1.6E-05 5E-06 6.3E-06 7.2E-06 2.8E-06 2.9E-06 2.6E-06 2E-06 1.1E-06 1.3E-06 1.5E-06 1.5E-06 1.1E-06 1E-06 8.8E-07 6.9E-07 5.4E-07 5.7E-07 6E-07 7.7E-07 7.5E-07 5.8E-07 4.7E-07 4.8E-07 4.8E-07 4.5E-07 0.00021

0.08363 0.07801 0.12069 0.10118 0.12008 0.03549 0.17739 0.07473 0.02403 0.03002 0.03463 0.01352 0.01402 0.01233 0.00941 0.00543 0.00616 0.00725 0.00718 0.00515 0.00489 0.00423 0.00332 0.0026 0.00273 0.00287 0.00367 0.0036 0.00279 0.00223 0.00229 0.00229 0.00216 1

46.0% 43.0% 55.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.03847 0.03354 0.06638 0.04654 0.04683 0.01562 0.09224 0.02765 0.01274 0.01141 0.01559 0.00568 0.00463 0.00456 0.00339 0.00261 0.00253 0.00305 0.00381 0.00242 0.00171 0.00203 0.00126 0.00135 0.00131 0.00117 0.00195 0.00162 0.00123 0.00116 0.00099 0.00119 0.00082 0.45745

315.0% 326.0% 323.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.26343 0.2543 0.38983 0.32882 0.41069 0.11784 0.53571 0.24288 0.07834 0.10208 0.10979 0.04285 0.04795 0.03932 0.03229 0.01755 0.01936 0.02473 0.02263 0.01652 0.01677 0.01422 0.01078 0.00841 0.00886 0.00897 0.01135 0.01119 0.00914 0.00697 0.00777 0.00741 0.00711 3.22584

H-4

H.5. Estimasi Titik DH5 ESTIMASI TITIK

DH5

TERHADAP TITIK DH1 DH2 DH3 DH4 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

397.555 464.613 199.642 217.479 165.895 574.345 335.932 284.543 399.249 287.939 185.852 397.363 416.74 491.037 616.02 831.856 755.017 654.083 629.27 783.901 835.456 939.136 1053.66 1228.74 1175.28 1123.3 967.019 959.563 1123.71 1271.21 1267.39 1285.68 1346.95

6.3E-06 4.6E-06 2.5E-05 2.1E-05 3.6E-05 3E-06 8.9E-06 1.2E-05 6.3E-06 1.2E-05 2.9E-05 6.3E-06 5.8E-06 4.1E-06 2.6E-06 1.4E-06 1.8E-06 2.3E-06 2.5E-06 1.6E-06 1.4E-06 1.1E-06 9E-07 6.6E-07 7.2E-07 7.9E-07 1.1E-06 1.1E-06 7.9E-07 6.2E-07 6.2E-07 6E-07 5.5E-07 0.0002

0.03092 0.02264 0.12262 0.10333 0.17758 0.01482 0.04331 0.06036 0.03066 0.05895 0.14149 0.03095 0.02814 0.02027 0.01288 0.00706 0.00857 0.01142 0.01234 0.00795 0.007 0.00554 0.0044 0.00324 0.00354 0.00387 0.00523 0.00531 0.00387 0.00302 0.00304 0.00296 0.00269 1

46.0% 43.0% 55.0% 43.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.01422 0.00974 0.06744 0.04443 0.06926 0.00652 0.02252 0.02233 0.01625 0.0224 0.06367 0.013 0.00929 0.0075 0.00464 0.00339 0.00352 0.0048 0.00654 0.00374 0.00245 0.00266 0.00167 0.00168 0.0017 0.00159 0.00277 0.00239 0.0017 0.00157 0.00131 0.00154 0.00102 0.43925

315.0% 326.0% 323.0% 311.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.09741 0.07381 0.39606 0.32136 0.60734 0.04919 0.13079 0.19618 0.09995 0.20042 0.44853 0.09812 0.09624 0.06466 0.04417 0.02281 0.02692 0.03895 0.03888 0.02553 0.02402 0.01862 0.01431 0.01049 0.01146 0.01212 0.01615 0.01651 0.0127 0.00947 0.01031 0.00955 0.00889 3.25192

H-5

H.6. Estimasi Titik DH6 ESTIMASI TITIK

DH6

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

436.285 419.237 313.56 199.625 165.895 476.807 225.878 118.962 261.467 199.865 210.238 426.427 394.011 423.745 516.558 741.432 681.602 615.813 632.261 775.023 791.154 864.197 1001.82 1158.47 1123.56 1096.71 948.046 970.824 1122.84 1283.37 1252.46 1246.47 1290.23

5.3E-06 5.7E-06 1E-05 2.5E-05 3.6E-05 4.4E-06 2E-05 7.1E-05 1.5E-05 2.5E-05 2.3E-05 5.5E-06 6.4E-06 5.6E-06 3.7E-06 1.8E-06 2.2E-06 2.6E-06 2.5E-06 1.7E-06 1.6E-06 1.3E-06 1E-06 7.5E-07 7.9E-07 8.3E-07 1.1E-06 1.1E-06 7.9E-07 6.1E-07 6.4E-07 6.4E-07 6E-07 0.00028

0.01855 0.02008 0.0359 0.08858 0.12827 0.01553 0.06919 0.24944 0.05164 0.08837 0.07987 0.01941 0.02274 0.01966 0.01323 0.00642 0.0076 0.00931 0.00883 0.00588 0.00564 0.00473 0.00352 0.00263 0.0028 0.00293 0.00393 0.00375 0.0028 0.00214 0.00225 0.00227 0.00212 1

46.0% 43.0% 55.0% 43.0% 46.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00853 0.00864 0.01975 0.03809 0.059 0.00683 0.03598 0.09229 0.02737 0.03358 0.03594 0.00815 0.0075 0.00727 0.00476 0.00308 0.00312 0.00391 0.00468 0.00276 0.00197 0.00227 0.00134 0.00137 0.00134 0.0012 0.00208 0.00169 0.00123 0.00111 0.00097 0.00118 0.00081 0.42981

315.0% 326.0% 323.0% 311.0% 325.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.05842 0.06548 0.11597 0.2755 0.41687 0.05155 0.20895 0.81068 0.16833 0.30046 0.25318 0.06154 0.07777 0.06271 0.04538 0.02074 0.02386 0.03174 0.02782 0.01887 0.01934 0.01588 0.01143 0.00852 0.00906 0.00919 0.01214 0.01165 0.00918 0.00671 0.00763 0.00734 0.007 3.23088

H-6

H.7. Estimasi Titik DH7 ESTIMASI TITIK

DH7

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

406.972 188.152 542.794 367.185 574.345 476.807 251.002 422.456 598.912 639.879 686.706 901.568 851.469 840.074 868.678 1082.29 1059.68 1045.05 1093.01 1223.3 1203 1224.77 1392.94 1511.27 1509.91 1518.06 1381.96 1429.16 1569.55 1738.25 1683.29 1647.39 1662.54

6E-06 2.8E-05 3.4E-06 7.4E-06 3E-06 4.4E-06 1.6E-05 5.6E-06 2.8E-06 2.4E-06 2.1E-06 1.2E-06 1.4E-06 1.4E-06 1.3E-06 8.5E-07 8.9E-07 9.2E-07 8.4E-07 6.7E-07 6.9E-07 6.7E-07 5.2E-07 4.4E-07 4.4E-07 4.3E-07 5.2E-07 4.9E-07 4.1E-07 3.3E-07 3.5E-07 3.7E-07 3.6E-07 9.7E-05

0.06232 0.29155 0.03503 0.07655 0.03129 0.0454 0.16383 0.05783 0.02877 0.02521 0.02189 0.0127 0.01424 0.01463 0.01368 0.00881 0.00919 0.00945 0.00864 0.0069 0.00713 0.00688 0.00532 0.00452 0.00453 0.00448 0.0054 0.00505 0.00419 0.00342 0.00364 0.0038 0.00373 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.02867 0.12537 0.01927 0.03292 0.01439 0.01771 0.08519 0.0214 0.01525 0.00958 0.00985 0.00533 0.0047 0.00541 0.00492 0.00423 0.00377 0.00397 0.00458 0.00324 0.0025 0.0033 0.00202 0.00235 0.00217 0.00184 0.00286 0.00227 0.00184 0.00178 0.00157 0.00198 0.00142 0.44764

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.1963 0.95047 0.11315 0.23808 0.10169 0.15527 0.49475 0.18796 0.0938 0.08571 0.06938 0.04025 0.04869 0.04665 0.04691 0.02846 0.02886 0.03223 0.02721 0.02214 0.02446 0.02312 0.01729 0.01464 0.01467 0.01402 0.0167 0.01572 0.01374 0.01069 0.01235 0.01228 0.01232 3.20997

H-7

H.8. Estimasi Titik DH8 ESTIMASI TITIK

DH8

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

345.08 226.374 363.369 164.247 335.932 225.878 251.002 190.118 389.012 399.261 435.707 651.519 608.113 611.962 666.979 890.3 850.882 814.325 849.342 985.419 980.987 1025.91 1181.62 1318.67 1301.53 1293.43 1151.06 1187.25 1333.28 1498.38 1454.73 1432.83 1461.62

8.4E-06 2E-05 7.6E-06 3.7E-05 8.9E-06 2E-05 1.6E-05 2.8E-05 6.6E-06 6.3E-06 5.3E-06 2.4E-06 2.7E-06 2.7E-06 2.2E-06 1.3E-06 1.4E-06 1.5E-06 1.4E-06 1E-06 1E-06 9.5E-07 7.2E-07 5.8E-07 5.9E-07 6E-07 7.5E-07 7.1E-07 5.6E-07 4.5E-07 4.7E-07 4.9E-07 4.7E-07 0.00019

0.04476 0.10401 0.04037 0.19758 0.04723 0.10447 0.0846 0.14746 0.03522 0.03344 0.02808 0.01256 0.01441 0.01423 0.01198 0.00672 0.00736 0.00804 0.00739 0.00549 0.00554 0.00506 0.00382 0.00307 0.00315 0.00319 0.00402 0.00378 0.003 0.00237 0.00252 0.0026 0.00249 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.02059 0.04472 0.0222 0.08496 0.02173 0.04074 0.03722 0.05456 0.01867 0.01271 0.01263 0.00527 0.00476 0.00527 0.00431 0.00323 0.00302 0.00338 0.00392 0.00258 0.00194 0.00243 0.00145 0.00159 0.00151 0.00131 0.00213 0.0017 0.00132 0.00123 0.00108 0.00135 0.00095 0.42646

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.14099 0.33907 0.13039 0.61446 0.1535 0.35728 0.28088 0.47925 0.11482 0.11368 0.089 0.0398 0.04929 0.0454 0.0411 0.02172 0.02312 0.02741 0.02327 0.01762 0.019 0.01702 0.01241 0.00993 0.01019 0.00997 0.01243 0.01176 0.00983 0.00743 0.00854 0.00839 0.00823 3.2472

H-8

H.9. Estimasi Titik DH9 ESTIMASI TITIK

DH9

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

488.079 414.121 412.146 253.049 284.543 118.962 422.456 190.118 202.98 217.867 298.181 491.634 429.848 422.734 479.942 704.827 661.472 626.235 671.096 801.29 791.137 838.01 991.642 1131.58 1111.73 1104.13 963.361 1006.72 1148.25 1315.96 1266.44 1242.71 1272.65

4.2E-06 5.8E-06 5.9E-06 1.6E-05 1.2E-05 7.1E-05 5.6E-06 2.8E-05 2.4E-05 2.1E-05 1.1E-05 4.1E-06 5.4E-06 5.6E-06 4.3E-06 2E-06 2.3E-06 2.5E-06 2.2E-06 1.6E-06 1.6E-06 1.4E-06 1E-06 7.8E-07 8.1E-07 8.2E-07 1.1E-06 9.9E-07 7.6E-07 5.8E-07 6.2E-07 6.5E-07 6.2E-07 0.00025

0.01705 0.02368 0.02391 0.06342 0.05016 0.28695 0.02275 0.11235 0.09856 0.08555 0.04567 0.0168 0.02198 0.02272 0.01763 0.00817 0.00928 0.01035 0.00902 0.00632 0.00649 0.00578 0.00413 0.00317 0.00329 0.00333 0.00438 0.00401 0.00308 0.00234 0.00253 0.00263 0.00251 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00784 0.01018 0.01315 0.02727 0.02307 0.11191 0.01001 0.05842 0.05224 0.03251 0.02055 0.00706 0.00725 0.00841 0.00635 0.00392 0.00381 0.00435 0.00478 0.00297 0.00227 0.00278 0.00157 0.00165 0.00158 0.00137 0.00232 0.0018 0.00136 0.00122 0.00109 0.00137 0.00095 0.43737

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.0537 0.07719 0.07722 0.19723 0.16301 0.98136 0.07554 0.3393 0.32132 0.29088 0.14478 0.05326 0.07517 0.07249 0.06047 0.0264 0.02914 0.03531 0.0284 0.0203 0.02225 0.01943 0.01342 0.01028 0.01065 0.01043 0.01352 0.01246 0.0101 0.00734 0.00858 0.00849 0.00827 3.27771

H-9

H.10. Estimasi Titik DH10 ESTIMASI TITIK

DH10

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

685.018 615.081 573.394 446.252 399.249 261.467 598.912 389.012 202.98 145.798 303.488 410.001 306.751 249.401 277.973 502.068 463.778 452.863 530.601 639.641 604.293 636.94 796.357 929.731 915.052 919.556 787.036 852.036 979.605 1153.36 1085.98 1049.75 1073.18

2.1E-06 2.6E-06 3E-06 5E-06 6.3E-06 1.5E-05 2.8E-06 6.6E-06 2.4E-05 4.7E-05 1.1E-05 5.9E-06 1.1E-05 1.6E-05 1.3E-05 4E-06 4.6E-06 4.9E-06 3.6E-06 2.4E-06 2.7E-06 2.5E-06 1.6E-06 1.2E-06 1.2E-06 1.2E-06 1.6E-06 1.4E-06 1E-06 7.5E-07 8.5E-07 9.1E-07 8.7E-07 0.00021

0.01024 0.0127 0.01461 0.02413 0.03014 0.07029 0.0134 0.03175 0.11663 0.22605 0.05217 0.02858 0.05107 0.07725 0.06219 0.01906 0.02234 0.02343 0.01707 0.01174 0.01316 0.01184 0.00758 0.00556 0.00574 0.00568 0.00776 0.00662 0.00501 0.00361 0.00407 0.00436 0.00417 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00471 0.00546 0.00804 0.01038 0.01387 0.02741 0.00589 0.01651 0.04315 0.0859 0.02348 0.01201 0.01685 0.02858 0.02239 0.00915 0.00916 0.00984 0.00905 0.00552 0.00461 0.00569 0.00288 0.00289 0.00275 0.00233 0.00411 0.00298 0.0022 0.00188 0.00175 0.00227 0.00159 0.40526

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.03226 0.04141 0.04721 0.07504 0.09797 0.24038 0.04447 0.09589 0.37903 0.76856 0.16538 0.09061 0.17465 0.24643 0.2133 0.06157 0.07015 0.0799 0.05376 0.0377 0.04513 0.0398 0.02462 0.01801 0.01859 0.01779 0.02397 0.02058 0.01642 0.01131 0.01381 0.01408 0.01377 3.29355

H-10

H.11. Estimasi Titik DH11 ESTIMASI TITIK

DH11

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

633.654 611.949 480.635 399.224 287.939 199.865 639.879 399.261 217.867 145.798 159.455 286.024 212.002 223.897 329.56 550.023 483.662 418.502 453.259 586.165 591.845 667.235 801.958 960.913 923.717 899.52 753.569 789.497 934.037 1099.67 1057.84 1047.04 1090.71

2.5E-06 2.7E-06 4.3E-06 6.3E-06 1.2E-05 2.5E-05 2.4E-06 6.3E-06 2.1E-05 4.7E-05 3.9E-05 1.2E-05 2.2E-05 2E-05 9.2E-06 3.3E-06 4.3E-06 5.7E-06 4.9E-06 2.9E-06 2.9E-06 2.2E-06 1.6E-06 1.1E-06 1.2E-06 1.2E-06 1.8E-06 1.6E-06 1.1E-06 8.3E-07 8.9E-07 9.1E-07 8.4E-07 0.00027

0.00916 0.00982 0.01592 0.02308 0.04437 0.09209 0.00898 0.02308 0.0775 0.17305 0.14468 0.04497 0.08185 0.07338 0.03387 0.01216 0.01573 0.021 0.01791 0.01071 0.0105 0.00826 0.00572 0.00398 0.00431 0.00455 0.00648 0.0059 0.00422 0.00304 0.00329 0.00336 0.00309 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00421 0.00422 0.00876 0.00992 0.02041 0.03591 0.00395 0.012 0.02867 0.09172 0.06511 0.01889 0.02701 0.02715 0.01219 0.00584 0.00645 0.00882 0.00949 0.00503 0.00368 0.00397 0.00217 0.00207 0.00207 0.00186 0.00343 0.00266 0.00186 0.00158 0.00141 0.00174 0.00118 0.43544

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.02886 0.03202 0.05143 0.07178 0.1442 0.31494 0.02983 0.06969 0.25187 0.56415 0.45863 0.14254 0.27991 0.23409 0.11617 0.03928 0.04938 0.07162 0.0564 0.03437 0.03602 0.02776 0.01859 0.01291 0.01397 0.01423 0.02002 0.01835 0.01383 0.00952 0.01114 0.01084 0.0102 3.25856

H-11

H.12. Estimasi Titik DH12 ESTIMASI TITIK

DH12

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

579.211 614.003 383.719 371.712 185.852 210.238 686.706 435.707 298.181 303.488 159.455 223.517 231.225 316.986 457.2 661.892 577.755 468.771 447.654 600.234 650.25 760.76 868.932 1047.49 990.34 937.841 782.171 782.368 942.959 1095.18 1083.62 1099.84 1162.48

3E-06 2.7E-06 6.8E-06 7.2E-06 2.9E-05 2.3E-05 2.1E-06 5.3E-06 1.1E-05 1.1E-05 3.9E-05 2E-05 1.9E-05 1E-05 4.8E-06 2.3E-06 3E-06 4.6E-06 5E-06 2.8E-06 2.4E-06 1.7E-06 1.3E-06 9.1E-07 1E-06 1.1E-06 1.6E-06 1.6E-06 1.1E-06 8.3E-07 8.5E-07 8.3E-07 7.4E-07 0.00023

0.01312 0.01167 0.02989 0.03185 0.1274 0.09956 0.00933 0.02318 0.04949 0.04778 0.17308 0.08808 0.08231 0.0438 0.02105 0.01004 0.01318 0.02003 0.02196 0.01221 0.01041 0.0076 0.00583 0.00401 0.00449 0.005 0.00719 0.00719 0.00495 0.00367 0.00375 0.00364 0.00326 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00603 0.00502 0.01644 0.0137 0.05861 0.03883 0.00411 0.01205 0.01831 0.02532 0.06577 0.03699 0.02716 0.0162 0.00758 0.00482 0.00541 0.00841 0.01164 0.00574 0.00364 0.00365 0.00221 0.00209 0.00215 0.00205 0.00381 0.00324 0.00218 0.00191 0.00161 0.00189 0.00124 0.41981

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.04132 0.03805 0.09654 0.09905 0.41406 0.3405 0.03098 0.07001 0.16086 0.15576 0.58846 0.27922 0.28149 0.13971 0.07221 0.03244 0.0414 0.06829 0.06917 0.03921 0.0357 0.02555 0.01894 0.01299 0.01454 0.01566 0.02223 0.02236 0.01623 0.01148 0.0127 0.01175 0.01075 3.2896

H-12

H.13. Estimasi Titik DH13 ESTIMASI TITIK

DH13

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

794.909 837.291 583.095 595.021 397.363 426.427 901.568 651.519 491.634 410.001 286.024 223.517 127.769 258.07 414.845 563.76 459.344 306.858 235.936 393.544 479.588 626.856 697.379 893.369 815.039 738.976 579.662 562.228 727.178 874.211 874.783 909.628 989.041

1.6E-06 1.4E-06 2.9E-06 2.8E-06 6.3E-06 5.5E-06 1.2E-06 2.4E-06 4.1E-06 5.9E-06 1.2E-05 2E-05 6.1E-05 1.5E-05 5.8E-06 3.1E-06 4.7E-06 1.1E-05 1.8E-05 6.5E-06 4.3E-06 2.5E-06 2.1E-06 1.3E-06 1.5E-06 1.8E-06 3E-06 3.2E-06 1.9E-06 1.3E-06 1.3E-06 1.2E-06 1E-06 0.00022

0.00726 0.00654 0.0135 0.01296 0.02906 0.02523 0.00564 0.01081 0.01898 0.0273 0.05609 0.09184 0.28106 0.06889 0.02666 0.01444 0.02175 0.04873 0.08243 0.02963 0.01995 0.01168 0.00943 0.00575 0.00691 0.0084 0.01366 0.01452 0.00868 0.006 0.006 0.00555 0.00469 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00334 0.00281 0.00742 0.00557 0.01337 0.00984 0.00248 0.00562 0.00702 0.01447 0.02131 0.04133 0.09275 0.02549 0.0096 0.00693 0.00892 0.02047 0.04369 0.01392 0.00698 0.0056 0.00359 0.00299 0.00332 0.00344 0.00724 0.00653 0.00382 0.00312 0.00258 0.00288 0.00178 0.41023

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.02287 0.02134 0.04359 0.0403 0.09444 0.0863 0.01874 0.03264 0.0617 0.08898 0.19069 0.29114 0.96124 0.21977 0.09145 0.04663 0.06828 0.16616 0.25964 0.0951 0.06843 0.03923 0.03066 0.01863 0.02238 0.0263 0.0422 0.04514 0.02846 0.01879 0.02033 0.01791 0.01548 3.29495

H-13

H.14. Estimasi Titik DH14 ESTIMASI TITIK

DH14

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

805.001 813.204 614.919 584.23 416.74 394.011 851.469 608.113 429.848 306.751 212.002 231.225 127.769 131.244 289.311 456.465 360.169 237.565 241.58 381.119 419.058 538.677 637.96 820.088 759.226 710.155 557.237 579.142 728.83 890.691 860.976 869.361 931.631

1.5E-06 1.5E-06 2.6E-06 2.9E-06 5.8E-06 6.4E-06 1.4E-06 2.7E-06 5.4E-06 1.1E-05 2.2E-05 1.9E-05 6.1E-05 5.8E-05 1.2E-05 4.8E-06 7.7E-06 1.8E-05 1.7E-05 6.9E-06 5.7E-06 3.4E-06 2.5E-06 1.5E-06 1.7E-06 2E-06 3.2E-06 3E-06 1.9E-06 1.3E-06 1.3E-06 1.3E-06 1.2E-06 0.0003

0.00519 0.00508 0.00889 0.00985 0.01936 0.02166 0.00464 0.00909 0.0182 0.03574 0.07482 0.0629 0.20598 0.19522 0.04017 0.01614 0.02592 0.05958 0.05762 0.02315 0.01915 0.01159 0.00826 0.005 0.00583 0.00667 0.01083 0.01003 0.00633 0.00424 0.00454 0.00445 0.00387 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00239 0.00219 0.00489 0.00424 0.00891 0.00845 0.00204 0.00473 0.00673 0.01894 0.02843 0.0283 0.08651 0.07223 0.01446 0.00775 0.01063 0.02502 0.03054 0.01088 0.0067 0.00556 0.00314 0.0026 0.0028 0.00273 0.00574 0.00451 0.00279 0.0022 0.00195 0.00231 0.00147 0.42277

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.01635 0.01658 0.02872 0.03064 0.06293 0.07408 0.0154 0.02746 0.05915 0.1165 0.25438 0.19938 0.65297 0.62276 0.1378 0.05213 0.0814 0.20318 0.1815 0.07431 0.06568 0.03894 0.02685 0.0162 0.0189 0.02087 0.03346 0.03118 0.02076 0.01327 0.01538 0.01437 0.01279 3.23625

H-14

H.15. Estimasi Titik DH15 ESTIMASI TITIK

DH15

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

856.493 831.177 690.072 623.097 491.037 423.745 840.074 611.962 422.734 249.401 223.897 316.986 258.07 131.244 158.417 345.029 264.229 205.139 290.837 390.252 369.899 448.54 578.081 740.249 699.821 681.487 541.893 603.009 731.456 904.204 844.029 824.296 867.111

1.4E-06 1.4E-06 2.1E-06 2.6E-06 4.1E-06 5.6E-06 1.4E-06 2.7E-06 5.6E-06 1.6E-05 2E-05 1E-05 1.5E-05 5.8E-05 4E-05 8.4E-06 1.4E-05 2.4E-05 1.2E-05 6.6E-06 7.3E-06 5E-06 3E-06 1.8E-06 2E-06 2.2E-06 3.4E-06 2.8E-06 1.9E-06 1.2E-06 1.4E-06 1.5E-06 1.3E-06 0.00029

0.00478 0.00507 0.00736 0.00902 0.01453 0.01951 0.00496 0.00936 0.01961 0.05633 0.0699 0.03487 0.05261 0.20342 0.13962 0.02943 0.05019 0.08326 0.04142 0.02301 0.02561 0.01742 0.01048 0.00639 0.00715 0.00754 0.01193 0.00964 0.00655 0.00429 0.00492 0.00516 0.00466 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0022 0.00218 0.00405 0.00388 0.00668 0.00761 0.00218 0.00487 0.00725 0.02986 0.02656 0.01569 0.0221 0.06713 0.05026 0.01413 0.02058 0.03497 0.02195 0.01081 0.00896 0.00836 0.00398 0.00333 0.00343 0.00309 0.00632 0.00434 0.00288 0.00223 0.00211 0.00268 0.00177 0.40844

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.01505 0.01653 0.02377 0.02807 0.04723 0.06674 0.01648 0.02826 0.06372 0.18364 0.23764 0.11054 0.16678 0.69569 0.47889 0.09507 0.15758 0.28393 0.13048 0.07385 0.08784 0.05852 0.03408 0.02072 0.02318 0.02361 0.03687 0.02997 0.02148 0.01341 0.01667 0.01666 0.01538 3.31831

H-15

H.16. Estimasi Titik DH16 ESTIMASI TITIK

DH16

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

951.803 893.031 810.195 712.956 616.02 516.558 868.678 666.979 479.942 277.973 329.56 457.2 414.845 289.311 158.417 225.887 192.72 253.428 392.94 441.249 353.21 359.138 525.07 651.801 641.237 664.209 549.771 652.113 750.139 929.889 834.945 780.256 796.157

1.1E-06 1.3E-06 1.5E-06 2E-06 2.6E-06 3.7E-06 1.3E-06 2.2E-06 4.3E-06 1.3E-05 9.2E-06 4.8E-06 5.8E-06 1.2E-05 4E-05 2E-05 2.7E-05 1.6E-05 6.5E-06 5.1E-06 8E-06 7.8E-06 3.6E-06 2.4E-06 2.4E-06 2.3E-06 3.3E-06 2.4E-06 1.8E-06 1.2E-06 1.4E-06 1.6E-06 1.6E-06 0.00022

0.00506 0.00575 0.00699 0.00902 0.01208 0.01718 0.00608 0.01031 0.01991 0.05934 0.04222 0.02194 0.02664 0.05478 0.18271 0.08986 0.12346 0.07139 0.0297 0.02355 0.03675 0.03555 0.01663 0.01079 0.01115 0.01039 0.01517 0.01078 0.00815 0.0053 0.00658 0.00753 0.00723 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00233 0.00247 0.00384 0.00388 0.00556 0.0067 0.00267 0.00536 0.00737 0.03145 0.01604 0.00987 0.01119 0.01808 0.0676 0.04314 0.05062 0.02999 0.01574 0.01107 0.01286 0.01706 0.00632 0.00561 0.00535 0.00426 0.00804 0.00485 0.00359 0.00276 0.00283 0.00392 0.00275 0.42517

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.01594 0.01874 0.02256 0.02805 0.03927 0.05877 0.02017 0.03113 0.0647 0.19346 0.14354 0.06954 0.08446 0.18736 0.58285 0.29026 0.38766 0.24345 0.09355 0.0756 0.12607 0.11945 0.05405 0.03497 0.03613 0.03253 0.04688 0.03353 0.02673 0.0166 0.0223 0.02433 0.02387 3.24851

H-16

H.17. Estimasi Titik DH17 ESTIMASI TITIK

DH17

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1177.23 1116.65 1028.99 938.587 831.856 741.432 1082.29 890.3 704.827 502.068 550.023 661.892 563.76 456.465 345.029 225.887 112.045 285.603 441.213 404.678 245.165 146.755 334.994 429.707 439.145 503.659 432.552 580.07 628.061 807.194 674.501 586.195 581.251

7.2E-07 8E-07 9.4E-07 1.1E-06 1.4E-06 1.8E-06 8.5E-07 1.3E-06 2E-06 4E-06 3.3E-06 2.3E-06 3.1E-06 4.8E-06 8.4E-06 2E-05 8E-05 1.2E-05 5.1E-06 6.1E-06 1.7E-05 4.6E-05 8.9E-06 5.4E-06 5.2E-06 3.9E-06 5.3E-06 3E-06 2.5E-06 1.5E-06 2.2E-06 2.9E-06 3E-06 0.00027

0.00271 0.00301 0.00354 0.00426 0.00542 0.00682 0.0032 0.00473 0.00755 0.01488 0.0124 0.00856 0.0118 0.018 0.0315 0.0735 0.29875 0.04598 0.01927 0.0229 0.0624 0.17414 0.03342 0.02031 0.01945 0.01478 0.02005 0.01115 0.00951 0.00576 0.00824 0.01091 0.0111 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00124 0.00129 0.00195 0.00183 0.00249 0.00266 0.00141 0.00246 0.00279 0.00789 0.00471 0.00385 0.00496 0.00594 0.01166 0.02646 0.12249 0.01931 0.01021 0.01076 0.02184 0.08359 0.0127 0.01056 0.00934 0.00606 0.01062 0.00502 0.00418 0.00299 0.00354 0.00568 0.00422 0.42671

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00852 0.00981 0.01144 0.01324 0.01761 0.02333 0.01063 0.01429 0.02454 0.0485 0.04215 0.02714 0.03741 0.06156 0.1005 0.25212 0.93807 0.15679 0.06069 0.07351 0.21403 0.58512 0.10862 0.06581 0.06301 0.04628 0.06194 0.03466 0.03119 0.01802 0.02795 0.03525 0.03663 3.26035

H-17

H.18. Estimasi Titik DH18 ESTIMASI TITIK

DH18

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1117.16 1075.55 954.231 881.077 755.017 681.602 1059.68 850.882 661.472 463.778 483.662 577.755 459.344 360.169 264.229 192.72 112.045 173.566 329.577 307.002 172.325 184.329 333.264 477.253 451.276 473.888 371.732 499.12 572.787 753.618 645.484 588.011 611.465

8E-07 8.6E-07 1.1E-06 1.3E-06 1.8E-06 2.2E-06 8.9E-07 1.4E-06 2.3E-06 4.6E-06 4.3E-06 3E-06 4.7E-06 7.7E-06 1.4E-05 2.7E-05 8E-05 3.3E-05 9.2E-06 1.1E-05 3.4E-05 2.9E-05 9E-06 4.4E-06 4.9E-06 4.5E-06 7.2E-06 4E-06 3E-06 1.8E-06 2.4E-06 2.9E-06 2.7E-06 0.00032

0.0025 0.0027 0.00342 0.00402 0.00547 0.00671 0.00278 0.00431 0.00713 0.0145 0.01333 0.00934 0.01478 0.02404 0.04466 0.08396 0.24839 0.10351 0.02871 0.03309 0.10501 0.09178 0.02808 0.01369 0.01531 0.01389 0.02257 0.01252 0.0095 0.00549 0.00748 0.00902 0.00834 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00115 0.00116 0.00188 0.00173 0.00252 0.00262 0.00122 0.00224 0.00264 0.00768 0.00507 0.0042 0.00621 0.00793 0.01653 0.03022 0.11923 0.04347 0.01522 0.01555 0.03675 0.04405 0.01067 0.00712 0.00735 0.00569 0.01196 0.00563 0.00418 0.00286 0.00322 0.00469 0.00317 0.4358

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00787 0.00879 0.01106 0.01249 0.01778 0.02296 0.00922 0.01301 0.02316 0.04726 0.04532 0.02961 0.04685 0.08221 0.14248 0.28798 0.8023 0.35297 0.09043 0.1062 0.36017 0.30837 0.09125 0.04436 0.04961 0.04346 0.06973 0.03893 0.03117 0.01719 0.02537 0.02913 0.02752 3.29621

H-18

H.19. Estimasi Titik DH19 ESTIMASI TITIK

DH19

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1038.84 1030.36 852.48 812.288 654.083 615.813 1045.05 814.325 626.235 452.863 418.502 468.771 306.858 237.565 205.139 253.428 285.603 173.566 158.354 192.419 181.497 321.811 400.649 588.392 521.714 481.087 337.179 406.529 526.773 701.046 640.41 633.721 694.395

9.3E-07 9.4E-07 1.4E-06 1.5E-06 2.3E-06 2.6E-06 9.2E-07 1.5E-06 2.5E-06 4.9E-06 5.7E-06 4.6E-06 1.1E-05 1.8E-05 2.4E-05 1.6E-05 1.2E-05 3.3E-05 4E-05 2.7E-05 3E-05 9.7E-06 6.2E-06 2.9E-06 3.7E-06 4.3E-06 8.8E-06 6.1E-06 3.6E-06 2E-06 2.4E-06 2.5E-06 2.1E-06 0.00029

0.00315 0.0032 0.00467 0.00515 0.00794 0.00895 0.00311 0.00512 0.00866 0.01656 0.01939 0.01545 0.03606 0.06017 0.0807 0.05287 0.04163 0.11273 0.13542 0.09172 0.10309 0.03279 0.02116 0.00981 0.01248 0.01467 0.02987 0.02055 0.01224 0.00691 0.00828 0.00846 0.00704 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00145 0.00138 0.00257 0.00221 0.00365 0.00349 0.00137 0.00266 0.0032 0.00878 0.00737 0.00695 0.01515 0.01986 0.02986 0.01903 0.01998 0.04622 0.07178 0.04311 0.03608 0.01574 0.00804 0.0051 0.00599 0.00602 0.01583 0.00925 0.00538 0.00359 0.00356 0.0044 0.00268 0.43172

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00991 0.01043 0.01509 0.01601 0.0258 0.03063 0.01032 0.01547 0.02814 0.05398 0.06592 0.04899 0.11432 0.20579 0.25742 0.18136 0.13447 0.35396 0.42659 0.29442 0.3536 0.11018 0.06876 0.03178 0.04042 0.04593 0.0923 0.0639 0.04014 0.02163 0.02807 0.02731 0.02324 3.24628

H-19

H.20. Estimasi Titik DH20 ESTIMASI TITIK

DH20

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1026.09 1051.06 818.478 816.123 629.27 632.261 1093.01 849.342 671.096 530.601 453.259 447.654 235.936 241.58 290.837 392.94 441.213 329.577 158.354 157.927 275.879 454.104 481.269 687.64 593.354 504.279 344.398 338.576 495.308 651.197 639.2 677.751 766.512

9.5E-07 9.1E-07 1.5E-06 1.5E-06 2.5E-06 2.5E-06 8.4E-07 1.4E-06 2.2E-06 3.6E-06 4.9E-06 5E-06 1.8E-05 1.7E-05 1.2E-05 6.5E-06 5.1E-06 9.2E-06 4E-05 4E-05 1.3E-05 4.8E-06 4.3E-06 2.1E-06 2.8E-06 3.9E-06 8.4E-06 8.7E-06 4.1E-06 2.4E-06 2.4E-06 2.2E-06 1.7E-06 0.00024

0.00402 0.00383 0.00631 0.00635 0.01068 0.01057 0.00354 0.00586 0.00939 0.01502 0.02058 0.0211 0.07594 0.07244 0.04998 0.02738 0.02172 0.03892 0.16858 0.1695 0.05554 0.0205 0.01825 0.00894 0.01201 0.01662 0.03564 0.03688 0.01723 0.00997 0.01035 0.0092 0.0072 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00185 0.00165 0.00347 0.00273 0.00491 0.00412 0.00156 0.00305 0.00347 0.00796 0.00782 0.00949 0.0319 0.0239 0.01849 0.00986 0.01042 0.01596 0.0708 0.07966 0.01944 0.00984 0.00694 0.00465 0.00576 0.00682 0.01889 0.01659 0.00758 0.00518 0.00445 0.00479 0.00273 0.42673

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.01265 0.01247 0.02038 0.01974 0.0347 0.03617 0.01175 0.0177 0.03051 0.04895 0.06996 0.06687 0.24074 0.24773 0.15943 0.09391 0.07014 0.1222 0.57487 0.54408 0.19052 0.06888 0.05932 0.02897 0.0389 0.05203 0.11013 0.11469 0.05652 0.0312 0.03508 0.02973 0.02374 3.27464

H-20

H.21. Estimasi Titik DH21 ESTIMASI TITIK

DH21

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1179.44 1194.07 975.109 964.353 783.901 775.023 1223.3 985.419 801.29 639.641 586.165 600.234 393.544 381.119 390.252 441.249 404.678 307.002 192.419 157.927 175.573 366.602 343.169 554.995 446.878 346.554 186.507 214.245 348.116 515.335 483.508 521.648 617.664

7.2E-07 7E-07 1.1E-06 1.1E-06 1.6E-06 1.7E-06 6.7E-07 1E-06 1.6E-06 2.4E-06 2.9E-06 2.8E-06 6.5E-06 6.9E-06 6.6E-06 5.1E-06 6.1E-06 1.1E-05 2.7E-05 4E-05 3.2E-05 7.4E-06 8.5E-06 3.2E-06 5E-06 8.3E-06 2.9E-05 2.2E-05 8.3E-06 3.8E-06 4.3E-06 3.7E-06 2.6E-06 0.00027

0.00271 0.00264 0.00397 0.00406 0.00614 0.00628 0.00252 0.00388 0.00587 0.00922 0.01098 0.01047 0.02435 0.02596 0.02476 0.01937 0.02303 0.04001 0.10186 0.15121 0.12234 0.02806 0.03202 0.01224 0.01888 0.0314 0.10842 0.08216 0.03112 0.0142 0.01613 0.01386 0.00989 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00125 0.00114 0.00218 0.00174 0.00282 0.00245 0.00111 0.00202 0.00217 0.00489 0.00417 0.00471 0.01023 0.00857 0.00916 0.00697 0.01105 0.01641 0.04278 0.08014 0.04282 0.01347 0.01217 0.00637 0.00906 0.01287 0.05746 0.03697 0.01369 0.00738 0.00694 0.00721 0.00376 0.44613

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00854 0.00862 0.01281 0.01261 0.01995 0.02147 0.00837 0.01173 0.01909 0.03005 0.03732 0.03318 0.07719 0.08879 0.07899 0.06644 0.07438 0.12564 0.34733 0.4763 0.41962 0.09428 0.10408 0.03967 0.06119 0.09828 0.335 0.25552 0.10207 0.04445 0.05469 0.04476 0.03262 3.24503

H-21

H.22. Estimasi Titik DH22 ESTIMASI TITIK

DH22

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1218.28 1201.07 1033.97 989.275 835.456 791.154 1203 980.987 791.137 604.293 591.845 650.25 479.588 419.058 369.899 353.21 245.165 172.325 181.497 275.879 175.573 191.314 219.584 415.377 340.262 315.357 199.542 335 400.746 581.532 483.663 455.33 513.249

6.7E-07 6.9E-07 9.4E-07 1E-06 1.4E-06 1.6E-06 6.9E-07 1E-06 1.6E-06 2.7E-06 2.9E-06 2.4E-06 4.3E-06 5.7E-06 7.3E-06 8E-06 1.7E-05 3.4E-05 3E-05 1.3E-05 3.2E-05 2.7E-05 2.1E-05 5.8E-06 8.6E-06 1E-05 2.5E-05 8.9E-06 6.2E-06 3E-06 4.3E-06 4.8E-06 3.8E-06 0.0003

0.00226 0.00233 0.00314 0.00343 0.00481 0.00536 0.00232 0.00349 0.00536 0.00919 0.00958 0.00794 0.01459 0.01911 0.02453 0.02691 0.05585 0.11304 0.1019 0.0441 0.10889 0.09171 0.06962 0.01946 0.02899 0.03375 0.0843 0.02991 0.0209 0.00993 0.01435 0.01619 0.01274 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00104 0.001 0.00173 0.00147 0.00221 0.00209 0.00102 0.00181 0.00198 0.00487 0.00364 0.00357 0.00613 0.00631 0.00908 0.00969 0.02681 0.04635 0.0428 0.02338 0.05118 0.04402 0.02645 0.01012 0.01392 0.01384 0.04468 0.01346 0.0092 0.00516 0.00617 0.00842 0.00484 0.44844

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00712 0.00759 0.01014 0.01067 0.01563 0.01834 0.0077 0.01053 0.01743 0.02997 0.03258 0.02517 0.04626 0.06537 0.07826 0.09229 0.18039 0.35493 0.34748 0.13893 0.34955 0.30815 0.22626 0.06303 0.09394 0.10565 0.2605 0.09302 0.06856 0.03107 0.04864 0.0523 0.04205 3.2395

H-22

H.23. Estimasi Titik DH23 ESTIMASI TITIK

DH23

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1300.24 1251.75 1138.45 1063.34 939.136 864.197 1224.77 1025.91 838.01 636.94 667.235 760.76 626.856 538.677 448.54 359.138 146.755 184.329 321.811 454.104 366.602 191.314 192.421 294.491 292.412 370.984 331.958 498.654 512.851 687.029 538.358 440.005 437.824

5.9E-07 6.4E-07 7.7E-07 8.8E-07 1.1E-06 1.3E-06 6.7E-07 9.5E-07 1.4E-06 2.5E-06 2.2E-06 1.7E-06 2.5E-06 3.4E-06 5E-06 7.8E-06 4.6E-05 2.9E-05 9.7E-06 4.8E-06 7.4E-06 2.7E-05 2.7E-05 1.2E-05 1.2E-05 7.3E-06 9.1E-06 4E-06 3.8E-06 2.1E-06 3.5E-06 5.2E-06 5.2E-06 0.00025

0.00238 0.00256 0.0031 0.00355 0.00455 0.00538 0.00268 0.00382 0.00572 0.0099 0.00902 0.00694 0.01022 0.01384 0.01996 0.03113 0.18645 0.11818 0.03877 0.01947 0.02988 0.10971 0.10845 0.0463 0.04696 0.02918 0.03644 0.01615 0.01527 0.00851 0.01385 0.02074 0.02095 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00109 0.0011 0.0017 0.00153 0.00209 0.0021 0.00118 0.00198 0.00212 0.00525 0.00343 0.00312 0.00429 0.00457 0.00738 0.01121 0.0895 0.04846 0.01629 0.01032 0.01404 0.0384 0.04121 0.02408 0.02254 0.01196 0.01931 0.00727 0.00672 0.00442 0.00596 0.01079 0.00796 0.43336

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00748 0.00835 0.01001 0.01104 0.0148 0.01839 0.00889 0.01152 0.01858 0.03227 0.03067 0.02199 0.03239 0.04733 0.06367 0.10679 0.60223 0.3711 0.13222 0.06134 0.09591 0.37631 0.35247 0.15002 0.15216 0.09132 0.1126 0.05022 0.05008 0.02663 0.04697 0.06699 0.06913 3.25186

H-23

H.24. Estimasi Titik DH24 ESTIMASI TITIK

DH24

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1432.86 1404.95 1252.59 1201.06 1053.66 1001.82 1392.94 1181.62 991.642 796.357 801.958 868.932 697.379 637.96 578.081 525.07 334.994 333.264 400.649 481.269 343.169 219.584 192.421 212.474 122.004 186.55 213.19 386.939 347.922 510.824 347.852 255.409 293.748

4.9E-07 5.1E-07 6.4E-07 6.9E-07 9E-07 1E-06 5.2E-07 7.2E-07 1E-06 1.6E-06 1.6E-06 1.3E-06 2.1E-06 2.5E-06 3E-06 3.6E-06 8.9E-06 9E-06 6.2E-06 4.3E-06 8.5E-06 2.1E-05 2.7E-05 2.2E-05 6.7E-05 2.9E-05 2.2E-05 6.7E-06 8.3E-06 3.8E-06 8.3E-06 1.5E-05 1.2E-05 0.0003

0.00162 0.00168 0.00212 0.0023 0.00299 0.00331 0.00171 0.00238 0.00338 0.00524 0.00517 0.0044 0.00684 0.00817 0.00995 0.01206 0.02963 0.02993 0.02071 0.01435 0.02823 0.06895 0.08979 0.07364 0.22335 0.09553 0.07315 0.02221 0.02746 0.01274 0.02748 0.05096 0.03853 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00074 0.00072 0.00117 0.00099 0.00138 0.00129 0.00075 0.00124 0.00125 0.00278 0.00196 0.00198 0.00287 0.0027 0.00368 0.00434 0.01422 0.01227 0.0087 0.00761 0.01327 0.02413 0.0431 0.03829 0.10721 0.03917 0.03877 0.00999 0.01208 0.00663 0.01181 0.0265 0.01464 0.45826

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.0051 0.00549 0.00684 0.00717 0.00973 0.01133 0.00569 0.00719 0.01099 0.01709 0.01758 0.01396 0.02167 0.02794 0.03174 0.04136 0.09569 0.09399 0.07063 0.04521 0.09062 0.2365 0.3017 0.23861 0.72367 0.29902 0.22603 0.06906 0.09009 0.03988 0.09314 0.16462 0.12715 3.24647

H-24

H.25. Estimasi Titik DH25 ESTIMASI TITIK

DH25

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1594.32 1544.81 1428.37 1357.73 1228.74 1158.47 1511.27 1318.67 1131.58 929.731 960.913 1047.49 893.369 820.088 740.249 651.801 429.707 477.253 588.392 687.64 554.995 415.377 294.491 212.474 147.648 327.951 417.163 583.415 501.423 629.414 428.803 254.443 167.263

3.9E-07 4.2E-07 4.9E-07 5.4E-07 6.6E-07 7.5E-07 4.4E-07 5.8E-07 7.8E-07 1.2E-06 1.1E-06 9.1E-07 1.3E-06 1.5E-06 1.8E-06 2.4E-06 5.4E-06 4.4E-06 2.9E-06 2.1E-06 3.2E-06 5.8E-06 1.2E-05 2.2E-05 4.6E-05 9.3E-06 5.7E-06 2.9E-06 4E-06 2.5E-06 5.4E-06 1.5E-05 3.6E-05 0.0002

0.00197 0.0021 0.00246 0.00272 0.00332 0.00373 0.00219 0.00288 0.00391 0.00579 0.00542 0.00457 0.00628 0.00745 0.00914 0.01179 0.02713 0.02199 0.01447 0.01059 0.01626 0.02903 0.05776 0.11096 0.22978 0.04657 0.02878 0.01472 0.01992 0.01264 0.02724 0.07737 0.17905 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00091 0.0009 0.00135 0.00117 0.00153 0.00146 0.00097 0.0015 0.00145 0.00307 0.00206 0.00205 0.00264 0.00246 0.00338 0.00424 0.01302 0.00902 0.00608 0.00561 0.00764 0.01016 0.02772 0.04216 0.11029 0.0191 0.01526 0.00662 0.00877 0.00658 0.01171 0.04023 0.06804 0.43915

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00621 0.00684 0.00793 0.00845 0.01078 0.01277 0.00728 0.0087 0.01271 0.01889 0.01844 0.01447 0.0199 0.02547 0.02916 0.04044 0.08762 0.06906 0.04934 0.03337 0.0522 0.09958 0.19407 0.36061 0.74448 0.14578 0.08894 0.04577 0.06535 0.03958 0.09235 0.24991 0.59085 3.25733

H-25

H.26. Estimasi Titik DH26 ESTIMASI TITIK

DH26

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1554.85 1525.41 1374.05 1322.88 1175.28 1123.56 1509.91 1301.53 1111.73 915.052 923.717 990.34 815.039 759.226 699.821 641.237 439.145 451.276 521.714 593.354 446.878 340.262 292.412 122.004 147.648 180.422 286.295 443.298 353.787 487.198 294.061 150.336 174.003

4.14E-07 4.3E-07 5.3E-07 5.71E-07 7.24E-07 7.92E-07 4.39E-07 5.9E-07 8.09E-07 1.19E-06 1.17E-06 1.02E-06 1.51E-06 1.73E-06 2.04E-06 2.43E-06 5.19E-06 4.91E-06 3.67E-06 2.84E-06 5.01E-06 8.64E-06 1.17E-05 6.72E-05 4.59E-05 3.07E-05 1.22E-05 5.09E-06 7.99E-06 4.21E-06 1.16E-05 4.42E-05 3.3E-05 0.00032

0.00129 0.00134 0.00165 0.00178 0.00226 0.00247 0.00137 0.00184 0.00252 0.00373 0.00366 0.00318 0.0047 0.00541 0.00637 0.00759 0.01618 0.01532 0.01146 0.00886 0.01563 0.02695 0.0365 0.20965 0.14315 0.09586 0.03807 0.01588 0.02493 0.01315 0.03609 0.13807 0.10307 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00059 0.00058 0.00091 0.00077 0.00104 0.00096 0.0006 0.00096 0.00093 0.00198 0.00139 0.00143 0.00197 0.00179 0.00236 0.00273 0.00777 0.00628 0.00482 0.0047 0.00734 0.00943 0.01752 0.07967 0.07444 0.0393 0.02018 0.00715 0.01097 0.00684 0.01552 0.0718 0.03917 0.44387

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00407 0.00437 0.00534 0.00555 0.00734 0.00845 0.00454 0.00556 0.00821 0.01215 0.01243 0.01009 0.01489 0.01851 0.02033 0.02603 0.05227 0.04812 0.0391 0.02792 0.05016 0.09245 0.12263 0.68135 0.46379 0.30006 0.11764 0.04939 0.08178 0.04115 0.12234 0.44598 0.34012 3.2441

H-26

H.27. Estimasi Titik DH27 ESTIMASI TITIK

DH27

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1515.1 1511.18 1317.59 1292.21 1123.3 1096.71 1518.06 1293.43 1104.13 919.556 899.52 937.841 738.976 710.155 681.487 664.209 503.659 473.888 481.087 504.279 346.554 315.357 370.984 186.55 327.951 180.422 160.253 277.498 174.244 325.038 172.047 181.497 308.598

4.36E-07 4.38E-07 5.76E-07 5.99E-07 7.93E-07 8.31E-07 4.34E-07 5.98E-07 8.2E-07 1.18E-06 1.24E-06 1.14E-06 1.83E-06 1.98E-06 2.15E-06 2.27E-06 3.94E-06 4.45E-06 4.32E-06 3.93E-06 8.33E-06 1.01E-05 7.27E-06 2.87E-05 9.3E-06 3.07E-05 3.89E-05 1.3E-05 3.29E-05 9.47E-06 3.38E-05 3.04E-05 1.05E-05 0.000297

0.00147 0.00147 0.00194 0.00201 0.00267 0.0028 0.00146 0.00201 0.00276 0.00398 0.00416 0.00382 0.00616 0.00667 0.00724 0.00762 0.01326 0.01498 0.01453 0.01323 0.028 0.03382 0.02444 0.09664 0.03127 0.10332 0.13096 0.04368 0.11078 0.03183 0.11362 0.1021 0.03532 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00067 0.00063 0.00107 0.00087 0.00123 0.00109 0.00064 0.00105 0.00102 0.00211 0.00158 0.00172 0.00259 0.0022 0.00268 0.00274 0.00636 0.00614 0.0061 0.00701 0.01316 0.01184 0.01173 0.03672 0.01626 0.04959 0.06941 0.01965 0.04874 0.01655 0.04886 0.05309 0.01342 0.45854

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00462 0.0048 0.00626 0.00626 0.00866 0.00956 0.00485 0.00607 0.00897 0.01297 0.01413 0.01212 0.01952 0.02281 0.0231 0.02615 0.04282 0.04703 0.04955 0.04166 0.08989 0.116 0.08211 0.31409 0.10132 0.33475 0.40467 0.13583 0.36334 0.09964 0.38518 0.32978 0.11654 3.24506

H-27

H.28. Estimasi Titik DH28 ESTIMASI TITIK

DH28

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1360.78 1365.24 1159.93 1141.24 967.019 948.046 1381.96 1151.06 963.361 787.036 753.569 782.171 579.662 557.237 541.893 549.771 432.552 371.732 337.179 344.398 186.507 199.542 331.958 213.19 417.163 286.295 160.253 175.419 201.246 381.996 304.436 338.148 447.234

5.4E-07 5.37E-07 7.43E-07 7.68E-07 1.07E-06 1.11E-06 5.24E-07 7.55E-07 1.08E-06 1.61E-06 1.76E-06 1.63E-06 2.98E-06 3.22E-06 3.41E-06 3.31E-06 5.34E-06 7.24E-06 8.8E-06 8.43E-06 2.87E-05 2.51E-05 9.07E-06 2.2E-05 5.75E-06 1.22E-05 3.89E-05 3.25E-05 2.47E-05 6.85E-06 1.08E-05 8.75E-06 5E-06 0.000285

0.00189 0.00188 0.00261 0.00269 0.00375 0.0039 0.00184 0.00265 0.00378 0.00566 0.00617 0.00573 0.01043 0.01129 0.01194 0.0116 0.01874 0.02537 0.03083 0.02956 0.10078 0.08804 0.03181 0.07713 0.02014 0.04277 0.13651 0.11392 0.08656 0.02402 0.03782 0.03066 0.01753 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00087 0.00081 0.00143 0.00116 0.00172 0.00152 0.00081 0.00138 0.0014 0.003 0.00235 0.00258 0.00438 0.00373 0.00442 0.00418 0.00899 0.0104 0.01295 0.01566 0.04737 0.03082 0.01527 0.02931 0.01048 0.02053 0.05597 0.05127 0.03809 0.01249 0.01626 0.01594 0.00666 0.43418

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00596 0.00613 0.00842 0.00837 0.01218 0.01334 0.00609 0.00799 0.01228 0.01845 0.02099 0.01816 0.03307 0.03861 0.03808 0.03978 0.06052 0.07966 0.10515 0.0931 0.3235 0.30199 0.10689 0.25068 0.06527 0.13857 0.42726 0.3543 0.28391 0.0752 0.12823 0.09903 0.05784 3.23901

H-28

H.29. Estimasi Titik DH29 ESTIMASI TITIK

DH29

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1357.07 1389.48 1141.31 1153 959.563 970.824 1429.16 1187.25 1006.72 852.036 789.497 782.368 562.228 579.142 603.009 652.113 580.07 499.12 406.529 338.576 214.245 335 498.654 386.939 583.415 443.298 277.498 175.419 175.932 313.026 343.052 452.747 586.08

5.43E-07 5.18E-07 7.68E-07 7.52E-07 1.09E-06 1.06E-06 4.9E-07 7.09E-07 9.87E-07 1.38E-06 1.6E-06 1.63E-06 3.16E-06 2.98E-06 2.75E-06 2.35E-06 2.97E-06 4.01E-06 6.05E-06 8.72E-06 2.18E-05 8.91E-06 4.02E-06 6.68E-06 2.94E-06 5.09E-06 1.3E-05 3.25E-05 3.23E-05 1.02E-05 8.5E-06 4.88E-06 2.91E-06 0.000198

0.00274 0.00261 0.00387 0.00379 0.00548 0.00535 0.00247 0.00358 0.00498 0.00695 0.00809 0.00824 0.01596 0.01504 0.01387 0.01186 0.01499 0.02025 0.03052 0.044 0.10989 0.04495 0.02029 0.03369 0.01482 0.02567 0.06551 0.16392 0.16297 0.05148 0.04286 0.02461 0.01469 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00126 0.00112 0.00213 0.00163 0.00252 0.00209 0.00109 0.00186 0.00184 0.00368 0.00308 0.00371 0.0067 0.00496 0.00513 0.00427 0.0072 0.0083 0.01282 0.02332 0.05165 0.01573 0.00974 0.0128 0.00771 0.01232 0.02686 0.08688 0.07171 0.02677 0.01843 0.0128 0.00558 0.45769

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00863 0.00852 0.01251 0.0118 0.0178 0.0183 0.0082 0.01081 0.01618 0.02265 0.02752 0.02612 0.05059 0.05143 0.04425 0.04069 0.04842 0.06358 0.10408 0.13861 0.35276 0.15417 0.06816 0.1095 0.04802 0.08317 0.20503 0.50653 0.53455 0.16113 0.1453 0.07949 0.04846 3.22695

H-29

H.30. Estimasi Titik DH30 ESTIMASI TITIK

DH30

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1520.99 1542.01 1309.44 1310.53 1123.71 1122.84 1569.55 1333.28 1148.25 979.605 934.037 942.959 727.178 728.83 731.456 750.139 628.061 572.787 526.773 495.308 348.116 400.746 512.851 347.922 501.423 353.787 174.244 201.246 175.932 180.834 170.179 312.416 459.933

4.32E-07 4.21E-07 5.83E-07 5.82E-07 7.92E-07 7.93E-07 4.06E-07 5.63E-07 7.58E-07 1.04E-06 1.15E-06 1.12E-06 1.89E-06 1.88E-06 1.87E-06 1.78E-06 2.54E-06 3.05E-06 3.6E-06 4.08E-06 8.25E-06 6.23E-06 3.8E-06 8.26E-06 3.98E-06 7.99E-06 3.29E-05 2.47E-05 3.23E-05 3.06E-05 3.45E-05 1.02E-05 4.73E-06 0.000238

0.00182 0.00177 0.00245 0.00245 0.00333 0.00333 0.00171 0.00237 0.00319 0.00438 0.00482 0.00473 0.00795 0.00791 0.00786 0.00747 0.01066 0.01281 0.01515 0.01714 0.03469 0.02618 0.01598 0.03473 0.01672 0.03359 0.13848 0.10381 0.13583 0.12857 0.14517 0.04307 0.01987 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00084 0.00076 0.00135 0.00105 0.00153 0.0013 0.00075 0.00123 0.00118 0.00232 0.00183 0.00213 0.00334 0.00261 0.00291 0.00269 0.00512 0.00525 0.00636 0.00908 0.01631 0.00916 0.00767 0.0132 0.0087 0.01612 0.05678 0.05502 0.06112 0.06685 0.06242 0.0224 0.00755 0.45694

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00572 0.00576 0.00792 0.00761 0.01082 0.0114 0.00567 0.00714 0.01036 0.01428 0.01638 0.01499 0.0252 0.02707 0.02507 0.02563 0.03443 0.04024 0.05167 0.05398 0.11136 0.08979 0.05371 0.11288 0.05418 0.10883 0.43343 0.32077 0.42244 0.40242 0.49213 0.13913 0.06559 3.20801

H-30

H.31. Estimasi Titik DH31 ESTIMASI TITIK

DH31

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1668.46 1702.25 1450.04 1466 1271.21 1283.37 1738.25 1498.38 1315.96 1153.36 1099.67 1095.18 874.211 890.691 904.204 929.889 807.194 753.618 701.046 651.197 515.335 581.532 687.029 510.824 629.414 487.198 325.038 381.996 313.026 180.834 207.966 395.349 545.576

3.59E-07 3.45E-07 4.76E-07 4.65E-07 6.19E-07 6.07E-07 3.31E-07 4.45E-07 5.77E-07 7.52E-07 8.27E-07 8.34E-07 1.31E-06 1.26E-06 1.22E-06 1.16E-06 1.53E-06 1.76E-06 2.03E-06 2.36E-06 3.77E-06 2.96E-06 2.12E-06 3.83E-06 2.52E-06 4.21E-06 9.47E-06 6.85E-06 1.02E-05 3.06E-05 2.31E-05 6.4E-06 3.36E-06 0.000129

0.00279 0.00268 0.0037 0.00362 0.00481 0.00472 0.00257 0.00346 0.00449 0.00584 0.00643 0.00648 0.01017 0.0098 0.00951 0.00899 0.01193 0.01368 0.01581 0.01833 0.02927 0.02298 0.01647 0.02978 0.01962 0.03274 0.07356 0.05326 0.07932 0.23767 0.1797 0.04972 0.02611 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 43.0% 52.0% 38.0% Z(v)_G

0.00128 0.00115 0.00203 0.00155 0.00221 0.00184 0.00113 0.0018 0.00166 0.0031 0.00244 0.00292 0.00427 0.00323 0.00352 0.00324 0.00573 0.00561 0.00664 0.00971 0.01375 0.00804 0.0079 0.01132 0.0102 0.01572 0.03016 0.02823 0.03569 0.10457 0.07727 0.02586 0.00992 0.44372

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 339.0% 323.0% 330.0% Z(v)_B

0.00879 0.00874 0.01194 0.01125 0.01563 0.01614 0.00854 0.01045 0.01459 0.01905 0.02185 0.02054 0.03224 0.0335 0.03032 0.03083 0.03853 0.04297 0.05393 0.05773 0.09394 0.07883 0.05532 0.0968 0.06356 0.10609 0.23025 0.16458 0.24668 0.77955 0.60918 0.16061 0.08617 3.25911

H-31

H.32. Estimasi Titik DH32 ESTIMASI TITIK

DH32

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1662.79 1669.62 1457.67 1445.19 1267.39 1252.46 1683.29 1454.73 1266.44 1085.98 1057.84 1083.62 874.783 860.976 844.029 834.945 674.501 645.484 640.41 639.2 483.508 483.663 538.358 347.852 428.803 294.061 172.047 304.436 343.052 170.179 207.966 187.459 337.747

3.62E-07 3.59E-07 4.71E-07 4.79E-07 6.23E-07 6.37E-07 3.53E-07 4.73E-07 6.23E-07 8.48E-07 8.94E-07 8.52E-07 1.31E-06 1.35E-06 1.4E-06 1.43E-06 2.2E-06 2.4E-06 2.44E-06 2.45E-06 4.28E-06 4.27E-06 3.45E-06 8.26E-06 5.44E-06 1.16E-05 3.38E-05 1.08E-05 8.5E-06 3.45E-05 2.31E-05 2.85E-05 8.77E-06 0.000207

0.00175 0.00173 0.00227 0.00231 0.00301 0.00308 0.0017 0.00228 0.00301 0.00409 0.00431 0.00411 0.00631 0.00651 0.00678 0.00692 0.01061 0.01159 0.01177 0.01181 0.02065 0.02063 0.01665 0.03989 0.02625 0.05582 0.16308 0.05208 0.04102 0.16668 0.11161 0.13736 0.04232 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 52.0% 38.0% Z(v)_G

0.0008 0.00074 0.00125 0.00099 0.00138 0.0012 0.00075 0.00119 0.00111 0.00217 0.00164 0.00185 0.00265 0.00215 0.00251 0.00249 0.00509 0.00475 0.00494 0.00626 0.0097 0.00722 0.00799 0.01516 0.01365 0.02679 0.06686 0.0276 0.01846 0.07334 0.05804 0.07143 0.01608 0.45826

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 323.0% 330.0% Z(v)_B

0.0055 0.00565 0.00734 0.00719 0.00977 0.01052 0.00566 0.00689 0.00978 0.01334 0.01467 0.01303 0.02 0.02227 0.02162 0.02375 0.03427 0.03638 0.04013 0.03722 0.06628 0.07078 0.05596 0.12965 0.08506 0.18086 0.51043 0.16094 0.12756 0.5467 0.34934 0.44368 0.13964 3.21184

H-32

H.33. Estimasi Titik DH33 ESTIMASI TITIK

DH33

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1672.55 1654.71 1482.4 1444.56 1285.68 1246.47 1647.39 1432.83 1242.71 1049.75 1047.04 1099.84 909.628 869.361 824.296 780.256 586.195 588.011 633.721 677.751 521.648 455.33 440.005 255.409 254.443 150.336 181.497 338.148 452.747 312.416 395.349 187.459 151.822

3.57E-07 3.65E-07 4.55E-07 4.79E-07 6.05E-07 6.44E-07 3.68E-07 4.87E-07 6.48E-07 9.07E-07 9.12E-07 8.27E-07 1.21E-06 1.32E-06 1.47E-06 1.64E-06 2.91E-06 2.89E-06 2.49E-06 2.18E-06 3.67E-06 4.82E-06 5.17E-06 1.53E-05 1.54E-05 4.42E-05 3.04E-05 8.75E-06 4.88E-06 1.02E-05 6.4E-06 2.85E-05 4.34E-05 0.000244

0.00146 0.00149 0.00186 0.00196 0.00248 0.00263 0.00151 0.00199 0.00265 0.00371 0.00373 0.00338 0.00495 0.00542 0.00602 0.00672 0.01191 0.01184 0.01019 0.00891 0.01504 0.01974 0.02114 0.06274 0.06322 0.1811 0.12425 0.0358 0.01997 0.04193 0.02619 0.11647 0.17757 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 38.0% Z(v)_G

0.00067 0.00064 0.00102 0.00084 0.00114 0.00103 0.00066 0.00104 0.00098 0.00197 0.00142 0.00152 0.00208 0.00179 0.00223 0.00242 0.00572 0.00485 0.00428 0.00472 0.00707 0.00691 0.01015 0.02384 0.03287 0.08693 0.05094 0.01897 0.00899 0.01845 0.01362 0.05008 0.06748 0.43733

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 330.0% Z(v)_B

0.00461 0.00487 0.00602 0.0061 0.00805 0.00901 0.00501 0.00602 0.00861 0.01211 0.01269 0.01073 0.01568 0.01852 0.01922 0.02306 0.03847 0.03717 0.03475 0.02807 0.04828 0.06771 0.07103 0.20391 0.20484 0.58676 0.38891 0.11061 0.0621 0.13755 0.08196 0.39484 0.58598 3.25325

H-33

H.34. Estimasi Titik DH34 ESTIMASI TITIK

DH34

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1723.46 1686.78 1546.05 1489.82 1346.95 1290.23 1662.54 1461.62 1272.65 1073.18 1090.71 1162.48 989.041 931.631 867.111 796.157 581.251 611.465 694.395 766.512 617.664 513.249 437.824 293.748 167.263 174.003 308.598 447.234 586.08 459.933 545.576 337.747 151.822

3.37E-07 3.51E-07 4.18E-07 4.51E-07 5.51E-07 6.01E-07 3.62E-07 4.68E-07 6.17E-07 8.68E-07 8.41E-07 7.4E-07 1.02E-06 1.15E-06 1.33E-06 1.58E-06 2.96E-06 2.67E-06 2.07E-06 1.7E-06 2.62E-06 3.8E-06 5.22E-06 1.16E-05 3.57E-05 3.3E-05 1.05E-05 5E-06 2.91E-06 4.73E-06 3.36E-06 8.77E-06 4.34E-05 0.000192

0.00176 0.00183 0.00218 0.00235 0.00287 0.00313 0.00189 0.00244 0.00322 0.00453 0.00438 0.00386 0.00533 0.00601 0.00694 0.00823 0.01544 0.01395 0.01082 0.00888 0.01367 0.0198 0.02721 0.06044 0.18642 0.17225 0.05476 0.02607 0.01518 0.02465 0.01752 0.04572 0.22626 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% Z(v)_G

0.00081 0.00079 0.0012 0.00101 0.00132 0.00122 0.00083 0.00127 0.00119 0.0024 0.00167 0.00174 0.00224 0.00198 0.00257 0.00296 0.00741 0.00572 0.00454 0.0047 0.00643 0.00693 0.01306 0.02297 0.09694 0.08268 0.02245 0.01382 0.00683 0.01085 0.00911 0.01966 0.11766 0.47695

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% Z(v)_B

0.00553 0.00598 0.00705 0.00731 0.00934 0.01071 0.00626 0.00737 0.01047 0.01476 0.01491 0.01223 0.0169 0.02055 0.02213 0.02822 0.04986 0.0438 0.03688 0.02796 0.04388 0.06791 0.09142 0.19643 0.60399 0.55811 0.17141 0.08057 0.04722 0.08087 0.05484 0.15499 0.73083 3.24069

H-34

LAMPIRAN I ESTIMASI KADAR MENGGUNAKAN METODE IDS

I.1.

Estimasi Titik DH1

ESTIMASI TITIK

DH1

TERHADAP TITIK DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 234.438 239.209 397.555 436.285 406.972 345.08 488.079 685.018 633.654 579.211 794.909 805.001 856.493 951.803 1177.23 1117.16 1038.84 1026.09 1179.44 1218.28 1300.24 1432.86 1594.32 1554.85 1515.1 1360.78 1357.07 1520.99 1668.46 1662.79 1672.55 1723.46

2.08E-05 1.82E-05 1.75E-05 6.33E-06 5.25E-06 6.04E-06 8.4E-06 4.2E-06 2.13E-06 2.49E-06 2.98E-06 1.58E-06 1.54E-06 1.36E-06 1.1E-06 7.22E-07 8.01E-07 9.27E-07 9.5E-07 7.19E-07 6.74E-07 5.92E-07 4.87E-07 3.93E-07 4.14E-07 4.36E-07 5.4E-07 5.43E-07 4.32E-07 3.59E-07 3.62E-07 3.57E-07 3.37E-07 0.00011

0.18939 0.16549 0.15895 0.05755 0.04778 0.05492 0.07638 0.03818 0.01938 0.02265 0.02711 0.01439 0.01404 0.0124 0.01004 0.00656 0.00729 0.00843 0.00864 0.00654 0.00613 0.00538 0.00443 0.00358 0.00376 0.00396 0.00491 0.00494 0.00393 0.00327 0.00329 0.00325 0.00306 1

51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.09697 0.0796 0.08488 0.02866 0.02513 0.02757 0.04086 0.02058 0.01031 0.01196 0.01448 0.00766 0.00738 0.00665 0.00525 0.00346 0.00361 0.00448 0.00424 0.00346 0.00319 0.00284 0.00237 0.00187 0.00199 0.00208 0.00263 0.0027 0.0021 0.00177 0.00175 0.00172 0.00164 0.51582

41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.07803 0.06437 0.0701 0.02544 0.02231 0.02411 0.03177 0.01764 0.00812 0.01031 0.01258 0.00636 0.00606 0.00573 0.00439 0.00307 0.00326 0.00397 0.00364 0.00305 0.00285 0.00245 0.00208 0.00165 0.00171 0.00174 0.00232 0.00224 0.00178 0.0015 0.00153 0.00152 0.00143 0.42912

I-1

I.2.

Estimasi Titik DH2

ESTIMASI TITIK

DH2

TERHADAP TITIK DH1 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 382.539 247.681 464.613 419.237 188.152 226.374 414.121 615.081 611.949 614.003 837.291 813.204 831.177 893.031 1116.65 1075.55 1030.36 1051.06 1194.07 1201.07 1251.75 1404.95 1544.81 1525.41 1511.18 1365.24 1389.48 1542.01 1702.25 1669.62 1654.71 1686.78

2.08E-05 6.83E-06 1.63E-05 4.63E-06 5.69E-06 2.82E-05 1.95E-05 5.83E-06 2.64E-06 2.67E-06 2.65E-06 1.43E-06 1.51E-06 1.45E-06 1.25E-06 8.02E-07 8.64E-07 9.42E-07 9.05E-07 7.01E-07 6.93E-07 6.38E-07 5.07E-07 4.19E-07 4.3E-07 4.38E-07 5.37E-07 5.18E-07 4.21E-07 3.45E-07 3.59E-07 3.65E-07 3.51E-07 0.000132

0.15809 0.05188 0.12376 0.03517 0.0432 0.21446 0.14816 0.04427 0.02007 0.02027 0.02014 0.01083 0.01148 0.01099 0.00952 0.00609 0.00656 0.00715 0.00687 0.00532 0.00526 0.00485 0.00385 0.00318 0.00326 0.00332 0.00407 0.00393 0.00319 0.00262 0.00272 0.00277 0.00267 1

48.8% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.07715 0.02496 0.06609 0.01752 0.02272 0.10766 0.07926 0.02386 0.01068 0.0107 0.01075 0.00576 0.00604 0.00589 0.00498 0.00321 0.00325 0.0038 0.00337 0.00282 0.00274 0.00256 0.00206 0.00166 0.00173 0.00175 0.00218 0.00215 0.0017 0.00142 0.00145 0.00147 0.00142 0.51475

39.5% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.06245 0.02018 0.05458 0.01555 0.02017 0.09415 0.06163 0.02045 0.00841 0.00922 0.00934 0.00479 0.00496 0.00508 0.00416 0.00285 0.00294 0.00337 0.00289 0.00249 0.00245 0.00221 0.0018 0.00147 0.00148 0.00146 0.00192 0.00179 0.00144 0.0012 0.00127 0.0013 0.00125 0.4307

I-2

I.3.

Estimasi Titik DH3

ESTIMASI TITIK

DH3

TERHADAP TITIK DH1 DH2 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

234.438 382.539 199.123 199.642 313.56 542.794 363.369 412.146 573.394 480.635 383.719 583.095 614.919 690.072 810.195 1028.99 954.231 852.48 818.478 975.109 1033.97 1138.45 1252.59 1428.37 1374.05 1317.59 1159.93 1141.31 1309.44 1450.04 1457.67 1482.4 1546.05

1.82E-05 6.83E-06 2.52E-05 2.51E-05 1.02E-05 3.39E-06 7.57E-06 5.89E-06 3.04E-06 4.33E-06 6.79E-06 2.94E-06 2.64E-06 2.1E-06 1.52E-06 9.44E-07 1.1E-06 1.38E-06 1.49E-06 1.05E-06 9.35E-07 7.72E-07 6.37E-07 4.9E-07 5.3E-07 5.76E-07 7.43E-07 7.68E-07 5.83E-07 4.76E-07 4.71E-07 4.55E-07 4.18E-07 0.00014

0.13038 0.04897 0.18073 0.17979 0.07288 0.02432 0.05427 0.04219 0.02179 0.03102 0.04867 0.02108 0.01895 0.01505 0.01092 0.00677 0.00787 0.00986 0.0107 0.00754 0.0067 0.00553 0.00457 0.00351 0.0038 0.00413 0.00533 0.0055 0.00418 0.00341 0.00337 0.00326 0.003 1

48.8% 51.2% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.06362 0.02507 0.09651 0.08953 0.03834 0.01221 0.02903 0.02274 0.01159 0.01638 0.02599 0.01121 0.00997 0.00807 0.00571 0.00357 0.0039 0.00524 0.00525 0.00399 0.00349 0.00292 0.00245 0.00184 0.00201 0.00217 0.00285 0.003 0.00223 0.00185 0.00179 0.00172 0.0016 0.51783

39.5% 41.2% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.0515 0.02017 0.0797 0.07947 0.03404 0.01068 0.02258 0.01949 0.00913 0.01411 0.02258 0.00932 0.00819 0.00695 0.00477 0.00317 0.00353 0.00464 0.0045 0.00352 0.00312 0.00252 0.00214 0.00162 0.00173 0.00181 0.00251 0.0025 0.00189 0.00156 0.00157 0.00153 0.0014 0.43793

I-3

I.4.

Estimasi Titik DH4

ESTIMASI TITIK

DH4

TERHADAP TITIK DH1 DH2 DH3 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

239.209 247.681 199.123 217.479 199.625 367.185 164.247 253.049 446.252 399.224 371.712 595.021 584.23 623.097 712.956 938.587 881.077 812.288 816.123 964.353 989.275 1063.34 1201.06 1357.73 1322.88 1292.21 1141.24 1153 1310.53 1466 1445.19 1444.56 1489.82

1.75E-05 1.63E-05 2.52E-05 2.11E-05 2.51E-05 7.42E-06 3.71E-05 1.56E-05 5.02E-06 6.27E-06 7.24E-06 2.82E-06 2.93E-06 2.58E-06 1.97E-06 1.14E-06 1.29E-06 1.52E-06 1.5E-06 1.08E-06 1.02E-06 8.84E-07 6.93E-07 5.42E-07 5.71E-07 5.99E-07 7.68E-07 7.52E-07 5.82E-07 4.65E-07 4.79E-07 4.79E-07 4.51E-07 0.000209

0.08363 0.07801 0.12069 0.10118 0.12008 0.03549 0.17739 0.07473 0.02403 0.03002 0.03463 0.01352 0.01402 0.01233 0.00941 0.00543 0.00616 0.00725 0.00718 0.00515 0.00489 0.00423 0.00332 0.0026 0.00273 0.00287 0.00367 0.0036 0.00279 0.00223 0.00229 0.00229 0.00216 1

48.8% 51.2% 48.1% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.04081 0.03994 0.05805 0.05039 0.06316 0.01782 0.0949 0.04028 0.01278 0.01585 0.01849 0.00719 0.00737 0.00661 0.00492 0.00286 0.00305 0.00385 0.00353 0.00272 0.00255 0.00223 0.00178 0.00136 0.00145 0.0015 0.00197 0.00197 0.00149 0.00121 0.00122 0.00121 0.00115 0.51567

39.5% 41.2% 38.9% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.03303 0.03214 0.04695 0.04472 0.05608 0.01558 0.07379 0.03453 0.01007 0.01366 0.01607 0.00597 0.00606 0.00569 0.00411 0.00254 0.00276 0.00342 0.00302 0.0024 0.00227 0.00193 0.00156 0.0012 0.00124 0.00126 0.00173 0.00163 0.00126 0.00102 0.00107 0.00108 0.00101 0.43086

I-4

I.5.

Estimasi Titik DH5

ESTIMASI TITIK

DH5

TERHADAP TITIK DH1 DH2 DH3 DH4 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

397.555 464.613 199.642 217.479 165.895 574.345 335.932 284.543 399.249 287.939 185.852 397.363 416.74 491.037 616.02 831.856 755.017 654.083 629.27 783.901 835.456 939.136 1053.66 1228.74 1175.28 1123.3 967.019 959.563 1123.71 1271.21 1267.39 1285.68 1346.95

6.33E-06 4.63E-06 2.51E-05 2.11E-05 3.63E-05 3.03E-06 8.86E-06 1.24E-05 6.27E-06 1.21E-05 2.9E-05 6.33E-06 5.76E-06 4.15E-06 2.64E-06 1.45E-06 1.75E-06 2.34E-06 2.53E-06 1.63E-06 1.43E-06 1.13E-06 9.01E-07 6.62E-07 7.24E-07 7.93E-07 1.07E-06 1.09E-06 7.92E-07 6.19E-07 6.23E-07 6.05E-07 5.51E-07 0.000205

0.03092 0.02264 0.12262 0.10333 0.17758 0.01482 0.04331 0.06036 0.03066 0.05895 0.14149 0.03095 0.02814 0.02027 0.01288 0.00706 0.00857 0.01142 0.01234 0.00795 0.007 0.00554 0.0044 0.00324 0.00354 0.00387 0.00523 0.00531 0.00387 0.00302 0.00304 0.00296 0.00269 1

48.8% 51.2% 48.1% 53.4% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.01509 0.01159 0.05898 0.05518 0.09341 0.00744 0.02317 0.03254 0.01631 0.03112 0.07556 0.01647 0.0148 0.01086 0.00674 0.00372 0.00424 0.00607 0.00606 0.00421 0.00365 0.00293 0.00236 0.00169 0.00187 0.00203 0.0028 0.0029 0.00206 0.00164 0.00162 0.00156 0.00144 0.5221

39.5% 41.2% 38.9% 44.1% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.01221 0.00933 0.0477 0.04557 0.08293 0.0065 0.01802 0.02789 0.01285 0.02682 0.06565 0.01368 0.01216 0.00936 0.00563 0.00331 0.00384 0.00538 0.0052 0.00371 0.00326 0.00253 0.00206 0.00149 0.00161 0.0017 0.00247 0.00241 0.00175 0.00139 0.00142 0.00139 0.00126 0.44246

I-5

I.6.

Estimasi Titik DH6

ESTIMASI TITIK

DH6

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

436.285 419.237 313.56 199.625 165.895 476.807 225.878 118.962 261.467 199.865 210.238 426.427 394.011 423.745 516.558 741.432 681.602 615.813 632.261 775.023 791.154 864.197 1001.82 1158.47 1123.56 1096.71 948.046 970.824 1122.84 1283.37 1252.46 1246.47 1290.23

5.25E-06 5.69E-06 1.02E-05 2.51E-05 3.63E-05 4.4E-06 1.96E-05 7.07E-05 1.46E-05 2.5E-05 2.26E-05 5.5E-06 6.44E-06 5.57E-06 3.75E-06 1.82E-06 2.15E-06 2.64E-06 2.5E-06 1.66E-06 1.6E-06 1.34E-06 9.96E-07 7.45E-07 7.92E-07 8.31E-07 1.11E-06 1.06E-06 7.93E-07 6.07E-07 6.37E-07 6.44E-07 6.01E-07 0.000283

0.01855 0.02008 0.0359 0.08858 0.12827 0.01553 0.06919 0.24944 0.05164 0.08837 0.07987 0.01941 0.02274 0.01966 0.01323 0.00642 0.0076 0.00931 0.00883 0.00588 0.00564 0.00473 0.00352 0.00263 0.0028 0.00293 0.00393 0.00375 0.0028 0.00214 0.00225 0.00227 0.00212 1

48.8% 51.2% 48.1% 53.4% 49.8% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00905 0.01028 0.01727 0.0473 0.06388 0.00779 0.03702 0.13445 0.02747 0.04666 0.04265 0.01033 0.01196 0.01054 0.00692 0.00338 0.00376 0.00494 0.00434 0.00311 0.00294 0.0025 0.00189 0.00138 0.00148 0.00154 0.0021 0.00205 0.00149 0.00116 0.00119 0.0012 0.00113 0.52515

39.5% 41.2% 38.9% 44.1% 44.2% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00733 0.00827 0.01397 0.03907 0.05669 0.00682 0.02878 0.11524 0.02164 0.04021 0.03706 0.00858 0.00982 0.00908 0.00578 0.00301 0.0034 0.00438 0.00372 0.00274 0.00262 0.00216 0.00165 0.00121 0.00127 0.00129 0.00185 0.0017 0.00127 0.00098 0.00105 0.00107 0.00099 0.4447

I-6

I.7.

Estimasi Titik DH7

ESTIMASI TITIK

DH7

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

406.972 188.152 542.794 367.185 574.345 476.807 251.002 422.456 598.912 639.879 686.706 901.568 851.469 840.074 868.678 1082.29 1059.68 1045.05 1093.01 1223.3 1203 1224.77 1392.94 1511.27 1509.91 1518.06 1381.96 1429.16 1569.55 1738.25 1683.29 1647.39 1662.54

6.04E-06 2.82E-05 3.39E-06 7.42E-06 3.03E-06 4.4E-06 1.59E-05 5.6E-06 2.79E-06 2.44E-06 2.12E-06 1.23E-06 1.38E-06 1.42E-06 1.33E-06 8.54E-07 8.91E-07 9.16E-07 8.37E-07 6.68E-07 6.91E-07 6.67E-07 5.15E-07 4.38E-07 4.39E-07 4.34E-07 5.24E-07 4.9E-07 4.06E-07 3.31E-07 3.53E-07 3.68E-07 3.62E-07 9.69E-05

0.06232 0.29155 0.03503 0.07655 0.03129 0.0454 0.16383 0.05783 0.02877 0.02521 0.02189 0.0127 0.01424 0.01463 0.01368 0.00881 0.00919 0.00945 0.00864 0.0069 0.00713 0.00688 0.00532 0.00452 0.00453 0.00448 0.0054 0.00505 0.00419 0.00342 0.00364 0.0038 0.00373 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.03041 0.14928 0.01685 0.04088 0.01558 0.02388 0.08765 0.03117 0.01531 0.01331 0.01169 0.00676 0.00749 0.00784 0.00715 0.00464 0.00455 0.00502 0.00424 0.00365 0.00372 0.00363 0.00285 0.00236 0.00239 0.00235 0.00289 0.00276 0.00223 0.00185 0.00193 0.00201 0.00199 0.52033

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.02462 0.12012 0.01363 0.03376 0.01383 0.0212 0.06815 0.02672 0.01206 0.01147 0.01016 0.00561 0.00615 0.00676 0.00598 0.00412 0.00412 0.00445 0.00364 0.00322 0.00332 0.00314 0.00249 0.00208 0.00206 0.00197 0.00255 0.00229 0.00189 0.00156 0.0017 0.00178 0.00175 0.42834

I-7

I.8.

Estimasi Titik DH8

ESTIMASI TITIK

DH8

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

345.08 226.374 363.369 164.247 335.932 225.878 251.002 190.118 389.012 399.261 435.707 651.519 608.113 611.962 666.979 890.3 850.882 814.325 849.342 985.419 980.987 1025.91 1181.62 1318.67 1301.53 1293.43 1151.06 1187.25 1333.28 1498.38 1454.73 1432.83 1461.62

8.4E-06 1.95E-05 7.57E-06 3.71E-05 8.86E-06 1.96E-05 1.59E-05 2.77E-05 6.61E-06 6.27E-06 5.27E-06 2.36E-06 2.7E-06 2.67E-06 2.25E-06 1.26E-06 1.38E-06 1.51E-06 1.39E-06 1.03E-06 1.04E-06 9.5E-07 7.16E-07 5.75E-07 5.9E-07 5.98E-07 7.55E-07 7.09E-07 5.63E-07 4.45E-07 4.73E-07 4.87E-07 4.68E-07 0.000188

0.04476 0.10401 0.04037 0.19758 0.04723 0.10447 0.0846 0.14746 0.03522 0.03344 0.02808 0.01256 0.01441 0.01423 0.01198 0.00672 0.00736 0.00804 0.00739 0.00549 0.00554 0.00506 0.00382 0.00307 0.00315 0.00319 0.00402 0.00378 0.003 0.00237 0.00252 0.0026 0.00249 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.02184 0.05325 0.01942 0.10551 0.02352 0.05495 0.04247 0.07948 0.01874 0.01765 0.01499 0.00668 0.00758 0.00763 0.00627 0.00354 0.00364 0.00427 0.00363 0.0029 0.00289 0.00267 0.00205 0.0016 0.00166 0.00167 0.00215 0.00206 0.0016 0.00129 0.00134 0.00137 0.00133 0.52166

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.01768 0.04285 0.0157 0.08713 0.02088 0.04879 0.03714 0.06813 0.01476 0.01521 0.01303 0.00555 0.00623 0.00658 0.00524 0.00315 0.0033 0.00379 0.00311 0.00256 0.00258 0.00231 0.00179 0.00141 0.00143 0.0014 0.0019 0.00172 0.00136 0.00109 0.00117 0.00122 0.00117 0.44132

I-8

I.9.

Estimasi Titik DH9

ESTIMASI TITIK

DH9

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

488.079 414.121 412.146 253.049 284.543 118.962 422.456 190.118 202.98 217.867 298.181 491.634 429.848 422.734 479.942 704.827 661.472 626.235 671.096 801.29 791.137 838.01 991.642 1131.58 1111.73 1104.13 963.361 1006.72 1148.25 1315.96 1266.44 1242.71 1272.65

4.2E-06 5.83E-06 5.89E-06 1.56E-05 1.24E-05 7.07E-05 5.6E-06 2.77E-05 2.43E-05 2.11E-05 1.12E-05 4.14E-06 5.41E-06 5.6E-06 4.34E-06 2.01E-06 2.29E-06 2.55E-06 2.22E-06 1.56E-06 1.6E-06 1.42E-06 1.02E-06 7.81E-07 8.09E-07 8.2E-07 1.08E-06 9.87E-07 7.58E-07 5.77E-07 6.23E-07 6.48E-07 6.17E-07 0.000246

0.01705 0.02368 0.02391 0.06342 0.05016 0.28695 0.02275 0.11235 0.09856 0.08555 0.04567 0.0168 0.02198 0.02272 0.01763 0.00817 0.00928 0.01035 0.00902 0.00632 0.00649 0.00578 0.00413 0.00317 0.00329 0.00333 0.00438 0.00401 0.00308 0.00234 0.00253 0.00263 0.00251 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00832 0.01212 0.0115 0.03387 0.02498 0.15094 0.01142 0.06011 0.05244 0.04517 0.02439 0.00894 0.01156 0.01218 0.00922 0.00431 0.00459 0.0055 0.00443 0.00335 0.00338 0.00305 0.00221 0.00166 0.00174 0.00175 0.00234 0.00219 0.00164 0.00127 0.00134 0.00139 0.00134 0.52463

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00673 0.00976 0.0093 0.02797 0.02217 0.13401 0.00999 0.04674 0.0413 0.03893 0.02119 0.00743 0.00949 0.0105 0.0077 0.00383 0.00416 0.00488 0.0038 0.00295 0.00302 0.00264 0.00194 0.00146 0.00149 0.00146 0.00207 0.00182 0.00139 0.00107 0.00118 0.00123 0.00117 0.44476

I-9

I.10. Estimasi Titik DH10 ESTIMASI TITIK

DH10

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

685.018 615.081 573.394 446.252 399.249 261.467 598.912 389.012 202.98 145.798 303.488 410.001 306.751 249.401 277.973 502.068 463.778 452.863 530.601 639.641 604.293 636.94 796.357 929.731 915.052 919.556 787.036 852.036 979.605 1153.36 1085.98 1049.75 1073.18

2.13E-06 2.64E-06 3.04E-06 5.02E-06 6.27E-06 1.46E-05 2.79E-06 6.61E-06 2.43E-05 4.7E-05 1.09E-05 5.95E-06 1.06E-05 1.61E-05 1.29E-05 3.97E-06 4.65E-06 4.88E-06 3.55E-06 2.44E-06 2.74E-06 2.46E-06 1.58E-06 1.16E-06 1.19E-06 1.18E-06 1.61E-06 1.38E-06 1.04E-06 7.52E-07 8.48E-07 9.07E-07 8.68E-07 0.000208

0.01024 0.0127 0.01461 0.02413 0.03014 0.07029 0.0134 0.03175 0.11663 0.22605 0.05217 0.02858 0.05107 0.07725 0.06219 0.01906 0.02234 0.02343 0.01707 0.01174 0.01316 0.01184 0.00758 0.00556 0.00574 0.00568 0.00776 0.00662 0.00501 0.00361 0.00407 0.00436 0.00417 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.005 0.0065 0.00703 0.01288 0.01501 0.03697 0.00672 0.01699 0.06286 0.11935 0.02786 0.01521 0.02686 0.04141 0.03252 0.01005 0.01106 0.01244 0.00838 0.00621 0.00686 0.00625 0.00406 0.00291 0.00304 0.00298 0.00415 0.00361 0.00267 0.00196 0.00216 0.00231 0.00223 0.52651

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00404 0.00523 0.00569 0.01064 0.01332 0.03282 0.00588 0.01321 0.05388 0.10285 0.02421 0.01263 0.02206 0.03569 0.02718 0.00892 0.01001 0.01104 0.00719 0.00548 0.00612 0.0054 0.00355 0.00256 0.00261 0.00249 0.00366 0.003 0.00226 0.00165 0.0019 0.00205 0.00195 0.4512

I-10

I.11. Estimasi Titik DH11 ESTIMASI TITIK

DH11

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

633.654 611.949 480.635 399.224 287.939 199.865 639.879 399.261 217.867 145.798 159.455 286.024 212.002 223.897 329.56 550.023 483.662 418.502 453.259 586.165 591.845 667.235 801.958 960.913 923.717 899.52 753.569 789.497 934.037 1099.67 1057.84 1047.04 1090.71

2.49E-06 2.67E-06 4.33E-06 6.27E-06 1.21E-05 2.5E-05 2.44E-06 6.27E-06 2.11E-05 4.7E-05 3.93E-05 1.22E-05 2.22E-05 1.99E-05 9.21E-06 3.31E-06 4.27E-06 5.71E-06 4.87E-06 2.91E-06 2.85E-06 2.25E-06 1.55E-06 1.08E-06 1.17E-06 1.24E-06 1.76E-06 1.6E-06 1.15E-06 8.27E-07 8.94E-07 9.12E-07 8.41E-07 0.000272

0.00916 0.00982 0.01592 0.02308 0.04437 0.09209 0.00898 0.02308 0.0775 0.17305 0.14468 0.04497 0.08185 0.07338 0.03387 0.01216 0.01573 0.021 0.01791 0.01071 0.0105 0.00826 0.00572 0.00398 0.00431 0.00455 0.00648 0.0059 0.00422 0.00304 0.00329 0.00336 0.00309 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00447 0.00503 0.00766 0.01233 0.0221 0.04844 0.00451 0.01235 0.04177 0.09206 0.07726 0.02392 0.04305 0.03933 0.01771 0.00641 0.00778 0.01115 0.00879 0.00566 0.00547 0.00436 0.00307 0.00208 0.00228 0.00239 0.00347 0.00322 0.00225 0.00165 0.00175 0.00178 0.00165 0.5272

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00362 0.00405 0.00619 0.01018 0.01961 0.04301 0.00394 0.0096 0.0358 0.07251 0.06713 0.01987 0.03536 0.0339 0.0148 0.00569 0.00704 0.00989 0.00754 0.005 0.00488 0.00377 0.00268 0.00184 0.00196 0.002 0.00306 0.00268 0.00191 0.00139 0.00153 0.00157 0.00145 0.44546

I-11

I.12. Estimasi Titik DH12 ESTIMASI TITIK

DH12

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

579.211 614.003 383.719 371.712 185.852 210.238 686.706 435.707 298.181 303.488 159.455 223.517 231.225 316.986 457.2 661.892 577.755 468.771 447.654 600.234 650.25 760.76 868.932 1047.49 990.34 937.841 782.171 782.368 942.959 1095.18 1083.62 1099.84 1162.48

2.98E-06 2.65E-06 6.79E-06 7.24E-06 2.9E-05 2.26E-05 2.12E-06 5.27E-06 1.12E-05 1.09E-05 3.93E-05 2E-05 1.87E-05 9.95E-06 4.78E-06 2.28E-06 3E-06 4.55E-06 4.99E-06 2.78E-06 2.37E-06 1.73E-06 1.32E-06 9.11E-07 1.02E-06 1.14E-06 1.63E-06 1.63E-06 1.12E-06 8.34E-07 8.52E-07 8.27E-07 7.4E-07 0.000227

0.01312 0.01167 0.02989 0.03185 0.1274 0.09956 0.00933 0.02318 0.04949 0.04778 0.17308 0.08808 0.08231 0.0438 0.02105 0.01004 0.01318 0.02003 0.02196 0.01221 0.01041 0.0076 0.00583 0.00401 0.00449 0.005 0.00719 0.00719 0.00495 0.00367 0.00375 0.00364 0.00326 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.0064 0.00598 0.01438 0.01701 0.06345 0.05237 0.00468 0.0124 0.02668 0.02542 0.09138 0.04686 0.04329 0.02347 0.01101 0.00529 0.00653 0.01063 0.01078 0.00646 0.00542 0.00401 0.00312 0.0021 0.00237 0.00263 0.00385 0.00393 0.00264 0.00199 0.00199 0.00192 0.00174 0.52219

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00518 0.00481 0.01163 0.01405 0.05631 0.0465 0.0041 0.00964 0.02287 0.02002 0.07875 0.03893 0.03556 0.02023 0.0092 0.0047 0.00591 0.00943 0.00925 0.0057 0.00484 0.00347 0.00273 0.00185 0.00204 0.0022 0.0034 0.00326 0.00224 0.00168 0.00175 0.00171 0.00152 0.44544

I-12

I.13. Estimasi Titik DH13 ESTIMASI TITIK

DH13

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

794.909 837.291 583.095 595.021 397.363 426.427 901.568 651.519 491.634 410.001 286.024 223.517 127.769 258.07 414.845 563.76 459.344 306.858 235.936 393.544 479.588 626.856 697.379 893.369 815.039 738.976 579.662 562.228 727.178 874.211 874.783 909.628 989.041

1.58E-06 1.43E-06 2.94E-06 2.82E-06 6.33E-06 5.5E-06 1.23E-06 2.36E-06 4.14E-06 5.95E-06 1.22E-05 2E-05 6.13E-05 1.5E-05 5.81E-06 3.15E-06 4.74E-06 1.06E-05 1.8E-05 6.46E-06 4.35E-06 2.54E-06 2.06E-06 1.25E-06 1.51E-06 1.83E-06 2.98E-06 3.16E-06 1.89E-06 1.31E-06 1.31E-06 1.21E-06 1.02E-06 0.000218

0.00726 0.00654 0.0135 0.01296 0.02906 0.02523 0.00564 0.01081 0.01898 0.0273 0.05609 0.09184 0.28106 0.06889 0.02666 0.01444 0.02175 0.04873 0.08243 0.02963 0.01995 0.01168 0.00943 0.00575 0.00691 0.0084 0.01366 0.01452 0.00868 0.006 0.006 0.00555 0.00469 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00354 0.00335 0.00649 0.00692 0.01447 0.01327 0.00283 0.00578 0.01023 0.01452 0.02961 0.04904 0.14784 0.03693 0.01394 0.00761 0.01076 0.02587 0.04047 0.01567 0.01039 0.00617 0.00506 0.00301 0.00365 0.00441 0.00731 0.00793 0.00462 0.00326 0.00318 0.00293 0.0025 0.5236

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00287 0.0027 0.00525 0.00572 0.01284 0.01178 0.00248 0.0045 0.00877 0.01144 0.02552 0.04261 0.12142 0.03183 0.01165 0.00676 0.00974 0.02295 0.0347 0.01384 0.00928 0.00532 0.00442 0.00265 0.00314 0.00369 0.00645 0.00659 0.00392 0.00275 0.00279 0.0026 0.0022 0.44516

I-13

I.14. Estimasi Titik DH14 ESTIMASI TITIK

DH14

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

805.001 813.204 614.919 584.23 416.74 394.011 851.469 608.113 429.848 306.751 212.002 231.225 127.769 131.244 289.311 456.465 360.169 237.565 241.58 381.119 419.058 538.677 637.96 820.088 759.226 710.155 557.237 579.142 728.83 890.691 860.976 869.361 931.631

1.54E-06 1.51E-06 2.64E-06 2.93E-06 5.76E-06 6.44E-06 1.38E-06 2.7E-06 5.41E-06 1.06E-05 2.22E-05 1.87E-05 6.13E-05 5.81E-05 1.19E-05 4.8E-06 7.71E-06 1.77E-05 1.71E-05 6.88E-06 5.69E-06 3.45E-06 2.46E-06 1.49E-06 1.73E-06 1.98E-06 3.22E-06 2.98E-06 1.88E-06 1.26E-06 1.35E-06 1.32E-06 1.15E-06 0.000297

0.00519 0.00508 0.00889 0.00985 0.01936 0.02166 0.00464 0.00909 0.0182 0.03574 0.07482 0.0629 0.20598 0.19522 0.04017 0.01614 0.02592 0.05958 0.05762 0.02315 0.01915 0.01159 0.00826 0.005 0.00583 0.00667 0.01083 0.01003 0.00633 0.00424 0.00454 0.00445 0.00387 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00253 0.0026 0.00428 0.00526 0.00964 0.01139 0.00233 0.00486 0.00981 0.01901 0.0395 0.03359 0.10958 0.10464 0.02101 0.00851 0.01283 0.03164 0.02829 0.01225 0.00998 0.00612 0.00443 0.00261 0.00309 0.0035 0.00579 0.00547 0.00337 0.0023 0.00241 0.00235 0.00207 0.52706

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00205 0.00209 0.00346 0.00434 0.00856 0.01012 0.00204 0.00378 0.00841 0.01497 0.03404 0.02918 0.09104 0.09019 0.01756 0.00755 0.01161 0.02806 0.02426 0.01081 0.0089 0.00528 0.00388 0.0023 0.00265 0.00293 0.00511 0.00455 0.00286 0.00194 0.00211 0.00209 0.00181 0.45057

I-14

I.15. Estimasi Titik DH15 ESTIMASI TITIK

DH15

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

856.493 831.177 690.072 623.097 491.037 423.745 840.074 611.962 422.734 249.401 223.897 316.986 258.07 131.244 158.417 345.029 264.229 205.139 290.837 390.252 369.899 448.54 578.081 740.249 699.821 681.487 541.893 603.009 731.456 904.204 844.029 824.296 867.111

1.36E-06 1.45E-06 2.1E-06 2.58E-06 4.15E-06 5.57E-06 1.42E-06 2.67E-06 5.6E-06 1.61E-05 1.99E-05 9.95E-06 1.5E-05 5.81E-05 3.98E-05 8.4E-06 1.43E-05 2.38E-05 1.18E-05 6.57E-06 7.31E-06 4.97E-06 2.99E-06 1.82E-06 2.04E-06 2.15E-06 3.41E-06 2.75E-06 1.87E-06 1.22E-06 1.4E-06 1.47E-06 1.33E-06 0.000285

0.00478 0.00507 0.00736 0.00902 0.01453 0.01951 0.00496 0.00936 0.01961 0.05633 0.0699 0.03487 0.05261 0.20342 0.13962 0.02943 0.05019 0.08326 0.04142 0.02301 0.02561 0.01742 0.01048 0.00639 0.00715 0.00754 0.01193 0.00964 0.00655 0.00429 0.00492 0.00516 0.00466 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00233 0.0026 0.00354 0.00482 0.00724 0.01026 0.00249 0.00501 0.01057 0.02997 0.0369 0.01862 0.02799 0.107 0.07302 0.01551 0.02484 0.04421 0.02034 0.01217 0.01334 0.0092 0.00562 0.00334 0.00378 0.00396 0.00638 0.00526 0.00349 0.00233 0.00261 0.00273 0.00249 0.52397

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00189 0.00209 0.00286 0.00398 0.00642 0.00911 0.00218 0.00389 0.00906 0.0236 0.0318 0.01618 0.02325 0.08788 0.06101 0.01377 0.02248 0.03922 0.01744 0.01074 0.01191 0.00794 0.00492 0.00295 0.00326 0.00331 0.00563 0.00437 0.00296 0.00196 0.00229 0.00242 0.00218 0.44497

I-15

I.16. Estimasi Titik DH16 ESTIMASI TITIK

DH16

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

951.803 893.031 810.195 712.956 616.02 516.558 868.678 666.979 479.942 277.973 329.56 457.2 414.845 289.311 158.417 225.887 192.72 253.428 392.94 441.249 353.21 359.138 525.07 651.801 641.237 664.209 549.771 652.113 750.139 929.889 834.945 780.256 796.157

1.1E-06 1.25E-06 1.52E-06 1.97E-06 2.64E-06 3.75E-06 1.33E-06 2.25E-06 4.34E-06 1.29E-05 9.21E-06 4.78E-06 5.81E-06 1.19E-05 3.98E-05 1.96E-05 2.69E-05 1.56E-05 6.48E-06 5.14E-06 8.02E-06 7.75E-06 3.63E-06 2.35E-06 2.43E-06 2.27E-06 3.31E-06 2.35E-06 1.78E-06 1.16E-06 1.43E-06 1.64E-06 1.58E-06 0.000218

0.00506 0.00575 0.00699 0.00902 0.01208 0.01718 0.00608 0.01031 0.01991 0.05934 0.04222 0.02194 0.02664 0.05478 0.18271 0.08986 0.12346 0.07139 0.0297 0.02355 0.03675 0.03555 0.01663 0.01079 0.01115 0.01039 0.01517 0.01078 0.00815 0.0053 0.00658 0.00753 0.00723 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00247 0.00294 0.00336 0.00482 0.00602 0.00904 0.00305 0.00551 0.01073 0.03157 0.02229 0.01171 0.01417 0.02882 0.09793 0.04736 0.06111 0.03791 0.01458 0.01246 0.01915 0.01877 0.00891 0.00564 0.0059 0.00546 0.00812 0.00589 0.00434 0.00288 0.00349 0.00398 0.00386 0.52426

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.002 0.00237 0.00272 0.00398 0.00534 0.00803 0.00267 0.00429 0.0092 0.02486 0.01921 0.01018 0.01178 0.02367 0.08441 0.04206 0.05531 0.03363 0.0125 0.011 0.01709 0.01621 0.0078 0.00498 0.00507 0.00456 0.00716 0.0049 0.00368 0.00243 0.00307 0.00353 0.00339 0.45305

I-16

I.17. Estimasi Titik DH17 ESTIMASI TITIK

DH17

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1177.23 1116.65 1028.99 938.587 831.856 741.432 1082.29 890.3 704.827 502.068 550.023 661.892 563.76 456.465 345.029 225.887 112.045 285.603 441.213 404.678 245.165 146.755 334.994 429.707 439.145 503.659 432.552 580.07 628.061 807.194 674.501 586.195 581.251

7.22E-07 8.02E-07 9.44E-07 1.14E-06 1.45E-06 1.82E-06 8.54E-07 1.26E-06 2.01E-06 3.97E-06 3.31E-06 2.28E-06 3.15E-06 4.8E-06 8.4E-06 1.96E-05 7.97E-05 1.23E-05 5.14E-06 6.11E-06 1.66E-05 4.64E-05 8.91E-06 5.42E-06 5.19E-06 3.94E-06 5.34E-06 2.97E-06 2.54E-06 1.53E-06 2.2E-06 2.91E-06 2.96E-06 0.000267

0.00271 0.00301 0.00354 0.00426 0.00542 0.00682 0.0032 0.00473 0.00755 0.01488 0.0124 0.00856 0.0118 0.018 0.0315 0.0735 0.29875 0.04598 0.01927 0.0229 0.0624 0.17414 0.03342 0.02031 0.01945 0.01478 0.02005 0.01115 0.00951 0.00576 0.00824 0.01091 0.0111 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00132 0.00154 0.0017 0.00227 0.0027 0.00359 0.00161 0.00253 0.00407 0.00792 0.00655 0.00457 0.00628 0.00947 0.01689 0.03844 0.14788 0.02442 0.00946 0.01212 0.03251 0.09195 0.01791 0.01062 0.01029 0.00776 0.01072 0.00609 0.00507 0.00313 0.00438 0.00577 0.00593 0.51744

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00107 0.00124 0.00138 0.00188 0.0024 0.00319 0.00141 0.00197 0.00349 0.00623 0.00564 0.00397 0.00522 0.00778 0.01456 0.03212 0.13384 0.02166 0.00811 0.0107 0.02902 0.07941 0.01567 0.00936 0.00885 0.00649 0.00946 0.00506 0.0043 0.00264 0.00384 0.00512 0.0052 0.45224

I-17

I.18. Estimasi Titik DH18 ESTIMASI TITIK

DH18

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1117.16 1075.55 954.231 881.077 755.017 681.602 1059.68 850.882 661.472 463.778 483.662 577.755 459.344 360.169 264.229 192.72 112.045 173.566 329.577 307.002 172.325 184.329 333.264 477.253 451.276 473.888 371.732 499.12 572.787 753.618 645.484 588.011 611.465

8.01E-07 8.64E-07 1.1E-06 1.29E-06 1.75E-06 2.15E-06 8.91E-07 1.38E-06 2.29E-06 4.65E-06 4.27E-06 3E-06 4.74E-06 7.71E-06 1.43E-05 2.69E-05 7.97E-05 3.32E-05 9.21E-06 1.06E-05 3.37E-05 2.94E-05 9E-06 4.39E-06 4.91E-06 4.45E-06 7.24E-06 4.01E-06 3.05E-06 1.76E-06 2.4E-06 2.89E-06 2.67E-06 0.000321

0.0025 0.0027 0.00342 0.00402 0.00547 0.00671 0.00278 0.00431 0.00713 0.0145 0.01333 0.00934 0.01478 0.02404 0.04466 0.08396 0.24839 0.10351 0.02871 0.03309 0.10501 0.09178 0.02808 0.01369 0.01531 0.01389 0.02257 0.01252 0.0095 0.00549 0.00748 0.00902 0.00834 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00122 0.00138 0.00165 0.00215 0.00272 0.00353 0.00139 0.0023 0.00384 0.00771 0.00704 0.00499 0.00786 0.01264 0.02394 0.04391 0.1309 0.05496 0.0141 0.0175 0.05471 0.04846 0.01505 0.00716 0.0081 0.00729 0.01207 0.00683 0.00507 0.00298 0.00397 0.00477 0.00445 0.52666

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00099 0.00111 0.00133 0.00177 0.00242 0.00313 0.00122 0.00179 0.00329 0.00607 0.00607 0.00433 0.00653 0.01038 0.02063 0.03669 0.11625 0.04875 0.01209 0.01545 0.04883 0.04185 0.01317 0.00631 0.00697 0.0061 0.01065 0.00568 0.0043 0.00251 0.00349 0.00423 0.0039 0.45829

I-18

I.19. Estimasi Titik DH19 ESTIMASI TITIK

DH19

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1038.84 1030.36 852.48 812.288 654.083 615.813 1045.05 814.325 626.235 452.863 418.502 468.771 306.858 237.565 205.139 253.428 285.603 173.566 158.354 192.419 181.497 321.811 400.649 588.392 521.714 481.087 337.179 406.529 526.773 701.046 640.41 633.721 694.395

9.27E-07 9.42E-07 1.38E-06 1.52E-06 2.34E-06 2.64E-06 9.16E-07 1.51E-06 2.55E-06 4.88E-06 5.71E-06 4.55E-06 1.06E-05 1.77E-05 2.38E-05 1.56E-05 1.23E-05 3.32E-05 3.99E-05 2.7E-05 3.04E-05 9.66E-06 6.23E-06 2.89E-06 3.67E-06 4.32E-06 8.8E-06 6.05E-06 3.6E-06 2.03E-06 2.44E-06 2.49E-06 2.07E-06 0.000294

0.00315 0.0032 0.00467 0.00515 0.00794 0.00895 0.00311 0.00512 0.00866 0.01656 0.01939 0.01545 0.03606 0.06017 0.0807 0.05287 0.04163 0.11273 0.13542 0.09172 0.10309 0.03279 0.02116 0.00981 0.01248 0.01467 0.02987 0.02055 0.01224 0.00691 0.00828 0.00846 0.00704 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00154 0.00164 0.00225 0.00275 0.00395 0.00471 0.00156 0.00274 0.00467 0.00881 0.01024 0.00825 0.01919 0.03165 0.04325 0.02765 0.02194 0.0558 0.06649 0.04852 0.05371 0.01731 0.01134 0.00513 0.0066 0.0077 0.01598 0.01122 0.00652 0.00375 0.0044 0.00447 0.00376 0.5195

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00124 0.00132 0.00182 0.00227 0.00351 0.00418 0.00137 0.00213 0.004 0.00694 0.00882 0.00717 0.01594 0.02599 0.03728 0.02311 0.01948 0.0505 0.05701 0.04283 0.04794 0.01495 0.00992 0.00452 0.00568 0.00644 0.0141 0.00933 0.00553 0.00316 0.00386 0.00397 0.0033 0.44962

I-19

I.20. Estimasi Titik DH20 ESTIMASI TITIK

DH20

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1026.09 1051.06 818.478 816.123 629.27 632.261 1093.01 849.342 671.096 530.601 453.259 447.654 235.936 241.58 290.837 392.94 441.213 329.577 158.354 157.927 275.879 454.104 481.269 687.64 593.354 504.279 344.398 338.576 495.308 651.197 639.2 677.751 766.512

9.5E-07 9.05E-07 1.49E-06 1.5E-06 2.53E-06 2.5E-06 8.37E-07 1.39E-06 2.22E-06 3.55E-06 4.87E-06 4.99E-06 1.8E-05 1.71E-05 1.18E-05 6.48E-06 5.14E-06 9.21E-06 3.99E-05 4.01E-05 1.31E-05 4.85E-06 4.32E-06 2.11E-06 2.84E-06 3.93E-06 8.43E-06 8.72E-06 4.08E-06 2.36E-06 2.45E-06 2.18E-06 1.7E-06 0.000237

0.00402 0.00383 0.00631 0.00635 0.01068 0.01057 0.00354 0.00586 0.00939 0.01502 0.02058 0.0211 0.07594 0.07244 0.04998 0.02738 0.02172 0.03892 0.16858 0.1695 0.05554 0.0205 0.01825 0.00894 0.01201 0.01662 0.03564 0.03688 0.01723 0.00997 0.01035 0.0092 0.0072 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00196 0.00196 0.00304 0.00339 0.00532 0.00556 0.00178 0.00314 0.00506 0.00799 0.01086 0.01126 0.0404 0.0381 0.02679 0.01432 0.01144 0.01926 0.08952 0.08966 0.02894 0.01082 0.00978 0.00468 0.00635 0.00873 0.01907 0.02013 0.00918 0.00541 0.00549 0.00487 0.00384 0.52812

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00159 0.00158 0.00245 0.0028 0.00472 0.00494 0.00155 0.00244 0.00434 0.00629 0.00936 0.00979 0.03357 0.03129 0.02309 0.01196 0.01016 0.01744 0.0794 0.07915 0.02583 0.00935 0.00856 0.00412 0.00546 0.0073 0.01682 0.01674 0.00779 0.00457 0.00482 0.00432 0.00337 0.45695

I-20

I.21. Estimasi Titik DH21 ESTIMASI TITIK

DH21

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1179.44 1194.07 975.109 964.353 783.901 775.023 1223.3 985.419 801.29 639.641 586.165 600.234 393.544 381.119 390.252 441.249 404.678 307.002 192.419 157.927 175.573 366.602 343.169 554.995 446.878 346.554 186.507 214.245 348.116 515.335 483.508 521.648 617.664

7.19E-07 7.01E-07 1.05E-06 1.08E-06 1.63E-06 1.66E-06 6.68E-07 1.03E-06 1.56E-06 2.44E-06 2.91E-06 2.78E-06 6.46E-06 6.88E-06 6.57E-06 5.14E-06 6.11E-06 1.06E-05 2.7E-05 4.01E-05 3.24E-05 7.44E-06 8.49E-06 3.25E-06 5.01E-06 8.33E-06 2.87E-05 2.18E-05 8.25E-06 3.77E-06 4.28E-06 3.67E-06 2.62E-06 0.000265

0.00271 0.00264 0.00397 0.00406 0.00614 0.00628 0.00252 0.00388 0.00587 0.00922 0.01098 0.01047 0.02435 0.02596 0.02476 0.01937 0.02303 0.04001 0.10186 0.15121 0.12234 0.02806 0.03202 0.01224 0.01888 0.0314 0.10842 0.08216 0.03112 0.0142 0.01613 0.01386 0.00989 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00132 0.00135 0.00191 0.00217 0.00306 0.0033 0.00127 0.00208 0.00317 0.0049 0.0058 0.00559 0.01295 0.01366 0.01327 0.01013 0.01214 0.01981 0.05409 0.07424 0.06374 0.01482 0.01716 0.0064 0.00999 0.01649 0.058 0.04486 0.01659 0.00771 0.00857 0.00733 0.00528 0.52312

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00107 0.00109 0.00154 0.00179 0.00271 0.00293 0.00111 0.00162 0.00271 0.00386 0.00499 0.00486 0.01076 0.01122 0.01144 0.00846 0.01078 0.01793 0.04797 0.06366 0.05689 0.0128 0.01502 0.00564 0.00859 0.01378 0.05117 0.0373 0.01407 0.0065 0.00752 0.0065 0.00463 0.45291

I-21

I.22. Estimasi Titik DH22 ESTIMASI TITIK

DH22

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1218.28 1201.07 1033.97 989.275 835.456 791.154 1203 980.987 791.137 604.293 591.845 650.25 479.588 419.058 369.899 353.21 245.165 172.325 181.497 275.879 175.573 191.314 219.584 415.377 340.262 315.357 199.542 335 400.746 581.532 483.663 455.33 513.249

6.74E-07 6.93E-07 9.35E-07 1.02E-06 1.43E-06 1.6E-06 6.91E-07 1.04E-06 1.6E-06 2.74E-06 2.85E-06 2.37E-06 4.35E-06 5.69E-06 7.31E-06 8.02E-06 1.66E-05 3.37E-05 3.04E-05 1.31E-05 3.24E-05 2.73E-05 2.07E-05 5.8E-06 8.64E-06 1.01E-05 2.51E-05 8.91E-06 6.23E-06 2.96E-06 4.27E-06 4.82E-06 3.8E-06 0.000298

0.00226 0.00233 0.00314 0.00343 0.00481 0.00536 0.00232 0.00349 0.00536 0.00919 0.00958 0.00794 0.01459 0.01911 0.02453 0.02691 0.05585 0.11304 0.1019 0.0441 0.10889 0.09171 0.06962 0.01946 0.02899 0.03375 0.0843 0.02991 0.0209 0.00993 0.01435 0.01619 0.01274 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.0011 0.00119 0.00151 0.00183 0.00239 0.00282 0.00116 0.00187 0.00289 0.00489 0.00506 0.00424 0.00776 0.01005 0.01315 0.01407 0.02943 0.05595 0.05411 0.02166 0.0576 0.04842 0.03731 0.01017 0.01534 0.01772 0.0451 0.01633 0.01114 0.00539 0.00762 0.00856 0.0068 0.52468

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00089 0.00096 0.00122 0.00151 0.00213 0.0025 0.00102 0.00145 0.00248 0.00385 0.00436 0.00368 0.00645 0.00826 0.01133 0.01176 0.02614 0.05064 0.048 0.01857 0.05085 0.04182 0.03265 0.00897 0.01319 0.01482 0.03979 0.01358 0.00945 0.00455 0.00669 0.00759 0.00596 0.45711

I-22

I.23. Estimasi Titik DH23 ESTIMASI TITIK

DH23

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1300.24 1251.75 1138.45 1063.34 939.136 864.197 1224.77 1025.91 838.01 636.94 667.235 760.76 626.856 538.677 448.54 359.138 146.755 184.329 321.811 454.104 366.602 191.314 192.421 294.491 292.412 370.984 331.958 498.654 512.851 687.029 538.358 440.005 437.824

5.92E-07 6.38E-07 7.72E-07 8.84E-07 1.13E-06 1.34E-06 6.67E-07 9.5E-07 1.42E-06 2.46E-06 2.25E-06 1.73E-06 2.54E-06 3.45E-06 4.97E-06 7.75E-06 4.64E-05 2.94E-05 9.66E-06 4.85E-06 7.44E-06 2.73E-05 2.7E-05 1.15E-05 1.17E-05 7.27E-06 9.07E-06 4.02E-06 3.8E-06 2.12E-06 3.45E-06 5.17E-06 5.22E-06 0.000249

0.00238 0.00256 0.0031 0.00355 0.00455 0.00538 0.00268 0.00382 0.00572 0.0099 0.00902 0.00694 0.01022 0.01384 0.01996 0.03113 0.18645 0.11818 0.03877 0.01947 0.02988 0.10971 0.10845 0.0463 0.04696 0.02918 0.03644 0.01615 0.01527 0.00851 0.01385 0.02074 0.02095 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00116 0.00131 0.00149 0.0019 0.00227 0.00283 0.00134 0.00204 0.00308 0.00527 0.00476 0.00371 0.00544 0.00728 0.0107 0.01628 0.09826 0.0585 0.02059 0.00956 0.01581 0.05716 0.05813 0.02422 0.02484 0.01532 0.0195 0.00882 0.00814 0.00462 0.00736 0.01097 0.01119 0.52382

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00094 0.00106 0.00121 0.00157 0.00201 0.00251 0.00118 0.00159 0.00264 0.00415 0.0041 0.00322 0.00452 0.00598 0.00922 0.01361 0.08726 0.05295 0.01826 0.0082 0.01395 0.05102 0.05086 0.02135 0.02137 0.01281 0.0172 0.00733 0.0069 0.0039 0.00646 0.00973 0.0098 0.45882

I-23

I.24. Estimasi Titik DH24 ESTIMASI TITIK

DH24

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1432.86 1404.95 1252.59 1201.06 1053.66 1001.82 1392.94 1181.62 991.642 796.357 801.958 868.932 697.379 637.96 578.081 525.07 334.994 333.264 400.649 481.269 343.169 219.584 192.421 212.474 122.004 186.55 213.19 386.939 347.922 510.824 347.852 255.409 293.748

4.87E-07 5.07E-07 6.37E-07 6.93E-07 9.01E-07 9.96E-07 5.15E-07 7.16E-07 1.02E-06 1.58E-06 1.55E-06 1.32E-06 2.06E-06 2.46E-06 2.99E-06 3.63E-06 8.91E-06 9E-06 6.23E-06 4.32E-06 8.49E-06 2.07E-05 2.7E-05 2.22E-05 6.72E-05 2.87E-05 2.2E-05 6.68E-06 8.26E-06 3.83E-06 8.26E-06 1.53E-05 1.16E-05 0.000301

0.00162 0.00168 0.00212 0.0023 0.00299 0.00331 0.00171 0.00238 0.00338 0.00524 0.00517 0.0044 0.00684 0.00817 0.00995 0.01206 0.02963 0.02993 0.02071 0.01435 0.02823 0.06895 0.08979 0.07364 0.22335 0.09553 0.07315 0.02221 0.02746 0.01274 0.02748 0.05096 0.03853 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00079 0.00086 0.00102 0.00123 0.00149 0.00174 0.00086 0.00127 0.00182 0.00279 0.00273 0.00235 0.00364 0.0043 0.00533 0.00631 0.01561 0.01482 0.011 0.00705 0.01493 0.03592 0.04741 0.03852 0.11815 0.05015 0.03913 0.01212 0.01464 0.00692 0.01459 0.02696 0.02057 0.52705

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00064 0.00069 0.00082 0.00102 0.00132 0.00155 0.00075 0.00099 0.00156 0.0022 0.00235 0.00204 0.00302 0.00353 0.0046 0.00527 0.01386 0.01341 0.00976 0.00604 0.01318 0.03206 0.04095 0.03395 0.10163 0.04194 0.03453 0.01008 0.01241 0.00584 0.0128 0.0239 0.01803 0.45673

I-24

I.25. Estimasi Titik DH25 ESTIMASI TITIK

DH25

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1594.32 1544.81 1428.37 1357.73 1228.74 1158.47 1511.27 1318.67 1131.58 929.731 960.913 1047.49 893.369 820.088 740.249 651.801 429.707 477.253 588.392 687.64 554.995 415.377 294.491 212.474 147.648 327.951 417.163 583.415 501.423 629.414 428.803 254.443 167.263

3.93E-07 4.19E-07 4.9E-07 5.42E-07 6.62E-07 7.45E-07 4.38E-07 5.75E-07 7.81E-07 1.16E-06 1.08E-06 9.11E-07 1.25E-06 1.49E-06 1.82E-06 2.35E-06 5.42E-06 4.39E-06 2.89E-06 2.11E-06 3.25E-06 5.8E-06 1.15E-05 2.22E-05 4.59E-05 9.3E-06 5.75E-06 2.94E-06 3.98E-06 2.52E-06 5.44E-06 1.54E-05 3.57E-05 0.0002

0.00197 0.0021 0.00246 0.00272 0.00332 0.00373 0.00219 0.00288 0.00391 0.00579 0.00542 0.00457 0.00628 0.00745 0.00914 0.01179 0.02713 0.02199 0.01447 0.01059 0.01626 0.02903 0.05776 0.11096 0.22978 0.04657 0.02878 0.01472 0.01992 0.01264 0.02724 0.07737 0.17905 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00096 0.00107 0.00118 0.00145 0.00165 0.00196 0.0011 0.00154 0.00211 0.00308 0.00286 0.00244 0.00334 0.00392 0.0049 0.00617 0.0143 0.01089 0.00768 0.0052 0.0086 0.01513 0.0305 0.05947 0.12155 0.02445 0.0154 0.00804 0.01062 0.00687 0.01447 0.04093 0.09561 0.52944

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00078 0.00086 0.00096 0.0012 0.00147 0.00174 0.00096 0.0012 0.00181 0.00243 0.00247 0.00212 0.00277 0.00322 0.00422 0.00515 0.0127 0.00985 0.00681 0.00446 0.00759 0.0135 0.02634 0.05204 0.10455 0.02045 0.01359 0.00668 0.00901 0.00579 0.0127 0.03629 0.08379 0.45949

I-25

I.26. Estimasi Titik DH26 ESTIMASI TITIK

DH26

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1554.85 1525.41 1374.05 1322.88 1175.28 1123.56 1509.91 1301.53 1111.73 915.052 923.717 990.34 815.039 759.226 699.821 641.237 439.145 451.276 521.714 593.354 446.878 340.262 292.412 122.004 147.648 180.422 286.295 443.298 353.787 487.198 294.061 150.336 174.003

4.14E-07 4.3E-07 5.3E-07 5.71E-07 7.24E-07 7.92E-07 4.39E-07 5.9E-07 8.09E-07 1.19E-06 1.17E-06 1.02E-06 1.51E-06 1.73E-06 2.04E-06 2.43E-06 5.19E-06 4.91E-06 3.67E-06 2.84E-06 5.01E-06 8.64E-06 1.17E-05 6.72E-05 4.59E-05 3.07E-05 1.22E-05 5.09E-06 7.99E-06 4.21E-06 1.16E-05 4.42E-05 3.3E-05 0.00032

0.00129 0.00134 0.00165 0.00178 0.00226 0.00247 0.00137 0.00184 0.00252 0.00373 0.00366 0.00318 0.0047 0.00541 0.00637 0.00759 0.01618 0.01532 0.01146 0.00886 0.01563 0.02695 0.0365 0.20965 0.14315 0.09586 0.03807 0.01588 0.02493 0.01315 0.03609 0.13807 0.10307 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00063 0.00069 0.0008 0.00095 0.00113 0.0013 0.00069 0.00099 0.00136 0.00198 0.00193 0.0017 0.0025 0.00285 0.00342 0.00397 0.00853 0.00759 0.00609 0.00435 0.00827 0.01404 0.01927 0.11237 0.07487 0.05033 0.02037 0.00867 0.01329 0.00714 0.01916 0.07304 0.05504 0.52927

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00051 0.00055 0.00064 0.00079 0.001 0.00115 0.0006 0.00077 0.00117 0.00156 0.00166 0.00148 0.00208 0.00234 0.00294 0.00332 0.00757 0.00686 0.0054 0.00373 0.0073 0.01253 0.01664 0.09832 0.06599 0.04208 0.01797 0.00721 0.01127 0.00602 0.01682 0.06476 0.04824 0.46128

I-26

I.27. Estimasi Titik DH27 ESTIMASI TITIK

DH27

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1515.1 1511.18 1317.59 1292.21 1123.3 1096.71 1518.06 1293.43 1104.13 919.556 899.52 937.841 738.976 710.155 681.487 664.209 503.659 473.888 481.087 504.279 346.554 315.357 370.984 186.55 327.951 180.422 160.253 277.498 174.244 325.038 172.047 181.497 308.598

4.36E-07 4.38E-07 5.76E-07 5.99E-07 7.93E-07 8.31E-07 4.34E-07 5.98E-07 8.2E-07 1.18E-06 1.24E-06 1.14E-06 1.83E-06 1.98E-06 2.15E-06 2.27E-06 3.94E-06 4.45E-06 4.32E-06 3.93E-06 8.33E-06 1.01E-05 7.27E-06 2.87E-05 9.3E-06 3.07E-05 3.89E-05 1.3E-05 3.29E-05 9.47E-06 3.38E-05 3.04E-05 1.05E-05 0.000297

0.00147 0.00147 0.00194 0.00201 0.00267 0.0028 0.00146 0.00201 0.00276 0.00398 0.00416 0.00382 0.00616 0.00667 0.00724 0.00762 0.01326 0.01498 0.01453 0.01323 0.028 0.03382 0.02444 0.09664 0.03127 0.10332 0.13096 0.04368 0.11078 0.03183 0.11362 0.1021 0.03532 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00071 0.00075 0.00093 0.00108 0.00133 0.00147 0.00073 0.00108 0.00149 0.00212 0.00219 0.00204 0.00328 0.00351 0.00388 0.00399 0.00699 0.00741 0.00772 0.00649 0.01481 0.01762 0.0129 0.0518 0.01635 0.05466 0.07006 0.02385 0.05904 0.01729 0.06033 0.05401 0.01886 0.53078

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00058 0.00061 0.00075 0.00089 0.00118 0.00131 0.00064 0.00084 0.00127 0.00167 0.00189 0.00177 0.00272 0.00288 0.00335 0.00333 0.0062 0.00671 0.00684 0.00557 0.01308 0.01573 0.01114 0.04533 0.01442 0.04701 0.06181 0.01983 0.05007 0.01458 0.05295 0.04788 0.01653 0.46135

I-27

I.28. Estimasi Titik DH28 ESTIMASI TITIK

DH28

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1360.78 1365.24 1159.93 1141.24 967.019 948.046 1381.96 1151.06 963.361 787.036 753.569 782.171 579.662 557.237 541.893 549.771 432.552 371.732 337.179 344.398 186.507 199.542 331.958 213.19 417.163 286.295 160.253 175.419 201.246 381.996 304.436 338.148 447.234

5.4E-07 5.37E-07 7.43E-07 7.68E-07 1.07E-06 1.11E-06 5.24E-07 7.55E-07 1.08E-06 1.61E-06 1.76E-06 1.63E-06 2.98E-06 3.22E-06 3.41E-06 3.31E-06 5.34E-06 7.24E-06 8.8E-06 8.43E-06 2.87E-05 2.51E-05 9.07E-06 2.2E-05 5.75E-06 1.22E-05 3.89E-05 3.25E-05 2.47E-05 6.85E-06 1.08E-05 8.75E-06 5E-06 0.000285

0.00189 0.00188 0.00261 0.00269 0.00375 0.0039 0.00184 0.00265 0.00378 0.00566 0.00617 0.00573 0.01043 0.01129 0.01194 0.0116 0.01874 0.02537 0.03083 0.02956 0.10078 0.08804 0.03181 0.07713 0.02014 0.04277 0.13651 0.11392 0.08656 0.02402 0.03782 0.03066 0.01753 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00092 0.00096 0.00125 0.00144 0.00187 0.00205 0.00092 0.00142 0.00204 0.00301 0.00326 0.00306 0.00555 0.00594 0.0064 0.00607 0.00987 0.01256 0.01637 0.01451 0.05331 0.04587 0.0168 0.04134 0.01054 0.02263 0.07167 0.0622 0.04614 0.01305 0.02008 0.01622 0.00936 0.52866

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00075 0.00077 0.00101 0.00119 0.00166 0.00182 0.00081 0.0011 0.00175 0.00237 0.00281 0.00266 0.00461 0.00488 0.00552 0.00507 0.00877 0.01137 0.01452 0.01244 0.04706 0.04094 0.01451 0.03617 0.00929 0.01946 0.05993 0.05172 0.03912 0.011 0.01763 0.01438 0.0082 0.45528

I-28

I.29. Estimasi Titik DH29 ESTIMASI TITIK

DH29

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1357.07 1389.48 1141.31 1153 959.563 970.824 1429.16 1187.25 1006.72 852.036 789.497 782.368 562.228 579.142 603.009 652.113 580.07 499.12 406.529 338.576 214.245 335 498.654 386.939 583.415 443.298 277.498 175.419 175.932 313.026 343.052 452.747 586.08

5.43E-07 5.18E-07 7.68E-07 7.52E-07 1.09E-06 1.06E-06 4.9E-07 7.09E-07 9.87E-07 1.38E-06 1.6E-06 1.63E-06 3.16E-06 2.98E-06 2.75E-06 2.35E-06 2.97E-06 4.01E-06 6.05E-06 8.72E-06 2.18E-05 8.91E-06 4.02E-06 6.68E-06 2.94E-06 5.09E-06 1.3E-05 3.25E-05 3.23E-05 1.02E-05 8.5E-06 4.88E-06 2.91E-06 0.000198

0.00274 0.00261 0.00387 0.00379 0.00548 0.00535 0.00247 0.00358 0.00498 0.00695 0.00809 0.00824 0.01596 0.01504 0.01387 0.01186 0.01499 0.02025 0.03052 0.044 0.10989 0.04495 0.02029 0.03369 0.01482 0.02567 0.06551 0.16392 0.16297 0.05148 0.04286 0.02461 0.01469 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00134 0.00134 0.00186 0.00203 0.00273 0.00282 0.00124 0.00191 0.00268 0.0037 0.00427 0.0044 0.00849 0.00791 0.00744 0.0062 0.0079 0.01002 0.01621 0.02161 0.05813 0.02342 0.01071 0.01806 0.00775 0.01358 0.03439 0.0877 0.08686 0.02795 0.02276 0.01302 0.00784 0.52827

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00108 0.00108 0.00151 0.00167 0.00242 0.0025 0.00108 0.00149 0.0023 0.00291 0.00368 0.00382 0.00705 0.0065 0.00641 0.00518 0.00702 0.00907 0.01438 0.01853 0.05132 0.0209 0.00925 0.0158 0.00683 0.01168 0.02876 0.07737 0.07366 0.02358 0.01997 0.01154 0.00687 0.45722

I-29

I.30. Estimasi Titik DH30 ESTIMASI TITIK

DH30

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH31 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1520.99 1542.01 1309.44 1310.53 1123.71 1122.84 1569.55 1333.28 1148.25 979.605 934.037 942.959 727.178 728.83 731.456 750.139 628.061 572.787 526.773 495.308 348.116 400.746 512.851 347.922 501.423 353.787 174.244 201.246 175.932 180.834 170.179 312.416 459.933

4.32E-07 4.21E-07 5.83E-07 5.82E-07 7.92E-07 7.93E-07 4.06E-07 5.63E-07 7.58E-07 1.04E-06 1.15E-06 1.12E-06 1.89E-06 1.88E-06 1.87E-06 1.78E-06 2.54E-06 3.05E-06 3.6E-06 4.08E-06 8.25E-06 6.23E-06 3.8E-06 8.26E-06 3.98E-06 7.99E-06 3.29E-05 2.47E-05 3.23E-05 3.06E-05 3.45E-05 1.02E-05 4.73E-06 0.000238

0.00182 0.00177 0.00245 0.00245 0.00333 0.00333 0.00171 0.00237 0.00319 0.00438 0.00482 0.00473 0.00795 0.00791 0.00786 0.00747 0.01066 0.01281 0.01515 0.01714 0.03469 0.02618 0.01598 0.03473 0.01672 0.03359 0.13848 0.10381 0.13583 0.12857 0.14517 0.04307 0.01987 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00089 0.00091 0.00118 0.00131 0.00166 0.00175 0.00086 0.00127 0.00172 0.00233 0.00254 0.00252 0.00423 0.00416 0.00421 0.00391 0.00562 0.00634 0.00805 0.00841 0.01835 0.01364 0.00844 0.01862 0.00875 0.01777 0.0727 0.05554 0.07416 0.06981 0.07709 0.02279 0.01061 0.53213

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00072 0.00073 0.00095 0.00108 0.00147 0.00156 0.00075 0.00098 0.00147 0.00184 0.00219 0.00219 0.00351 0.00342 0.00363 0.00327 0.00499 0.00574 0.00714 0.00721 0.0162 0.01217 0.00729 0.01629 0.00771 0.01528 0.06079 0.049 0.06167 0.05888 0.06765 0.0202 0.0093 0.45728

I-30

I.31. Estimasi Titik DH31 ESTIMASI TITIK

DH31

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH32 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1668.46 1702.25 1450.04 1466 1271.21 1283.37 1738.25 1498.38 1315.96 1153.36 1099.67 1095.18 874.211 890.691 904.204 929.889 807.194 753.618 701.046 651.197 515.335 581.532 687.029 510.824 629.414 487.198 325.038 381.996 313.026 180.834 207.966 395.349 545.576

3.59E-07 3.45E-07 4.76E-07 4.65E-07 6.19E-07 6.07E-07 3.31E-07 4.45E-07 5.77E-07 7.52E-07 8.27E-07 8.34E-07 1.31E-06 1.26E-06 1.22E-06 1.16E-06 1.53E-06 1.76E-06 2.03E-06 2.36E-06 3.77E-06 2.96E-06 2.12E-06 3.83E-06 2.52E-06 4.21E-06 9.47E-06 6.85E-06 1.02E-05 3.06E-05 2.31E-05 6.4E-06 3.36E-06 0.000129

0.00279 0.00268 0.0037 0.00362 0.00481 0.00472 0.00257 0.00346 0.00449 0.00584 0.00643 0.00648 0.01017 0.0098 0.00951 0.00899 0.01193 0.01368 0.01581 0.01833 0.02927 0.02298 0.01647 0.02978 0.01962 0.03274 0.07356 0.05326 0.07932 0.23767 0.1797 0.04972 0.02611 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 53.1% 52.9% 53.4% Z(v)_G

0.00136 0.00137 0.00178 0.00193 0.0024 0.00248 0.00129 0.00185 0.00242 0.00311 0.00339 0.00346 0.00541 0.00515 0.0051 0.0047 0.00629 0.00677 0.0084 0.009 0.01548 0.01197 0.00869 0.01596 0.01026 0.01732 0.03862 0.02849 0.04331 0.12668 0.09542 0.0263 0.01394 0.53012

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 46.6% 46.9% 46.8% Z(v)_B

0.0011 0.00111 0.00144 0.00159 0.00213 0.0022 0.00113 0.00144 0.00207 0.00245 0.00292 0.00301 0.00449 0.00423 0.00439 0.00393 0.00558 0.00613 0.00745 0.00772 0.01367 0.01069 0.00751 0.01397 0.00904 0.0149 0.03229 0.02514 0.03601 0.10743 0.08374 0.02332 0.01222 0.45644

I-31

I.32. Estimasi Titik DH32 ESTIMASI TITIK

DH32

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH33 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1662.79 1669.62 1457.67 1445.19 1267.39 1252.46 1683.29 1454.73 1266.44 1085.98 1057.84 1083.62 874.783 860.976 844.029 834.945 674.501 645.484 640.41 639.2 483.508 483.663 538.358 347.852 428.803 294.061 172.047 304.436 343.052 170.179 207.966 187.459 337.747

3.62E-07 3.59E-07 4.71E-07 4.79E-07 6.23E-07 6.37E-07 3.53E-07 4.73E-07 6.23E-07 8.48E-07 8.94E-07 8.52E-07 1.31E-06 1.35E-06 1.4E-06 1.43E-06 2.2E-06 2.4E-06 2.44E-06 2.45E-06 4.28E-06 4.27E-06 3.45E-06 8.26E-06 5.44E-06 1.16E-05 3.38E-05 1.08E-05 8.5E-06 3.45E-05 2.31E-05 2.85E-05 8.77E-06 0.000207

0.00175 0.00173 0.00227 0.00231 0.00301 0.00308 0.0017 0.00228 0.00301 0.00409 0.00431 0.00411 0.00631 0.00651 0.00678 0.00692 0.01061 0.01159 0.01177 0.01181 0.02065 0.02063 0.01665 0.03989 0.02625 0.05582 0.16308 0.05208 0.04102 0.16668 0.11161 0.13736 0.04232 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 52.9% 53.4% Z(v)_G

0.00085 0.00089 0.00109 0.00123 0.0015 0.00162 0.00086 0.00122 0.00162 0.00218 0.00228 0.0022 0.00336 0.00343 0.00363 0.00362 0.00559 0.00573 0.00625 0.0058 0.01092 0.01075 0.00879 0.02138 0.01373 0.02953 0.08562 0.02786 0.0224 0.08884 0.0606 0.07267 0.0226 0.53063

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.9% 46.8% Z(v)_B

0.00069 0.00071 0.00088 0.00102 0.00133 0.00144 0.00075 0.00095 0.00139 0.00171 0.00196 0.00191 0.00279 0.00281 0.00313 0.00303 0.00497 0.00519 0.00554 0.00497 0.00964 0.0096 0.00759 0.01871 0.0121 0.0254 0.07159 0.02458 0.01862 0.07534 0.05112 0.06442 0.0198 0.4557

I-32

I.33. Estimasi Titik DH33 ESTIMASI TITIK

DH33

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH34 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1672.55 1654.71 1482.4 1444.56 1285.68 1246.47 1647.39 1432.83 1242.71 1049.75 1047.04 1099.84 909.628 869.361 824.296 780.256 586.195 588.011 633.721 677.751 521.648 455.33 440.005 255.409 254.443 150.336 181.497 338.148 452.747 312.416 395.349 187.459 151.822

3.57E-07 3.65E-07 4.55E-07 4.79E-07 6.05E-07 6.44E-07 3.68E-07 4.87E-07 6.48E-07 9.07E-07 9.12E-07 8.27E-07 1.21E-06 1.32E-06 1.47E-06 1.64E-06 2.91E-06 2.89E-06 2.49E-06 2.18E-06 3.67E-06 4.82E-06 5.17E-06 1.53E-05 1.54E-05 4.42E-05 3.04E-05 8.75E-06 4.88E-06 1.02E-05 6.4E-06 2.85E-05 4.34E-05 0.000244

0.00146 0.00149 0.00186 0.00196 0.00248 0.00263 0.00151 0.00199 0.00265 0.00371 0.00373 0.00338 0.00495 0.00542 0.00602 0.00672 0.01191 0.01184 0.01019 0.00891 0.01504 0.01974 0.02114 0.06274 0.06322 0.1811 0.12425 0.0358 0.01997 0.04193 0.02619 0.11647 0.17757 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 53.4% Z(v)_G

0.00071 0.00077 0.0009 0.00105 0.00123 0.00139 0.00076 0.00107 0.00143 0.00198 0.00197 0.00181 0.00263 0.00285 0.00323 0.00352 0.00628 0.00586 0.00541 0.00438 0.00796 0.01029 0.01116 0.03363 0.03306 0.0958 0.06523 0.01915 0.0109 0.02235 0.01422 0.06185 0.09482 0.52962

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.8% Z(v)_B

0.00058 0.00062 0.00072 0.00086 0.00109 0.00123 0.00066 0.00083 0.00122 0.00156 0.0017 0.00157 0.00219 0.00234 0.00278 0.00294 0.00557 0.0053 0.0048 0.00375 0.00702 0.00918 0.00964 0.02943 0.02914 0.0824 0.05455 0.0169 0.00907 0.01895 0.01199 0.05428 0.0831 0.45797

I-33

I.34. Estimasi Titik DH34 ESTIMASI TITIK

DH34

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 TOTAL

di

di^-2

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1723.46 1686.78 1546.05 1489.82 1346.95 1290.23 1662.54 1461.62 1272.65 1073.18 1090.71 1162.48 989.041 931.631 867.111 796.157 581.251 611.465 694.395 766.512 617.664 513.249 437.824 293.748 167.263 174.003 308.598 447.234 586.08 459.933 545.576 337.747 151.822

3.37E-07 3.51E-07 4.18E-07 4.51E-07 5.51E-07 6.01E-07 3.62E-07 4.68E-07 6.17E-07 8.68E-07 8.41E-07 7.4E-07 1.02E-06 1.15E-06 1.33E-06 1.58E-06 2.96E-06 2.67E-06 2.07E-06 1.7E-06 2.62E-06 3.8E-06 5.22E-06 1.16E-05 3.57E-05 3.3E-05 1.05E-05 5E-06 2.91E-06 4.73E-06 3.36E-06 8.77E-06 4.34E-05 0.000192

0.00176 0.00183 0.00218 0.00235 0.00287 0.00313 0.00189 0.00244 0.00322 0.00453 0.00438 0.00386 0.00533 0.00601 0.00694 0.00823 0.01544 0.01395 0.01082 0.00888 0.01367 0.0198 0.02721 0.06044 0.18642 0.17225 0.05476 0.02607 0.01518 0.02465 0.01752 0.04572 0.22626 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% Z(v)_G

0.00086 0.00094 0.00105 0.00125 0.00143 0.00165 0.00095 0.00131 0.00174 0.00241 0.00231 0.00206 0.00284 0.00316 0.00372 0.0043 0.00814 0.0069 0.00574 0.00436 0.00723 0.01031 0.01437 0.0324 0.0975 0.09112 0.02875 0.01395 0.00829 0.01314 0.00951 0.02428 0.11969 0.52766

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% Z(v)_B

0.00069 0.00076 0.00085 0.00104 0.00127 0.00146 0.00083 0.00102 0.00149 0.0019 0.00199 0.00179 0.00236 0.0026 0.0032 0.0036 0.00722 0.00625 0.00509 0.00374 0.00638 0.00921 0.01241 0.02835 0.08594 0.07838 0.02404 0.01231 0.00689 0.01114 0.00802 0.02131 0.10612 0.45963

I-34

LAMPIRAN J ESTIMASI TEBAL MENGGUNAKAN METODE IDC

J.1. Estimasi Titik DH1 ESTIMASI TITIK

DH1

TERHADAP TITIK DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 234.438 239.209 397.555 436.285 406.972 345.08 488.079 685.018 633.654 579.211 794.909 805.001 856.493 951.803 1177.23 1117.16 1038.84 1026.09 1179.44 1218.28 1300.24 1432.86 1594.32 1554.85 1515.1 1360.78 1357.07 1520.99 1668.46 1662.79 1672.55 1723.46

9.5E-08 7.76E-08 7.31E-08 1.59E-08 1.2E-08 1.48E-08 2.43E-08 8.6E-09 3.11E-09 3.93E-09 5.15E-09 1.99E-09 1.92E-09 1.59E-09 1.16E-09 6.13E-10 7.17E-10 8.92E-10 9.26E-10 6.09E-10 5.53E-10 4.55E-10 3.4E-10 2.47E-10 2.66E-10 2.88E-10 3.97E-10 4E-10 2.84E-10 2.15E-10 2.18E-10 2.14E-10 1.95E-10 3.48E-07

0.27297 0.22296 0.20988 0.04572 0.03459 0.04262 0.06991 0.02471 0.00894 0.01129 0.01478 0.00572 0.00551 0.00457 0.00333 0.00176 0.00206 0.00256 0.00266 0.00175 0.00159 0.00131 0.00098 0.00071 0.00076 0.00083 0.00114 0.00115 0.00082 0.00062 0.00062 0.00061 0.00056 1

43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.11738 0.12263 0.09025 0.02103 0.01349 0.01875 0.03635 0.00914 0.00474 0.00429 0.00665 0.0024 0.00182 0.00169 0.0012 0.00085 0.00084 0.00108 0.00141 0.00082 0.00056 0.00063 0.00037 0.00037 0.00037 0.00034 0.0006 0.00052 0.00036 0.00032 0.00027 0.00032 0.00021 0.46205

326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.88987 0.72016 0.65274 0.14859 0.11831 0.1415 0.21113 0.0803 0.02914 0.03839 0.04687 0.01813 0.01883 0.01459 0.01143 0.00569 0.00647 0.00874 0.00838 0.00562 0.00545 0.00439 0.00317 0.0023 0.00248 0.00259 0.00352 0.00357 0.00268 0.00194 0.00212 0.00198 0.00185 3.21291

J-1

J.2. Estimasi Titik DH2 ESTIMASI TITIK

DH2

TERHADAP TITIK DH1 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 382.539 247.681 464.613 419.237 188.152 226.374 414.121 615.081 611.949 614.003 837.291 813.204 831.177 893.031 1116.65 1075.55 1030.36 1051.06 1194.07 1201.07 1251.75 1404.95 1544.81 1525.41 1511.18 1365.24 1389.48 1542.01 1702.25 1669.62 1654.71 1686.78

9.5E-08 1.79E-08 6.58E-08 9.97E-09 1.36E-08 1.5E-07 8.62E-08 1.41E-08 4.3E-09 4.36E-09 4.32E-09 1.7E-09 1.86E-09 1.74E-09 1.4E-09 7.18E-10 8.04E-10 9.14E-10 8.61E-10 5.87E-10 5.77E-10 5.1E-10 3.61E-10 2.71E-10 2.82E-10 2.9E-10 3.93E-10 3.73E-10 2.73E-10 2.03E-10 2.15E-10 2.21E-10 2.08E-10 4.8E-07

0.19778 0.03718 0.137 0.02075 0.02825 0.31251 0.17944 0.02931 0.00895 0.00908 0.00899 0.00355 0.00387 0.00363 0.00292 0.0015 0.00167 0.0019 0.00179 0.00122 0.0012 0.00106 0.00075 0.00056 0.00059 0.0006 0.00082 0.00078 0.00057 0.00042 0.00045 0.00046 0.00043 1

46.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.09098 0.02045 0.05891 0.00955 0.01102 0.13751 0.09331 0.01084 0.00474 0.00345 0.00405 0.00149 0.00128 0.00134 0.00105 0.00072 0.00069 0.0008 0.00095 0.00057 0.00042 0.00051 0.00029 0.00029 0.00028 0.00025 0.00043 0.00035 0.00025 0.00022 0.00019 0.00024 0.00016 0.45758

315.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.62302 0.12011 0.42606 0.06745 0.09661 1.03755 0.54191 0.09526 0.02916 0.03088 0.02851 0.01124 0.01324 0.01156 0.01003 0.00483 0.00525 0.00649 0.00565 0.00392 0.00412 0.00357 0.00244 0.00183 0.0019 0.00189 0.00253 0.00241 0.00186 0.00132 0.00152 0.00148 0.00143 3.19703

J-2

J.3. Estimasi Titik DH3 ESTIMASI TITIK

DH3

TERHADAP TITIK DH1 DH2 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

234.438 382.539 199.123 199.642 313.56 542.794 363.369 412.146 573.394 480.635 383.719 583.095 614.919 690.072 810.195 1028.99 954.231 852.48 818.478 975.109 1033.97 1138.45 1252.59 1428.37 1374.05 1317.59 1159.93 1141.31 1309.44 1450.04 1457.67 1482.4 1546.05

7.76E-08 1.79E-08 1.27E-07 1.26E-07 3.24E-08 6.25E-09 2.08E-08 1.43E-08 5.3E-09 9.01E-09 1.77E-08 5.04E-09 4.3E-09 3.04E-09 1.88E-09 9.18E-10 1.15E-09 1.61E-09 1.82E-09 1.08E-09 9.05E-10 6.78E-10 5.09E-10 3.43E-10 3.85E-10 4.37E-10 6.41E-10 6.73E-10 4.45E-10 3.28E-10 3.23E-10 3.07E-10 2.71E-10 4.81E-07

0.16144 0.03716 0.26347 0.26142 0.06747 0.01301 0.04336 0.02971 0.01103 0.01873 0.03682 0.01049 0.00895 0.00633 0.00391 0.00191 0.00239 0.00336 0.00379 0.00224 0.00188 0.00141 0.00106 0.00071 0.0008 0.00091 0.00133 0.0014 0.00093 0.00068 0.00067 0.00064 0.00056 1

46.0% 43.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.07426 0.01598 0.11329 0.12025 0.02631 0.00572 0.02255 0.01099 0.00585 0.00712 0.01657 0.00441 0.00295 0.00234 0.00141 0.00092 0.00098 0.00141 0.00201 0.00105 0.00066 0.00068 0.0004 0.00037 0.00038 0.00037 0.00071 0.00063 0.00041 0.00035 0.00029 0.00033 0.00021 0.44218

315.0% 326.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.50854 0.12114 0.8194 0.84962 0.23076 0.04318 0.13094 0.09657 0.03597 0.0637 0.11671 0.03326 0.0306 0.02019 0.01342 0.00617 0.00752 0.01145 0.01195 0.0072 0.00645 0.00474 0.00344 0.00231 0.0026 0.00285 0.00412 0.00435 0.00304 0.00214 0.00228 0.00206 0.00186 3.20051

J-3

J.4. Estimasi Titik DH4 ESTIMASI TITIK

DH4

TERHADAP TITIK DH1 DH2 DH3 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

239.209 247.681 199.123 217.479 199.625 367.185 164.247 253.049 446.252 399.224 371.712 595.021 584.23 623.097 712.956 938.587 881.077 812.288 816.123 964.353 989.275 1063.34 1201.06 1357.73 1322.88 1292.21 1141.24 1153 1310.53 1466 1445.19 1444.56 1489.82

7.31E-08 6.58E-08 1.27E-07 9.72E-08 1.26E-07 2.02E-08 2.26E-07 6.17E-08 1.13E-08 1.57E-08 1.95E-08 4.75E-09 5.01E-09 4.13E-09 2.76E-09 1.21E-09 1.46E-09 1.87E-09 1.84E-09 1.12E-09 1.03E-09 8.32E-10 5.77E-10 4E-10 4.32E-10 4.63E-10 6.73E-10 6.52E-10 4.44E-10 3.17E-10 3.31E-10 3.32E-10 3.02E-10 8.73E-07

0.08364 0.07535 0.14501 0.11131 0.14392 0.02313 0.25839 0.07066 0.01288 0.01799 0.02229 0.00543 0.00574 0.00473 0.00316 0.00138 0.00167 0.00214 0.00211 0.00128 0.00118 0.00095 0.00066 0.00046 0.00049 0.00053 0.00077 0.00075 0.00051 0.00036 0.00038 0.00038 0.00035 1

46.0% 43.0% 55.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.03848 0.0324 0.07976 0.0512 0.05613 0.01018 0.13436 0.02614 0.00683 0.00684 0.01003 0.00228 0.00189 0.00175 0.00114 0.00066 0.00069 0.0009 0.00112 0.0006 0.00041 0.00046 0.00025 0.00024 0.00024 0.00022 0.00041 0.00034 0.00022 0.00019 0.00016 0.0002 0.00013 0.46684

315.0% 326.0% 323.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.26348 0.24565 0.46839 0.36175 0.49221 0.07678 0.78034 0.22963 0.042 0.06118 0.07067 0.01723 0.01964 0.0151 0.01084 0.00447 0.00526 0.00728 0.00663 0.0041 0.00406 0.0032 0.00215 0.00148 0.0016 0.00166 0.00238 0.00232 0.00167 0.00114 0.00129 0.00123 0.00114 3.20793

J-4

J.5. Estimasi Titik DH5 ESTIMASI TITIK

DH5

TERHADAP TITIK DH1 DH2 DH3 DH4 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

397.555 464.613 199.642 217.479 165.895 574.345 335.932 284.543 399.249 287.939 185.852 397.363 416.74 491.037 616.02 831.856 755.017 654.083 629.27 783.901 835.456 939.136 1053.66 1228.74 1175.28 1123.3 967.019 959.563 1123.71 1271.21 1267.39 1285.68 1346.95

1.59E-08 9.97E-09 1.26E-07 9.72E-08 2.19E-07 5.28E-09 2.64E-08 4.34E-08 1.57E-08 4.19E-08 1.56E-07 1.59E-08 1.38E-08 8.45E-09 4.28E-09 1.74E-09 2.32E-09 3.57E-09 4.01E-09 2.08E-09 1.71E-09 1.21E-09 8.55E-10 5.39E-10 6.16E-10 7.06E-10 1.11E-09 1.13E-09 7.05E-10 4.87E-10 4.91E-10 4.71E-10 4.09E-10 8.23E-07

0.01934 0.01212 0.15272 0.11814 0.26617 0.00641 0.03206 0.05275 0.0191 0.0509 0.1893 0.01937 0.01679 0.01026 0.0052 0.00211 0.00282 0.00434 0.00488 0.00252 0.00208 0.00147 0.00104 0.00066 0.00075 0.00086 0.00134 0.00138 0.00086 0.00059 0.0006 0.00057 0.0005 1

46.0% 43.0% 55.0% 43.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0089 0.00521 0.084 0.0508 0.10381 0.00282 0.01667 0.01952 0.01012 0.01934 0.08519 0.00813 0.00554 0.0038 0.00187 0.00101 0.00116 0.00182 0.00258 0.00119 0.00073 0.0007 0.00039 0.00034 0.00036 0.00035 0.00071 0.00062 0.00038 0.00031 0.00026 0.0003 0.00019 0.43912

315.0% 326.0% 323.0% 311.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.06092 0.0395 0.49329 0.36743 0.91031 0.0213 0.09681 0.17143 0.06225 0.17308 0.60009 0.0614 0.05742 0.03274 0.01783 0.00682 0.00887 0.01481 0.01536 0.0081 0.00715 0.00493 0.00338 0.00212 0.00243 0.00268 0.00415 0.00428 0.00281 0.00185 0.00202 0.00185 0.00164 3.26104

J-5

J.6. Estimasi Titik DH6 ESTIMASI TITIK

DH6

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

436.285 419.237 313.56 199.625 165.895 476.807 225.878 118.962 261.467 199.865 210.238 426.427 394.011 423.745 516.558 741.432 681.602 615.813 632.261 775.023 791.154 864.197 1001.82 1158.47 1123.56 1096.71 948.046 970.824 1122.84 1283.37 1252.46 1246.47 1290.23

1.2E-08 1.36E-08 3.24E-08 1.26E-07 2.19E-07 9.23E-09 8.68E-08 5.94E-07 5.59E-08 1.25E-07 1.08E-07 1.29E-08 1.63E-08 1.31E-08 7.26E-09 2.45E-09 3.16E-09 4.28E-09 3.96E-09 2.15E-09 2.02E-09 1.55E-09 9.95E-10 6.43E-10 7.05E-10 7.58E-10 1.17E-09 1.09E-09 7.06E-10 4.73E-10 5.09E-10 5.16E-10 4.66E-10 1.46E-06

0.00825 0.0093 0.02223 0.08617 0.15014 0.00632 0.05948 0.40717 0.03835 0.08586 0.07377 0.00884 0.01121 0.00901 0.00497 0.00168 0.00216 0.00294 0.00271 0.00147 0.00138 0.00106 0.00068 0.00044 0.00048 0.00052 0.0008 0.00075 0.00048 0.00032 0.00035 0.00035 0.00032 1

46.0% 43.0% 55.0% 43.0% 46.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0038 0.004 0.01223 0.03705 0.06907 0.00278 0.03093 0.15065 0.02032 0.03263 0.0332 0.00371 0.0037 0.00333 0.00179 0.00081 0.00089 0.00123 0.00144 0.00069 0.00048 0.00051 0.00026 0.00023 0.00023 0.00021 0.00043 0.00034 0.00021 0.00017 0.00015 0.00018 0.00012 0.41777

315.0% 326.0% 323.0% 311.0% 325.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.026 0.03033 0.07182 0.26799 0.48796 0.02099 0.17963 1.32329 0.12502 0.29192 0.23384 0.02802 0.03833 0.02874 0.01706 0.00543 0.0068 0.01001 0.00854 0.00473 0.00475 0.00357 0.00222 0.00143 0.00157 0.00163 0.00249 0.00233 0.00159 0.00102 0.00118 0.00114 0.00105 3.2324

J-6

J.7. Estimasi Titik DH7 ESTIMASI TITIK

DH7

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

406.972 188.152 542.794 367.185 574.345 476.807 251.002 422.456 598.912 639.879 686.706 901.568 851.469 840.074 868.678 1082.29 1059.68 1045.05 1093.01 1223.3 1203 1224.77 1392.94 1511.27 1509.91 1518.06 1381.96 1429.16 1569.55 1738.25 1683.29 1647.39 1662.54

1.48E-08 1.5E-07 6.25E-09 2.02E-08 5.28E-09 9.23E-09 6.32E-08 1.33E-08 4.65E-09 3.82E-09 3.09E-09 1.36E-09 1.62E-09 1.69E-09 1.53E-09 7.89E-10 8.4E-10 8.76E-10 7.66E-10 5.46E-10 5.74E-10 5.44E-10 3.7E-10 2.9E-10 2.91E-10 2.86E-10 3.79E-10 3.43E-10 2.59E-10 1.9E-10 2.1E-10 2.24E-10 2.18E-10 3.08E-07

0.04814 0.48717 0.02029 0.06555 0.01713 0.02993 0.2052 0.04304 0.0151 0.01239 0.01002 0.00443 0.00526 0.00547 0.00495 0.00256 0.00273 0.00284 0.00249 0.00177 0.00186 0.00177 0.0012 0.00094 0.00094 0.00093 0.00123 0.00111 0.00084 0.00062 0.00068 0.00073 0.00071 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.02214 0.20948 0.01116 0.02818 0.00788 0.01167 0.1067 0.01592 0.00801 0.00471 0.00451 0.00186 0.00173 0.00203 0.00178 0.00123 0.00112 0.00119 0.00132 0.00083 0.00065 0.00085 0.00046 0.00049 0.00045 0.00038 0.00065 0.0005 0.00037 0.00032 0.00029 0.00038 0.00027 0.44952

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.15164 1.58817 0.06554 0.20385 0.05566 0.10238 0.61969 0.13988 0.04924 0.04211 0.03177 0.01404 0.01798 0.01746 0.01698 0.00827 0.00856 0.00969 0.00783 0.00569 0.00639 0.00593 0.0039 0.00305 0.00305 0.0029 0.0038 0.00346 0.00275 0.00193 0.00231 0.00234 0.00233 3.20058

J-7

J.8. Estimasi Titik DH8 ESTIMASI TITIK

DH8

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

345.08 226.374 363.369 164.247 335.932 225.878 251.002 190.118 389.012 399.261 435.707 651.519 608.113 611.962 666.979 890.3 850.882 814.325 849.342 985.419 980.987 1025.91 1181.62 1318.67 1301.53 1293.43 1151.06 1187.25 1333.28 1498.38 1454.73 1432.83 1461.62

2.43E-08 8.62E-08 2.08E-08 2.26E-07 2.64E-08 8.68E-08 6.32E-08 1.46E-07 1.7E-08 1.57E-08 1.21E-08 3.62E-09 4.45E-09 4.36E-09 3.37E-09 1.42E-09 1.62E-09 1.85E-09 1.63E-09 1.05E-09 1.06E-09 9.26E-10 6.06E-10 4.36E-10 4.54E-10 4.62E-10 6.56E-10 5.98E-10 4.22E-10 2.97E-10 3.25E-10 3.4E-10 3.2E-10 7.54E-07

0.03227 0.11432 0.02764 0.29931 0.03498 0.11508 0.08386 0.19299 0.02253 0.02084 0.01603 0.0048 0.0059 0.00579 0.00447 0.00188 0.00215 0.00246 0.00216 0.00139 0.0014 0.00123 0.0008 0.00058 0.0006 0.00061 0.00087 0.00079 0.00056 0.00039 0.00043 0.00045 0.00042 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.01485 0.04916 0.0152 0.1287 0.01609 0.04488 0.0369 0.07141 0.01194 0.00792 0.00722 0.00201 0.00195 0.00214 0.00161 0.0009 0.00088 0.00103 0.00115 0.00065 0.00049 0.00059 0.00031 0.0003 0.00029 0.00025 0.00046 0.00036 0.00025 0.0002 0.00019 0.00023 0.00016 0.42066

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.10166 0.37269 0.08928 0.93085 0.11369 0.39356 0.27843 0.62722 0.07344 0.07085 0.05083 0.0152 0.02017 0.01846 0.01533 0.00607 0.00676 0.00837 0.00682 0.00445 0.00482 0.00413 0.00261 0.00187 0.00195 0.00192 0.00269 0.00246 0.00184 0.00123 0.00146 0.00146 0.0014 3.23398

J-8

J.9. Estimasi Titik DH9 ESTIMASI TITIK

DH9

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

488.079 414.121 412.146 253.049 284.543 118.962 422.456 190.118 202.98 217.867 298.181 491.634 429.848 422.734 479.942 704.827 661.472 626.235 671.096 801.29 791.137 838.01 991.642 1131.58 1111.73 1104.13 963.361 1006.72 1148.25 1315.96 1266.44 1242.71 1272.65

8.6E-09 1.41E-08 1.43E-08 6.17E-08 4.34E-08 5.94E-07 1.33E-08 1.46E-07 1.2E-07 9.67E-08 3.77E-08 8.42E-09 1.26E-08 1.32E-08 9.05E-09 2.86E-09 3.46E-09 4.07E-09 3.31E-09 1.94E-09 2.02E-09 1.7E-09 1.03E-09 6.9E-10 7.28E-10 7.43E-10 1.12E-09 9.8E-10 6.61E-10 4.39E-10 4.92E-10 5.21E-10 4.85E-10 1.22E-06

0.00705 0.01155 0.01171 0.05061 0.0356 0.48712 0.01088 0.11934 0.09806 0.0793 0.03093 0.0069 0.01033 0.01086 0.00742 0.00234 0.00283 0.00334 0.00271 0.00159 0.00166 0.00139 0.00084 0.00057 0.0006 0.00061 0.00092 0.0008 0.00054 0.00036 0.0004 0.00043 0.0004 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00324 0.00497 0.00644 0.02176 0.01637 0.18998 0.00479 0.06206 0.05197 0.03014 0.01392 0.0029 0.00341 0.00402 0.00267 0.00112 0.00116 0.0014 0.00144 0.00075 0.00058 0.00067 0.00032 0.00029 0.00029 0.00025 0.00049 0.00036 0.00024 0.00019 0.00017 0.00022 0.00015 0.42873

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.02222 0.03764 0.03784 0.1574 0.11569 1.66595 0.03611 0.36041 0.31968 0.26963 0.09806 0.02188 0.03531 0.03463 0.02544 0.00757 0.0089 0.01139 0.00855 0.00512 0.00568 0.00468 0.00273 0.00183 0.00193 0.00191 0.00283 0.0025 0.00178 0.00113 0.00137 0.00138 0.00131 3.31049

J-9

J.10. Estimasi Titik DH10 ESTIMASI TITIK

DH10

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

685.018 615.081 573.394 446.252 399.249 261.467 598.912 389.012 202.98 145.798 303.488 410.001 306.751 249.401 277.973 502.068 463.778 452.863 530.601 639.641 604.293 636.94 796.357 929.731 915.052 919.556 787.036 852.036 979.605 1153.36 1085.98 1049.75 1073.18

3.11E-09 4.3E-09 5.3E-09 1.13E-08 1.57E-08 5.59E-08 4.65E-09 1.7E-08 1.2E-07 3.23E-07 3.58E-08 1.45E-08 3.46E-08 6.45E-08 4.66E-08 7.9E-09 1E-08 1.08E-08 6.69E-09 3.82E-09 4.53E-09 3.87E-09 1.98E-09 1.24E-09 1.31E-09 1.29E-09 2.05E-09 1.62E-09 1.06E-09 6.52E-10 7.81E-10 8.64E-10 8.09E-10 8.17E-07

0.00381 0.00526 0.00649 0.01378 0.01924 0.0685 0.0057 0.0208 0.14641 0.39507 0.0438 0.01777 0.04242 0.07893 0.05701 0.00967 0.01227 0.01318 0.0082 0.00468 0.00555 0.00474 0.00242 0.00152 0.0016 0.00157 0.00251 0.00198 0.0013 0.0008 0.00096 0.00106 0.00099 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00175 0.00226 0.00357 0.00592 0.00885 0.02671 0.00251 0.01082 0.05417 0.15013 0.01971 0.00746 0.014 0.0292 0.02052 0.00464 0.00503 0.00554 0.00434 0.0022 0.00194 0.00227 0.00092 0.00079 0.00077 0.00065 0.00133 0.00089 0.00057 0.00041 0.00041 0.00055 0.00038 0.39124

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.012 0.01715 0.02098 0.04285 0.06253 0.23426 0.01892 0.06281 0.47583 1.34325 0.13886 0.05632 0.14508 0.25178 0.19553 0.03125 0.03854 0.04496 0.02582 0.01502 0.01903 0.01592 0.00788 0.00494 0.00518 0.00493 0.00776 0.00616 0.00427 0.0025 0.00324 0.00342 0.00327 3.32223

J-10

J.11. Estimasi Titik DH11 ESTIMASI TITIK

DH11

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

633.654 611.949 480.635 399.224 287.939 199.865 639.879 399.261 217.867 145.798 159.455 286.024 212.002 223.897 329.56 550.023 483.662 418.502 453.259 586.165 591.845 667.235 801.958 960.913 923.717 899.52 753.569 789.497 934.037 1099.67 1057.84 1047.04 1090.71

3.93E-09 4.36E-09 9.01E-09 1.57E-08 4.19E-08 1.25E-07 3.82E-09 1.57E-08 9.67E-08 3.23E-07 2.47E-07 4.27E-08 1.05E-07 8.91E-08 2.79E-08 6.01E-09 8.84E-09 1.36E-08 1.07E-08 4.97E-09 4.82E-09 3.37E-09 1.94E-09 1.13E-09 1.27E-09 1.37E-09 2.34E-09 2.03E-09 1.23E-09 7.52E-10 8.45E-10 8.71E-10 7.71E-10 1.22E-06

0.00323 0.00358 0.0074 0.01291 0.03441 0.10289 0.00314 0.01291 0.07943 0.26505 0.20261 0.03511 0.08621 0.07319 0.02295 0.00494 0.00726 0.01121 0.00882 0.00408 0.00396 0.00277 0.00159 0.00093 0.00104 0.00113 0.00192 0.00167 0.00101 0.00062 0.00069 0.00072 0.00063 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00149 0.00154 0.00407 0.00555 0.01583 0.04013 0.00138 0.00671 0.02939 0.14048 0.09118 0.01474 0.02845 0.02708 0.00826 0.00237 0.00298 0.00471 0.00468 0.00192 0.00139 0.00133 0.00061 0.00048 0.0005 0.00046 0.00102 0.00075 0.00044 0.00032 0.0003 0.00037 0.00024 0.44113

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.01017 0.01169 0.0239 0.04015 0.11183 0.35189 0.01041 0.03898 0.25816 0.86407 0.64229 0.11128 0.29484 0.23347 0.07872 0.01595 0.0228 0.03822 0.02779 0.01309 0.01359 0.00929 0.00518 0.003 0.00338 0.00353 0.00593 0.00519 0.00331 0.00193 0.00235 0.00231 0.00209 3.26077

J-11

J.12. Estimasi Titik DH12 ESTIMASI TITIK

DH12

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

579.211 614.003 383.719 371.712 185.852 210.238 686.706 435.707 298.181 303.488 159.455 223.517 231.225 316.986 457.2 661.892 577.755 468.771 447.654 600.234 650.25 760.76 868.932 1047.49 990.34 937.841 782.171 782.368 942.959 1095.18 1083.62 1099.84 1162.48

5.15E-09 4.32E-09 1.77E-08 1.95E-08 1.56E-07 1.08E-07 3.09E-09 1.21E-08 3.77E-08 3.58E-08 2.47E-07 8.96E-08 8.09E-08 3.14E-08 1.05E-08 3.45E-09 5.19E-09 9.71E-09 1.11E-08 4.62E-09 3.64E-09 2.27E-09 1.52E-09 8.7E-10 1.03E-09 1.21E-09 2.09E-09 2.09E-09 1.19E-09 7.61E-10 7.86E-10 7.52E-10 6.37E-10 9.11E-07

0.00565 0.00474 0.01944 0.02138 0.17107 0.11818 0.00339 0.01328 0.04142 0.03929 0.27086 0.09834 0.08883 0.03448 0.01149 0.00379 0.00569 0.01066 0.01224 0.00508 0.00399 0.00249 0.00167 0.00096 0.00113 0.00133 0.00229 0.00229 0.00131 0.00084 0.00086 0.00083 0.0007 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0026 0.00204 0.01069 0.00919 0.07869 0.04609 0.00149 0.0069 0.01533 0.02082 0.10293 0.0413 0.02931 0.01276 0.00414 0.00182 0.00233 0.00448 0.00649 0.00239 0.0014 0.0012 0.00064 0.0005 0.00054 0.00055 0.00122 0.00103 0.00058 0.00043 0.00037 0.00043 0.00027 0.41093

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.0178 0.01547 0.06278 0.0665 0.55597 0.40417 0.01126 0.04009 0.13462 0.12807 0.92093 0.31174 0.3038 0.10999 0.03941 0.01223 0.01788 0.03635 0.03856 0.0163 0.0137 0.00838 0.00544 0.0031 0.00366 0.00417 0.00709 0.00713 0.0043 0.00262 0.00293 0.00267 0.00231 3.31141

J-12

J.13. Estimasi Titik DH13 ESTIMASI TITIK

DH13

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

794.909 837.291 583.095 595.021 397.363 426.427 901.568 651.519 491.634 410.001 286.024 223.517 127.769 258.07 414.845 563.76 459.344 306.858 235.936 393.544 479.588 626.856 697.379 893.369 815.039 738.976 579.662 562.228 727.178 874.211 874.783 909.628 989.041

1.99E-09 1.7E-09 5.04E-09 4.75E-09 1.59E-08 1.29E-08 1.36E-09 3.62E-09 8.42E-09 1.45E-08 4.27E-08 8.96E-08 4.79E-07 5.82E-08 1.4E-08 5.58E-09 1.03E-08 3.46E-08 7.61E-08 1.64E-08 9.07E-09 4.06E-09 2.95E-09 1.4E-09 1.85E-09 2.48E-09 5.13E-09 5.63E-09 2.6E-09 1.5E-09 1.49E-09 1.33E-09 1.03E-09 9.38E-07

0.00212 0.00182 0.00538 0.00506 0.017 0.01375 0.00146 0.00386 0.00897 0.01547 0.04558 0.0955 0.51128 0.06205 0.01494 0.00595 0.011 0.03691 0.0812 0.0175 0.00967 0.00433 0.00314 0.0015 0.00197 0.00264 0.00548 0.006 0.00277 0.0016 0.00159 0.00142 0.0011 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00098 0.00078 0.00296 0.00218 0.00782 0.00536 0.00064 0.00201 0.00332 0.0082 0.01732 0.04298 0.16872 0.02296 0.00538 0.00286 0.00451 0.0155 0.04304 0.00822 0.00338 0.00208 0.00119 0.00078 0.00095 0.00108 0.0029 0.0027 0.00122 0.00083 0.00069 0.00074 0.00042 0.38468

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00669 0.00592 0.01737 0.01574 0.05524 0.04704 0.00483 0.01165 0.02917 0.05044 0.15496 0.30274 1.74858 0.19793 0.05124 0.01922 0.03455 0.12586 0.25578 0.05616 0.03316 0.01455 0.01022 0.00485 0.00638 0.00827 0.01692 0.01866 0.0091 0.005 0.0054 0.00458 0.00364 3.33182

J-13

J.14. Estimasi Titik DH14 ESTIMASI TITIK

DH14

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

805.001 813.204 614.919 584.23 416.74 394.011 851.469 608.113 429.848 306.751 212.002 231.225 127.769 131.244 289.311 456.465 360.169 237.565 241.58 381.119 419.058 538.677 637.96 820.088 759.226 710.155 557.237 579.142 728.83 890.691 860.976 869.361 931.631

1.92E-09 1.86E-09 4.3E-09 5.01E-09 1.38E-08 1.63E-08 1.62E-09 4.45E-09 1.26E-08 3.46E-08 1.05E-07 8.09E-08 4.79E-07 4.42E-07 4.13E-08 1.05E-08 2.14E-08 7.46E-08 7.09E-08 1.81E-08 1.36E-08 6.4E-09 3.85E-09 1.81E-09 2.29E-09 2.79E-09 5.78E-09 5.15E-09 2.58E-09 1.42E-09 1.57E-09 1.52E-09 1.24E-09 1.49E-06

0.00129 0.00125 0.00288 0.00336 0.00927 0.01097 0.00109 0.00298 0.00844 0.02324 0.07039 0.05425 0.32156 0.29669 0.0277 0.00705 0.01436 0.05003 0.04757 0.01212 0.00911 0.00429 0.00258 0.00122 0.00153 0.00187 0.00388 0.00345 0.00173 0.00095 0.00105 0.00102 0.00083 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00059 0.00054 0.00159 0.00145 0.00426 0.00428 0.00048 0.00155 0.00312 0.01232 0.02675 0.02441 0.13505 0.10977 0.00997 0.00339 0.00589 0.02101 0.02521 0.00569 0.00319 0.00206 0.00098 0.00063 0.00074 0.00077 0.00205 0.00155 0.00076 0.00049 0.00045 0.00053 0.00032 0.41185

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00405 0.00407 0.00932 0.01046 0.03012 0.0375 0.00361 0.00901 0.02745 0.07575 0.23933 0.17199 1.01934 0.94644 0.095 0.02278 0.04508 0.17059 0.14985 0.03889 0.03126 0.01442 0.0084 0.00394 0.00497 0.00586 0.01198 0.01074 0.00568 0.00297 0.00356 0.0033 0.00274 3.22042

J-14

J.15. Estimasi Titik DH15 ESTIMASI TITIK

DH15

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

856.493 831.177 690.072 623.097 491.037 423.745 840.074 611.962 422.734 249.401 223.897 316.986 258.07 131.244 158.417 345.029 264.229 205.139 290.837 390.252 369.899 448.54 578.081 740.249 699.821 681.487 541.893 603.009 731.456 904.204 844.029 824.296 867.111

1.59E-09 1.74E-09 3.04E-09 4.13E-09 8.45E-09 1.31E-08 1.69E-09 4.36E-09 1.32E-08 6.45E-08 8.91E-08 3.14E-08 5.82E-08 4.42E-07 2.52E-07 2.43E-08 5.42E-08 1.16E-07 4.06E-08 1.68E-08 1.98E-08 1.11E-08 5.18E-09 2.47E-09 2.92E-09 3.16E-09 6.28E-09 4.56E-09 2.56E-09 1.35E-09 1.66E-09 1.79E-09 1.53E-09 1.3E-06

0.00122 0.00133 0.00233 0.00317 0.00647 0.01007 0.00129 0.00334 0.01015 0.04941 0.0683 0.02407 0.0446 0.33908 0.19281 0.01866 0.04155 0.0888 0.03116 0.0129 0.01515 0.00849 0.00397 0.00189 0.00224 0.00242 0.00482 0.0035 0.00196 0.00104 0.00127 0.00137 0.00118 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00056 0.00057 0.00128 0.00136 0.00298 0.00393 0.00057 0.00174 0.00375 0.02619 0.02595 0.01083 0.01873 0.1119 0.06941 0.00896 0.01704 0.03729 0.01651 0.00606 0.0053 0.00408 0.00151 0.00098 0.00107 0.00099 0.00255 0.00157 0.00086 0.00054 0.00055 0.00071 0.00045 0.38679

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00384 0.00435 0.00753 0.00985 0.02104 0.03445 0.00429 0.0101 0.03298 0.16109 0.2322 0.07629 0.14138 1.15964 0.66134 0.06028 0.13047 0.30279 0.09815 0.0414 0.05195 0.02854 0.0129 0.00612 0.00725 0.00758 0.01489 0.01087 0.00642 0.00325 0.00432 0.00442 0.00388 3.35587

J-15

J.16. Estimasi Titik DH16 ESTIMASI TITIK

DH16

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

951.803 893.031 810.195 712.956 616.02 516.558 868.678 666.979 479.942 277.973 329.56 457.2 414.845 289.311 158.417 225.887 192.72 253.428 392.94 441.249 353.21 359.138 525.07 651.801 641.237 664.209 549.771 652.113 750.139 929.889 834.945 780.256 796.157

1.16E-09 1.4E-09 1.88E-09 2.76E-09 4.28E-09 7.26E-09 1.53E-09 3.37E-09 9.05E-09 4.66E-08 2.79E-08 1.05E-08 1.4E-08 4.13E-08 2.52E-07 8.68E-08 1.4E-07 6.14E-08 1.65E-08 1.16E-08 2.27E-08 2.16E-08 6.91E-09 3.61E-09 3.79E-09 3.41E-09 6.02E-09 3.61E-09 2.37E-09 1.24E-09 1.72E-09 2.11E-09 1.98E-09 8.22E-07

0.00141 0.00171 0.00229 0.00336 0.00521 0.00883 0.00186 0.0041 0.01101 0.05667 0.03401 0.01274 0.01705 0.05027 0.30617 0.10561 0.17005 0.07478 0.02006 0.01417 0.02762 0.02628 0.00841 0.0044 0.00462 0.00415 0.00733 0.00439 0.00288 0.00151 0.00209 0.00256 0.00241 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00065 0.00073 0.00126 0.00144 0.0024 0.00344 0.00082 0.00213 0.00407 0.03004 0.01292 0.00573 0.00716 0.01659 0.11328 0.05069 0.06972 0.03141 0.01063 0.00666 0.00967 0.01261 0.0032 0.00229 0.00222 0.0017 0.00388 0.00198 0.00127 0.00079 0.0009 0.00133 0.00092 0.41453

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00445 0.00557 0.00739 0.01045 0.01692 0.0302 0.00616 0.01239 0.03578 0.18475 0.11562 0.04037 0.05405 0.17191 0.97668 0.34111 0.53397 0.25501 0.0632 0.04548 0.09475 0.08829 0.02733 0.01424 0.01496 0.013 0.02263 0.01365 0.00946 0.00474 0.00709 0.00828 0.00796 3.23784

J-16

J.17. Estimasi Titik DH17 ESTIMASI TITIK

DH17

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1177.23 1116.65 1028.99 938.587 831.856 741.432 1082.29 890.3 704.827 502.068 550.023 661.892 563.76 456.465 345.029 225.887 112.045 285.603 441.213 404.678 245.165 146.755 334.994 429.707 439.145 503.659 432.552 580.07 628.061 807.194 674.501 586.195 581.251

6.13E-10 7.18E-10 9.18E-10 1.21E-09 1.74E-09 2.45E-09 7.89E-10 1.42E-09 2.86E-09 7.9E-09 6.01E-09 3.45E-09 5.58E-09 1.05E-08 2.43E-08 8.68E-08 7.11E-07 4.29E-08 1.16E-08 1.51E-08 6.79E-08 3.16E-07 2.66E-08 1.26E-08 1.18E-08 7.83E-09 1.24E-08 5.12E-09 4.04E-09 1.9E-09 3.26E-09 4.96E-09 5.09E-09 1.42E-06

0.00043 0.00051 0.00065 0.00085 0.00123 0.00173 0.00056 0.001 0.00201 0.00557 0.00424 0.00243 0.00394 0.00742 0.01717 0.0612 0.50147 0.03028 0.00821 0.01064 0.04787 0.22317 0.01876 0.00889 0.00833 0.00552 0.00872 0.00361 0.00285 0.00134 0.0023 0.0035 0.00359 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0002 0.00022 0.00036 0.00037 0.00056 0.00067 0.00024 0.00052 0.00075 0.00295 0.00161 0.00109 0.00165 0.00245 0.00635 0.02203 0.2056 0.01272 0.00435 0.005 0.01675 0.10712 0.00713 0.00462 0.004 0.00226 0.00462 0.00163 0.00125 0.0007 0.00099 0.00182 0.00136 0.42397

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00136 0.00165 0.00209 0.00265 0.00398 0.00592 0.00185 0.00302 0.00655 0.01817 0.01441 0.00771 0.01248 0.02536 0.05478 0.20991 1.57463 0.10325 0.02587 0.03417 0.16419 0.74986 0.06098 0.0288 0.02699 0.01728 0.02693 0.01124 0.00934 0.0042 0.00779 0.01131 0.01185 3.24058

J-17

J.18. Estimasi Titik DH18 ESTIMASI TITIK

DH18

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1117.16 1075.55 954.231 881.077 755.017 681.602 1059.68 850.882 661.472 463.778 483.662 577.755 459.344 360.169 264.229 192.72 112.045 173.566 329.577 307.002 172.325 184.329 333.264 477.253 451.276 473.888 371.732 499.12 572.787 753.618 645.484 588.011 611.465

7.17E-10 8.04E-10 1.15E-09 1.46E-09 2.32E-09 3.16E-09 8.4E-10 1.62E-09 3.46E-09 1E-08 8.84E-09 5.19E-09 1.03E-08 2.14E-08 5.42E-08 1.4E-07 7.11E-07 1.91E-07 2.79E-08 3.46E-08 1.95E-07 1.6E-07 2.7E-08 9.2E-09 1.09E-08 9.4E-09 1.95E-08 8.04E-09 5.32E-09 2.34E-09 3.72E-09 4.92E-09 4.37E-09 1.69E-06

0.00042 0.00048 0.00068 0.00087 0.00138 0.00187 0.0005 0.00096 0.00204 0.00593 0.00523 0.00307 0.00611 0.01267 0.03208 0.08268 0.42076 0.11319 0.01653 0.02045 0.11565 0.0945 0.01599 0.00544 0.00644 0.00556 0.01152 0.00476 0.00315 0.00138 0.0022 0.00291 0.00259 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0002 0.0002 0.00037 0.00037 0.00063 0.00073 0.00022 0.0005 0.00076 0.00314 0.00199 0.00138 0.00256 0.00418 0.01187 0.02977 0.20196 0.04754 0.00876 0.00961 0.04048 0.04536 0.00608 0.00283 0.00309 0.00228 0.00611 0.00214 0.00139 0.00072 0.00095 0.00151 0.00098 0.44067

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00134 0.00155 0.0022 0.00269 0.00447 0.00639 0.00165 0.0029 0.00665 0.01934 0.01779 0.00973 0.01936 0.04332 0.10234 0.28361 1.35904 0.38598 0.05208 0.06566 0.39669 0.31752 0.05197 0.01764 0.02087 0.01741 0.0356 0.0148 0.01033 0.00433 0.00746 0.0094 0.00854 3.30063

J-18

J.19. Estimasi Titik DH19 ESTIMASI TITIK

DH19

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1038.84 1030.36 852.48 812.288 654.083 615.813 1045.05 814.325 626.235 452.863 418.502 468.771 306.858 237.565 205.139 253.428 285.603 173.566 158.354 192.419 181.497 321.811 400.649 588.392 521.714 481.087 337.179 406.529 526.773 701.046 640.41 633.721 694.395

8.92E-10 9.14E-10 1.61E-09 1.87E-09 3.57E-09 4.28E-09 8.76E-10 1.85E-09 4.07E-09 1.08E-08 1.36E-08 9.71E-09 3.46E-08 7.46E-08 1.16E-07 6.14E-08 4.29E-08 1.91E-07 2.52E-07 1.4E-07 1.67E-07 3E-08 1.55E-08 4.91E-09 7.04E-09 8.98E-09 2.61E-08 1.49E-08 6.84E-09 2.9E-09 3.81E-09 3.93E-09 2.99E-09 1.26E-06

0.00071 0.00072 0.00128 0.00148 0.00283 0.00339 0.00069 0.00147 0.00323 0.00853 0.01081 0.00769 0.02742 0.0591 0.09178 0.04868 0.03401 0.15154 0.19954 0.11122 0.13253 0.02377 0.01232 0.00389 0.00558 0.00712 0.02067 0.01179 0.00542 0.0023 0.00302 0.00311 0.00237 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00033 0.00031 0.0007 0.00064 0.0013 0.00132 0.00031 0.00076 0.00119 0.00452 0.00411 0.00346 0.01152 0.0195 0.03396 0.01752 0.01633 0.06213 0.10575 0.05227 0.04638 0.01141 0.00468 0.00202 0.00268 0.00292 0.01095 0.00531 0.00239 0.0012 0.0013 0.00162 0.0009 0.43169

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00223 0.00236 0.00413 0.0046 0.0092 0.0116 0.0023 0.00443 0.01049 0.02781 0.03675 0.02438 0.08693 0.20211 0.29279 0.16697 0.10986 0.47583 0.62854 0.357 0.45457 0.07988 0.04004 0.0126 0.01808 0.02227 0.06387 0.03668 0.01778 0.0072 0.01023 0.01006 0.00781 3.24137

J-19

J.20. Estimasi Titik DH20 ESTIMASI TITIK

DH20

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1026.09 1051.06 818.478 816.123 629.27 632.261 1093.01 849.342 671.096 530.601 453.259 447.654 235.936 241.58 290.837 392.94 441.213 329.577 158.354 157.927 275.879 454.104 481.269 687.64 593.354 504.279 344.398 338.576 495.308 651.197 639.2 677.751 766.512

9.26E-10 8.61E-10 1.82E-09 1.84E-09 4.01E-09 3.96E-09 7.66E-10 1.63E-09 3.31E-09 6.69E-09 1.07E-08 1.11E-08 7.61E-08 7.09E-08 4.06E-08 1.65E-08 1.16E-08 2.79E-08 2.52E-07 2.54E-07 4.76E-08 1.07E-08 8.97E-09 3.08E-09 4.79E-09 7.8E-09 2.45E-08 2.58E-08 8.23E-09 3.62E-09 3.83E-09 3.21E-09 2.22E-09 9.51E-07

0.00097 0.00091 0.00192 0.00193 0.00422 0.00416 0.0008 0.00172 0.00348 0.00704 0.01129 0.01172 0.08002 0.07454 0.04272 0.01732 0.01224 0.02936 0.26467 0.26682 0.05005 0.01122 0.00943 0.00323 0.00503 0.0082 0.02573 0.02708 0.00865 0.00381 0.00402 0.00338 0.00233 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00045 0.00039 0.00105 0.00083 0.00194 0.00162 0.00035 0.00089 0.00129 0.00373 0.00429 0.00527 0.03361 0.0246 0.01581 0.00624 0.00587 0.01204 0.11116 0.12541 0.01752 0.00539 0.00358 0.00168 0.00241 0.00336 0.01364 0.01219 0.00381 0.00198 0.00173 0.00176 0.00089 0.42676

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00306 0.00295 0.00619 0.00601 0.01371 0.01422 0.00267 0.00518 0.0113 0.02294 0.03837 0.03714 0.25367 0.25494 0.13628 0.05942 0.03952 0.09218 0.90253 0.8565 0.17169 0.03771 0.03064 0.01047 0.0163 0.02565 0.0795 0.08421 0.02837 0.01191 0.01364 0.0109 0.0077 3.28751

J-20

J.21. Estimasi Titik DH21 ESTIMASI TITIK

DH21

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1179.44 1194.07 975.109 964.353 783.901 775.023 1223.3 985.419 801.29 639.641 586.165 600.234 393.544 381.119 390.252 441.249 404.678 307.002 192.419 157.927 175.573 366.602 343.169 554.995 446.878 346.554 186.507 214.245 348.116 515.335 483.508 521.648 617.664

6.09E-10 5.87E-10 1.08E-09 1.12E-09 2.08E-09 2.15E-09 5.46E-10 1.05E-09 1.94E-09 3.82E-09 4.97E-09 4.62E-09 1.64E-08 1.81E-08 1.68E-08 1.16E-08 1.51E-08 3.46E-08 1.4E-07 2.54E-07 1.85E-07 2.03E-08 2.47E-08 5.85E-09 1.12E-08 2.4E-08 1.54E-07 1.02E-07 2.37E-08 7.31E-09 8.85E-09 7.04E-09 4.24E-09 1.11E-06

0.00055 0.00053 0.00097 0.00101 0.00187 0.00194 0.00049 0.00094 0.00175 0.00344 0.00448 0.00417 0.01479 0.01628 0.01517 0.01049 0.0136 0.03116 0.12654 0.22888 0.16657 0.0183 0.02231 0.00527 0.0101 0.02166 0.13896 0.09167 0.02137 0.00659 0.00798 0.00635 0.00383 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00025 0.00023 0.00053 0.00043 0.00086 0.00076 0.00022 0.00049 0.00065 0.00183 0.0017 0.00188 0.00621 0.00537 0.00561 0.00378 0.00653 0.01277 0.05315 0.1213 0.0583 0.00878 0.00848 0.00274 0.00485 0.00888 0.07365 0.04125 0.0094 0.00343 0.00343 0.0033 0.00145 0.4525

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00173 0.00173 0.00314 0.00313 0.00608 0.00662 0.00163 0.00285 0.00569 0.01123 0.01522 0.01321 0.04689 0.05569 0.04839 0.03599 0.04394 0.09783 0.4315 0.72096 0.57133 0.06148 0.0725 0.01709 0.03273 0.0678 0.42938 0.2851 0.07009 0.02062 0.02704 0.02051 0.01262 3.24174

J-21

J.22. Estimasi Titik DH22 ESTIMASI TITIK

DH22

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1218.28 1201.07 1033.97 989.275 835.456 791.154 1203 980.987 791.137 604.293 591.845 650.25 479.588 419.058 369.899 353.21 245.165 172.325 181.497 275.879 175.573 191.314 219.584 415.377 340.262 315.357 199.542 335 400.746 581.532 483.663 455.33 513.249

5.53E-10 5.77E-10 9.05E-10 1.03E-09 1.71E-09 2.02E-09 5.74E-10 1.06E-09 2.02E-09 4.53E-09 4.82E-09 3.64E-09 9.07E-09 1.36E-08 1.98E-08 2.27E-08 6.79E-08 1.95E-07 1.67E-07 4.76E-08 1.85E-07 1.43E-07 9.44E-08 1.4E-08 2.54E-08 3.19E-08 1.26E-07 2.66E-08 1.55E-08 5.08E-09 8.84E-09 1.06E-08 7.4E-09 1.26E-06

0.00044 0.00046 0.00072 0.00082 0.00136 0.0016 0.00046 0.00084 0.0016 0.0036 0.00383 0.00289 0.0072 0.01079 0.01568 0.01801 0.05386 0.1551 0.13276 0.0378 0.14665 0.11335 0.07497 0.01108 0.02015 0.02531 0.0999 0.02111 0.01233 0.00404 0.00702 0.00841 0.00587 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0002 0.0002 0.00039 0.00035 0.00063 0.00063 0.0002 0.00044 0.00059 0.00191 0.00145 0.0013 0.00302 0.00356 0.0058 0.00648 0.02585 0.06359 0.05576 0.02004 0.06893 0.05441 0.02849 0.00576 0.00967 0.01038 0.05295 0.0095 0.00543 0.0021 0.00302 0.00437 0.00223 0.44962

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00138 0.00149 0.00232 0.00255 0.00442 0.00548 0.00151 0.00254 0.00521 0.01173 0.01302 0.00915 0.02281 0.03689 0.05003 0.06178 0.17398 0.48703 0.45271 0.11908 0.47076 0.38087 0.24364 0.03588 0.06528 0.07922 0.30869 0.06566 0.04045 0.01263 0.02378 0.02716 0.01937 3.23851

J-22

J.23. Estimasi Titik DH23 ESTIMASI TITIK

DH23

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1300.24 1251.75 1138.45 1063.34 939.136 864.197 1224.77 1025.91 838.01 636.94 667.235 760.76 626.856 538.677 448.54 359.138 146.755 184.329 321.811 454.104 366.602 191.314 192.421 294.491 292.412 370.984 331.958 498.654 512.851 687.029 538.358 440.005 437.824

4.55E-10 5.1E-10 6.78E-10 8.32E-10 1.21E-09 1.55E-09 5.44E-10 9.26E-10 1.7E-09 3.87E-09 3.37E-09 2.27E-09 4.06E-09 6.4E-09 1.11E-08 2.16E-08 3.16E-07 1.6E-07 3E-08 1.07E-08 2.03E-08 1.43E-07 1.4E-07 3.92E-08 4E-08 1.96E-08 2.73E-08 8.06E-09 7.41E-09 3.08E-09 6.41E-09 1.17E-08 1.19E-08 1.06E-06

0.00043 0.00048 0.00064 0.00079 0.00114 0.00147 0.00052 0.00088 0.00161 0.00366 0.00319 0.00215 0.00384 0.00606 0.01049 0.02044 0.29963 0.15121 0.02842 0.01011 0.01922 0.13524 0.13292 0.03708 0.03788 0.01855 0.02589 0.00764 0.00702 0.00292 0.00607 0.01112 0.01128 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.0002 0.00021 0.00035 0.00034 0.00053 0.00057 0.00023 0.00046 0.0006 0.00194 0.00121 0.00097 0.00161 0.002 0.00388 0.00736 0.14382 0.062 0.01193 0.00536 0.00903 0.04734 0.05051 0.01928 0.01818 0.0076 0.01372 0.00344 0.00309 0.00152 0.00261 0.00578 0.00429 0.43196

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00136 0.00157 0.00207 0.00245 0.00372 0.00502 0.00171 0.00265 0.00523 0.01195 0.01084 0.00682 0.01219 0.02072 0.03348 0.07012 0.9678 0.4748 0.0969 0.03186 0.0617 0.46389 0.432 0.12014 0.12272 0.05805 0.08 0.02375 0.02303 0.00914 0.02058 0.03591 0.03724 3.25139

J-23

J.24. Estimasi Titik DH24 ESTIMASI TITIK

DH24

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1432.86 1404.95 1252.59 1201.06 1053.66 1001.82 1392.94 1181.62 991.642 796.357 801.958 868.932 697.379 637.96 578.081 525.07 334.994 333.264 400.649 481.269 343.169 219.584 192.421 212.474 122.004 186.55 213.19 386.939 347.922 510.824 347.852 255.409 293.748

3.4E-10 3.61E-10 5.09E-10 5.77E-10 8.55E-10 9.95E-10 3.7E-10 6.06E-10 1.03E-09 1.98E-09 1.94E-09 1.52E-09 2.95E-09 3.85E-09 5.18E-09 6.91E-09 2.66E-08 2.7E-08 1.55E-08 8.97E-09 2.47E-08 9.44E-08 1.4E-07 1.04E-07 5.51E-07 1.54E-07 1.03E-07 1.73E-08 2.37E-08 7.5E-09 2.38E-08 6E-08 3.95E-08 1.45E-06

0.00023 0.00025 0.00035 0.0004 0.00059 0.00069 0.00025 0.00042 0.00071 0.00136 0.00134 0.00105 0.00203 0.00265 0.00357 0.00476 0.01833 0.01861 0.01071 0.00618 0.01705 0.06507 0.0967 0.07182 0.37936 0.10612 0.0711 0.01189 0.01636 0.00517 0.01637 0.04135 0.02718 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00011 0.00011 0.00019 0.00017 0.00027 0.00027 0.00011 0.00022 0.00026 0.00072 0.00051 0.00047 0.00085 0.00088 0.00132 0.00171 0.0088 0.00763 0.0045 0.00328 0.00801 0.02277 0.04641 0.03735 0.18209 0.04351 0.03768 0.00535 0.0072 0.00269 0.00704 0.0215 0.01033 0.46431

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00074 0.00081 0.00113 0.00124 0.00191 0.00234 0.00085 0.00126 0.0023 0.00445 0.00454 0.00333 0.00644 0.00907 0.01138 0.01632 0.05919 0.05844 0.03653 0.01947 0.05472 0.22319 0.3249 0.2327 1.22912 0.33215 0.2197 0.03698 0.05365 0.01618 0.05549 0.13356 0.08969 3.24377

J-24

J.25. Estimasi Titik DH25 ESTIMASI TITIK

DH25

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1594.32 1544.81 1428.37 1357.73 1228.74 1158.47 1511.27 1318.67 1131.58 929.731 960.913 1047.49 893.369 820.088 740.249 651.801 429.707 477.253 588.392 687.64 554.995 415.377 294.491 212.474 147.648 327.951 417.163 583.415 501.423 629.414 428.803 254.443 167.263

2.47E-10 2.71E-10 3.43E-10 4E-10 5.39E-10 6.43E-10 2.9E-10 4.36E-10 6.9E-10 1.24E-09 1.13E-09 8.7E-10 1.4E-09 1.81E-09 2.47E-09 3.61E-09 1.26E-08 9.2E-09 4.91E-09 3.08E-09 5.85E-09 1.4E-08 3.92E-08 1.04E-07 3.11E-07 2.84E-08 1.38E-08 5.04E-09 7.93E-09 4.01E-09 1.27E-08 6.07E-08 2.14E-07 8.66E-07

0.00028 0.00031 0.0004 0.00046 0.00062 0.00074 0.00033 0.0005 0.0008 0.00144 0.0013 0.001 0.00162 0.00209 0.00285 0.00417 0.01455 0.01062 0.00567 0.00355 0.00675 0.01611 0.0452 0.12035 0.35865 0.03273 0.0159 0.00581 0.00916 0.00463 0.01464 0.07008 0.24669 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00013 0.00013 0.00022 0.0002 0.00029 0.00029 0.00015 0.00026 0.00029 0.00076 0.00049 0.00045 0.00068 0.00069 0.00105 0.0015 0.00698 0.00435 0.00238 0.00188 0.00317 0.00564 0.0217 0.04573 0.17215 0.01342 0.00843 0.00262 0.00403 0.00241 0.0063 0.03644 0.09374 0.43896

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.0009 0.00102 0.00128 0.00143 0.00202 0.00254 0.00111 0.00152 0.00259 0.00468 0.00442 0.00318 0.00513 0.00716 0.00908 0.0143 0.04699 0.03335 0.01932 0.01118 0.02168 0.05525 0.15187 0.39113 1.16201 0.10244 0.04914 0.01808 0.03003 0.01449 0.04963 0.22635 0.81407 3.25939

J-25

J.26. Estimasi Titik DH26 ESTIMASI TITIK

DH26

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1554.85 1525.41 1374.05 1322.88 1175.28 1123.56 1509.91 1301.53 1111.73 915.052 923.717 990.34 815.039 759.226 699.821 641.237 439.145 451.276 521.714 593.354 446.878 340.262 292.412 122.004 147.648 180.422 286.295 443.298 353.787 487.198 294.061 150.336 174.003

2.66E-10 2.82E-10 3.85E-10 4.32E-10 6.16E-10 7.05E-10 2.91E-10 4.54E-10 7.28E-10 1.31E-09 1.27E-09 1.03E-09 1.85E-09 2.29E-09 2.92E-09 3.79E-09 1.18E-08 1.09E-08 7.04E-09 4.79E-09 1.12E-08 2.54E-08 4E-08 5.51E-07 3.11E-07 1.7E-07 4.26E-08 1.15E-08 2.26E-08 8.65E-09 3.93E-08 2.94E-07 1.9E-07 1.77E-06

0.00015 0.00016 0.00022 0.00024 0.00035 0.0004 0.00016 0.00026 0.00041 0.00074 0.00072 0.00058 0.00104 0.00129 0.00165 0.00214 0.00667 0.00615 0.00398 0.0027 0.00633 0.01434 0.0226 0.31109 0.17552 0.09619 0.02407 0.00649 0.01276 0.00489 0.02222 0.16627 0.10723 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

6.9E-05 6.8E-05 0.00012 0.0001 0.00016 0.00016 7.2E-05 0.00013 0.00015 0.00039 0.00027 0.00026 0.00044 0.00043 0.00061 0.00077 0.0032 0.00252 0.00167 0.00143 0.00298 0.00502 0.01085 0.11821 0.09127 0.03944 0.01276 0.00292 0.00561 0.00254 0.00955 0.08646 0.04075 0.44139

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00047 0.00052 0.0007 0.00076 0.00113 0.00136 0.00054 0.00077 0.00134 0.0024 0.00244 0.00184 0.00331 0.00441 0.00526 0.00735 0.02155 0.0193 0.01357 0.00852 0.02032 0.04919 0.07592 1.01103 0.56868 0.30108 0.07439 0.02017 0.04185 0.01529 0.07532 0.53705 0.35388 3.24171

J-26

J.27. Estimasi Titik DH27 ESTIMASI TITIK

DH27

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1515.1 1511.18 1317.59 1292.21 1123.3 1096.71 1518.06 1293.43 1104.13 919.556 899.52 937.841 738.976 710.155 681.487 664.209 503.659 473.888 481.087 504.279 346.554 315.357 370.984 186.55 327.951 180.422 160.253 277.498 174.244 325.038 172.047 181.497 308.598

2.88E-10 2.9E-10 4.37E-10 4.63E-10 7.06E-10 7.58E-10 2.86E-10 4.62E-10 7.43E-10 1.29E-09 1.37E-09 1.21E-09 2.48E-09 2.79E-09 3.16E-09 3.41E-09 7.83E-09 9.4E-09 8.98E-09 7.8E-09 2.4E-08 3.19E-08 1.96E-08 1.54E-07 2.84E-08 1.7E-07 2.43E-07 4.68E-08 1.89E-07 2.91E-08 1.96E-07 1.67E-07 3.4E-08 1.39E-06

0.00021 0.00021 0.00031 0.00033 0.00051 0.00055 0.00021 0.00033 0.00054 0.00093 0.00099 0.00087 0.00179 0.00201 0.00228 0.00246 0.00564 0.00677 0.00647 0.00562 0.01731 0.02297 0.01411 0.11098 0.02043 0.12268 0.17508 0.03372 0.1362 0.02098 0.14148 0.12052 0.02452 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

9.5E-05 9E-05 0.00017 0.00014 0.00023 0.00021 9.1E-05 0.00017 0.0002 0.00049 0.00038 0.00039 0.00075 0.00066 0.00084 0.00089 0.00271 0.00278 0.00272 0.00298 0.00814 0.00804 0.00677 0.04217 0.01062 0.05889 0.09279 0.01517 0.05993 0.01091 0.06084 0.06267 0.00932 0.46325

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00065 0.00068 0.00102 0.00104 0.00165 0.00187 0.00068 0.00101 0.00174 0.00302 0.00337 0.00277 0.00566 0.00688 0.00726 0.00843 0.01822 0.02126 0.02207 0.0177 0.05557 0.0788 0.04742 0.3607 0.06619 0.39749 0.54099 0.10486 0.44673 0.06567 0.47963 0.38926 0.08091 3.24119

J-27

J.28. Estimasi Titik DH28 ESTIMASI TITIK

DH28

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1360.78 1365.24 1159.93 1141.24 967.019 948.046 1381.96 1151.06 963.361 787.036 753.569 782.171 579.662 557.237 541.893 549.771 432.552 371.732 337.179 344.398 186.507 199.542 331.958 213.19 417.163 286.295 160.253 175.419 201.246 381.996 304.436 338.148 447.234

3.97E-10 3.93E-10 6.41E-10 6.73E-10 1.11E-09 1.17E-09 3.79E-10 6.56E-10 1.12E-09 2.05E-09 2.34E-09 2.09E-09 5.13E-09 5.78E-09 6.28E-09 6.02E-09 1.24E-08 1.95E-08 2.61E-08 2.45E-08 1.54E-07 1.26E-07 2.73E-08 1.03E-07 1.38E-08 4.26E-08 2.43E-07 1.85E-07 1.23E-07 1.79E-08 3.54E-08 2.59E-08 1.12E-08 1.23E-06

0.00032 0.00032 0.00052 0.00055 0.0009 0.00096 0.00031 0.00053 0.00091 0.00167 0.0019 0.0017 0.00418 0.00471 0.00512 0.00491 0.01007 0.01587 0.02126 0.01995 0.12563 0.10259 0.02228 0.08412 0.01123 0.03473 0.19805 0.15099 0.1 0.01462 0.02889 0.02108 0.00911 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 45.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00015 0.00014 0.00029 0.00024 0.00041 0.00037 0.00014 0.00028 0.00034 0.00089 0.00072 0.00077 0.00176 0.00155 0.0019 0.00177 0.00483 0.00651 0.00893 0.01058 0.05905 0.0359 0.01069 0.03196 0.00584 0.01667 0.0812 0.06795 0.044 0.0076 0.01242 0.01096 0.00346 0.43026

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 311.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00102 0.00104 0.00169 0.00171 0.00293 0.00327 0.00103 0.00161 0.00296 0.00545 0.00648 0.0054 0.01327 0.01611 0.01634 0.01682 0.03253 0.04982 0.0725 0.06285 0.40328 0.35187 0.07486 0.27338 0.03638 0.11254 0.61989 0.46959 0.328 0.04577 0.09793 0.06809 0.03007 3.22646

J-28

J.29. Estimasi Titik DH29 ESTIMASI TITIK

DH29

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1357.07 1389.48 1141.31 1153 959.563 970.824 1429.16 1187.25 1006.72 852.036 789.497 782.368 562.228 579.142 603.009 652.113 580.07 499.12 406.529 338.576 214.245 335 498.654 386.939 583.415 443.298 277.498 175.419 175.932 313.026 343.052 452.747 586.08

4E-10 3.73E-10 6.73E-10 6.52E-10 1.13E-09 1.09E-09 3.43E-10 5.98E-10 9.8E-10 1.62E-09 2.03E-09 2.09E-09 5.63E-09 5.15E-09 4.56E-09 3.61E-09 5.12E-09 8.04E-09 1.49E-08 2.58E-08 1.02E-07 2.66E-08 8.06E-09 1.73E-08 5.04E-09 1.15E-08 4.68E-08 1.85E-07 1.84E-07 3.26E-08 2.48E-08 1.08E-08 4.97E-09 7.44E-07

0.00054 0.0005 0.0009 0.00088 0.00152 0.00147 0.00046 0.0008 0.00132 0.00217 0.00273 0.00281 0.00757 0.00692 0.00613 0.00485 0.00689 0.01081 0.02001 0.03465 0.13674 0.03577 0.01084 0.02321 0.00677 0.01544 0.06293 0.24911 0.24694 0.04384 0.03331 0.01449 0.00668 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 44.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00025 0.00022 0.0005 0.00038 0.0007 0.00057 0.0002 0.00042 0.00049 0.00115 0.00104 0.00126 0.00318 0.00228 0.00227 0.00175 0.00331 0.00443 0.00841 0.01836 0.06427 0.01252 0.00521 0.00882 0.00352 0.00741 0.0258 0.13203 0.10865 0.0228 0.01432 0.00753 0.00254 0.46657

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 328.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00169 0.00163 0.00292 0.00273 0.00495 0.00503 0.00153 0.00243 0.00428 0.00709 0.00929 0.0089 0.02399 0.02368 0.01956 0.01663 0.02225 0.03396 0.06825 0.10913 0.43893 0.12268 0.03644 0.07544 0.02194 0.05001 0.19696 0.76974 0.80995 0.13722 0.11291 0.0468 0.02204 3.21099

J-29

J.30. Estimasi Titik DH30 ESTIMASI TITIK

DH30

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1520.99 1542.01 1309.44 1310.53 1123.71 1122.84 1569.55 1333.28 1148.25 979.605 934.037 942.959 727.178 728.83 731.456 750.139 628.061 572.787 526.773 495.308 348.116 400.746 512.851 347.922 501.423 353.787 174.244 201.246 175.932 180.834 170.179 312.416 459.933

2.84E-10 2.73E-10 4.45E-10 4.44E-10 7.05E-10 7.06E-10 2.59E-10 4.22E-10 6.61E-10 1.06E-09 1.23E-09 1.19E-09 2.6E-09 2.58E-09 2.56E-09 2.37E-09 4.04E-09 5.32E-09 6.84E-09 8.23E-09 2.37E-08 1.55E-08 7.41E-09 2.37E-08 7.93E-09 2.26E-08 1.89E-07 1.23E-07 1.84E-07 1.69E-07 2.03E-07 3.28E-08 1.03E-08 1.05E-06

0.00027 0.00026 0.00042 0.00042 0.00067 0.00067 0.00025 0.0004 0.00063 0.00101 0.00116 0.00113 0.00247 0.00245 0.00243 0.00225 0.00383 0.00505 0.00649 0.00781 0.0225 0.01475 0.00704 0.02254 0.00753 0.02143 0.17942 0.11645 0.1743 0.16051 0.19258 0.03113 0.00976 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 52.0% 43.0% 52.0% 38.0% Z(v)_G

0.00012 0.00011 0.00023 0.00018 0.00031 0.00026 0.00011 0.00021 0.00023 0.00054 0.00044 0.00051 0.00104 0.00081 0.0009 0.00081 0.00184 0.00207 0.00273 0.00414 0.01057 0.00516 0.00338 0.00856 0.00391 0.01029 0.07356 0.06172 0.07844 0.08346 0.08281 0.01619 0.00371 0.45935

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 313.0% 339.0% 323.0% 330.0% Z(v)_B

0.00085 0.00084 0.00137 0.00131 0.00217 0.00229 0.00081 0.00121 0.00204 0.00329 0.00396 0.00359 0.00782 0.00838 0.00774 0.00771 0.01237 0.01586 0.02214 0.0246 0.07222 0.05059 0.02364 0.07324 0.02439 0.06945 0.56157 0.35984 0.54208 0.50239 0.65285 0.10054 0.03219 3.19539

J-30

J.31. Estimasi Titik DH31 ESTIMASI TITIK

DH31

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1668.46 1702.25 1450.04 1466 1271.21 1283.37 1738.25 1498.38 1315.96 1153.36 1099.67 1095.18 874.211 890.691 904.204 929.889 807.194 753.618 701.046 651.197 515.335 581.532 687.029 510.824 629.414 487.198 325.038 381.996 313.026 180.834 207.966 395.349 545.576

2.15E-10 2.03E-10 3.28E-10 3.17E-10 4.87E-10 4.73E-10 1.9E-10 2.97E-10 4.39E-10 6.52E-10 7.52E-10 7.61E-10 1.5E-09 1.42E-09 1.35E-09 1.24E-09 1.9E-09 2.34E-09 2.9E-09 3.62E-09 7.31E-09 5.08E-09 3.08E-09 7.5E-09 4.01E-09 8.65E-09 2.91E-08 1.79E-08 3.26E-08 1.69E-07 1.11E-07 1.62E-08 6.16E-09 4.39E-07

0.00049 0.00046 0.00075 0.00072 0.00111 0.00108 0.00043 0.00068 0.001 0.00148 0.00171 0.00173 0.00341 0.00322 0.00308 0.00283 0.00433 0.00532 0.00661 0.00824 0.01663 0.01157 0.00702 0.01708 0.00913 0.01968 0.06629 0.04084 0.07421 0.38494 0.25308 0.03684 0.01402 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 43.0% 52.0% 38.0% Z(v)_G

0.00023 0.0002 0.00041 0.00031 0.00051 0.00042 0.00019 0.00035 0.00037 0.00079 0.00065 0.00078 0.00143 0.00106 0.00114 0.00102 0.00208 0.00218 0.00277 0.00437 0.00782 0.00405 0.00337 0.00649 0.00475 0.00945 0.02718 0.02164 0.0334 0.16937 0.10882 0.01916 0.00533 0.44207

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 339.0% 323.0% 330.0% Z(v)_B

0.00154 0.0015 0.00241 0.00225 0.0036 0.00368 0.00144 0.00204 0.00325 0.00484 0.00582 0.00549 0.0108 0.01102 0.00982 0.00971 0.01398 0.0167 0.02253 0.02597 0.05339 0.0397 0.02359 0.0555 0.02958 0.06378 0.20748 0.12619 0.23081 1.26259 0.85793 0.11898 0.04626 3.27416

J-31

J.32. Estimasi Titik DH32 ESTIMASI TITIK

DH32

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1662.79 1669.62 1457.67 1445.19 1267.39 1252.46 1683.29 1454.73 1266.44 1085.98 1057.84 1083.62 874.783 860.976 844.029 834.945 674.501 645.484 640.41 639.2 483.508 483.663 538.358 347.852 428.803 294.061 172.047 304.436 343.052 170.179 207.966 187.459 337.747

2.18E-10 2.15E-10 3.23E-10 3.31E-10 4.91E-10 5.09E-10 2.1E-10 3.25E-10 4.92E-10 7.81E-10 8.45E-10 7.86E-10 1.49E-09 1.57E-09 1.66E-09 1.72E-09 3.26E-09 3.72E-09 3.81E-09 3.83E-09 8.85E-09 8.84E-09 6.41E-09 2.38E-08 1.27E-08 3.93E-08 1.96E-07 3.54E-08 2.48E-08 2.03E-07 1.11E-07 1.52E-07 2.6E-08 8.75E-07

0.00025 0.00025 0.00037 0.00038 0.00056 0.00058 0.00024 0.00037 0.00056 0.00089 0.00097 0.0009 0.00171 0.00179 0.0019 0.00196 0.00372 0.00425 0.00435 0.00438 0.01011 0.0101 0.00733 0.02716 0.0145 0.04495 0.22445 0.04051 0.02831 0.23192 0.12708 0.17352 0.02967 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 52.0% 38.0% Z(v)_G

0.00011 0.00011 0.0002 0.00016 0.00026 0.00023 0.00011 0.00019 0.00021 0.00047 0.00037 0.0004 0.00072 0.00059 0.0007 0.00071 0.00179 0.00174 0.00183 0.00232 0.00475 0.00354 0.00352 0.01032 0.00754 0.02158 0.09203 0.02147 0.01274 0.10205 0.06608 0.09023 0.01127 0.46033

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 323.0% 330.0% Z(v)_B

0.00078 0.0008 0.00119 0.00118 0.00182 0.00199 0.0008 0.00112 0.00183 0.00291 0.00328 0.00285 0.00541 0.00613 0.00606 0.00674 0.01203 0.01335 0.01484 0.01379 0.03246 0.03465 0.02461 0.08826 0.04697 0.14565 0.70254 0.12518 0.08805 0.76071 0.39777 0.56046 0.0979 3.20412

J-32

J.33. Estimasi Titik DH33 ESTIMASI TITIK

DH33

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1672.55 1654.71 1482.4 1444.56 1285.68 1246.47 1647.39 1432.83 1242.71 1049.75 1047.04 1099.84 909.628 869.361 824.296 780.256 586.195 588.011 633.721 677.751 521.648 455.33 440.005 255.409 254.443 150.336 181.497 338.148 452.747 312.416 395.349 187.459 151.822

2.14E-10 2.21E-10 3.07E-10 3.32E-10 4.71E-10 5.16E-10 2.24E-10 3.4E-10 5.21E-10 8.64E-10 8.71E-10 7.52E-10 1.33E-09 1.52E-09 1.79E-09 2.11E-09 4.96E-09 4.92E-09 3.93E-09 3.21E-09 7.04E-09 1.06E-08 1.17E-08 6E-08 6.07E-08 2.94E-07 1.67E-07 2.59E-08 1.08E-08 3.28E-08 1.62E-08 1.52E-07 2.86E-07 1.16E-06

0.00018 0.00019 0.00026 0.00028 0.0004 0.00044 0.00019 0.00029 0.00045 0.00074 0.00075 0.00065 0.00114 0.00131 0.00153 0.00181 0.00426 0.00422 0.00337 0.00276 0.00605 0.0091 0.01008 0.05155 0.05214 0.25279 0.14366 0.02221 0.00926 0.02817 0.0139 0.13039 0.24544 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 38.0% Z(v)_G

8.4E-05 8.2E-05 0.00015 0.00012 0.00019 0.00017 8.5E-05 0.00015 0.00017 0.00039 0.00028 0.00029 0.00048 0.00043 0.00057 0.00065 0.00205 0.00173 0.00142 0.00146 0.00284 0.00318 0.00484 0.01959 0.02711 0.12134 0.0589 0.01177 0.00416 0.01239 0.00723 0.05607 0.09327 0.43366

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 330.0% Z(v)_B

0.00058 0.00062 0.00085 0.00089 0.00131 0.00152 0.00064 0.00088 0.00145 0.00242 0.00254 0.00205 0.00362 0.00447 0.00489 0.0062 0.01377 0.01327 0.01151 0.00869 0.01942 0.03121 0.03388 0.16754 0.16894 0.81905 0.44967 0.06864 0.02878 0.09239 0.04351 0.44201 0.80996 3.25718

J-33

J.34. Estimasi Titik DH34 ESTIMASI TITIK

DH34

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1723.46 1686.78 1546.05 1489.82 1346.95 1290.23 1662.54 1461.62 1272.65 1073.18 1090.71 1162.48 989.041 931.631 867.111 796.157 581.251 611.465 694.395 766.512 617.664 513.249 437.824 293.748 167.263 174.003 308.598 447.234 586.08 459.933 545.576 337.747 151.822

1.95E-10 2.08E-10 2.71E-10 3.02E-10 4.09E-10 4.66E-10 2.18E-10 3.2E-10 4.85E-10 8.09E-10 7.71E-10 6.37E-10 1.03E-09 1.24E-09 1.53E-09 1.98E-09 5.09E-09 4.37E-09 2.99E-09 2.22E-09 4.24E-09 7.4E-09 1.19E-08 3.95E-08 2.14E-07 1.9E-07 3.4E-08 1.12E-08 4.97E-09 1.03E-08 6.16E-09 2.6E-08 2.86E-07 8.7E-07

0.00022 0.00024 0.00031 0.00035 0.00047 0.00053 0.00025 0.00037 0.00056 0.00093 0.00089 0.00073 0.00119 0.00142 0.00176 0.00228 0.00585 0.00503 0.00343 0.00255 0.00488 0.0085 0.01369 0.04533 0.24552 0.21808 0.03909 0.01284 0.00571 0.01181 0.00707 0.02982 0.32831 1

46.0% 43.0% 55.0% 43.0% 46.0% 39.0% 44.0% 52.0% 37.0% 53.0% 38.0% 45.0% 42.0% 33.0% 37.0% 36.0% 48.0% 41.0% 42.0% 53.0% 47.0% 35.0% 48.0% 38.0% 52.0% 48.0% 41.0% 53.0% 45.0% 44.0% 52.0% 43.0% 52.0% Z(v)_G

0.0001 0.0001 0.00017 0.00015 0.00022 0.00021 0.00011 0.00019 0.00021 0.00049 0.00034 0.00033 0.0005 0.00047 0.00065 0.00082 0.00281 0.00206 0.00144 0.00135 0.00229 0.00297 0.00657 0.01722 0.12767 0.10468 0.01603 0.00681 0.00257 0.0052 0.00368 0.01282 0.17072 0.49195

315.0% 326.0% 323.0% 311.0% 325.0% 342.0% 332.0% 302.0% 325.0% 326.0% 340.0% 317.0% 317.0% 342.0% 319.0% 343.0% 323.0% 314.0% 341.0% 315.0% 321.0% 343.0% 336.0% 325.0% 324.0% 324.0% 313.0% 309.0% 311.0% 328.0% 313.0% 339.0% 323.0% Z(v)_B

0.00071 0.00078 0.001 0.00108 0.00153 0.00183 0.00083 0.00111 0.00181 0.00303 0.00301 0.00232 0.00376 0.00486 0.00562 0.00781 0.0189 0.01578 0.0117 0.00804 0.01565 0.02915 0.046 0.14731 0.79548 0.70658 0.12236 0.03969 0.01775 0.03873 0.02214 0.10109 1.06043 3.23788

J-34

LAMPIRAN K ESTIMASI KADAR MENGGUNAKAN METODE IDC

K.1. Estimasi Titik DH1 ESTIMASI TITIK

DH1

TERHADAP TITIK DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 234.438 239.209 397.555 436.285 406.972 345.08 488.079 685.018 633.654 579.211 794.909 805.001 856.493 951.803 1177.23 1117.16 1038.84 1026.09 1179.44 1218.28 1300.24 1432.86 1594.32 1554.85 1515.1 1360.78 1357.07 1520.99 1668.46 1662.79 1672.55 1723.46

9.5E-08 7.76E-08 7.31E-08 1.59E-08 1.2E-08 1.48E-08 2.43E-08 8.6E-09 3.11E-09 3.93E-09 5.15E-09 1.99E-09 1.92E-09 1.59E-09 1.16E-09 6.13E-10 7.17E-10 8.92E-10 9.26E-10 6.09E-10 5.53E-10 4.55E-10 3.4E-10 2.47E-10 2.66E-10 2.88E-10 3.97E-10 4E-10 2.84E-10 2.15E-10 2.18E-10 2.14E-10 1.95E-10 3.48E-07

0.27297 0.22296 0.20988 0.04572 0.03459 0.04262 0.06991 0.02471 0.00894 0.01129 0.01478 0.00572 0.00551 0.00457 0.00333 0.00176 0.00206 0.00256 0.00266 0.00175 0.00159 0.00131 0.00098 0.00071 0.00076 0.00083 0.00114 0.00115 0.00082 0.00062 0.00062 0.00061 0.00056 1

51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.13976 0.10724 0.11208 0.02277 0.0182 0.0214 0.0374 0.01332 0.00475 0.00596 0.00789 0.00304 0.0029 0.00245 0.00174 0.00093 0.00102 0.00136 0.00131 0.00093 0.00083 0.00069 0.00052 0.00037 0.0004 0.00043 0.00061 0.00063 0.00044 0.00034 0.00033 0.00032 0.0003 0.51266

41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.11246 0.08673 0.09256 0.02021 0.01616 0.01871 0.02908 0.01142 0.00374 0.00514 0.00686 0.00253 0.00238 0.00211 0.00146 0.00082 0.00092 0.00121 0.00112 0.00082 0.00074 0.0006 0.00046 0.00033 0.00035 0.00036 0.00054 0.00052 0.00037 0.00028 0.00029 0.00029 0.00026 0.42182

K-1

K.2. Estimasi Titik DH2 ESTIMASI TITIK

DH2

TERHADAP TITIK DH1 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

219.146 382.539 247.681 464.613 419.237 188.152 226.374 414.121 615.081 611.949 614.003 837.291 813.204 831.177 893.031 1116.65 1075.55 1030.36 1051.06 1194.07 1201.07 1251.75 1404.95 1544.81 1525.41 1511.18 1365.24 1389.48 1542.01 1702.25 1669.62 1654.71 1686.78

9.5E-08 1.79E-08 6.58E-08 9.97E-09 1.36E-08 1.5E-07 8.62E-08 1.41E-08 4.3E-09 4.36E-09 4.32E-09 1.7E-09 1.86E-09 1.74E-09 1.4E-09 7.18E-10 8.04E-10 9.14E-10 8.61E-10 5.87E-10 5.77E-10 5.1E-10 3.61E-10 2.71E-10 2.82E-10 2.9E-10 3.93E-10 3.73E-10 2.73E-10 2.03E-10 2.15E-10 2.21E-10 2.08E-10 4.8E-07

0.19778 0.03718 0.137 0.02075 0.02825 0.31251 0.17944 0.02931 0.00895 0.00908 0.00899 0.00355 0.00387 0.00363 0.00292 0.0015 0.00167 0.0019 0.00179 0.00122 0.0012 0.00106 0.00075 0.00056 0.00059 0.0006 0.00082 0.00078 0.00057 0.00042 0.00045 0.00046 0.00043 1

48.8% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.09652 0.01789 0.07316 0.01034 0.01486 0.15688 0.096 0.0158 0.00476 0.0048 0.0048 0.00189 0.00204 0.00194 0.00153 0.00079 0.00083 0.00101 0.00088 0.00065 0.00063 0.00056 0.0004 0.0003 0.00031 0.00032 0.00044 0.00042 0.0003 0.00023 0.00024 0.00024 0.00023 0.51196

39.5% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.07812 0.01446 0.06042 0.00917 0.01319 0.13719 0.07465 0.01354 0.00375 0.00413 0.00417 0.00157 0.00167 0.00167 0.00128 0.0007 0.00075 0.0009 0.00075 0.00057 0.00056 0.00048 0.00035 0.00026 0.00027 0.00026 0.00039 0.00035 0.00026 0.00019 0.00021 0.00022 0.0002 0.42667

K-2

K.3. Estimasi Titik DH3 ESTIMASI TITIK

DH3

TERHADAP TITIK DH1 DH2 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

234.438 382.539 199.123 199.642 313.56 542.794 363.369 412.146 573.394 480.635 383.719 583.095 614.919 690.072 810.195 1028.99 954.231 852.48 818.478 975.109 1033.97 1138.45 1252.59 1428.37 1374.05 1317.59 1159.93 1141.31 1309.44 1450.04 1457.67 1482.4 1546.05

7.76E-08 1.79E-08 1.27E-07 1.26E-07 3.24E-08 6.25E-09 2.08E-08 1.43E-08 5.3E-09 9.01E-09 1.77E-08 5.04E-09 4.3E-09 3.04E-09 1.88E-09 9.18E-10 1.15E-09 1.61E-09 1.82E-09 1.08E-09 9.05E-10 6.78E-10 5.09E-10 3.43E-10 3.85E-10 4.37E-10 6.41E-10 6.73E-10 4.45E-10 3.28E-10 3.23E-10 3.07E-10 2.71E-10 4.81E-07

0.16144 0.03716 0.26347 0.26142 0.06747 0.01301 0.04336 0.02971 0.01103 0.01873 0.03682 0.01049 0.00895 0.00633 0.00391 0.00191 0.00239 0.00336 0.00379 0.00224 0.00188 0.00141 0.00106 0.00071 0.0008 0.00091 0.00133 0.0014 0.00093 0.00068 0.00067 0.00064 0.00056 1

48.8% 51.2% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.07878 0.01903 0.14069 0.13019 0.03549 0.00653 0.0232 0.01602 0.00587 0.00989 0.01966 0.00558 0.00471 0.00339 0.00205 0.00101 0.00119 0.00178 0.00186 0.00119 0.00098 0.00074 0.00057 0.00037 0.00042 0.00048 0.00071 0.00076 0.00049 0.00037 0.00036 0.00034 0.0003 0.515

39.5% 41.2% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.06377 0.01531 0.11619 0.11555 0.03151 0.00571 0.01804 0.01373 0.00462 0.00852 0.01708 0.00464 0.00386 0.00292 0.00171 0.00089 0.00107 0.00158 0.0016 0.00105 0.00088 0.00064 0.0005 0.00033 0.00036 0.0004 0.00063 0.00064 0.00042 0.00031 0.00031 0.0003 0.00026 0.43534

K-3

K.4. Estimasi Titik DH4 ESTIMASI TITIK

DH4

TERHADAP TITIK DH1 DH2 DH3 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

239.209 247.681 199.123 217.479 199.625 367.185 164.247 253.049 446.252 399.224 371.712 595.021 584.23 623.097 712.956 938.587 881.077 812.288 816.123 964.353 989.275 1063.34 1201.06 1357.73 1322.88 1292.21 1141.24 1153 1310.53 1466 1445.19 1444.56 1489.82

7.31E-08 6.58E-08 1.27E-07 9.72E-08 1.26E-07 2.02E-08 2.26E-07 6.17E-08 1.13E-08 1.57E-08 1.95E-08 4.75E-09 5.01E-09 4.13E-09 2.76E-09 1.21E-09 1.46E-09 1.87E-09 1.84E-09 1.12E-09 1.03E-09 8.32E-10 5.77E-10 4E-10 4.32E-10 4.63E-10 6.73E-10 6.52E-10 4.44E-10 3.17E-10 3.31E-10 3.32E-10 3.02E-10 8.73E-07

0.08364 0.07535 0.14501 0.11131 0.14392 0.02313 0.25839 0.07066 0.01288 0.01799 0.02229 0.00543 0.00574 0.00473 0.00316 0.00138 0.00167 0.00214 0.00211 0.00128 0.00118 0.00095 0.00066 0.00046 0.00049 0.00053 0.00077 0.00075 0.00051 0.00036 0.00038 0.00038 0.00035 1

48.8% 51.2% 48.1% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.04082 0.03858 0.06975 0.05543 0.0757 0.01161 0.13824 0.03808 0.00685 0.0095 0.0119 0.00289 0.00302 0.00254 0.00165 0.00073 0.00083 0.00113 0.00103 0.00068 0.00062 0.0005 0.00035 0.00024 0.00026 0.00028 0.00041 0.00041 0.00027 0.0002 0.0002 0.0002 0.00018 0.51511

39.5% 41.2% 38.9% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.03304 0.03104 0.05641 0.0492 0.06721 0.01015 0.10749 0.03264 0.0054 0.00819 0.01034 0.0024 0.00248 0.00219 0.00138 0.00065 0.00075 0.00101 0.00089 0.0006 0.00055 0.00043 0.00031 0.00021 0.00023 0.00023 0.00036 0.00034 0.00023 0.00017 0.00018 0.00018 0.00016 0.42703

K-4

K.5. Estimasi Titik DH5 ESTIMASI TITIK

DH5

TERHADAP TITIK DH1 DH2 DH3 DH4 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

397.555 464.613 199.642 217.479 165.895 574.345 335.932 284.543 399.249 287.939 185.852 397.363 416.74 491.037 616.02 831.856 755.017 654.083 629.27 783.901 835.456 939.136 1053.66 1228.74 1175.28 1123.3 967.019 959.563 1123.71 1271.21 1267.39 1285.68 1346.95

1.59E-08 9.97E-09 1.26E-07 9.72E-08 2.19E-07 5.28E-09 2.64E-08 4.34E-08 1.57E-08 4.19E-08 1.56E-07 1.59E-08 1.38E-08 8.45E-09 4.28E-09 1.74E-09 2.32E-09 3.57E-09 4.01E-09 2.08E-09 1.71E-09 1.21E-09 8.55E-10 5.39E-10 6.16E-10 7.06E-10 1.11E-09 1.13E-09 7.05E-10 4.87E-10 4.91E-10 4.71E-10 4.09E-10 8.23E-07

0.01934 0.01212 0.15272 0.11814 0.26617 0.00641 0.03206 0.05275 0.0191 0.0509 0.1893 0.01937 0.01679 0.01026 0.0052 0.00211 0.00282 0.00434 0.00488 0.00252 0.00208 0.00147 0.00104 0.00066 0.00075 0.00086 0.00134 0.00138 0.00086 0.00059 0.0006 0.00057 0.0005 1

48.8% 51.2% 48.1% 53.4% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00944 0.0062 0.07346 0.06309 0.14001 0.00322 0.01715 0.02843 0.01016 0.02688 0.10109 0.0103 0.00883 0.0055 0.00272 0.00111 0.0014 0.00231 0.00239 0.00133 0.00109 0.00077 0.00056 0.00034 0.0004 0.00045 0.00072 0.00075 0.00046 0.00032 0.00032 0.0003 0.00027 0.52176

39.5% 41.2% 38.9% 44.1% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00764 0.00499 0.05941 0.0521 0.1243 0.00282 0.01334 0.02437 0.008 0.02316 0.08784 0.00856 0.00725 0.00474 0.00227 0.00099 0.00126 0.00205 0.00205 0.00118 0.00097 0.00067 0.00049 0.0003 0.00034 0.00038 0.00063 0.00062 0.00039 0.00027 0.00028 0.00027 0.00023 0.44416

K-5

K.6. Estimasi Titik DH6 ESTIMASI TITIK

DH6

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

436.285 419.237 313.56 199.625 165.895 476.807 225.878 118.962 261.467 199.865 210.238 426.427 394.011 423.745 516.558 741.432 681.602 615.813 632.261 775.023 791.154 864.197 1001.82 1158.47 1123.56 1096.71 948.046 970.824 1122.84 1283.37 1252.46 1246.47 1290.23

1.2E-08 1.36E-08 3.24E-08 1.26E-07 2.19E-07 9.23E-09 8.68E-08 5.94E-07 5.59E-08 1.25E-07 1.08E-07 1.29E-08 1.63E-08 1.31E-08 7.26E-09 2.45E-09 3.16E-09 4.28E-09 3.96E-09 2.15E-09 2.02E-09 1.55E-09 9.95E-10 6.43E-10 7.05E-10 7.58E-10 1.17E-09 1.09E-09 7.06E-10 4.73E-10 5.09E-10 5.16E-10 4.66E-10 1.46E-06

0.00825 0.0093 0.02223 0.08617 0.15014 0.00632 0.05948 0.40717 0.03835 0.08586 0.07377 0.00884 0.01121 0.00901 0.00497 0.00168 0.00216 0.00294 0.00271 0.00147 0.00138 0.00106 0.00068 0.00044 0.00048 0.00052 0.0008 0.00075 0.00048 0.00032 0.00035 0.00035 0.00032 1

48.8% 51.2% 48.1% 53.4% 49.8% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00403 0.00476 0.01069 0.04601 0.07477 0.00317 0.03182 0.21946 0.0204 0.04533 0.03939 0.0047 0.00589 0.00483 0.0026 0.00089 0.00107 0.00156 0.00133 0.00078 0.00072 0.00056 0.00037 0.00023 0.00026 0.00027 0.00043 0.00041 0.00026 0.00018 0.00019 0.00019 0.00017 0.52773

39.5% 41.2% 38.9% 44.1% 44.2% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00326 0.00383 0.00865 0.038 0.06636 0.00278 0.02474 0.18811 0.01607 0.03907 0.03423 0.00391 0.00484 0.00416 0.00217 0.00079 0.00097 0.00138 0.00114 0.00069 0.00064 0.00048 0.00032 0.0002 0.00022 0.00023 0.00038 0.00034 0.00022 0.00015 0.00016 0.00017 0.00015 0.44882

K-6

K.7. Estimasi Titik DH7 ESTIMASI TITIK

DH7

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

406.972 188.152 542.794 367.185 574.345 476.807 251.002 422.456 598.912 639.879 686.706 901.568 851.469 840.074 868.678 1082.29 1059.68 1045.05 1093.01 1223.3 1203 1224.77 1392.94 1511.27 1509.91 1518.06 1381.96 1429.16 1569.55 1738.25 1683.29 1647.39 1662.54

1.48E-08 1.5E-07 6.25E-09 2.02E-08 5.28E-09 9.23E-09 6.32E-08 1.33E-08 4.65E-09 3.82E-09 3.09E-09 1.36E-09 1.62E-09 1.69E-09 1.53E-09 7.89E-10 8.4E-10 8.76E-10 7.66E-10 5.46E-10 5.74E-10 5.44E-10 3.7E-10 2.9E-10 2.91E-10 2.86E-10 3.79E-10 3.43E-10 2.59E-10 1.9E-10 2.1E-10 2.24E-10 2.18E-10 3.08E-07

0.04814 0.48717 0.02029 0.06555 0.01713 0.02993 0.2052 0.04304 0.0151 0.01239 0.01002 0.00443 0.00526 0.00547 0.00495 0.00256 0.00273 0.00284 0.00249 0.00177 0.00186 0.00177 0.0012 0.00094 0.00094 0.00093 0.00123 0.00111 0.00084 0.00062 0.00068 0.00073 0.00071 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.02349 0.24943 0.00976 0.035 0.00853 0.01575 0.10978 0.0232 0.00804 0.00654 0.00535 0.00236 0.00276 0.00293 0.00259 0.00135 0.00135 0.00151 0.00122 0.00094 0.00097 0.00093 0.00064 0.00049 0.0005 0.00049 0.00066 0.00061 0.00045 0.00034 0.00036 0.00038 0.00038 0.51907

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.01902 0.20071 0.00789 0.02891 0.00757 0.01398 0.08536 0.01988 0.00633 0.00564 0.00465 0.00196 0.00227 0.00253 0.00216 0.0012 0.00122 0.00134 0.00105 0.00083 0.00087 0.00081 0.00056 0.00043 0.00043 0.00041 0.00058 0.0005 0.00038 0.00028 0.00032 0.00034 0.00033 0.42073

K-7

K.8. Estimasi Titik DH8 ESTIMASI TITIK

DH8

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

345.08 226.374 363.369 164.247 335.932 225.878 251.002 190.118 389.012 399.261 435.707 651.519 608.113 611.962 666.979 890.3 850.882 814.325 849.342 985.419 980.987 1025.91 1181.62 1318.67 1301.53 1293.43 1151.06 1187.25 1333.28 1498.38 1454.73 1432.83 1461.62

2.43E-08 8.62E-08 2.08E-08 2.26E-07 2.64E-08 8.68E-08 6.32E-08 1.46E-07 1.7E-08 1.57E-08 1.21E-08 3.62E-09 4.45E-09 4.36E-09 3.37E-09 1.42E-09 1.62E-09 1.85E-09 1.63E-09 1.05E-09 1.06E-09 9.26E-10 6.06E-10 4.36E-10 4.54E-10 4.62E-10 6.56E-10 5.98E-10 4.22E-10 2.97E-10 3.25E-10 3.4E-10 3.2E-10 7.54E-07

0.03227 0.11432 0.02764 0.29931 0.03498 0.11508 0.08386 0.19299 0.02253 0.02084 0.01603 0.0048 0.0059 0.00579 0.00447 0.00188 0.00215 0.00246 0.00216 0.00139 0.0014 0.00123 0.0008 0.00058 0.0006 0.00061 0.00087 0.00079 0.00056 0.00039 0.00043 0.00045 0.00042 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.01575 0.05853 0.0133 0.15983 0.01742 0.06053 0.0421 0.10402 0.01198 0.011 0.00856 0.00255 0.0031 0.0031 0.00234 0.00099 0.00107 0.0013 0.00106 0.00073 0.00073 0.00065 0.00043 0.0003 0.00032 0.00032 0.00047 0.00043 0.0003 0.00021 0.00023 0.00024 0.00023 0.52414

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.01275 0.0471 0.01075 0.132 0.01546 0.05374 0.03682 0.08916 0.00944 0.00948 0.00744 0.00212 0.00255 0.00267 0.00195 0.00088 0.00096 0.00116 0.00091 0.00065 0.00065 0.00056 0.00038 0.00027 0.00027 0.00027 0.00041 0.00036 0.00025 0.00018 0.0002 0.00021 0.0002 0.44221

K-8

K.9. Estimasi Titik DH9 ESTIMASI TITIK

DH9

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

488.079 414.121 412.146 253.049 284.543 118.962 422.456 190.118 202.98 217.867 298.181 491.634 429.848 422.734 479.942 704.827 661.472 626.235 671.096 801.29 791.137 838.01 991.642 1131.58 1111.73 1104.13 963.361 1006.72 1148.25 1315.96 1266.44 1242.71 1272.65

8.6E-09 1.41E-08 1.43E-08 6.17E-08 4.34E-08 5.94E-07 1.33E-08 1.46E-07 1.2E-07 9.67E-08 3.77E-08 8.42E-09 1.26E-08 1.32E-08 9.05E-09 2.86E-09 3.46E-09 4.07E-09 3.31E-09 1.94E-09 2.02E-09 1.7E-09 1.03E-09 6.9E-10 7.28E-10 7.43E-10 1.12E-09 9.8E-10 6.61E-10 4.39E-10 4.92E-10 5.21E-10 4.85E-10 1.22E-06

0.00705 0.01155 0.01171 0.05061 0.0356 0.48712 0.01088 0.11934 0.09806 0.0793 0.03093 0.0069 0.01033 0.01086 0.00742 0.00234 0.00283 0.00334 0.00271 0.00159 0.00166 0.00139 0.00084 0.00057 0.0006 0.00061 0.00092 0.0008 0.00054 0.00036 0.0004 0.00043 0.0004 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00344 0.00591 0.00563 0.02703 0.01773 0.25623 0.00546 0.06385 0.05217 0.04187 0.01652 0.00367 0.00543 0.00582 0.00388 0.00123 0.0014 0.00177 0.00133 0.00084 0.00086 0.00074 0.00045 0.0003 0.00032 0.00032 0.00049 0.00044 0.00029 0.0002 0.00021 0.00023 0.00021 0.52627

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00279 0.00476 0.00456 0.02232 0.01573 0.22749 0.00478 0.04965 0.04109 0.03608 0.01435 0.00305 0.00446 0.00502 0.00324 0.0011 0.00127 0.00157 0.00114 0.00074 0.00077 0.00064 0.00039 0.00026 0.00027 0.00027 0.00043 0.00036 0.00024 0.00016 0.00019 0.0002 0.00019 0.44956

K-9

K.10. Estimasi Titik DH10 ESTIMASI TITIK

DH10

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

685.018 615.081 573.394 446.252 399.249 261.467 598.912 389.012 202.98 145.798 303.488 410.001 306.751 249.401 277.973 502.068 463.778 452.863 530.601 639.641 604.293 636.94 796.357 929.731 915.052 919.556 787.036 852.036 979.605 1153.36 1085.98 1049.75 1073.18

3.11E-09 4.3E-09 5.3E-09 1.13E-08 1.57E-08 5.59E-08 4.65E-09 1.7E-08 1.2E-07 3.23E-07 3.58E-08 1.45E-08 3.46E-08 6.45E-08 4.66E-08 7.9E-09 1E-08 1.08E-08 6.69E-09 3.82E-09 4.53E-09 3.87E-09 1.98E-09 1.24E-09 1.31E-09 1.29E-09 2.05E-09 1.62E-09 1.06E-09 6.52E-10 7.81E-10 8.64E-10 8.09E-10 8.17E-07

0.00381 0.00526 0.00649 0.01378 0.01924 0.0685 0.0057 0.0208 0.14641 0.39507 0.0438 0.01777 0.04242 0.07893 0.05701 0.00967 0.01227 0.01318 0.0082 0.00468 0.00555 0.00474 0.00242 0.00152 0.0016 0.00157 0.00251 0.00198 0.0013 0.0008 0.00096 0.00106 0.00099 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00186 0.00269 0.00312 0.00736 0.00958 0.03603 0.00286 0.01113 0.07891 0.2086 0.02339 0.00945 0.02231 0.04231 0.02981 0.0051 0.00608 0.007 0.00402 0.00248 0.00289 0.0025 0.0013 0.0008 0.00085 0.00083 0.00134 0.00108 0.00069 0.00043 0.00051 0.00056 0.00053 0.52841

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.0015 0.00217 0.00253 0.00608 0.0085 0.03199 0.0025 0.00865 0.06764 0.17976 0.02032 0.00785 0.01833 0.03647 0.02491 0.00453 0.0055 0.00621 0.00345 0.00218 0.00258 0.00216 0.00114 0.0007 0.00073 0.00069 0.00119 0.0009 0.00059 0.00037 0.00045 0.0005 0.00046 0.45352

K-10

K.11. Estimasi Titik DH11 ESTIMASI TITIK

DH11

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

633.654 611.949 480.635 399.224 287.939 199.865 639.879 399.261 217.867 145.798 159.455 286.024 212.002 223.897 329.56 550.023 483.662 418.502 453.259 586.165 591.845 667.235 801.958 960.913 923.717 899.52 753.569 789.497 934.037 1099.67 1057.84 1047.04 1090.71

3.93E-09 4.36E-09 9.01E-09 1.57E-08 4.19E-08 1.25E-07 3.82E-09 1.57E-08 9.67E-08 3.23E-07 2.47E-07 4.27E-08 1.05E-07 8.91E-08 2.79E-08 6.01E-09 8.84E-09 1.36E-08 1.07E-08 4.97E-09 4.82E-09 3.37E-09 1.94E-09 1.13E-09 1.27E-09 1.37E-09 2.34E-09 2.03E-09 1.23E-09 7.52E-10 8.45E-10 8.71E-10 7.71E-10 1.22E-06

0.00323 0.00358 0.0074 0.01291 0.03441 0.10289 0.00314 0.01291 0.07943 0.26505 0.20261 0.03511 0.08621 0.07319 0.02295 0.00494 0.00726 0.01121 0.00882 0.00408 0.00396 0.00277 0.00159 0.00093 0.00104 0.00113 0.00192 0.00167 0.00101 0.00062 0.00069 0.00072 0.00063 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00158 0.00184 0.00356 0.00689 0.01714 0.05412 0.00157 0.00691 0.04282 0.14101 0.1082 0.01868 0.04535 0.03923 0.012 0.0026 0.00359 0.00595 0.00433 0.00216 0.00206 0.00146 0.00085 0.00048 0.00055 0.00059 0.00103 0.00091 0.00054 0.00034 0.00037 0.00038 0.00034 0.52941

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00128 0.00148 0.00288 0.00569 0.01521 0.04805 0.00138 0.00537 0.0367 0.11106 0.09401 0.01552 0.03724 0.03381 0.01003 0.00231 0.00325 0.00528 0.00371 0.0019 0.00184 0.00126 0.00075 0.00043 0.00047 0.0005 0.00091 0.00076 0.00046 0.00028 0.00032 0.00034 0.0003 0.44476

K-11

K.12. Estimasi Titik DH12 ESTIMASI TITIK

DH12

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

579.211 614.003 383.719 371.712 185.852 210.238 686.706 435.707 298.181 303.488 159.455 223.517 231.225 316.986 457.2 661.892 577.755 468.771 447.654 600.234 650.25 760.76 868.932 1047.49 990.34 937.841 782.171 782.368 942.959 1095.18 1083.62 1099.84 1162.48

5.15E-09 4.32E-09 1.77E-08 1.95E-08 1.56E-07 1.08E-07 3.09E-09 1.21E-08 3.77E-08 3.58E-08 2.47E-07 8.96E-08 8.09E-08 3.14E-08 1.05E-08 3.45E-09 5.19E-09 9.71E-09 1.11E-08 4.62E-09 3.64E-09 2.27E-09 1.52E-09 8.7E-10 1.03E-09 1.21E-09 2.09E-09 2.09E-09 1.19E-09 7.61E-10 7.86E-10 7.52E-10 6.37E-10 9.11E-07

0.00565 0.00474 0.01944 0.02138 0.17107 0.11818 0.00339 0.01328 0.04142 0.03929 0.27086 0.09834 0.08883 0.03448 0.01149 0.00379 0.00569 0.01066 0.01224 0.00508 0.00399 0.00249 0.00167 0.00096 0.00113 0.00133 0.00229 0.00229 0.00131 0.00084 0.00086 0.00083 0.0007 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00276 0.00243 0.00935 0.01142 0.08519 0.06216 0.0017 0.0071 0.02233 0.0209 0.14302 0.05232 0.04672 0.01848 0.00601 0.002 0.00282 0.00566 0.00601 0.00269 0.00208 0.00132 0.0009 0.0005 0.0006 0.0007 0.00123 0.00125 0.0007 0.00045 0.00046 0.00044 0.00037 0.52205

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00223 0.00195 0.00756 0.00943 0.07561 0.05519 0.00149 0.00552 0.01914 0.01646 0.12324 0.04347 0.03837 0.01593 0.00502 0.00177 0.00255 0.00502 0.00515 0.00237 0.00186 0.00114 0.00079 0.00044 0.00051 0.00058 0.00108 0.00104 0.00059 0.00038 0.0004 0.00039 0.00033 0.44703

K-12

K.13. Estimasi Titik DH13 ESTIMASI TITIK

DH13

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

794.909 837.291 583.095 595.021 397.363 426.427 901.568 651.519 491.634 410.001 286.024 223.517 127.769 258.07 414.845 563.76 459.344 306.858 235.936 393.544 479.588 626.856 697.379 893.369 815.039 738.976 579.662 562.228 727.178 874.211 874.783 909.628 989.041

1.99E-09 1.7E-09 5.04E-09 4.75E-09 1.59E-08 1.29E-08 1.36E-09 3.62E-09 8.42E-09 1.45E-08 4.27E-08 8.96E-08 4.79E-07 5.82E-08 1.4E-08 5.58E-09 1.03E-08 3.46E-08 7.61E-08 1.64E-08 9.07E-09 4.06E-09 2.95E-09 1.4E-09 1.85E-09 2.48E-09 5.13E-09 5.63E-09 2.6E-09 1.5E-09 1.49E-09 1.33E-09 1.03E-09 9.38E-07

0.00212 0.00182 0.00538 0.00506 0.017 0.01375 0.00146 0.00386 0.00897 0.01547 0.04558 0.0955 0.51128 0.06205 0.01494 0.00595 0.011 0.03691 0.0812 0.0175 0.00967 0.00433 0.00314 0.0015 0.00197 0.00264 0.00548 0.006 0.00277 0.0016 0.00159 0.00142 0.0011 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00104 0.00093 0.00259 0.0027 0.00846 0.00723 0.00073 0.00206 0.00484 0.00823 0.02406 0.051 0.26893 0.03326 0.00781 0.00314 0.00545 0.0196 0.03987 0.00926 0.00504 0.00229 0.00169 0.00078 0.00104 0.00139 0.00293 0.00328 0.00148 0.00087 0.00085 0.00075 0.00059 0.52414

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00084 0.00075 0.00209 0.00223 0.00751 0.00642 0.00064 0.0016 0.00415 0.00648 0.02074 0.04431 0.22087 0.02867 0.00653 0.00279 0.00493 0.01738 0.03419 0.00817 0.0045 0.00197 0.00147 0.00069 0.0009 0.00116 0.00258 0.00272 0.00125 0.00073 0.00074 0.00066 0.00052 0.4412

K-13

K.14. Estimasi Titik DH14 ESTIMASI TITIK

DH14

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

805.001 813.204 614.919 584.23 416.74 394.011 851.469 608.113 429.848 306.751 212.002 231.225 127.769 131.244 289.311 456.465 360.169 237.565 241.58 381.119 419.058 538.677 637.96 820.088 759.226 710.155 557.237 579.142 728.83 890.691 860.976 869.361 931.631

1.92E-09 1.86E-09 4.3E-09 5.01E-09 1.38E-08 1.63E-08 1.62E-09 4.45E-09 1.26E-08 3.46E-08 1.05E-07 8.09E-08 4.79E-07 4.42E-07 4.13E-08 1.05E-08 2.14E-08 7.46E-08 7.09E-08 1.81E-08 1.36E-08 6.4E-09 3.85E-09 1.81E-09 2.29E-09 2.79E-09 5.78E-09 5.15E-09 2.58E-09 1.42E-09 1.57E-09 1.52E-09 1.24E-09 1.49E-06

0.00129 0.00125 0.00288 0.00336 0.00927 0.01097 0.00109 0.00298 0.00844 0.02324 0.07039 0.05425 0.32156 0.29669 0.0277 0.00705 0.01436 0.05003 0.04757 0.01212 0.00911 0.00429 0.00258 0.00122 0.00153 0.00187 0.00388 0.00345 0.00173 0.00095 0.00105 0.00102 0.00083 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00063 0.00064 0.00139 0.0018 0.00462 0.00577 0.00055 0.0016 0.00455 0.01236 0.03717 0.02897 0.17107 0.15903 0.01449 0.00372 0.00711 0.02656 0.02336 0.00641 0.00475 0.00227 0.00138 0.00064 0.00081 0.00098 0.00207 0.00189 0.00092 0.00052 0.00056 0.00054 0.00044 0.52953

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00051 0.00051 0.00112 0.00148 0.0041 0.00512 0.00048 0.00124 0.0039 0.00974 0.03203 0.02517 0.14213 0.13707 0.0121 0.0033 0.00643 0.02356 0.02003 0.00566 0.00424 0.00196 0.00121 0.00056 0.0007 0.00082 0.00183 0.00157 0.00078 0.00043 0.00049 0.00048 0.00039 0.45114

K-14

K.15. Estimasi Titik DH15 ESTIMASI TITIK

DH15

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

856.493 831.177 690.072 623.097 491.037 423.745 840.074 611.962 422.734 249.401 223.897 316.986 258.07 131.244 158.417 345.029 264.229 205.139 290.837 390.252 369.899 448.54 578.081 740.249 699.821 681.487 541.893 603.009 731.456 904.204 844.029 824.296 867.111

1.59E-09 1.74E-09 3.04E-09 4.13E-09 8.45E-09 1.31E-08 1.69E-09 4.36E-09 1.32E-08 6.45E-08 8.91E-08 3.14E-08 5.82E-08 4.42E-07 2.52E-07 2.43E-08 5.42E-08 1.16E-07 4.06E-08 1.68E-08 1.98E-08 1.11E-08 5.18E-09 2.47E-09 2.92E-09 3.16E-09 6.28E-09 4.56E-09 2.56E-09 1.35E-09 1.66E-09 1.79E-09 1.53E-09 1.3E-06

0.00122 0.00133 0.00233 0.00317 0.00647 0.01007 0.00129 0.00334 0.01015 0.04941 0.0683 0.02407 0.0446 0.33908 0.19281 0.01866 0.04155 0.0888 0.03116 0.0129 0.01515 0.00849 0.00397 0.00189 0.00224 0.00242 0.00482 0.0035 0.00196 0.00104 0.00127 0.00137 0.00118 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.0006 0.00068 0.00112 0.00169 0.00322 0.0053 0.00065 0.00179 0.00547 0.02629 0.03606 0.01285 0.02373 0.17835 0.10084 0.00984 0.02057 0.04715 0.0153 0.00682 0.00789 0.00449 0.00213 0.00099 0.00118 0.00127 0.00258 0.00191 0.00104 0.00056 0.00068 0.00072 0.00063 0.52439

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00048 0.00055 0.00091 0.0014 0.00286 0.0047 0.00057 0.00139 0.00469 0.0207 0.03107 0.01117 0.01971 0.14648 0.08426 0.00873 0.01862 0.04182 0.01312 0.00602 0.00704 0.00387 0.00186 0.00087 0.00102 0.00106 0.00227 0.00159 0.00089 0.00047 0.00059 0.00064 0.00055 0.442

K-15

K.16. Estimasi Titik DH16 ESTIMASI TITIK

DH16

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

951.803 893.031 810.195 712.956 616.02 516.558 868.678 666.979 479.942 277.973 329.56 457.2 414.845 289.311 158.417 225.887 192.72 253.428 392.94 441.249 353.21 359.138 525.07 651.801 641.237 664.209 549.771 652.113 750.139 929.889 834.945 780.256 796.157

1.16E-09 1.4E-09 1.88E-09 2.76E-09 4.28E-09 7.26E-09 1.53E-09 3.37E-09 9.05E-09 4.66E-08 2.79E-08 1.05E-08 1.4E-08 4.13E-08 2.52E-07 8.68E-08 1.4E-07 6.14E-08 1.65E-08 1.16E-08 2.27E-08 2.16E-08 6.91E-09 3.61E-09 3.79E-09 3.41E-09 6.02E-09 3.61E-09 2.37E-09 1.24E-09 1.72E-09 2.11E-09 1.98E-09 8.22E-07

0.00141 0.00171 0.00229 0.00336 0.00521 0.00883 0.00186 0.0041 0.01101 0.05667 0.03401 0.01274 0.01705 0.05027 0.30617 0.10561 0.17005 0.07478 0.02006 0.01417 0.02762 0.02628 0.00841 0.0044 0.00462 0.00415 0.00733 0.00439 0.00288 0.00151 0.00209 0.00256 0.00241 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00069 0.00088 0.0011 0.00179 0.00259 0.00465 0.00093 0.00219 0.00593 0.03015 0.01796 0.0068 0.00907 0.02644 0.16411 0.05565 0.08418 0.03971 0.00985 0.00749 0.01439 0.01387 0.00451 0.0023 0.00244 0.00218 0.00392 0.0024 0.00154 0.00082 0.00111 0.00136 0.00129 0.52429

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00056 0.0007 0.00089 0.00148 0.0023 0.00412 0.00082 0.00171 0.00509 0.02375 0.01547 0.00591 0.00754 0.02171 0.14145 0.04942 0.07618 0.03522 0.00845 0.00662 0.01284 0.01198 0.00394 0.00203 0.0021 0.00182 0.00346 0.00199 0.0013 0.00069 0.00097 0.0012 0.00113 0.45486

K-16

K.17. Estimasi Titik DH17 ESTIMASI TITIK

DH17

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1177.23 1116.65 1028.99 938.587 831.856 741.432 1082.29 890.3 704.827 502.068 550.023 661.892 563.76 456.465 345.029 225.887 112.045 285.603 441.213 404.678 245.165 146.755 334.994 429.707 439.145 503.659 432.552 580.07 628.061 807.194 674.501 586.195 581.251

6.13E-10 7.18E-10 9.18E-10 1.21E-09 1.74E-09 2.45E-09 7.89E-10 1.42E-09 2.86E-09 7.9E-09 6.01E-09 3.45E-09 5.58E-09 1.05E-08 2.43E-08 8.68E-08 7.11E-07 4.29E-08 1.16E-08 1.51E-08 6.79E-08 3.16E-07 2.66E-08 1.26E-08 1.18E-08 7.83E-09 1.24E-08 5.12E-09 4.04E-09 1.9E-09 3.26E-09 4.96E-09 5.09E-09 1.42E-06

0.00043 0.00051 0.00065 0.00085 0.00123 0.00173 0.00056 0.001 0.00201 0.00557 0.00424 0.00243 0.00394 0.00742 0.01717 0.0612 0.50147 0.03028 0.00821 0.01064 0.04787 0.22317 0.01876 0.00889 0.00833 0.00552 0.00872 0.00361 0.00285 0.00134 0.0023 0.0035 0.00359 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00021 0.00026 0.00031 0.00046 0.00061 0.00091 0.00028 0.00053 0.00109 0.00297 0.00224 0.0013 0.00209 0.0039 0.0092 0.03201 0.24823 0.01608 0.00403 0.00563 0.02494 0.11784 0.01006 0.00465 0.00441 0.0029 0.00466 0.00197 0.00152 0.00073 0.00122 0.00185 0.00192 0.511

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00017 0.00021 0.00025 0.00038 0.00054 0.00081 0.00024 0.00042 0.00093 0.00234 0.00193 0.00113 0.00174 0.0032 0.00793 0.02674 0.22466 0.01426 0.00346 0.00497 0.02226 0.10177 0.0088 0.0041 0.00379 0.00242 0.00411 0.00164 0.00129 0.00061 0.00107 0.00164 0.00168 0.4515

K-17

K.18. Estimasi Titik DH18 ESTIMASI TITIK

DH18

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1117.16 1075.55 954.231 881.077 755.017 681.602 1059.68 850.882 661.472 463.778 483.662 577.755 459.344 360.169 264.229 192.72 112.045 173.566 329.577 307.002 172.325 184.329 333.264 477.253 451.276 473.888 371.732 499.12 572.787 753.618 645.484 588.011 611.465

7.17E-10 8.04E-10 1.15E-09 1.46E-09 2.32E-09 3.16E-09 8.4E-10 1.62E-09 3.46E-09 1E-08 8.84E-09 5.19E-09 1.03E-08 2.14E-08 5.42E-08 1.4E-07 7.11E-07 1.91E-07 2.79E-08 3.46E-08 1.95E-07 1.6E-07 2.7E-08 9.2E-09 1.09E-08 9.4E-09 1.95E-08 8.04E-09 5.32E-09 2.34E-09 3.72E-09 4.92E-09 4.37E-09 1.69E-06

0.00042 0.00048 0.00068 0.00087 0.00138 0.00187 0.0005 0.00096 0.00204 0.00593 0.00523 0.00307 0.00611 0.01267 0.03208 0.08268 0.42076 0.11319 0.01653 0.02045 0.11565 0.0945 0.01599 0.00544 0.00644 0.00556 0.01152 0.00476 0.00315 0.00138 0.0022 0.00291 0.00259 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00021 0.00024 0.00033 0.00046 0.00068 0.00098 0.00025 0.00051 0.0011 0.00316 0.00276 0.00164 0.00325 0.00666 0.0172 0.04324 0.22174 0.0601 0.00812 0.01082 0.06026 0.0499 0.00857 0.00285 0.00341 0.00292 0.00616 0.0026 0.00168 0.00075 0.00117 0.00154 0.00138 0.52664

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00017 0.0002 0.00026 0.00038 0.00061 0.00087 0.00022 0.0004 0.00094 0.00249 0.00238 0.00142 0.0027 0.00547 0.01482 0.03613 0.19691 0.05331 0.00696 0.00955 0.05378 0.04309 0.0075 0.00251 0.00293 0.00244 0.00544 0.00216 0.00142 0.00063 0.00103 0.00137 0.00121 0.46172

K-18

K.19. Estimasi Titik DH19 ESTIMASI TITIK

DH19

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1038.84 1030.36 852.48 812.288 654.083 615.813 1045.05 814.325 626.235 452.863 418.502 468.771 306.858 237.565 205.139 253.428 285.603 173.566 158.354 192.419 181.497 321.811 400.649 588.392 521.714 481.087 337.179 406.529 526.773 701.046 640.41 633.721 694.395

8.92E-10 9.14E-10 1.61E-09 1.87E-09 3.57E-09 4.28E-09 8.76E-10 1.85E-09 4.07E-09 1.08E-08 1.36E-08 9.71E-09 3.46E-08 7.46E-08 1.16E-07 6.14E-08 4.29E-08 1.91E-07 2.52E-07 1.4E-07 1.67E-07 3E-08 1.55E-08 4.91E-09 7.04E-09 8.98E-09 2.61E-08 1.49E-08 6.84E-09 2.9E-09 3.81E-09 3.93E-09 2.99E-09 1.26E-06

0.00071 0.00072 0.00128 0.00148 0.00283 0.00339 0.00069 0.00147 0.00323 0.00853 0.01081 0.00769 0.02742 0.0591 0.09178 0.04868 0.03401 0.15154 0.19954 0.11122 0.13253 0.02377 0.01232 0.00389 0.00558 0.00712 0.02067 0.01179 0.00542 0.0023 0.00302 0.00311 0.00237 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00034 0.00037 0.00062 0.00079 0.00141 0.00178 0.00035 0.00079 0.00174 0.00454 0.00571 0.00411 0.01459 0.03108 0.0492 0.02546 0.01792 0.07501 0.09797 0.05883 0.06905 0.01255 0.0066 0.00203 0.00295 0.00374 0.01106 0.00644 0.00289 0.00125 0.0016 0.00165 0.00126 0.51568

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00028 0.0003 0.0005 0.00065 0.00125 0.00158 0.0003 0.00061 0.00149 0.00357 0.00492 0.00357 0.01212 0.02553 0.0424 0.02127 0.01592 0.06789 0.084 0.05194 0.06162 0.01084 0.00578 0.00179 0.00254 0.00312 0.00976 0.00535 0.00245 0.00105 0.00141 0.00146 0.00111 0.44839

K-19

K.20. Estimasi Titik DH20 ESTIMASI TITIK

DH20

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1026.09 1051.06 818.478 816.123 629.27 632.261 1093.01 849.342 671.096 530.601 453.259 447.654 235.936 241.58 290.837 392.94 441.213 329.577 158.354 157.927 275.879 454.104 481.269 687.64 593.354 504.279 344.398 338.576 495.308 651.197 639.2 677.751 766.512

9.26E-10 8.61E-10 1.82E-09 1.84E-09 4.01E-09 3.96E-09 7.66E-10 1.63E-09 3.31E-09 6.69E-09 1.07E-08 1.11E-08 7.61E-08 7.09E-08 4.06E-08 1.65E-08 1.16E-08 2.79E-08 2.52E-07 2.54E-07 4.76E-08 1.07E-08 8.97E-09 3.08E-09 4.79E-09 7.8E-09 2.45E-08 2.58E-08 8.23E-09 3.62E-09 3.83E-09 3.21E-09 2.22E-09 9.51E-07

0.00097 0.00091 0.00192 0.00193 0.00422 0.00416 0.0008 0.00172 0.00348 0.00704 0.01129 0.01172 0.08002 0.07454 0.04272 0.01732 0.01224 0.02936 0.26467 0.26682 0.05005 0.01122 0.00943 0.00323 0.00503 0.0082 0.02573 0.02708 0.00865 0.00381 0.00402 0.00338 0.00233 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00047 0.00046 0.00092 0.00103 0.0021 0.00219 0.0004 0.00092 0.00187 0.00374 0.00596 0.00626 0.04257 0.03921 0.0229 0.00906 0.00645 0.01453 0.14054 0.14115 0.02608 0.00593 0.00505 0.00169 0.00266 0.0043 0.01376 0.01478 0.00461 0.00207 0.00214 0.00179 0.00125 0.52885

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00038 0.00037 0.00075 0.00085 0.00186 0.00194 0.00035 0.00071 0.00161 0.00295 0.00514 0.00544 0.03537 0.0322 0.01974 0.00757 0.00573 0.01315 0.12466 0.12461 0.02328 0.00512 0.00442 0.00149 0.00229 0.0036 0.01214 0.01229 0.00391 0.00174 0.00188 0.00158 0.00109 0.46021

K-20

K.21. Estimasi Titik DH21 ESTIMASI TITIK

DH21

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1179.44 1194.07 975.109 964.353 783.901 775.023 1223.3 985.419 801.29 639.641 586.165 600.234 393.544 381.119 390.252 441.249 404.678 307.002 192.419 157.927 175.573 366.602 343.169 554.995 446.878 346.554 186.507 214.245 348.116 515.335 483.508 521.648 617.664

6.09E-10 5.87E-10 1.08E-09 1.12E-09 2.08E-09 2.15E-09 5.46E-10 1.05E-09 1.94E-09 3.82E-09 4.97E-09 4.62E-09 1.64E-08 1.81E-08 1.68E-08 1.16E-08 1.51E-08 3.46E-08 1.4E-07 2.54E-07 1.85E-07 2.03E-08 2.47E-08 5.85E-09 1.12E-08 2.4E-08 1.54E-07 1.02E-07 2.37E-08 7.31E-09 8.85E-09 7.04E-09 4.24E-09 1.11E-06

0.00055 0.00053 0.00097 0.00101 0.00187 0.00194 0.00049 0.00094 0.00175 0.00344 0.00448 0.00417 0.01479 0.01628 0.01517 0.01049 0.0136 0.03116 0.12654 0.22888 0.16657 0.0183 0.02231 0.00527 0.0101 0.02166 0.13896 0.09167 0.02137 0.00659 0.00798 0.00635 0.00383 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00027 0.00027 0.00047 0.00054 0.00093 0.00102 0.00025 0.0005 0.00094 0.00183 0.00236 0.00223 0.00787 0.00857 0.00813 0.00549 0.00717 0.01542 0.06719 0.11238 0.08678 0.00966 0.01196 0.00276 0.00534 0.01137 0.07434 0.05005 0.01139 0.00358 0.00423 0.00336 0.00204 0.5207

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00022 0.00022 0.00038 0.00044 0.00083 0.0009 0.00022 0.00039 0.00081 0.00144 0.00204 0.00193 0.00654 0.00704 0.00701 0.00459 0.00637 0.01396 0.0596 0.09636 0.07745 0.00834 0.01046 0.00243 0.0046 0.00951 0.06559 0.04162 0.00966 0.00302 0.00372 0.00298 0.00179 0.45243

K-21

K.22. Estimasi Titik DH22 ESTIMASI TITIK

DH22

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1218.28 1201.07 1033.97 989.275 835.456 791.154 1203 980.987 791.137 604.293 591.845 650.25 479.588 419.058 369.899 353.21 245.165 172.325 181.497 275.879 175.573 191.314 219.584 415.377 340.262 315.357 199.542 335 400.746 581.532 483.663 455.33 513.249

5.53E-10 5.77E-10 9.05E-10 1.03E-09 1.71E-09 2.02E-09 5.74E-10 1.06E-09 2.02E-09 4.53E-09 4.82E-09 3.64E-09 9.07E-09 1.36E-08 1.98E-08 2.27E-08 6.79E-08 1.95E-07 1.67E-07 4.76E-08 1.85E-07 1.43E-07 9.44E-08 1.4E-08 2.54E-08 3.19E-08 1.26E-07 2.66E-08 1.55E-08 5.08E-09 8.84E-09 1.06E-08 7.4E-09 1.26E-06

0.00044 0.00046 0.00072 0.00082 0.00136 0.0016 0.00046 0.00084 0.0016 0.0036 0.00383 0.00289 0.0072 0.01079 0.01568 0.01801 0.05386 0.1551 0.13276 0.0378 0.14665 0.11335 0.07497 0.01108 0.02015 0.02531 0.0999 0.02111 0.01233 0.00404 0.00702 0.00841 0.00587 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00021 0.00023 0.00035 0.00044 0.00068 0.00084 0.00023 0.00045 0.00086 0.00191 0.00202 0.00154 0.00383 0.00567 0.00841 0.00942 0.02839 0.07678 0.0705 0.01856 0.07758 0.05985 0.04018 0.00579 0.01066 0.01329 0.05345 0.01153 0.00657 0.00219 0.00373 0.00445 0.00313 0.52372

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00017 0.00019 0.00028 0.00036 0.0006 0.00075 0.0002 0.00035 0.00074 0.00151 0.00174 0.00134 0.00318 0.00466 0.00725 0.00787 0.02521 0.06949 0.06253 0.01591 0.06849 0.05169 0.03516 0.00511 0.00917 0.01111 0.04715 0.00959 0.00557 0.00185 0.00327 0.00394 0.00275 0.45917

K-22

K.23. Estimasi Titik DH23 ESTIMASI TITIK

DH23

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1300.24 1251.75 1138.45 1063.34 939.136 864.197 1224.77 1025.91 838.01 636.94 667.235 760.76 626.856 538.677 448.54 359.138 146.755 184.329 321.811 454.104 366.602 191.314 192.421 294.491 292.412 370.984 331.958 498.654 512.851 687.029 538.358 440.005 437.824

4.55E-10 5.1E-10 6.78E-10 8.32E-10 1.21E-09 1.55E-09 5.44E-10 9.26E-10 1.7E-09 3.87E-09 3.37E-09 2.27E-09 4.06E-09 6.4E-09 1.11E-08 2.16E-08 3.16E-07 1.6E-07 3E-08 1.07E-08 2.03E-08 1.43E-07 1.4E-07 3.92E-08 4E-08 1.96E-08 2.73E-08 8.06E-09 7.41E-09 3.08E-09 6.41E-09 1.17E-08 1.19E-08 1.06E-06

0.00043 0.00048 0.00064 0.00079 0.00114 0.00147 0.00052 0.00088 0.00161 0.00366 0.00319 0.00215 0.00384 0.00606 0.01049 0.02044 0.29963 0.15121 0.02842 0.01011 0.01922 0.13524 0.13292 0.03708 0.03788 0.01855 0.02589 0.00764 0.00702 0.00292 0.00607 0.01112 0.01128 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00021 0.00025 0.00031 0.00042 0.00057 0.00077 0.00026 0.00047 0.00087 0.00195 0.00168 0.00115 0.00205 0.00319 0.00562 0.01069 0.1579 0.07485 0.01509 0.00497 0.01017 0.07046 0.07125 0.01939 0.02004 0.00974 0.01385 0.00417 0.00374 0.00159 0.00322 0.00588 0.00603 0.52278

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00017 0.0002 0.00025 0.00035 0.00051 0.00069 0.00023 0.00036 0.00074 0.00154 0.00145 0.001 0.0017 0.00262 0.00485 0.00893 0.14023 0.06774 0.01338 0.00426 0.00898 0.06289 0.06234 0.01709 0.01723 0.00814 0.01222 0.00347 0.00317 0.00134 0.00283 0.00521 0.00528 0.46138

K-23

K.24. Estimasi Titik DH24 ESTIMASI TITIK

DH24

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1432.86 1404.95 1252.59 1201.06 1053.66 1001.82 1392.94 1181.62 991.642 796.357 801.958 868.932 697.379 637.96 578.081 525.07 334.994 333.264 400.649 481.269 343.169 219.584 192.421 212.474 122.004 186.55 213.19 386.939 347.922 510.824 347.852 255.409 293.748

3.4E-10 3.61E-10 5.09E-10 5.77E-10 8.55E-10 9.95E-10 3.7E-10 6.06E-10 1.03E-09 1.98E-09 1.94E-09 1.52E-09 2.95E-09 3.85E-09 5.18E-09 6.91E-09 2.66E-08 2.7E-08 1.55E-08 8.97E-09 2.47E-08 9.44E-08 1.4E-07 1.04E-07 5.51E-07 1.54E-07 1.03E-07 1.73E-08 2.37E-08 7.5E-09 2.38E-08 6E-08 3.95E-08 1.45E-06

0.00023 0.00025 0.00035 0.0004 0.00059 0.00069 0.00025 0.00042 0.00071 0.00136 0.00134 0.00105 0.00203 0.00265 0.00357 0.00476 0.01833 0.01861 0.01071 0.00618 0.01705 0.06507 0.0967 0.07182 0.37936 0.10612 0.0711 0.01189 0.01636 0.00517 0.01637 0.04135 0.02718 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00011 0.00013 0.00017 0.00021 0.00029 0.00036 0.00013 0.00022 0.00038 0.00073 0.00071 0.00056 0.00108 0.0014 0.00191 0.00249 0.00966 0.00921 0.00569 0.00303 0.00902 0.0339 0.05106 0.03756 0.20068 0.05571 0.03804 0.00649 0.00872 0.00281 0.00869 0.02187 0.01451 0.52754

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

9.3E-05 0.0001 0.00014 0.00018 0.00026 0.00032 0.00011 0.00017 0.00033 0.00057 0.00061 0.00049 0.0009 0.00115 0.00165 0.00208 0.00858 0.00834 0.00505 0.0026 0.00796 0.03026 0.04409 0.03311 0.17261 0.04659 0.03356 0.0054 0.00739 0.00237 0.00763 0.01939 0.01272 0.45677

K-24

K.25. Estimasi Titik DH25 ESTIMASI TITIK

DH25

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1594.32 1544.81 1428.37 1357.73 1228.74 1158.47 1511.27 1318.67 1131.58 929.731 960.913 1047.49 893.369 820.088 740.249 651.801 429.707 477.253 588.392 687.64 554.995 415.377 294.491 212.474 147.648 327.951 417.163 583.415 501.423 629.414 428.803 254.443 167.263

2.47E-10 2.71E-10 3.43E-10 4E-10 5.39E-10 6.43E-10 2.9E-10 4.36E-10 6.9E-10 1.24E-09 1.13E-09 8.7E-10 1.4E-09 1.81E-09 2.47E-09 3.61E-09 1.26E-08 9.2E-09 4.91E-09 3.08E-09 5.85E-09 1.4E-08 3.92E-08 1.04E-07 3.11E-07 2.84E-08 1.38E-08 5.04E-09 7.93E-09 4.01E-09 1.27E-08 6.07E-08 2.14E-07 8.66E-07

0.00028 0.00031 0.0004 0.00046 0.00062 0.00074 0.00033 0.0005 0.0008 0.00144 0.0013 0.001 0.00162 0.00209 0.00285 0.00417 0.01455 0.01062 0.00567 0.00355 0.00675 0.01611 0.0452 0.12035 0.35865 0.03273 0.0159 0.00581 0.00916 0.00463 0.01464 0.07008 0.24669 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00014 0.00016 0.00019 0.00025 0.00031 0.00039 0.00017 0.00027 0.00043 0.00076 0.00069 0.00054 0.00086 0.0011 0.00153 0.00218 0.00767 0.00526 0.00301 0.00174 0.00357 0.00839 0.02387 0.06451 0.18972 0.01718 0.00851 0.00317 0.00488 0.00251 0.00777 0.03707 0.13173 0.53053

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00011 0.00013 0.00015 0.0002 0.00028 0.00035 0.00015 0.00021 0.00037 0.0006 0.00059 0.00047 0.00072 0.0009 0.00131 0.00182 0.00681 0.00476 0.00267 0.00149 0.00315 0.00749 0.02061 0.05644 0.16318 0.01437 0.00751 0.00264 0.00414 0.00212 0.00682 0.03287 0.11545 0.46088

K-25

K.26. Estimasi Titik DH26 ESTIMASI TITIK

DH26

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1554.85 1525.41 1374.05 1322.88 1175.28 1123.56 1509.91 1301.53 1111.73 915.052 923.717 990.34 815.039 759.226 699.821 641.237 439.145 451.276 521.714 593.354 446.878 340.262 292.412 122.004 147.648 180.422 286.295 443.298 353.787 487.198 294.061 150.336 174.003

2.66E-10 2.82E-10 3.85E-10 4.32E-10 6.16E-10 7.05E-10 2.91E-10 4.54E-10 7.28E-10 1.31E-09 1.27E-09 1.03E-09 1.85E-09 2.29E-09 2.92E-09 3.79E-09 1.18E-08 1.09E-08 7.04E-09 4.79E-09 1.12E-08 2.54E-08 4E-08 5.51E-07 3.11E-07 1.7E-07 4.26E-08 1.15E-08 2.26E-08 8.65E-09 3.93E-08 2.94E-07 1.9E-07 1.77E-06

0.00015 0.00016 0.00022 0.00024 0.00035 0.0004 0.00016 0.00026 0.00041 0.00074 0.00072 0.00058 0.00104 0.00129 0.00165 0.00214 0.00667 0.00615 0.00398 0.0027 0.00633 0.01434 0.0226 0.31109 0.17552 0.09619 0.02407 0.00649 0.01276 0.00489 0.02222 0.16627 0.10723 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

7.3E-05 8.1E-05 0.0001 0.00013 0.00017 0.00021 8.2E-05 0.00014 0.00022 0.00039 0.00038 0.00031 0.00056 0.00068 0.00088 0.00112 0.00352 0.00304 0.00211 0.00133 0.00335 0.00747 0.01193 0.16674 0.0918 0.0505 0.01288 0.00354 0.0068 0.00265 0.0118 0.08796 0.05726 0.53021

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

5.9E-05 6.6E-05 8.5E-05 0.00011 0.00015 0.00019 7.2E-05 0.00011 0.00019 0.00031 0.00033 0.00027 0.00046 0.00056 0.00076 0.00094 0.00312 0.00275 0.00187 0.00114 0.00296 0.00667 0.0103 0.1459 0.08091 0.04223 0.01136 0.00294 0.00577 0.00224 0.01035 0.07798 0.05019 0.46334

K-26

K.27. Estimasi Titik DH27 ESTIMASI TITIK

DH27

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH28 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1515.1 1511.18 1317.59 1292.21 1123.3 1096.71 1518.06 1293.43 1104.13 919.556 899.52 937.841 738.976 710.155 681.487 664.209 503.659 473.888 481.087 504.279 346.554 315.357 370.984 186.55 327.951 180.422 160.253 277.498 174.244 325.038 172.047 181.497 308.598

2.88E-10 2.9E-10 4.37E-10 4.63E-10 7.06E-10 7.58E-10 2.86E-10 4.62E-10 7.43E-10 1.29E-09 1.37E-09 1.21E-09 2.48E-09 2.79E-09 3.16E-09 3.41E-09 7.83E-09 9.4E-09 8.98E-09 7.8E-09 2.4E-08 3.19E-08 1.96E-08 1.54E-07 2.84E-08 1.7E-07 2.43E-07 4.68E-08 1.89E-07 2.91E-08 1.96E-07 1.67E-07 3.4E-08 1.39E-06

0.00021 0.00021 0.00031 0.00033 0.00051 0.00055 0.00021 0.00033 0.00054 0.00093 0.00099 0.00087 0.00179 0.00201 0.00228 0.00246 0.00564 0.00677 0.00647 0.00562 0.01731 0.02297 0.01411 0.11098 0.02043 0.12268 0.17508 0.03372 0.1362 0.02098 0.14148 0.12052 0.02452 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.0001 0.00011 0.00015 0.00018 0.00025 0.00029 0.0001 0.00018 0.00029 0.00049 0.00052 0.00047 0.00095 0.00106 0.00122 0.00129 0.00297 0.00335 0.00344 0.00276 0.00916 0.01197 0.00745 0.05949 0.01068 0.0649 0.09367 0.01841 0.07259 0.01139 0.07513 0.06375 0.01309 0.53185

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

8.2E-05 8.6E-05 0.00012 0.00015 0.00022 0.00026 9E-05 0.00014 0.00025 0.00039 0.00045 0.00041 0.00079 0.00087 0.00105 0.00107 0.00264 0.00303 0.00305 0.00237 0.00808 0.01068 0.00643 0.05205 0.00942 0.05582 0.08264 0.01531 0.06156 0.00961 0.06593 0.05652 0.01147 0.46304

K-27

K.28. Estimasi Titik DH28 ESTIMASI TITIK

DH28

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH29 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1360.78 1365.24 1159.93 1141.24 967.019 948.046 1381.96 1151.06 963.361 787.036 753.569 782.171 579.662 557.237 541.893 549.771 432.552 371.732 337.179 344.398 186.507 199.542 331.958 213.19 417.163 286.295 160.253 175.419 201.246 381.996 304.436 338.148 447.234

3.97E-10 3.93E-10 6.41E-10 6.73E-10 1.11E-09 1.17E-09 3.79E-10 6.56E-10 1.12E-09 2.05E-09 2.34E-09 2.09E-09 5.13E-09 5.78E-09 6.28E-09 6.02E-09 1.24E-08 1.95E-08 2.61E-08 2.45E-08 1.54E-07 1.26E-07 2.73E-08 1.03E-07 1.38E-08 4.26E-08 2.43E-07 1.85E-07 1.23E-07 1.79E-08 3.54E-08 2.59E-08 1.12E-08 1.23E-06

0.00032 0.00032 0.00052 0.00055 0.0009 0.00096 0.00031 0.00053 0.00091 0.00167 0.0019 0.0017 0.00418 0.00471 0.00512 0.00491 0.01007 0.01587 0.02126 0.01995 0.12563 0.10259 0.02228 0.08412 0.01123 0.03473 0.19805 0.15099 0.1 0.01462 0.02889 0.02108 0.00911 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00016 0.00016 0.00025 0.00029 0.00045 0.0005 0.00016 0.00029 0.00049 0.00089 0.00101 0.00091 0.00223 0.00248 0.00275 0.00257 0.00531 0.00785 0.01129 0.0098 0.06646 0.05345 0.01176 0.04509 0.00587 0.01837 0.10398 0.08244 0.0533 0.00794 0.01534 0.01115 0.00487 0.52983

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00013 0.00013 0.0002 0.00024 0.0004 0.00045 0.00014 0.00022 0.00042 0.0007 0.00087 0.00079 0.00185 0.00203 0.00237 0.00214 0.00471 0.00711 0.01001 0.0084 0.05867 0.0477 0.01016 0.03945 0.00518 0.0158 0.08694 0.06855 0.0452 0.0067 0.01346 0.00989 0.00426 0.45528

K-28

K.29. Estimasi Titik DH29 ESTIMASI TITIK

DH29

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH30 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1357.07 1389.48 1141.31 1153 959.563 970.824 1429.16 1187.25 1006.72 852.036 789.497 782.368 562.228 579.142 603.009 652.113 580.07 499.12 406.529 338.576 214.245 335 498.654 386.939 583.415 443.298 277.498 175.419 175.932 313.026 343.052 452.747 586.08

4E-10 3.73E-10 6.73E-10 6.52E-10 1.13E-09 1.09E-09 3.43E-10 5.98E-10 9.8E-10 1.62E-09 2.03E-09 2.09E-09 5.63E-09 5.15E-09 4.56E-09 3.61E-09 5.12E-09 8.04E-09 1.49E-08 2.58E-08 1.02E-07 2.66E-08 8.06E-09 1.73E-08 5.04E-09 1.15E-08 4.68E-08 1.85E-07 1.84E-07 3.26E-08 2.48E-08 1.08E-08 4.97E-09 7.44E-07

0.00054 0.0005 0.0009 0.00088 0.00152 0.00147 0.00046 0.0008 0.00132 0.00217 0.00273 0.00281 0.00757 0.00692 0.00613 0.00485 0.00689 0.01081 0.02001 0.03465 0.13674 0.03577 0.01084 0.02321 0.00677 0.01544 0.06293 0.24911 0.24694 0.04384 0.03331 0.01449 0.00668 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 53.3% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00026 0.00026 0.00044 0.00047 0.00076 0.00077 0.00023 0.00043 0.00071 0.00116 0.00144 0.0015 0.00403 0.00364 0.00329 0.00254 0.00363 0.00535 0.01063 0.01701 0.07233 0.01863 0.00573 0.01244 0.00354 0.00817 0.03304 0.13327 0.13162 0.02381 0.01769 0.00766 0.00357 0.53003

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.2% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00021 0.00021 0.00035 0.00039 0.00067 0.00069 0.0002 0.00033 0.00061 0.00091 0.00124 0.0013 0.00334 0.00299 0.00283 0.00212 0.00322 0.00484 0.00943 0.01459 0.06386 0.01663 0.00495 0.01089 0.00312 0.00702 0.02763 0.11758 0.11162 0.02008 0.01552 0.0068 0.00313 0.45929

K-29

K.30. Estimasi Titik DH30 ESTIMASI TITIK

DH30

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH31 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1520.99 1542.01 1309.44 1310.53 1123.71 1122.84 1569.55 1333.28 1148.25 979.605 934.037 942.959 727.178 728.83 731.456 750.139 628.061 572.787 526.773 495.308 348.116 400.746 512.851 347.922 501.423 353.787 174.244 201.246 175.932 180.834 170.179 312.416 459.933

2.84E-10 2.73E-10 4.45E-10 4.44E-10 7.05E-10 7.06E-10 2.59E-10 4.22E-10 6.61E-10 1.06E-09 1.23E-09 1.19E-09 2.6E-09 2.58E-09 2.56E-09 2.37E-09 4.04E-09 5.32E-09 6.84E-09 8.23E-09 2.37E-08 1.55E-08 7.41E-09 2.37E-08 7.93E-09 2.26E-08 1.89E-07 1.23E-07 1.84E-07 1.69E-07 2.03E-07 3.28E-08 1.03E-08 1.05E-06

0.00027 0.00026 0.00042 0.00042 0.00067 0.00067 0.00025 0.0004 0.00063 0.00101 0.00116 0.00113 0.00247 0.00245 0.00243 0.00225 0.00383 0.00505 0.00649 0.00781 0.0225 0.01475 0.00704 0.02254 0.00753 0.02143 0.17942 0.11645 0.1743 0.16051 0.19258 0.03113 0.00976 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 54.3% 53.1% 52.9% 53.4% Z(v)_G

0.00013 0.00013 0.0002 0.00023 0.00033 0.00035 0.00012 0.00021 0.00034 0.00054 0.00062 0.0006 0.00131 0.00129 0.0013 0.00118 0.00202 0.0025 0.00345 0.00384 0.0119 0.00768 0.00372 0.01208 0.00394 0.01134 0.09419 0.0623 0.09517 0.08716 0.10226 0.01647 0.00521 0.53411

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.8% 46.6% 46.9% 46.8% Z(v)_B

0.00011 0.00011 0.00016 0.00019 0.0003 0.00031 0.00011 0.00017 0.00029 0.00042 0.00053 0.00053 0.00109 0.00106 0.00112 0.00098 0.00179 0.00226 0.00306 0.00329 0.01051 0.00686 0.00321 0.01057 0.00347 0.00975 0.07876 0.05497 0.07913 0.07351 0.08974 0.0146 0.00457 0.45752

K-30

K.31. Estimasi Titik DH31 ESTIMASI TITIK

DH31

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH32 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1668.46 1702.25 1450.04 1466 1271.21 1283.37 1738.25 1498.38 1315.96 1153.36 1099.67 1095.18 874.211 890.691 904.204 929.889 807.194 753.618 701.046 651.197 515.335 581.532 687.029 510.824 629.414 487.198 325.038 381.996 313.026 180.834 207.966 395.349 545.576

2.15E-10 2.03E-10 3.28E-10 3.17E-10 4.87E-10 4.73E-10 1.9E-10 2.97E-10 4.39E-10 6.52E-10 7.52E-10 7.61E-10 1.5E-09 1.42E-09 1.35E-09 1.24E-09 1.9E-09 2.34E-09 2.9E-09 3.62E-09 7.31E-09 5.08E-09 3.08E-09 7.5E-09 4.01E-09 8.65E-09 2.91E-08 1.79E-08 3.26E-08 1.69E-07 1.11E-07 1.62E-08 6.16E-09 4.39E-07

0.00049 0.00046 0.00075 0.00072 0.00111 0.00108 0.00043 0.00068 0.001 0.00148 0.00171 0.00173 0.00341 0.00322 0.00308 0.00283 0.00433 0.00532 0.00661 0.00824 0.01663 0.01157 0.00702 0.01708 0.00913 0.01968 0.06629 0.04084 0.07421 0.38494 0.25308 0.03684 0.01402 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 53.1% 52.9% 53.4% Z(v)_G

0.00024 0.00024 0.00036 0.00039 0.00055 0.00057 0.00022 0.00036 0.00054 0.00079 0.0009 0.00093 0.00181 0.00169 0.00165 0.00148 0.00228 0.00263 0.00351 0.00405 0.0088 0.00603 0.00371 0.00915 0.00477 0.01041 0.0348 0.02185 0.04052 0.20517 0.13438 0.01949 0.00749 0.53175

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 46.6% 46.9% 46.8% Z(v)_B

0.00019 0.00019 0.00029 0.00032 0.00049 0.0005 0.00019 0.00028 0.00046 0.00062 0.00078 0.0008 0.00151 0.00139 0.00142 0.00124 0.00203 0.00238 0.00311 0.00347 0.00777 0.00538 0.0032 0.00801 0.00421 0.00896 0.0291 0.01928 0.03369 0.17399 0.11793 0.01728 0.00656 0.45703

K-31

K.32. Estimasi Titik DH32 ESTIMASI TITIK

DH32

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH33 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1662.79 1669.62 1457.67 1445.19 1267.39 1252.46 1683.29 1454.73 1266.44 1085.98 1057.84 1083.62 874.783 860.976 844.029 834.945 674.501 645.484 640.41 639.2 483.508 483.663 538.358 347.852 428.803 294.061 172.047 304.436 343.052 170.179 207.966 187.459 337.747

2.18E-10 2.15E-10 3.23E-10 3.31E-10 4.91E-10 5.09E-10 2.1E-10 3.25E-10 4.92E-10 7.81E-10 8.45E-10 7.86E-10 1.49E-09 1.57E-09 1.66E-09 1.72E-09 3.26E-09 3.72E-09 3.81E-09 3.83E-09 8.85E-09 8.84E-09 6.41E-09 2.38E-08 1.27E-08 3.93E-08 1.96E-07 3.54E-08 2.48E-08 2.03E-07 1.11E-07 1.52E-07 2.6E-08 8.75E-07

0.00025 0.00025 0.00037 0.00038 0.00056 0.00058 0.00024 0.00037 0.00056 0.00089 0.00097 0.0009 0.00171 0.00179 0.0019 0.00196 0.00372 0.00425 0.00435 0.00438 0.01011 0.0101 0.00733 0.02716 0.0145 0.04495 0.22445 0.04051 0.02831 0.23192 0.12708 0.17352 0.02967 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 52.9% 53.4% Z(v)_G

0.00012 0.00013 0.00018 0.0002 0.00028 0.00031 0.00012 0.0002 0.0003 0.00047 0.00051 0.00048 0.00091 0.00094 0.00102 0.00103 0.00196 0.0021 0.00231 0.00215 0.00535 0.00526 0.00387 0.01456 0.00758 0.02378 0.11784 0.02167 0.01546 0.12362 0.06901 0.09179 0.01584 0.53135

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.9% 46.8% Z(v)_B

9.8E-05 0.0001 0.00014 0.00017 0.00025 0.00027 0.00011 0.00015 0.00026 0.00037 0.00044 0.00042 0.00075 0.00077 0.00088 0.00086 0.00174 0.0019 0.00205 0.00184 0.00472 0.0047 0.00334 0.01274 0.00668 0.02045 0.09854 0.01912 0.01285 0.10483 0.0582 0.08138 0.01388 0.45503

K-32

K.33. Estimasi Titik DH33 ESTIMASI TITIK

DH33

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH34 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1672.55 1654.71 1482.4 1444.56 1285.68 1246.47 1647.39 1432.83 1242.71 1049.75 1047.04 1099.84 909.628 869.361 824.296 780.256 586.195 588.011 633.721 677.751 521.648 455.33 440.005 255.409 254.443 150.336 181.497 338.148 452.747 312.416 395.349 187.459 151.822

2.14E-10 2.21E-10 3.07E-10 3.32E-10 4.71E-10 5.16E-10 2.24E-10 3.4E-10 5.21E-10 8.64E-10 8.71E-10 7.52E-10 1.33E-09 1.52E-09 1.79E-09 2.11E-09 4.96E-09 4.92E-09 3.93E-09 3.21E-09 7.04E-09 1.06E-08 1.17E-08 6E-08 6.07E-08 2.94E-07 1.67E-07 2.59E-08 1.08E-08 3.28E-08 1.62E-08 1.52E-07 2.86E-07 1.16E-06

0.00018 0.00019 0.00026 0.00028 0.0004 0.00044 0.00019 0.00029 0.00045 0.00074 0.00075 0.00065 0.00114 0.00131 0.00153 0.00181 0.00426 0.00422 0.00337 0.00276 0.00605 0.0091 0.01008 0.05155 0.05214 0.25279 0.14366 0.02221 0.00926 0.02817 0.0139 0.13039 0.24544 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 53.4% Z(v)_G

9E-05 9.7E-05 0.00013 0.00015 0.0002 0.00023 9.6E-05 0.00016 0.00024 0.0004 0.0004 0.00034 0.00061 0.00069 0.00082 0.00095 0.00225 0.00209 0.00179 0.00135 0.0032 0.00474 0.00532 0.02763 0.02727 0.13373 0.07542 0.01188 0.00505 0.01501 0.00755 0.06924 0.13107 0.5302

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.8% Z(v)_B

7.3E-05 7.8E-05 0.0001 0.00013 0.00018 0.00021 8.4E-05 0.00012 0.00021 0.00031 0.00034 0.0003 0.0005 0.00056 0.00071 0.00079 0.002 0.00189 0.00159 0.00116 0.00283 0.00423 0.0046 0.02418 0.02404 0.11502 0.06307 0.01049 0.0042 0.01273 0.00637 0.06076 0.11487 0.45871

K-33

K.34. Estimasi Titik DH34 ESTIMASI TITIK

DH34

TERHADAP TITIK DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 TOTAL

di

di^-3

i

Z(xi)_G

Z(v)_G

Z(xi)_B

Z(v)_B

1723.46 1686.78 1546.05 1489.82 1346.95 1290.23 1662.54 1461.62 1272.65 1073.18 1090.71 1162.48 989.041 931.631 867.111 796.157 581.251 611.465 694.395 766.512 617.664 513.249 437.824 293.748 167.263 174.003 308.598 447.234 586.08 459.933 545.576 337.747 151.822

1.95E-10 2.08E-10 2.71E-10 3.02E-10 4.09E-10 4.66E-10 2.18E-10 3.2E-10 4.85E-10 8.09E-10 7.71E-10 6.37E-10 1.03E-09 1.24E-09 1.53E-09 1.98E-09 5.09E-09 4.37E-09 2.99E-09 2.22E-09 4.24E-09 7.4E-09 1.19E-08 3.95E-08 2.14E-07 1.9E-07 3.4E-08 1.12E-08 4.97E-09 1.03E-08 6.16E-09 2.6E-08 2.86E-07 8.7E-07

0.00022 0.00024 0.00031 0.00035 0.00047 0.00053 0.00025 0.00037 0.00056 0.00093 0.00089 0.00073 0.00119 0.00142 0.00176 0.00228 0.00585 0.00503 0.00343 0.00255 0.00488 0.0085 0.01369 0.04533 0.24552 0.21808 0.03909 0.01284 0.00571 0.01181 0.00707 0.02982 0.32831 1

48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% Z(v)_G

0.00011 0.00012 0.00015 0.00019 0.00023 0.00028 0.00013 0.0002 0.0003 0.00049 0.00047 0.00039 0.00063 0.00075 0.00094 0.00119 0.00308 0.00249 0.00182 0.00125 0.00258 0.00443 0.00723 0.0243 0.12841 0.11536 0.02052 0.00687 0.00312 0.00629 0.00384 0.01583 0.17367 0.52768

39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% Z(v)_B

8.9E-05 9.9E-05 0.00012 0.00015 0.00021 0.00025 0.00011 0.00015 0.00026 0.00039 0.0004 0.00034 0.00052 0.00061 0.00081 0.00099 0.00274 0.00225 0.00162 0.00107 0.00228 0.00395 0.00624 0.02126 0.11318 0.09923 0.01716 0.00606 0.00259 0.00534 0.00324 0.0139 0.15398 0.4616

K-34

LAMPIRAN L PERBANDINGAN TEBAL DAN KADAR AKTUAL DENGAN HASIL ESTIMASI

L.1. Rekapitulasi Data Aktual Drill Name DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34

Gravel 0.46 0.43 0.55 0.43 0.46 0.39 0.44 0.52 0.37 0.53 0.38 0.45 0.42 0.33 0.37 0.36 0.48 0.41 0.42 0.53 0.47 0.35 0.48 0.38 0.52 0.48 0.41 0.53 0.45 0.44 0.52 0.43 0.52 0.38

Tebal Boulder 3.15 3.26 3.23 3.11 3.25 3.42 3.32 3.02 3.25 3.26 3.4 3.17 3.17 3.42 3.19 3.43 3.23 3.14 3.41 3.15 3.21 3.43 3.36 3.25 3.24 3.24 3.13 3.09 3.11 3.28 3.13 3.39 3.23 3.3

Gravel 48.8% 51.2% 48.1% 53.4% 49.8% 52.6% 50.2% 53.5% 53.9% 53.2% 52.8% 53.4% 53.2% 52.6% 53.6% 52.3% 52.7% 49.5% 53.1% 49.1% 52.9% 52.1% 52.8% 53.6% 52.3% 52.9% 52.5% 53.5% 54.6% 53.3% 54.3% 53.1% 52.9% 53.4%

Kadar Boulder 39.5% 41.2% 38.9% 44.1% 44.2% 46.7% 43.9% 41.6% 46.2% 41.9% 45.5% 46.4% 44.2% 43.2% 46.2% 43.7% 46.8% 44.8% 47.1% 42.1% 46.7% 46.5% 45.6% 46.9% 46.1% 45.5% 43.9% 47.2% 45.4% 45.2% 45.8% 46.6% 46.9% 46.8%

L-1

L.2. Rekapitulasi Data Estimasi IDS Drill Name DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34

Gravel 0.46 0.45 0.44 0.46 0.44 0.43 0.45 0.43 0.44 0.41 0.44 0.42 0.41 0.42 0.41 0.43 0.43 0.44 0.43 0.43 0.45 0.45 0.43 0.46 0.44 0.44 0.46 0.43 0.46 0.46 0.44 0.46 0.44 0.48

Tebal Boulder 3.22 3.21 3.22 3.23 3.25 3.23 3.21 3.25 3.28 3.29 3.26 3.29 3.29 3.24 3.32 3.25 3.26 3.30 3.25 3.27 3.25 3.24 3.25 3.25 3.26 3.24 3.25 3.24 3.23 3.21 3.26 3.21 3.25 3.24

Gravel 51.58% 51.48% 51.78% 51.57% 52.21% 52.51% 52.03% 52.17% 52.46% 52.65% 52.72% 52.22% 52.36% 52.71% 52.40% 52.43% 51.74% 52.67% 51.95% 52.81% 52.31% 52.47% 52.38% 52.70% 52.94% 52.93% 53.08% 52.87% 52.83% 53.21% 53.01% 53.06% 52.96% 52.77%

Kadar Boulder 42.91% 43.07% 43.79% 43.09% 44.25% 44.47% 42.83% 44.13% 44.48% 45.12% 44.55% 44.54% 44.52% 45.06% 44.50% 45.30% 45.22% 45.83% 44.96% 45.70% 45.29% 45.71% 45.88% 45.67% 45.95% 46.13% 46.14% 45.53% 45.72% 45.73% 45.64% 45.57% 45.80% 45.96%

L-2

L.3. Rekapitulasi Data Estimasi IDC Drill Name DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34

Gravel 0.46 0.46 0.44 0.47 0.44 0.42 0.45 0.42 0.43 0.39 0.44 0.41 0.38 0.41 0.39 0.41 0.42 0.44 0.43 0.43 0.45 0.45 0.43 0.46 0.44 0.44 0.46 0.43 0.47 0.46 0.44 0.46 0.43 0.49

Tebal Boulder 3.21 3.20 3.20 3.21 3.26 3.23 3.20 3.23 3.31 3.32 3.26 3.31 3.33 3.22 3.36 3.24 3.24 3.30 3.24 3.29 3.24 3.24 3.25 3.24 3.26 3.24 3.24 3.23 3.21 3.20 3.27 3.20 3.26 3.24

Gravel 51.27% 51.20% 51.50% 51.51% 52.18% 52.77% 51.91% 52.41% 52.63% 52.84% 52.94% 52.21% 52.41% 52.95% 52.44% 52.43% 51.10% 52.66% 51.57% 52.89% 52.07% 52.37% 52.28% 52.75% 53.05% 53.02% 53.18% 52.98% 53.00% 53.41% 53.18% 53.13% 53.02% 52.77%

Kadar Boulder 42.18% 42.67% 43.53% 42.70% 44.42% 44.88% 42.07% 44.22% 44.96% 45.35% 44.48% 44.70% 44.12% 45.11% 44.20% 45.49% 45.15% 46.17% 44.84% 46.02% 45.24% 45.92% 46.14% 45.68% 46.09% 46.33% 46.30% 45.53% 45.93% 45.75% 45.70% 45.50% 45.87% 46.16%

L-3

L.4. Deviasi Hasil Estimasi IDS Terhadap Data Aktual Drill Name DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 Rata-rata

Gravel -0.01 0.06 -0.20 0.06 -0.05 0.10 0.02 -0.18 0.18 -0.24 0.15 -0.07 -0.02 0.28 0.10 0.18 -0.11 0.06 0.03 -0.19 -0.05 0.28 -0.10 0.21 -0.16 -0.08 0.12 -0.18 0.02 0.04 -0.15 0.07 -0.16 0.26 0.0080

Tebal Boulder 0.02 -0.02 0.00 0.04 0.00 -0.06 -0.03 0.08 0.01 0.01 -0.04 0.04 0.04 -0.05 0.04 -0.05 0.01 0.05 -0.05 0.04 0.01 -0.06 -0.03 0.00 0.01 0.00 0.04 0.05 0.04 -0.02 0.04 -0.05 0.01 -0.02 0.0022

Gravel 0.06 0.01 0.08 -0.03 0.05 0.00 0.04 -0.02 -0.03 -0.01 0.00 -0.02 -0.02 0.00 -0.02 0.00 -0.02 0.06 -0.02 0.08 -0.01 0.01 -0.01 -0.02 0.01 0.00 0.01 -0.01 -0.03 0.00 -0.02 0.00 0.00 -0.01 0.0024

Kadar Boulder 0.09 0.05 0.13 -0.02 0.00 -0.05 -0.02 0.06 -0.04 0.08 -0.02 -0.04 0.01 0.04 -0.04 0.04 -0.03 0.02 -0.05 0.09 -0.03 -0.02 0.01 -0.03 0.00 0.01 0.05 -0.04 0.01 0.01 0.00 -0.02 -0.02 -0.02 0.0057

L-4

L.5. Deviasi Hasil Estimasi IDC Terhadap Data Aktual Drill Name DH1 DH2 DH3 DH4 DH5 DH6 DH7 DH8 DH9 DH10 DH11 DH12 DH13 DH14 DH15 DH16 DH17 DH18 DH19 DH20 DH21 DH22 DH23 DH24 DH25 DH26 DH27 DH28 DH29 DH30 DH31 DH32 DH33 DH34 Rata-rata

Gravel 0.00 0.06 -0.20 0.09 -0.05 0.07 0.02 -0.19 0.16 -0.26 0.16 -0.09 -0.08 0.25 0.05 0.15 -0.12 0.07 0.03 -0.19 -0.04 0.28 -0.10 0.22 -0.16 -0.08 0.13 -0.19 0.04 0.04 -0.15 0.07 -0.17 0.29 0.0042

Tebal Boulder 0.02 -0.02 -0.01 0.03 0.00 -0.05 -0.04 0.07 0.02 0.02 -0.04 0.04 0.05 -0.06 0.05 -0.06 0.00 0.05 -0.05 0.04 0.01 -0.06 -0.03 0.00 0.01 0.00 0.04 0.04 0.03 -0.03 0.05 -0.05 0.01 -0.02 0.0023

Gravel 0.05 0.00 0.07 -0.04 0.05 0.00 0.03 -0.02 -0.02 -0.01 0.00 -0.02 -0.01 0.01 -0.02 0.00 -0.03 0.06 -0.03 0.08 -0.02 0.01 -0.01 -0.02 0.01 0.00 0.01 -0.01 -0.03 0.00 -0.02 0.00 0.00 -0.01 0.0024

Kadar Boulder 0.07 0.04 0.12 -0.03 0.00 -0.04 -0.04 0.06 -0.03 0.08 -0.02 -0.04 0.00 0.04 -0.04 0.04 -0.04 0.03 -0.05 0.09 -0.03 -0.01 0.01 -0.03 0.00 0.02 0.05 -0.04 0.01 0.01 0.00 -0.02 -0.02 -0.01 0.0058

L-5

LAMPIRAN M HASIL PERHITUNGAN SUMBERDAYA

M.1. Rumus Perhitungan Sumberdaya =

=

×

×

M.2. Hasil Perhitungan Sumberdaya

Estimasi IDS pada Lapisan Gravel IDC pada Lapisan Gravel IDS pada Lapisan Boulder IDC pada Lapisan Boulder

Ukuran Block (m^2)

BLOCK REGULAR Tebal Jumlah Volume Total Blok (m^3) (m)

Tonase (ton)

Kadar (%Fe)

100×100

92

40.79

407,900

1,957,920

52.55

100×100

92

40.95

409,500

1,965,600

52.50

100×100

92

299.76

2,997,600

14,388,480

44.85

100×100

92

299.31

2,993,100

14,366,880

44.77

Tonase (ton)

Kadar (%Fe)

40,320 402,000 1,543,080 1,985,400 39,360 400,800 1,548,480 1,988,640 5,795,520 4,606,560 3,985,080 14,387,160 5,793,600 4,596,240 3,975,960 14,365,800

52.00 52.32 52.58 52.30 52.00 52.16 52.54 52.23 44.81 44.78 44.99 44.86 44.81 44.68 44.83 44.77

Ukuran Estimasi Block (m^2) 100×100 IDS pada Lapisan 100×50 Gravel 100×25 Total Block Non Regular 100×100 IDC pada Lapisan 100×50 Gravel 100×25 Total Block Non Regular 100×100 IDS pada Lapisan 100×50 Boulder 100×25 Total Block Non Regular 100×100 IDC pada Lapisan 100×50 Boulder 100×25 Total Block Non Regular

BLOCK NON REGULAR Tebal Jumlah Volume Total Blok (m^3) (m) 2 0.84 8,400 38 16.75 83,750 291 128.59 321,475 331 413,625 2 0.82 8,200 38 16.70 83,500 291 129.04 322,600 331 414,300 37 120.74 1,207,400 59 191.94 959,700 102 332.09 830,225 198 2,997,325 37 120.70 1,207,000 59 191.51 957,550 102 331.33 828,325 198 2,992,875

M-1

M.3. Deviasi Sumberdaya Block Regular terhadap Block Non Regular Estimasi

Block Regular

Deviasi

IDS pada Lapisan Gravel IDC pada Lapisan Gravel IDS pada Lapisan Boulder IDC pada Lapisan Boulder

100×100 100×100 100×100 100×100

-0.01384 -0.01159 0.00009 0.00008

M-2

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF