LABORATORIUM ILMU UKUR TANAH FAKULTAS TEKNIK JURUSAN SIPIL UNIVERSITAS KRISTEN MARANATHA Jl. Prof. Drg. Suria Sumantri 65 Bandung – Bandung – 40614 40614
SURAT TUGAS PRAKTIKUM ILMU UKUR TANAH Regu
: A1
Anggota
: 1. Hansen Wijaya 2. Angtonya Ferlya Am 3. Diego Banjarnahor 4. Yolanda Prisila
Judul Tugas
: ● Hitungan ● Hitungan Koordinat ● Hitungan Azimuth, Sudut dan Jarak ● Prisma Segitiga
Judul Praktikum
: ● Poligon ● Waterpass Memanjang ● Waterpass Profil ● Pemetaan Situasi ● Planimeter
NRP. 1621029 NRP. 1621051 NRP. 1621064 NRP. 1621086
● Cut & Fill
● Stereoskop Titik Patok / Titik Awal Elevasi Titik Awal Pemasukan Tugas
::: 4 Mei 2017
Bandung, 4 Mei 2017 Asisten,
(Roi Milyardi, S.T.)
GALIAN DAN TIMBUNAN Dasar Teori
Dalam pekerjaan teknik sipil, ada pekerjaan yang disebut pekerjaan tanah (earth work). Maksudnya adalah pekerjaan yang menyangkut penggalian, penimbunan dan pemindahan tanah. Untuk itu diperlukan pekerjaan pengukuran profil memanjang dan melintang untul mengetahui besarnya volume tanah yang akan digali maupun ditimbun, sehingga bisa dihasilkan hasil yang ekonomis. Misalnya: Dalam proyek pekerjaan jalan setapak dari stasiun A ke B yang berjarak 100m. Maka, untuk pekerjaan tanah pada proyek tersebut diperlukan pengukuran profil memanjang dari stsiun A ke B serta beberapa profil melintang dengan panjang sesuai dengan lebar jalan yang direncanakan. Bila setiap jarak 25 m dibuat profil melintang, maka akan diperlukan 5 buah profil melintang dalam proyek jalan ini.
Setelah Profil memanjang dan melintang selesai dibuat, kemudian ditarik garis-garis rencana jalan. Dari sini nantinya dapat diketahui dimanan diperlukan penggalian, penimbunan dan volume tanahnya. Rumus yang digunakan: Volume Galian:
+ 2
× −(−)
Hitungan Cut and Fill-Regu A1 | 1
Dimana: Gi = Luas rencana galian pada titik I
Gi+1 = Luas rencana galian pada titik
(m2)
2 i+1(m )
di+1 = Jarak dari titik I ke titik
i+1 (m)
Vg j = Volume galian ke-j antara I dan i+1 (m
2
)
Jadi volume galian total: Vg j =
∑=
Volume timbunan:
+ 2
× −(−)
Dimana: Ti
= Luas rencana timbunan
di+1
pada titik I (m2)
(m)
Ti+1
Vtj
= Luas rencana timbunan
pada titik i+1 (m2)
= jarak dari titik I ke titik i+1
=
Volume
timbunan
ke-j
antara titik I dan i+1 (m 3)
Jadi volume timbunan total: Vt j = ∑= =
Tujuan Pengukuran Galian dan Timbunan
Tujuan dari galian dan timbunan adalah untuk menentukan besar volume galian dan timbunan dari hasil pengukuran profil memanjang dan melintang pada suatu perencanaan pekerjaan jalanan atau bangunan Pelaksanaan Pengukuran Galian dan Timbunan
Langkah-langkah pekerjaan yang dilakukan:
Hitungan Cut and Fill-Regu A1 | 2
1. Siapkan data dan hasil penggambaran waterpass profil baik arah memanjang maupun melintang. 2. Tentukan panjang dan lebar pengukuran yang diinginkan (akan ditentukan oleh asisten). 3. Tentukan garis rencananya yang baik sehingga akan diperoleh hasil yang ekonomis. 4. Hitung galian dan timbunan total yang diperlukan.
Hitungan Cut and Fill-Regu A1 | 3
1. Rumah Type 100/200 (Potongan Depan)
Elevasi Potongan = 229 m Luas Galian
= 1292.76 m2
Volume Galian = 1292.76×10 = 12927.6 m3
2. Rumah Type 100/200 (Potongan Tengah)
Hitungan Cut and Fill-Regu A1 | 4
Elevasi Potongan = 229 m Luas Galian = 1687.24 m2 Volume Galian =1687.24 ×10 = 16872.4 m3
3. Rumah Type 100/200 (Potongan Belakang)
Elevasi Potongan = 229 m Luas Galian =1681.88 m2 Volume Galian = 1681.88 ×10 = 16818.8 m3
4. Jalan Cempaka I
Hitungan Cut and Fill-Regu A1 | 5
Elevasi Potongan = 229 m Luas Galian = 1304.32 m2 Volume Galian = 1304.32 X 6 = 7825.92 m3
5. Rumah Type 123/240 (Potongan Depan)
Elevasi Potongan = 230 m Luas Timbunan = 214.7 m2
Luas Galian = 406.8 m2
Volume Timbunan = 214.7×20
Volume Galian = 406.8 ×20
= 4294 m3
= 8136 m3
6. Rumah Type 123/240 (Potongan Tengah)
Hitungan Cut and Fill-Regu A1 | 6
Elevasi Potongan = 229 m Luas Timbunan= 98.75
Luas Galian = 409.4 m2
Volume Timbunan = 98.75×20
Volume Galian = 409.4×20
= 1975 m3
7.
= 8188 m3
Rumah Type 123/240 (Potongan Belakang)
Elevasi Potongan = 229 m Luas Galian= 709.8 m2 Volume Galian = 709.8×20 = 14196 m3
8.
Jalan Cempaka II Hitungan Cut and Fill-Regu A1 | 7
Elevasi Potongan = 229 m Luas Galian = 167.5 m2 Volume Galian = 167.5 ×6 = 1005 m3
9. Jalan Cempaka III
Elevasi Potongan = 230.5 m Luas Galian = 425.02 m2
Luas Timbunan = 202.86 m2
Volume Galian = 425.02 ×6
Volume Timbunan = 149,8 ×6
= 2550.12 m3
10.
= 1271.16 m3
Ruko Type 72/90 (Potongan Tengah)
Hitungan Cut and Fill-Regu A1 | 8
Elevasi Potongan = 231 m Luas Galian= G1+G2 = 252.8486+249,7077 = 502,5563 m2
Volume Galian = 502,5563 x6 = 3015,3378 m3
11.
Luas Timbunan = T 1+T2 = 118,9473 + 65.8243 = 184,7716 m2 Volume Timbunan = 184,7716 ×6 = 1108,6269 m3
Ruko Type 72/90 (Tampak Depan)
Hitungan Cut and Fill-Regu A1 | 9
Elevasi Potongan = 230 m Luas Galian= G1+G2 = 224,4389 + 212,3214 = 436,7603 m2
Volume Galian = 436,7603 ×6 = 2620,5618 m3
12.
Luas Timbunan = T 1+T2 = 93,6337 + 138,7332 = 1481,3669 m2 Volume Timbunan = 1481,3669 ×6 = 8888,2014 m3
Ruko Type 72/90 (Tampak Belakang)
Hitungan Cut and Fill-Regu A1 | 10
Elevasi Potongan = 230 m =3641,0004 m3
Luas Galian= G1+G2 + G2 = 250,1800+119,3627+
Luas Timbunan = T 1
237,2907
= 118,8739
=606,8334 m2
Volume Timbunan = 118,8739 ×6
Volume Galian = 606,8334 ×6
=
713,2434
m3
Volume Total dan Persentase:
No. 1
2
3 4 5
Letak Galian dan Timbunan Rumah Type 100 (Potongan Depan) Rumah Type 100 (Potongan Tengah) Rumah Type 100 (Potongan Belakang) Jalan Cempaka I Rumah Type 123 (Potongan Depan)
Elevasi Grading (m)
Galian (m3)
Timbunan (m3)
Δ (m3)
Δ (%)
12927.6
0.0
12927.6
100.0 %
229
1687.2
0.0
-1687.2
100.0 %
1681.9
0.0
1681.9
100.0 %
7825.9
0.0
7825.9
100.0 %
8136.0
4294.0
-3842.0
-47.2%
229
229 229
230
Hitungan Cut and Fill-Regu A1 | 11
6
7 8 9 10
11
12
Rumah Type 123 (Potongan Tengah) Rumah Type 123 (Potongan Belakang) Jalan Cempaka II Jalan Cempaka III Ruko Type 72 (Potongan Depan) Ruko Type 72 (Potongan Tengah) Ruko Type 72 (Potongan Belakang) Ʃ=
8188.0
1975.0
6213.0
75.9%
14196.0
0.0
14196.0
1005.0
0.0
1005.0
2550.1
1271.2
1279.0
50.2%
2620.6
8888.2
6267.6
239.2 %
3015.3
1108.6
-1906.7
-63.2%
606.8
713.2
106.4
17.5%
64440.5
18250.2
229
229 229 230.5
231
100.0 % 100.0 %
230
230
Persentase:
64440.5−18250.2 64440.5
× 100%
× 100% 71.67 %
Hitungan Cut and Fill-Regu A1 | 12
PEMBAHASAN 1.
Dari pengukuran waterpass profil (profil memanjang dan melintang), kita dapat memperkirakan dan menentukan volume galian dan timbunan pada perencanaan suatu jalan atau bangunan agar didapat hasil yang seekonomis mungkin.
2.
Galian dan timbunan berfungsi untuk memperbaiki kontur tanah.
3.
Dari perhitungan yang dilakukan didapat volume galian total lebih besar dari volume timbunan total, maka ada kelebihan tanah untuk penimbunan, sehingga diperlukan biaya untuk memindahkan tanah yang tidak terpakai.
4.
Kesalahan yang terjadi ini dikarenakan kurang telitinya pada saat melakukan grading tanah.
5.
Agar presentase volume galian dan timbunan dapat lebih ekonomis maka harus dilakukan penggrading ulang dengan lebih teliti.
Hitungan Cut and Fill-Regu A1 | 13
SIMPULAN Dari hasil pengukuran dan perhitungan galian dan timbunan, maka didapatkan hasil sebagai berikut:
No.
Letak Galian dan Timbunan
Elevasi Grading (m)
Galian (m3)
Timbunan (m3)
12927.6
0.0
1687.2
0.0
1681.9
0.0
7825.9
0.0
8136.0
4294.0
8188.0
1975.0
14196.0
0.0
1
Rumah Type 100 (Potongan Depan)
229
2
Rumah Type 100 (Potongan Tengah)
229
3
Rumah Type 100 (Potongan Belakang)
229
4
Jalan Cempaka I
229
5
Rumah Type 123 (Potongan Depan)
230
6
Rumah Type 123 (Potongan Tengah)
229
7
Rumah Type 123 (Potongan Belakang)
229
8
Jalan Cempaka II
229
1005.0
0.0
9
Jalan Cempaka III
230.5
2550.1
1271.2
10
Ruko Type 72 (Potongan Depan)
231
2620.6
8888.2
11
Ruko Type 72 (Potongan Tengah)
230
3015.3
1108.6
12
Ruko Type 72 (Potongan Belakang)
230
606.8
713.2
64440.5
18250.2
Ʃ= Dengan elevasi potong diantara 229-231 m.
Hitungan Cut and Fill-Regu A1 | 14
DAFTAR PUSTAKA 1. Modul Kuliah Ilmu Ukur Tanah Universitas Kristen Maranatha. 2.
Pedoman Pelaksanaan Laboratorium Ilmu Ukur Tanah Universitas Kristen Maranatha.
Hitungan Cut and Fill-Regu A1 | 15