JUPITER_ATP.pdf

November 23, 2017 | Author: Richard Pascual | Category: Icon (Computing), Password, Tab (Gui), Menu (Computing), Technology
Share Embed Donate


Short Description

Download JUPITER_ATP.pdf...

Description

JUPITER Acceptance Test Specification Revision A – 2014-08-11

Proprietary and Confidential Information All rights reserved. No part of this document may be reproduced or sent to third party companies without the express prior written permission of Polystar OSIX AB. All intellectual property rights of whatever nature in the business concepts, products or product concepts and any associated documentation including know-how, copyright, patent, design right, moral right, registered design or trademark is and shall remain the exclusive property of Polystar OSIX AB.

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Table of Contents Scope ..................................................................................................................................................... 4 Test results ............................................................................................................................................. 5 1.

2.

3.

4.

5.

6.

7.

Start up .......................................................................................................................................... 7 1.1.

Login to Jupiter

1.2.

Verify installed and licensed Solution Packages

1.3.

Verify user privileges settings Passed [ ] Failed [

] ............................................................. 8

1.4.

Verify user’s access privileges Passed [ ] Failed [

].......................................................... 10

] Failed [

] ............................................................................. 7 Passed [

] Failed [

] ................................ 8

User Accounts ............................................................................................................................... 11 2.1.

Start the User Account manager Passed [ ] Failed [

2.2.

Create a User Group

2.3.

Create a User account

2.4.

Change privileges for a User Group Passed [ ] Failed [

2.5.

Change User Settings

Passed [ ] Failed [

] ...................................................... 11

]..................................................................... 11

Passed [ ] Failed [

] ................................................................... 12

Passed [ ] Failed [

] .................................................. 13

] .................................................................... 14

Dashboard .................................................................................................................................... 15 3.1.

Start the Dashboard

3.2.

Insert Objects into the Dashboard Passed [

3.3.

Save the dashboard using 'Save As' Passed [ ] Failed [

3.4.

Open in Inspector

Passed [ ] Failed [

] ...................................................................... 15

Passed [ ] Failed [

] Failed [

] ................................................... 15 ] ................................................. 16

] ......................................................................... 18

Inspector ...................................................................................................................................... 19 4.1.

Start the Inspector

4.2.

Create a new report

4.3.

Save the report

4.4.

Charts

4.5.

Passed [ ] Failed [

Verify drill-down to possible objects Passed [ ] Failed [

Passed [

] Failed [

Passed [ ] Failed [

Passed [ ] Failed [

] ........................................................................ 19 ] ..................................................................... 20

]............................................................................ 21

] ........................................................................................ 22 ] ................................................... 24

KPI Builder.................................................................................................................................... 25 5.1.

Start the KPI builder

5.2.

Create a Folder

5.3.

Create a KPI

5.4.

Save a KPI

5.5.

Verify KPI visibility in Inspector Passed [

5.6.

Passed [ ] Failed [

Test various combinations of formulas and resources Passed [

Passed [ Passed [

Passed [

] Failed [

] Failed [ ] Failed [

] ..................................................................... 25

] .......................................................................... 25

] .............................................................................. 26 ] ................................................................................. 27 ] Failed [

] ....................................................... 27 ] Failed [

] ....................... 28

KPI and aggregate validation .......................................................................................................... 29 6.1.

Check if data comes into system for different KPIs

6.2.

Check if data comes into system for different aggregates levels Passed [ ] Failed [

Passed [ ] Failed [

] ........................... 29 ] ........... 30

Reference Data ............................................................................................................................. 33 7.1.

8.

Passed [

Verify reference data dimensions and values

Passed [

] Failed [

] .................................. 33

Alarms / Alarm Configuration .......................................................................................................... 35 8.1.

Basic Function

8.2.

View History

8.3.

Create Reports

Passed [ ] Failed [ Passed [

] Failed [

Passed [ ] Failed [

] ............................................................................. 35 ] ................................................................................ 35 ] ............................................................................. 36

[2]

Document name: Date:

8.4.

Jupiter AcceptanceTest 2012-09-28

Use Time Schema

Passed [ ] Failed [

Revision: Responsible:

C CPM/PT

] ......................................................................... 36

Acceptance Certificate ........................................................................................................................... 37

[3]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Scope This document is System Acceptance Test procedure performed on the Jupiter system installation. All test cases are numbered with a unique number. The Acceptance Tests (AT) is divided into two (2) main tasks: 1. Basic test covering Licensing, User access and Applications (GUI) 2. Test to verify configuration as KPIs, Aggregates and Reference Data . Subject of testing are all servers and functionality of Jupiter system. Vendor is obligated to install configure and solve all eventually appeared problems. All remarks and outstanding items mentioned bellow, Polystar is obligated to solve in agreed period after signing of the Acceptance Test Document or separately defined period for solving of each outstanding-item/remark.

[4]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Test results Test Case

1

Start up

1.1

Login to Jupiter

1.2

Verify installed and licensed Solution Packages

1.3

Verify user privileges settings

1.4

Verify user’s access privileges

2

User Accounts

2.1

Start the User Account manager

2.2

Create a User Group

2.3

Create a User account

2.4

Change privileges for a User Group

2.5

Change User Settings

3

Dashboard

3.1

Start the Dashboard

3.2

Insert Objects into the Dashboard

3.3

Save the dashboard using 'Save As'

3.4

Open in Inspector

4

Inspector

4.1

Start the Inspector

4.2

Create a new report

4.3

Save the report

4.4

Charts

4.5

Verify drill-down to possible

5

KPI Builder

5.1

Start the KPI builder

5.2

Create a Folder

5.3

Create a KPI

5.4

Save a KPI

5.5

Verify KPI visibility in Inspector

Passed

[5]

Failed

Comment

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

5.6

Test various combinations of formulas & resources

6

KPI and aggregate validation

6.1

Check if data comes into system for different KPIs

Revision: Responsible:

6.2 Check if data comes into system for different aggregates levels

7

Reference Data

7.1

Verify reference data dimensions and values

8

Alarms / Alarm Configuration

8.1

Alarms Basic Function

8.2

Alarms Configuration

8.3

Alarms Create Reports

8.4

Alarms Use Time Schema

[6]

C CPM/PT

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

1. Start up 1.1. Login to Jupiter

Passed [

] Failed [

]

Steps 1.

Start the web browser

2.

“Browse” to the Jupiter server

3.

A web page with Polystar logo star is open

4.

A pop-up window “Log on to Jupiter” appear

5.

Enter un-valid User Name and Password

6.

Enter valid User Name and Password

Expected Result • A pop-up Warning with information “Incorrect username and password. Please try again...” appears when wrong Username and Password is used

• Login to Jupiter is successful when valid User Name and Password is entered. Icons for the licensed programs will be shown on the Jupiter desktop (Dashboard, Inspector, and Alarms)

Comment

[7]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

1.2. Verify installed and licensed Solution Packages Passed [ ] Failed [ ] Steps 1.

Right click in Jupiter workspace



A pop-up menu appears

2.

Hover the mouse over System Settings



A pop-up menu appears

3.

Select KPI Builder

Expected Result • A pop-up window presents the installed solution packages in the map structure (BellTelSMSAccoutning)

Comment

1.3. Verify user privileges settings

Passed [ ] Failed [

]

Steps 1.

Open up User Accounts in System Settings

2.

Click on selected user group

3.

A window tab for “Program Access” appears

4.

Check program access privileges for selected user group

5.

Click on tab for “Folder Access”

6.

Check folder access privileges for selected user group

Expected Result • Program and Folder Access privileges should correspond to what’s defined for each user group

[8]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

Comment

[9]

C CPM/PT

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

1.4. Verify user’s access privileges

C CPM/PT

Passed [ ] Failed [

Steps 1.

Login as a standard user

2.

Right click in Jupiter workspace

3.

A pop-up menu appears

4.

Hover the mouse over System Settings

5.

A pop-up menu appears

6.

Check program access privileges for standard user group

Expected Result • Program Access privileges should correspond to what’s defined for each user group

Comment

[10]

]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

2. User Accounts 2.1. Start the User Account manager

Passed [ ] Failed [

]

Steps 1.

Right click in Jupiter workspace

2.

Hover the mouse over System Settings

3.

Select User Accounts

Expected Result 1.

The The The The The

User Accounts manager opens user who log in should be chosen on left tree right panel can not be edited information of the user should be display correctly information of the title should be display correctly

2.

The gui should be display correctly.

Comment

2.2. Create a User Group

Passed [ ] Failed [

Steps 1.

Right click in Jupiter workspace

2.

Hover the mouse over System Settings

3.

Select User Accounts

4.

Left click in the left pane of the User Account manager

5.

A pop-up menu appear

6.

Select New Group

7.

Enter some name for the group in the pop-up dialog box “New Group” and click OK

Expected Result The new group that you added is visible in the left panel of the User Accounts manager

[11]

]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

2.3. Create a User account

Passed [ ] Failed [

]

Steps 1.

Right click on the User Group that was created in previous test



A pop-up menu appear

2.

Select New User

3.

Enter some User ID for the user in the pop-up dialog box “New User” and click OK



A tab “User Setting” is opened

4.

Fill in Password and Confirm Password and click Save

5.

Try to log on as the new user

6.

Try to create users under the existing user groups

Expected Result • The new user that you added is visible in the left pane of the User Accounts manager under the group that it was connected to • It is possible to log in as the new user • It is possible to create users under already existing user groups

Comment

[12]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

2.4. Change privileges for a User Group

C CPM/PT

Passed [ ] Failed [

]

Steps 1.

Right click on the User group that was created in previous test

·

A pop-up menu appears

2.

Select Edit

3.

Change some privileges in the “Program Access” tab and in the “Folder Access” tab

4.

Log in as a User belonging to the modified group and verify that the privilege settings

Expected Results • It is possible to change “Program Access” privileges

• It is possible to change “Folder Access” privileges

• The user is affected by the group’s privilege settings

Comment

[13]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

2.5. Change User Settings

C CPM/PT

Passed [ ] Failed [

Steps 1.

Right click on the User that was created in previous test



A pop-up menu appears

1.

Select Edit

2.

Change password and try to log in as the user

3.

Unmark the Active box and try to log in as the user

Expected Result • It is possible to change Password • It is not possible to login as a not active user

Comment

[14]

]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

3. Dashboard 3.1. Start the Dashboard

Passed [

] Failed [

]

Steps 1.

Double-click the Dashboard icon on the Jupiter desktop

2.

Close the Dashboard main window

3.

Right-click on the Jupiter desktop

4.

A shortcut menu is displayed

5.

Hover with the mouse pointer over Software Programs to display the hierarchical menu showing Jupiter’s applications

6.

Click Dashboard to start the application

Expected Result •

The Dashboard program is started both when using the desktop icon and the menu shortcut

Comment

3.2. Insert Objects into the Dashboard

Passed [

] Failed [

]

Steps 1.

Left-click on Insert in the menu bar in the Dashboard created in previous test (“Untitled(0)”), a drop down menu opens

2.

Left click on Insert report in the dropdown menu, a pop-up menu opens

3.

Choose some various reports from the pop-up menu and click OK

4.

Repeat the steps above for Image and text

5.

Modify the layout of the dashboard

6.

Click on “Unlock View” to unlock the dashboard

[15]

Document name: Date:

7.

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Modify the time settings for the dashboard by left click on the “Time” in the lower left bar of the Dashboard

Expected Result • The reports, Images and text that is chosen is inserted in the dashboard • The layout and Time options of the dashboard can be modified

Comment

3.3. Save the dashboard using 'Save As'

Passed [ ] Failed [

]

Steps 1.

Left-click on Save in the menu bar in I the Dashboard created in previous TC, a drop down menu opens

2.

Left click on “Save as” in the dropdown menu, a pop-up menu opens

3.

Mark the folder dashboard in your user folder

4.

Choose a name for the dashboard click OK

[16]

Document name: Date:

5.

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Save the dashboard in the public folder, using the “Save as” function above

Expected Result • The dashboard is saved with the name of your choice • The dashboard is visible in Private folder in the left upper pane of the Dashboard manager • The public dashboard is visible in Public folder in the left upper pane of the Dashboard manager

Comment

[17]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

3.4. Open in Inspector

C CPM/PT

Passed [ ] Failed [

]

Steps 1.

Open a dashboard that contain some different reports

2.

Unlock the view

3.

Right click on one report, the report will be selected and a drop down menu appears

4.

Left click on “Open in Inspector” in the drop down menu

Expected Result • The selected report is opened in Inspector with the same filters, Time settings etc that was defined for the report in the dashboard view

Comment

[18]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

4. Inspector 4.1. Start the Inspector

Passed [ ] Failed [

]

Steps 1.

Double-click the Inspector icon on the Jupiter desktop

2.

Close the Inspector main window

3.

Right-click on the Jupiter desktop.

4.

A shortcut menu is displayed.

5.

Hover with the mouse pointer over Software Programs to display the hierarchical menu showing Jupiter’s applications.

6.

Click Inspector to start the application

Expected Result • The Inspector program is started both when using the desktop icon and the menu shortcut

Comment

[19]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

4.2. Create a new report

Passed [

C CPM/PT

] Failed [

]

Preconditions • Jupiter is connected to a SMACK data base populated with data for the KPIs Steps 1.

Left click on New in Inspector bar menu, a new tab Untitled is shown in the right pane of the Inspector

2.

Right click on Data in the lower left pane of the Inspector

3.

Left click on Add KPI from the pop-up menu

4.

Choose a KPI from the “Add KPI” pop-up menu. Do also try the Search function.

5.

Left click on Time in the lower left corner of the Inspector frame and set relevant Time properties

6.

Refresh the report by left-click on the Refresh icon in the top right corner of the Inspector

7.

Toggle between the list view and the chart view by left-click on the icon “List View/Chart View” in the top right corner of the Inspector

Expected Result • The report is created and data is fetched when doing refresh

[20]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

4.3. Save the report

Passed [ ] Failed [

]

Steps 1.

Left-click on Save in the menu bar in the Inspector

2.

Left click on “Save” in the dropdown menu

3.

Mark the folder Private and choose a name for the report and then click OK

4.

Left click on “Save as” in the dropdown menu

5.

Mark the folder Private and choose the same name for the report as in step 3 and then click OK

6.

Mark the folder Private and choose a different name for the report than in step 3 and then click OK

7.

Repeat the steps 4-1 above but now you shall save the report in the public folder, using the “Save as” function above.

Expected Result 1.

A drop down menu opens

2.

The "Save as a file" window opens

3.

The report is saved and visible in Private folder in the left upper pane of the Inspector

4.

The "Save as a file" window opens

5.

A "Confirm" window appears saying "File already exist, override it?"

6.

The report is saved and visible in Private folder in the left upper pane of the Inspector

7.

The public report is visible in Public folder in the left upper pane of the Inspector

[21]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

4.4. Charts

Passed [ ] Failed [

]

Steps 1.

Open the report according to test case "Open the Report"

2.

Display the data in different Chart types by right click on the Chart type in the lower left pane of the Inspector and the choose Change Chart from the appearing drop down menu

3.

By expanding the Chat Type in the lower left pane of the Inspector a list of Chart attributes are shown. Test to change a random choice of the attributes to random properties values

4.

Hoover the mouse pointer over some points in the graph. Values for that point shall be displayed. Compare those values with the values in the List View

Expected Result • Different Chart types display the data in correct way

[22]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

• Various combinations of graph attributes are possible to change • Values are displayed correct when hovering the mouse in the graph

Comment

[23]

C CPM/PT

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

4.5. Verify drill-down to possible objects

C CPM/PT

Passed [ ] Failed [

]

Steps 1.

Open the report (SUNToOther) according to "Open the report" in the List View

2.

Left click on any value in a column in the table



A pop-up menu appears

1.

Select “Drill down by MAP Error

2.

Repeat the test in the Chart View. The pop-up menu is obtained by left-click on a point in the chart

Expected Result • A new tab is opened in inspector for the selected object • The values for the object corresponds to the value in the Inspector report

Comment

[24]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

5. KPI Builder 5.1. Start the KPI builder

Passed [ ] Failed [

]

Steps 1. Right click in Jupiter workspace •

A pop-up menu appears

2.

Hover the mouse over System Settings



A pop-up menu appears

3.

Select KPI Builder

Expected Result •

The KPI builder opens

Comment

5.2. Create a Folder

Passed [

Steps 1.

Start the KPI Builder

2.

Right click in the left pane of the KPI Builder.

3.

A pop-up menu will appear.

4.

Left click on “New Folder”.

5.

A pop-up window will appear.

6.

Enter a name for your folder and click OK.

Expected Result ·

The new folder is shown in the left pane of the KPI builder.

[25]

] Failed [

]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

5.3. Create a KPI

Passed [

] Failed [

Steps 1.

Create a new folder according to test case "Create a Folder"

2.

Right click on the new folder

3.

A pop-up menu will appear

4.

Left click on “New KPI”

5.

A pop-up window “New KPI” will appear

6.

Enter the name for the new KPI and click OK

Expected Result ·

The new folder and the new KPI is shown in left pane of the KPI builder.

Comment

[26]

]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

5.4. Save a KPI

Passed [

C CPM/PT

] Failed [

]

Steps 1.

Mark the KPI created in test case "Create a KPI" in the left pane of the KPI Builder

2.

Right click on “Formula” in the right pane of the KPI Builder

3.

Left click on “Select Counter”

4.

A pop-up window “Counter Selection” will appear

5.

Mark a Counter and click OK

6.

Click on Save at the bottom right in the KPI Builder window

7.

A Pop-up window appears with “Save changes?”

8.

Click on Yes

Expected Result ·

A pop-up window appears with information “KPI building successful!”

Comment

5.5. Verify KPI visibility in Inspector

Passed [

] Failed [

]

Steps 1.

Open the Inspector by clicking on the Inspector icon

2.

Right click on Data in the lower left pane in the Inspector

3.

A pop-up menu will appear

4.

Click on add KPI

5.

A pop-up window “Add KPI” appear with a list of available KPI structure (a refresh might be needed)

Expected Result ·

The KPI created in test case "Create a KPI" is visible in the “Add KPI window”

[27]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

5.6. Test various combinations of formulas and resources Passed [ ] Failed [ ] Steps 1.

Right click on the KPI created in TC "Create a KPI"

2.

Right click on “formula” in the right pane of the KPI builder

3.

Left click on “Select Formula” from the pop-up menu

4.

Choice a formula from the pop-up window “Formula Selection”

5.

Choose counters by right click on the variables and choose “Select Counter” from the pop-up menu

6.

Verify the formula by open the KPI in inspector

7.

Repeat for various formulas and counters

Expected Result ·

The KPI is successfully opened in Inspector

·

The formulas tested are working

Comment

[28]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

6. KPI and aggregate validation 6.1. Check if data comes into system for different KPIs Passed [ ] Failed [ ] Steps 1.

Open up Inspector

2.

Right click on “Data” in below left window and click “Add New KPI”

3.

Open up selected interface map (SUNSMSAccounting) and select all KPI (use Ctrl-Click)

4.

Click “Refresh” and values for selected KPIs will appear in window

5.

Repeat step 1-4 for all protocol maps

Active KPIs

OK/Not

Comment

OK SMS Accounting KPI SMS Attempts SMS Timeout SMS Failed SMS Success SMSSuccessRate

Expected Result • A window presents all KPIs for selected interface and all are expected to contain values

[29]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Comment

6.2. Check if data comes into system for different aggregates levels Passed [ ] Failed [ ] Steps 1.

Open up Inspector

2.

Right click on “Data” in below left window and click “Add New KPI”

3.

Open up selected interface map and select one KPI (SMS Attempts from SMSAccountingKPI)

4.

Click “Time” in below left corner

5.

Set “Use Relative Time” to “true”

6.

Set “Aggregation” to “1 day”

7.

Set “Relative Time” to “Previous 2 days” and click “Refresh”

8.

Click “Refresh” and values for selected KPIs will appear in window

9.

Repeat step 1-3 and change to “1 hour” and “Previous 43 hours”

10. Repeat step 1-3 and change to “15 min” and “Previous 1 hours” 11. Repeat step 3-10 for all the SMS Accounting KPIs

[30]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Loading of data

Revision: Responsible:

1day

1hour

C CPM/PT

15 min

OK/Not OK

SMS Accounting KPI SMS Attempts SMS Timeout SMS Failed SMS Success SMSSuccessRate

Expected Result • Windows presents all data for all selected time periods divided by aggregation level

[31]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

Comment

[32]

C CPM/PT

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

7. Reference Data 7.1. Verify reference data dimensions and values Passed [ ] Failed [ ] Steps 1.

Open up Inspector

2.

Right click on “Data” in below left window and click “Add New KPI”

3.

Open up selected interface map(SUNSMSAccounting) and select one KPI (SMS Attempts)

4.

Click “Time” in below left corner

5.

Set “Use Relative Time” to “true”

6.

Set “Aggregation” to “1 hour”

7.

Set “Relative Time” to “Previous 24 hours”

8.

Click “Refresh” and values for selected KPI will appear in window

9.

Right click to select drill down

10. Repeat 2-10 for all list reference data below

Reference Data

OK/Not OK

SMS Accounting Refernce Data Orinating Node Terminating Node Map Error MAP OP Code

Expected Result • All values presented should have a valid reference information

[33]

Comment

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

Comment

[34]

C CPM/PT

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

8. Alarms / Alarm Configuration 8.1.

Basic Function

Passed [ ] Failed [

]

Steps 1. Right click on the desktop and select System Settings -> Alarm Configuration 2. Click on New to open a new alarm tab 3. Select any KPI by right click the Data in the lower right pane and open the Add KPI pane. 4. Set the alarm Level Configuration so one of the levels (higher than clear) will cause be registered as alarm (tip: use the Inspector to find suitable values). 5. Do NOT select a Time Schema Expected Result • Check in the Alarms that the alarm is generated. And that the severity is according to the level configuration. Comment

8.2. View History

Passed [

] Failed [

]

Steps 1. Use the alarm created in “Basic Function” or create a new 2. Do NOT select a Time Schema 3. In Alarms select an alarm and right click it and choose among the different options. For example deactivate and activate it back. Expected Result •

Right click the alarm and select History. Compare the history with your earlier actions.

Comment

[35]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

8.3. Create Reports

C CPM/PT

Passed [ ] Failed [

]

Steps 1. Use the alarm created in “Basic Function” or create a new 2. Do NOT select a Time Schema 3. Right click on an alarm in Alarms and select Create Report. Expected Result • The Inspector opens showing the value of the KPI of the alarm. The Time Properties are set by default. Comment

8.4. Use Time Schema

Passed [ ] Failed [

]

Steps 1. Use the alarm created in “Basic Function” or create a new 2. Set the Time Schema to a suitable schema. Can be necessary to create a schema (a schema that is limited within a certain time or if possible only certain days). 3.

Make sure that the Level Configuration is set so one of the levels (higher than clear) will be set.

Expected Result • Verify that it behaves accordingly. E.g. that the alarm, do follow the Time Schema definition. Comment

[36]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

C CPM/PT

Acceptance Certificate Customer

BellTel

Project

SMS Accounting

Customer ref Polystar ref Acceptance Date

Scope Being Accepted Jupiter for SMS Accounting in accordance with P.O. XXXXX to BellTel, in Manila, Philippines. This signed document signifies formal acceptance of Jupiter supplied by Polystar AB according to the terms stated in the PO XXXXX. Any exceptions to this are noted below and acknowledged by Polystar AB, which remains responsible for their resolution.

Exception

Agreed Completion Date

The Polystar Project Manager confirms that all the contractual requirements agreed with the client for OSIX complies to P.O. 5500045342/ 5500045344/ 5500045350 and by this letter requests the acceptance from Digitel Mobile Philippines Inc.

BellTel, Project Manager

Shawn Teng, Customer Project Manager

BellTelError! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not found.Error! Reference source not

Polystar AB

[37]

Document name: Date:

Jupiter AcceptanceTest 2012-09-28

Revision: Responsible:

found.Error! Reference source not found.Error! Reference source not found. Date: 2014-10-10

Date: 2014-10-10

[38]

C CPM/PT

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF