Jurnal Harga Prov. Kalimantan Tengah 2017

March 22, 2018 | Author: rici kurniawan | Category: N/A
Share Embed Donate


Short Description

Jurnal Harga Satuan Kalimantan Tengah 2017...

Description

BARGASATUANBABANBANGUNAN D.ll\T 11PAB PEKERJ.l PROVIl\TSI EALIIIAl\TTAN TENGAB

EDISI 36 - TERBARU

EDISI 35

EDISI 34

EDISI 33

EDISI 32

DAPAT N HARGA KHUSUS UNTUK PEMBELIAN MIN 5 EKSEMPLAR ( Khusus pembelian di kantor redaksi dan selama persediaan masih ada)

HUB: 021 31925229; 3192534

~JOURNAL

OF BUILDING CONSTRUCTION, INTERIOR&MATERIALPRICE

HARGASATUAN UPAH NO

UR AI AN

SATUAN

UPAH

Mandor

Oranglhari

147.000

2

Kepala Tukang Batu

Oranglhari

137.000

3

Kepala Tukang Besi

Oranglhari

132.000

4

Kepala Tukang Kayu

Oranglhari

132.000

5

Kepala Tukang Cat

Oranglhari

132.000

6

Tukang Batu

Oranglhari

121 .000

7

Tukang Besi

Oranglhari

121 .000

8

Tukang Kayu

Oranglhari

121 .000

9

Tukang Gali Tanah

Oranglhari

111.000

10

Tukang Cat

Oranglhari

121 .000

11

Tukang Listrik

Oranglhari

116.000

12

Tukang Las

Oranglhari

116.000

13

Tukang Pancang

Oranglhari

111.000

14

Tukang Tebas

Oranglhari

111.000

15

Tukang Anyam

Oranglhari

111 .000

16

Pembantu Tukang Batu

Oranglhari

111 .000

17

Pembantu Tukang Kayu

Oranglhari

111.000

18

Pembantu Tukang Besi

Oranglhari

111.000

19

Pembantu Tukang Cat

Oranglhari

111 .000

20

Pembantu Sapir I kenek

Oranglhari

111 .000

21

Penjaga Malam

Oranglhari

105.000

22

Mekanik

Oranglhari

121 .000

23

Pembantu Mekanik

Oranglhari

111 .000

24

Operator Terlatih

Oranglhari

121.000

25

Operator kurang terlatih

Oranglhari

121.000

26

Pembantu Operator

Oranglhari

105.000

27

Sapir material I truk

Oranglhari

121.000

28

Sapir personil

Oranglhari

121 .000

29

Buruh tak terlatih

Oranglhari

105.000

30

Buruh lapangan agak terlatih

Oranglhari

109.000

31

Buruh lapangan terlatih

Oranglhari

111 .000

EDIS/36 TAHUN XXIII

2017

JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR

583

~

I

JOURNALOFBUilDNC, CONSTRUCTKJN,INTERKJR&M'\TER1ALPRJCE

HARGABAHANBANGUNAN SATUAN A

HARGA (Rp)

BAHANATAP

Asbes Gelombang Ukuran 4mm (1220 x 2440mm)

lbr

68.700

Asbes Gelombang Ukuran 6mm (1220 x 2440mm)

lbr

87.200

Asbes Gelombang Nusa 180 x 80

lbr

43.300

4

Atap Sakura Roof uk. 80 x 77 em Merpati

lbr

121.700

5

Bubungan Atap Asbes

psg

38.200

6

Genteng Metal Prima Roof Tebal 0,25 - 2 x 4

bh

27.100

7

Genteng Metal Sakuraroof 0,35 - 2x4 (Prima)

lbr

52.800

8

Rangka Atap Baja Ringan (Galvanum)

btg

98.000

9

Seng Bubungan I Nok

bh

27.100

10

Seng Nok Model U

lbr

24.400

11

Seng Nok Model C

lbr

31.100

12

Seng Gelombang BJLS 0,20

lbr

54.100

13

Seng Gelombang BJLS 30

lbr

56.500

14

Seng Plastik Gelombang

lbr

94.700

15

Seng Plat .

lbr

67.600

Seng Plat BJLS (Iebar 30 em) m'

lbr

13.600

Seng Plat BJLS 30 lb

lbr

15.000

Seng Plat BJLS 50 lbr

lbr

20.300

Seng Talang 45 em m'

m'

23.000

Talang PVC 1/2 lingkaran btg

btg

106.700

21

Talang PVC btg 117.800,00

btg

19.500

22

Talang PVC siku -siku btg

btg

111.700

Baut Baja

kg

151.000

2

Besi Beton Polos 6 mm

btg

39.100

3

Besi Beton Polos 8 mm

btg

58.600

4

Besi Beton Po los 10 mm

btg

88.600

5

Besi Beton Poles 12 mm

btg

138.100

6

Besi Beton Polos 14 mm

btg

162.800

Besi Beton Polos 16 mm

btg

188.800

Besi Beton Polos 19 mm

btg

253.900

Besi Beton Ulir 010

btg

76.200

Besi Beton Ulir 013

btg

130.200

2

3

16 17 18 19 20

B

7 8 9 10

584

BAHANBESI

JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR

Eotst36 TAHUNXX/112017

~

JOLrl-1 7

589

I

JO"""-OFBUWNQ CONSTRUCTKJN, INTEROR&MATERLALF1'JCE

• 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115

590

BAHAN

~ SATUAN

Kawat Konduktor AAAC 120 mm AAAC95 mm AAAC 70 mm AAAC 50 mm AAAC 35 mm Kawat BC 6 mm Kawat BC 16mm Kawat BC 25mm Kawat BC 35mm Kawat BC 50mm Kawat BC 70mm Kawat BC 95mm Kabel TM 20KV M (NA2XSEYBY) 3 X 35 mm 3 X 50 mm 3 X 70 mm 3 X 150 mm 3 X 240 mm Kabel TM 20KV M( NFA2XSY-T) 3 X 150 +50 mm 3 X 150 + 95 mm 3 X 185 + 95 mm 3 X 24 +50 mm Kabel TR NYFGbY 2 X6 mm 2 X 10 mm 2 X 16 mm 3 X6 mm 3 X 10 mm 3 X 16 mm 4 X6 mm 4 X 10 mm 4 X 16 mm 4 X 25 mm 4 X 35 mm 4 X 50 mm 4 X 70 mm 4 x 95 mm Kabel NYY 4 X6 mm 4 X 10 mm 4 X 25 mm 4 X 35 mm 4 X 50 mm 1 X 120 mm 1 X 50 mm 1 X 70 mm 1 X 95 mm 1 X 120 mm

JURNAL HARGA SATUAN BAHAN 8ANGUNAN, K ONSTRUKSI & INTERIOR

HARGA

(Rp)

m m m m m m m m m m m m

44.200 38.900 36.700 26.600 23.100 11.000 31.900 42.800 61.800 75.400 107.800 171 .1 00

m m m m m

328.700 351.500 389 .300 541 .000 650.200

m m m m

379.400 443.100 459.900 480.100

m m m m m m m m m m m m m m

54.300 71.700 91.300 65.200 86.900 108.600 78.200 106.500 141 .200 198.300 250.200 358.700 470.000 637.200

m m m m m m m m m m

112.700 142.700 187.800 217.800 277.900 193.100 88.600 121 .100 169.500 217.700

Eotst 36 TAHUN XXIII 2017

~JOURNAL NO

116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159

Eo!SI

BAHAN

OF BUILDING CONSTRUCTION, INTERIOR&MATERIALPRICE

SATUAN

1 X 150 mm 1 X 240 mm 1 X 300 mm

HARGA

(Rp)

m m m

258.200 418.000

m m m

14.500 19.800 23.600 34.200 235.100

523.500

KABELNYM 2 X 2,5 mm 2 X4 mm 4 X 2,5 mm 4 X4 mm 4 X 35 mm Kabel TW/STEDIL VTC 0 AL 3 X 35 + 25 mm AL 3 X 50 + 35 mm

m m m m

AL 3 X 59 + 35 mm AL 3 X 70 + 50 mm AL 2X10mm2 AL 2 X 16 mm2 AL 2 X 25 mm2 AL 4 X 10 mm2 AL 4 X 16 mm2 AL4 X25 mm2 AL 4 X 35 mm2 Kabel lnstalasi 2 X 1,5 mm2 Kabel Power 2 X 2,5 mm2 Lighting Arester LA24 KV5 kA LA 24 KV 10 Ka Fuse Link Type K ( 3A,4A, 6A, 8A) Type K ( 10 A, 12 A, 15 A, 20 A) Type K ( 25A, 30A, 40 A, 50 A) Type K ( 60 A, 65A, 80 A, 1 00 A) Fuse link AB Chance (2A, 3 A, 4 A, 6 A, 8 A ) Fuse link AB Chance ( 10 A, 15 A, 20 A ) Fuse link AB Chance ( 25 A, 30 A) lnsolator 20 KV Type Pin POS Type LinePOS TYPE STAR INROD 9 tanpa strain clamp + C.arm) Trafo 3 Phase 20 KV/82 25 KVA-3 Phase 50 KVA-3 Phase 100 KVA-3 Phase 160 KVA-3 Phase 200 KVA-2 Phase 250 KVA-2 Phase KWH Meter 1 PH 2 KWT KLS 2 230 V. 5/20 230 V. 20/60 230 v. 50/1 00

36

TAHUN XXIII

2017

41.800 57.200 61.700 78.500 9.100 12.400 18.100 18.600

m m m m m m m m m m m

24.800 30.100 41.600 12.000 16.000

bh bh

1.297.600 1.346.600

bh bh bh bh bh bh bh

35.500 35.500 54.300 87.500 80.800 80.800

bh bh bh

479.500 621.900 435.700

bh bh bh bh bh bh

48.733.800 70.039.600 87.341.900 114.130.700 129.445.700 151.200.000

bh bh bh

444.700 511.400 590.100

JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR

591

I

JOURNALOFBUILDOJG OONSTRUCTKlN,INTERIOR&M
View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF