L2 V4 08 C264 LBUS Configuration E 01

Share Embed Donate


Short Description

SAS...

Description

MiCOM C264 LBUS Configuration PACiS Technical Training Level 2 CS&P Support Team

PCL

• Content  LBUS Direct Implementation  Use of Library

Schneider Electric - CS&P – C264 LBUS Configuration – E01

2

• Content  LBUS Direct Implementation  Use of Library

Schneider Electric - CS&P – C264 LBUS Configuration – E01

3

• Add / Configure a LBUS (1) 1) LBUS can be added at MiCOM C264 Level => Protocol Oriented

2) LBUS attributes (example given with T103, cf. C264 AP chapter) Number of retries : number of time C264 will try to poll IED

Acknowledgement time-out : IED response time-out

Synchronization cycle : periodic synchro. frames

Inter frame

Downgraded cycle : when IED not responding, periodic retry

Schneider Electric - CS&P – C264 LBUS Configuration – E01

4

• Add / Configure a LBUS (2) 3) Connect LBUS to communication port

4) Configure C264 communication Communication parameters Note that COM3 and COM4 should have same transmission speed For COM3 and COM4 => Tx carrier management set to Switched

Schneider Electric - CS&P – C264 LBUS Configuration – E01

5

• Add / Configure an IED (1) 1) IED can be added at LBUS Level

2) IED attributes (example given with T103, cf. C264 AP chapter) IED @ on LBUS

Automatic disturbance available for SMT + local name for COMTRADE file display in viewing tool (WaveWin, …) N/A for DNP3

No space in the name of the directory

Schneider Electric - CS&P – C264 LBUS Configuration – E01

6

• Add / Configure an IED (2) 3) IED Should be connected to a Acq Profile 1) Add the IED Acq Profile under LBUS 2) Complete relation “has for acq profile” between IED and acq profile

4) Acq Profile attributes (example given with T103, cf. C264 AP chapter) 4.1) General Tab

IED main protective function code here T103 FTYPE = 160 (OC)

Schneider Electric - CS&P – C264 LBUS Configuration – E01

7

• Add / Configure an IED (3) 4) Acq Profile attributes (example given with T103, cf. C264 AP chapter) 4.2) Acquisition Tab GI period : - 0 => GI at connection only - advised = 3600s (1h)

MV reduction coefficient : - 1.2 or 2.4 (cf. IED documentation) - MV = red_coeff x transmitted val x nominal val.

Nominal values per setting group AI channel : Channel number as per IED setting

5) Under Acq Profile => disturbance channels

Schneider Electric - CS&P – C264 LBUS Configuration – E01

8

• Add / Configure IED Mapping (1) 1) Add DP (DataPoints) addresses IED Mapping : set of SPS, DPS, MPS, MV, SPC, DPC, … managed by IED (cf. IED documentation)

To add a DP address : 1) select kind of DP Mapping 2) Through Objects Entry Window, add an address

Schneider Electric - CS&P – C264 LBUS Configuration – E01

9

• Add / Configure IED Mapping (2) 2) Configure DP addresses (example given with T103) 2.1) SPS address SPS address : as per IED documentation, here ASDU, FTYP and INF (as per IEC-60870-5-103 standard public or IED private)

2.2) DPS address DPS address : as per IED documentation, here ASDU, FTYP and INF (as per IED private)

Contact = relevant status

Schneider Electric - CS&P – C264 LBUS Configuration – E01

10

• Add / Configure IED Mapping (3) 2) Configure DP addresses (example given with T103) 2.3) SPC address SPC address : as per IED documentation, here ASDU, FTYP and INF (as per IEC-60870-5-103 standard public or IED private)

DE/SBO regarding LBUS protocol 2.4) MV address MV address : as per IED documentation, here ASDU, FTYP, INF and index=rank in ASDU (as per IEC-608705-103 standard public or IED private)

Schneider Electric - CS&P – C264 LBUS Configuration – E01

11

• Add / Configure IED Mapping (4) 3) Link DP with the relevant address (example given with T103) => Relation “has for IED address” Under datapoint : DP link with relevant address on the IED

Schneider Electric - CS&P – C264 LBUS Configuration – E01

12

• Miscellaneous (1) 1) IED System information

IED SPS Com : Gives connection status between C264 and IED (animated at PACiS OI Level)

IED SPS Synchro : Gives IED synchronization status

+ IED RDRE Ready : SPS indicates when IED disturbance file is ready at C264 level Note : “ext IEC Mapping” added by “SBUS automatic addressing”, but not in template

Schneider Electric - CS&P – C264 LBUS Configuration – E01

13

• Miscellaneous (2) 2) Modbus LBUS

Standard attributes : same as T103 (nb of retries, response timeout, …)

Synchronization : None/AREVA (for AREVA Modbus)

Modbus IED acq. Profile : definition of Modbus type (MiCOM S20 = AREVA Modbus)

Schneider Electric - CS&P – C264 LBUS Configuration – E01

14

• Miscellaneous (3) 3) Reminder  Limits up to 4 communication links (LBUS+TBUS serial or ethernet) up to 4 LBUS up to 2 TBUS

 Connections BIU port 1 => RS232/RS485

Jumpers on BIU board

BIU port 2 => RS232/RS485/RS422

CPU port 3 => RS232 CPU port 4 => RS232

Schneider Electric - CS&P – C264 LBUS Configuration – E01

ECU200 => Fiber Optics ECU201 => RS485/RS422

15

• Content  LBUS Direct Implementation  Use of Library

Schneider Electric - CS&P – C264 LBUS Configuration – E01

16

• Why using a template? 1) Direct implementation : => configure IED general info => add mapping (DP addresses) => add DP and link Repeat for each IED and then test resulting configuration => JOB INTENSIVE 2) Template instantiations : => DP and links already done => only configure IED name and @ => repeatable => all DP already tested OK => IED integration => SAVE TIME

Schneider Electric - CS&P – C264 LBUS Configuration – E01

17

• List of integrated IED and relevant templates 1) Integrated IED : => PACiS version + IED version => integration report => relevant template 2) List of integrated IED : => LN database “Products and System Info”

Schneider Electric - CS&P – C264 LBUS Configuration – E01

18

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF