LABORATORIUM ILMU UKUR TANAH FAKULTAS TEKNIK JURUSAN SIPIL UNIVERSITAS KRISTEN MARANATHA Jl. Prof. Drg. Suria Sumantri 65 Bandung –  Bandung  –  40614  40614

SURAT TUGAS PRAKTIKUM ILMU UKUR TANAH Regu

: A1

Anggota

: 1. Hansen Wijaya 2. Angtonya Ferlya Am 3. Diego Banjarnahor 4. Yolanda Prisila

Judul Tugas

: ● Hitungan ● Hitungan Koordinat ● Hitungan Azimuth, Sudut dan Jarak  ● Prisma Segitiga

Judul Praktikum

: ● Poligon ● Waterpass Memanjang ● Waterpass Profil ● Pemetaan Situasi ● Planimeter 

NRP. 1621029 NRP. 1621051 NRP. 1621064 NRP. 1621086

● Cut & Fill

● Stereoskop Titik Patok / Titik Awal Elevasi Titik Awal Pemasukan Tugas

::: 4 Mei 2017

Bandung, 4 Mei 2017 Asisten,

(Roi Milyardi, S.T.)

GALIAN DAN TIMBUNAN Dasar Teori

Dalam pekerjaan teknik sipil, ada pekerjaan yang disebut pekerjaan tanah (earth work). Maksudnya adalah pekerjaan yang menyangkut penggalian,  penimbunan dan pemindahan tanah. Untuk itu diperlukan pekerjaan pengukuran profil memanjang dan melintang untul mengetahui besarnya volume tanah yang akan digali maupun ditimbun, sehingga bisa dihasilkan hasil yang ekonomis. Misalnya: Dalam proyek pekerjaan jalan setapak dari stasiun A ke B yang berjarak 100m. Maka, untuk pekerjaan tanah pada proyek tersebut diperlukan pengukuran  profil memanjang dari stsiun A ke B serta beberapa profil melintang dengan  panjang sesuai dengan lebar jalan yang direncanakan. Bila setiap jarak 25 m dibuat profil melintang, maka akan diperlukan 5 buah profil melintang dalam  proyek jalan ini.

Setelah Profil memanjang dan melintang selesai dibuat, kemudian ditarik garis-garis rencana jalan. Dari sini nantinya dapat diketahui dimanan diperlukan  penggalian, penimbunan dan volume tanahnya. Rumus yang digunakan: Volume Galian:

  

   + 2

× −(−)

Hitungan Cut and Fill-Regu A1  | 1

Dimana: Gi = Luas rencana galian pada titik I

Gi+1 = Luas rencana galian pada titik

(m2)

2 i+1(m )

di+1 = Jarak dari titik I ke titik

i+1 (m)

Vg j = Volume galian ke-j antara I dan i+1 (m

2

)

Jadi volume galian total: Vg j =

∑=   

Volume timbunan:

  

   + 2

× −(−)

Dimana: Ti

= Luas rencana timbunan

di+1

 pada titik I (m2)

(m)

Ti+1

Vtj

= Luas rencana timbunan

 pada titik i+1 (m2)

= jarak dari titik I ke titik i+1

=

Volume

timbunan

ke-j

antara titik I dan i+1 (m 3)

Jadi volume timbunan total: Vt j = ∑= = 

Tujuan Pengukuran Galian dan Timbunan

Tujuan dari galian dan timbunan adalah untuk menentukan besar volume galian dan timbunan dari hasil pengukuran profil memanjang dan melintang pada suatu perencanaan pekerjaan jalanan atau bangunan Pelaksanaan Pengukuran Galian dan Timbunan

Langkah-langkah pekerjaan yang dilakukan:

Hitungan Cut and Fill-Regu A1  | 2

1. Siapkan data dan hasil penggambaran waterpass profil baik arah memanjang maupun melintang. 2. Tentukan panjang dan lebar pengukuran yang diinginkan (akan ditentukan oleh asisten). 3. Tentukan garis rencananya yang baik sehingga akan diperoleh hasil yang ekonomis. 4. Hitung galian dan timbunan total yang diperlukan.

Hitungan Cut and Fill-Regu A1  | 3

1. Rumah Type 100/200 (Potongan Depan)

Elevasi Potongan = 229 m Luas Galian

= 1292.76 m2

Volume Galian = 1292.76×10 = 12927.6 m3

2. Rumah Type 100/200 (Potongan Tengah)

Hitungan Cut and Fill-Regu A1  | 4

Elevasi Potongan = 229 m Luas Galian = 1687.24 m2 Volume Galian =1687.24 ×10 = 16872.4 m3

3. Rumah Type 100/200 (Potongan Belakang)

Elevasi Potongan = 229 m Luas Galian =1681.88 m2 Volume Galian = 1681.88 ×10 = 16818.8 m3

4. Jalan Cempaka I

Hitungan Cut and Fill-Regu A1  | 5

Elevasi Potongan = 229 m Luas Galian = 1304.32 m2 Volume Galian = 1304.32 X 6 = 7825.92 m3

5. Rumah Type 123/240 (Potongan Depan)

Elevasi Potongan = 230 m Luas Timbunan = 214.7 m2

Luas Galian = 406.8 m2

Volume Timbunan = 214.7×20

Volume Galian = 406.8 ×20

= 4294 m3

= 8136 m3

6. Rumah Type 123/240 (Potongan Tengah)

Hitungan Cut and Fill-Regu A1  | 6

Elevasi Potongan = 229 m Luas Timbunan= 98.75

Luas Galian = 409.4 m2

Volume Timbunan = 98.75×20

Volume Galian = 409.4×20

= 1975 m3

7.

= 8188 m3

Rumah Type 123/240 (Potongan Belakang)

Elevasi Potongan = 229 m Luas Galian= 709.8 m2 Volume Galian = 709.8×20 = 14196 m3

8.

Jalan Cempaka II Hitungan Cut and Fill-Regu A1  | 7

Elevasi Potongan = 229 m Luas Galian = 167.5 m2 Volume Galian = 167.5 ×6 = 1005 m3

9. Jalan Cempaka III

Elevasi Potongan = 230.5 m Luas Galian = 425.02 m2

Luas Timbunan = 202.86 m2

Volume Galian = 425.02 ×6

Volume Timbunan = 149,8 ×6

= 2550.12 m3

10.

= 1271.16 m3

Ruko Type 72/90 (Potongan Tengah)

Hitungan Cut and Fill-Regu A1  | 8

Elevasi Potongan = 231 m Luas Galian= G1+G2 = 252.8486+249,7077 = 502,5563 m2

Volume Galian = 502,5563  x6 = 3015,3378 m3

11.

Luas Timbunan = T 1+T2 = 118,9473 + 65.8243 = 184,7716 m2 Volume Timbunan = 184,7716 ×6 = 1108,6269 m3

Ruko Type 72/90 (Tampak Depan)

Hitungan Cut and Fill-Regu A1  | 9

Elevasi Potongan = 230 m Luas Galian= G1+G2 = 224,4389 + 212,3214 = 436,7603 m2

Volume Galian = 436,7603 ×6 = 2620,5618 m3

12.

Luas Timbunan = T 1+T2 = 93,6337 + 138,7332 = 1481,3669 m2 Volume Timbunan = 1481,3669 ×6 = 8888,2014 m3

Ruko Type 72/90 (Tampak Belakang)

Hitungan Cut and Fill-Regu A1  | 10

Elevasi Potongan = 230 m =3641,0004 m3

Luas Galian= G1+G2 + G2 = 250,1800+119,3627+

Luas Timbunan = T 1

237,2907

= 118,8739

=606,8334 m2

Volume Timbunan = 118,8739 ×6

Volume Galian = 606,8334 ×6

=

713,2434

m3

Volume Total dan Persentase:

 No. 1

2

3 4 5

Letak Galian dan Timbunan Rumah Type 100 (Potongan Depan) Rumah Type 100 (Potongan Tengah) Rumah Type 100 (Potongan Belakang) Jalan Cempaka I Rumah Type 123 (Potongan Depan)

Elevasi Grading (m)

Galian (m3)

Timbunan (m3)

Δ (m3)

Δ (%)

12927.6

0.0

12927.6

100.0 %

229

1687.2

0.0

-1687.2

100.0 %

1681.9

0.0

1681.9

100.0 %

7825.9

0.0

7825.9

100.0 %

8136.0

4294.0

-3842.0

-47.2%

229

229 229

230

Hitungan Cut and Fill-Regu A1  | 11

6

7 8 9 10

11

12

Rumah Type 123 (Potongan Tengah) Rumah Type 123 (Potongan Belakang) Jalan Cempaka II Jalan Cempaka III Ruko Type 72 (Potongan Depan) Ruko Type 72 (Potongan Tengah) Ruko Type 72 (Potongan Belakang) Ʃ=

8188.0

1975.0

6213.0

75.9%

14196.0

0.0

14196.0

1005.0

0.0

1005.0

2550.1

1271.2

1279.0

50.2%

2620.6

8888.2

6267.6

239.2 %

3015.3

1108.6

-1906.7

-63.2%

606.8

713.2

106.4

17.5%

64440.5

18250.2

229

229 229 230.5

231

100.0 % 100.0 %

230

230

Persentase:

 

  



 64440.5−18250.2 64440.5

  × 100%

 × 100%  71.67 %

Hitungan Cut and Fill-Regu A1  | 12

PEMBAHASAN 1.

Dari pengukuran waterpass profil (profil memanjang dan melintang), kita dapat memperkirakan dan menentukan volume galian dan timbunan pada  perencanaan suatu jalan atau bangunan agar didapat hasil yang seekonomis mungkin.

2.

Galian dan timbunan berfungsi untuk memperbaiki kontur tanah.

3.

Dari perhitungan yang dilakukan didapat volume galian total lebih besar dari volume timbunan total, maka ada kelebihan tanah untuk penimbunan, sehingga diperlukan biaya untuk memindahkan tanah yang tidak terpakai.

4.

Kesalahan yang terjadi ini dikarenakan kurang telitinya pada saat melakukan grading tanah.

5.

Agar presentase volume galian dan timbunan dapat lebih ekonomis maka harus dilakukan penggrading ulang dengan lebih teliti.

Hitungan Cut and Fill-Regu A1  | 13

SIMPULAN Dari hasil pengukuran dan perhitungan galian dan timbunan, maka didapatkan hasil sebagai berikut:

 No.

Letak Galian dan Timbunan

Elevasi Grading (m)

Galian (m3)

Timbunan (m3)

12927.6

0.0

1687.2

0.0

1681.9

0.0

7825.9

0.0

8136.0

4294.0

8188.0

1975.0

14196.0

0.0

1

Rumah Type 100 (Potongan Depan)

229

2

Rumah Type 100 (Potongan Tengah)

229

3

Rumah Type 100 (Potongan Belakang)

229

4

Jalan Cempaka I

229

5

Rumah Type 123 (Potongan Depan)

230

6

Rumah Type 123 (Potongan Tengah)

229

7

Rumah Type 123 (Potongan Belakang)

229

8

Jalan Cempaka II

229

1005.0

0.0

9

Jalan Cempaka III

230.5

2550.1

1271.2

10

Ruko Type 72 (Potongan Depan)

231

2620.6

8888.2

11

Ruko Type 72 (Potongan Tengah)

230

3015.3

1108.6

12

Ruko Type 72 (Potongan Belakang)

230

606.8

713.2

64440.5

18250.2

Ʃ= Dengan elevasi potong diantara 229-231 m.

Hitungan Cut and Fill-Regu A1  | 14

DAFTAR PUSTAKA 1. Modul Kuliah Ilmu Ukur Tanah Universitas Kristen Maranatha. 2.

Pedoman Pelaksanaan Laboratorium Ilmu Ukur Tanah Universitas Kristen Maranatha.

Hitungan Cut and Fill-Regu A1  | 15

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF