L1 V4 00 System Terminology E 01
Short Description
Download L1 V4 00 System Terminology E 01...
Description
PACiS Terminology PACiS Technical Training CS&P – Support Team
PCL
• Content
Electric Network Definition Primary Devices Protections Datapoints
Schneider Electric - CS&P – System Terminology – E01
2
• Content
Electric Network Definition Primary Devices Protections Datapoints
Schneider Electric - CS&P – System Terminology – E01
3
• What is Electric Network Electric Network is a Hierarchy of Voltage
Transmission Transport 600-400kV
Repartition 220kV
kV 400
225 kV
Bi-directional Mesh
Distribution
90 kV
Distribution 110-90 kV Directional Antenna
Delivery 2-6-20kV Antenna / Annealing
Schneider Electric - CS&P – System Terminology – E01
6-20 kV
4
• What is Electric Network Carry Electricity from Producers to Consumers
Producer Industrial Consumer Schneider Electric - CS&P – System Terminology – E01
Domestic Consumer 5
• What is Substation Substation is a node in the grid electric network Substation is linked to one voltage level
Schneider Electric - CS&P – System Terminology – E01
1.
Dispatch power flow on branch/lines
2.
Allow maintenance (line/device)
3.
Select/eliminate fault in only one section
4.
Mesh network (stability) 6
• System Terminology
SITE SUBSTATION VOLTAGE LEVEL BAY
MODULE Schneider Electric - CS&P – System Terminology – E01
7
• Content
Electric Network Definition Primary Devices Protections Datapoints
Schneider Electric - CS&P – System Terminology – E01
8
• Primary Device: Bus Bar Feeder => interface to Voltage level (line branch, transformer) Bus Bar => Backbone to dispatch power between feeders
Schneider Electric - CS&P – System Terminology – E01
9
• Primary Device: Circuit Breaker Make / Break Current then Power flow Operate under Nominal or Faulty condition
Schneider Electric - CS&P – System Terminology – E01
- exploitation - shortcut current
10
• Primary Device: Bar / Line Isolator Bar Isolator : Isolate CB / Bar (maintenance/exploitation) Line Isolator : Isolate CB / Line (line maintenance)
Schneider Electric - CS&P – System Terminology – E01
11
• Primary Device: Earth switch Isolator Ground a isolated part of the circuit for maintenance
Schneider Electric - CS&P – System Terminology – E01
12
• Primary Devices list Feeder (line) Bus bar Circuit Breaker Bar Isolator Line Isolator Earth Isolator
• Transformer • Generator
G
• Motor
M
• Capacitor Bank • Reactor Schneider Electric - CS&P – System Terminology – E01
13
• Switching Devices Kind Breaking
Isolation
ICC
4IN
IN
VN
VPeak
Breaker
X
X
X
-
-
Isolator
-
-
-
X
X
-
X
X
-
-
Switch disconnector
-
X
X
X
X
Contactor
-
-
X
X
-
Breaker Isolator
X
X
X
X
X
Switch
Roughly : ICC =10 IN Roughly : VPeak = 2 VN Schneider Electric - CS&P – System Terminology – E01
between phase, phase to earth up to 6 VN (thunder peak 50ms) 14
• Measurement Transformer CT/VT Provide current / voltage measurement to Protection/Control System
Schneider Electric - CS&P – System Terminology – E01
15
• Why measurement CT/VT CT/VT : Lower Primary Values (HV) to Secondary Values (LV) • Galvanic Isolation (no current between HV / LV) • Measurement Reduction
3 000 Amps
1 Amp
Schneider Electric - CS&P – System Terminology – E01
64 000 Volts
120 Volts
16
• Voltage Transformer Overview (1) Description (1)
245 kV
100 V
Schneider Electric - CS&P – System Terminology – E01
17
• Voltage Transformer Overview (2) Description (2)
P1 S1
P2
S2
Np.Us = Ns.Up
Schneider Electric - CS&P – System Terminology – E01
18
• Current Transformer Overview (1) Description (1) 3000 A
3000 A
3000 spires
1A 245 kV
1A Schneider Electric - CS&P – System Terminology – E01
19
• Current Transformer Overview (2) Description (2)
P1
S1
P2
S2
Np.Ip = Ns.Is
Schneider Electric - CS&P – System Terminology – E01
20
• Electric Definitions Substation •Site Partition => Local/Remote substation •Substation Control Uniqueness •(nb=1) The Business DB (except Cascade) Voltage Level •Association of Bus Bars for Auto Volt. Regul. •Often only one BB (nb 4-5-x) Bay •ANSI => 1 CB with associate circuits & protections •Association of switchgears/transformers & functions •Local/Remote Bay, SBMC, Bay Control Uniqueness •Special (coupler, section, feeder, transformer) •Often Generic (more easy) •Bay belongs to only one C264 Module •Primary Electric Device, ANSI functions, Group of DP •Special (CB, disconnector, transformer, AR, Sync) •Often Generic (DPS/DPC association possible) Datapoint •Real Time information (95% electric) •At any level Schneider Electric - CS&P – System Terminology – E01
21
• SCE Preview SITE SUBSTATION
SUBSTATION VOLTAGE LEVEL 1 BAY FEEDER 1
CB 1
VOLTAGE LEVEL N
VOLTAGE LEVEL 2
BAY TRANSFO
SW 1
BAY FEEDER 2
TR 1
SW 2
Position
Position
TPI
Control
Control
Control
Schneider Electric - CS&P – System Terminology – E01
22
• Content
Electric Network Definition Primary Devices Protections Datapoints
Schneider Electric - CS&P – System Terminology – E01
23
• Why protecting Control
=> dispatch energy => keep service => maintenance operation Protection => Fault (Shortcut)
• • • •
(continuity, quality)
Short circuit implies unbalancing, voltage drop… Isolate Faulty section Save device from destruction Secure installation fire / explosion (arc) people security (insulation)
Protection => Exploitation (Overload)
• Unbalanced exploitation • Damaging isolation • Degrading devices
Schneider Electric - CS&P – System Terminology – E01
24
• MiCOM Range P
Protection
C
Computer
M
Measurement
S
System
H
Hubb=> Hubb=> Switch
Schneider Electric - CS&P – System Terminology – E01
25
• MiCOM Naming Pxyz for Protection e.g. Pxyz P
Protection
X
Application (e.g.: 1=overcurrent 1=overcurrent) overcurrent)
Y
Hardware platform (e.g. 20 serie) serie)
Z
Options (additional hard, threshold..)
Schneider Electric - CS&P – System Terminology – E01
26
• MiCOM Naming P_y_ Hardware platform
20 Series
30 Series
40 Series Schneider Electric - CS&P – System Terminology – E01
27
• MiCOM Naming Px__ P900 Voltage/Frequency P800 Auxiliary P700 Bars Differential P600 Transformer Differential P500 Line Differential P400 Distance P300 Generator P200 Motor P100 Overcurrent Schneider Electric - CS&P – System Terminology – E01
28
• MiCOM P Application Substation: P540
P440
P900 Voltage/Frequency
P845
P120
P920 P940
P800 Auxiliary P700 Bars Differential P140
P600 Transformer Differential
P630 T&D
P500 Line Differential P400 Distance P300 Generator M
P200 Motor G
P100 Overcurrent
P220 P120
Schneider Electric - CS&P – System Terminology – E01
P240 P520 ou P540
P340 29
• Content
Electric Network Definition Primary Devices Protections Datapoints
Schneider Electric - CS&P – System Terminology – E01
30
• Datapoint Terminology REAL TIME DATA = DATAPOINTS Several KIND of DP
IEC61850
SPS DPS MPS
Single Point Status Double Point Status Multiple Point Status
BINARY
MV TPI
Measurement Value Tap Position Indication
MV, WYE_MX, DEL MEASUR. BST_ST &
SCT DCT
Single CounTer Double CounTer
SPC DPC SP
Single Point Control Double Point Control SetPoint
Schneider Electric - CS&P – System Terminology – E01
INPUTS
SPS_ST , SPC_ST DPS_ST, DPC_ST INS_ST
COUNTERS BCR_ST
SPC_CO OUTPUTS DPC_CO,BST_CO APC_SP
31
• Supervision Datapoint Attributes Supervision Status/Value
Quality
SPS
Reset/Set
Valid / FSS / Invalid
DPS
Open(01)/Close(10)
Valid / FSS / Invalid
MPS
State16
Valid / FSS / Threshold / Invalid
MV, TPI, DM
Value (Float32)
Valid / FSS / Threshold / Invalid
SCT, DCT
Integer
Common Invalid +DPS invalid +MV, xCT invalid
Unknown (IED), Self-Check Fault (Hard) Jammed (00) Undefined (11) Open Circuit, Undefined, OverRange
FSS
Force (auto/Manu) an Invalid DP Suppress (Make DP invalid) Substitute (Force the Status/Value of DP)
Threshold
For Alarms / Events L,LL,LLL, H, HH, HHH with hysteresis
Schneider Electric - CS&P – System Terminology – E01
32
• Control Datapoint SPC, DPC, SP Kind Direct Execute
Select Before Operate
One Shot Medium/Low Volt.
Selection / Wait(cancel) / Execute HV + Control Uniqueness => order run Bay
Where 2) Supervision OI SCADA
Direct Execute
Select Before Operate
DE, SBO like pop-up DE, SBO
SBO pop-up DE, SBO
1) SBUS/C264
DE
SBO Select Open/Close Execute Open/Close
3) IED
DE, SBO
DE, SBO
Schneider Electric - CS&P – System Terminology – E01
33
• Control Checks Station •Operator Right / Gateway channel in control •Remote/Local Station •Device operating mode (operational, not stand-by…) •Control Uniqueness Station (GOOSE) •Topological ILK Bay •Control Uniqueness Bay (order running) •Remote/Local Bay Module (switch, transformer..) •Current Module State/Value •Bay interlock open/close (including module specific conditions) •Locking •Auto/Manu Dependency (automation running) •Recuperation Time Inner Simple “Built-in” Automation •Output / feedback input (Delays….) •Physical SBO, Direct Execute, 3 phases, Communication IED Schneider Electric - CS&P – System Terminology – E01