JOB SAFETY ANALYSIS FORM SEQUENCE OF BASIC ACTIVITY STEPS/ PRESSURE LEAKAGE TEST 1) Check pipe length 2) Check mech. joints & pipe joints
POTENTIAL HAZARD Trip hazard Trip hazard
3) Check manual pump 4) Inject water pressure w/ manual pump 5)Water pressure established, repeat #2 procedure 6) Check end caps 7) Release of water pressure
Parts defect/ Malfunction Bursting of rubber hose Bursting of main pipes body and its joints Detachment where installed Hit by pressurized water
HAZARDS CONTROL Watch your steps Proper handling of tools
RESPONSIBLE PARTY Site supervisor Site supervisor
Follow safety procedure for small tools requirement inspection Site supervisor Pump gradually/ constant observation Site supervisor Initial backfill of trench Secure support/ tightly installed Complete PPE suits and stand clear
Site supervisor Site supervisor Site supervisor REVISION:
Concrete Batching Plant Requirements Description 1) Design Mix 20N/mm2 or 3000 psi ( 28 days ) 2) Design Mix 28N/mm2 or 3500 psi ( 28 days ) 3) Test Certificate a. Cement b. Sand c. Gravel stone d. Water e. Admixture 4) Batching plant calibration certificate 5) Testing equipment calibration certificate 6) Concrete cylinder sample a. 3000 psi ( 28 days ) b. 3500 psi ( 28 days )
unit ea ea
Qty 1 1
ea ea ea ea ea ea ea
1 1 1 1 1 1 1
ea ea
3 3
Note: All of the above, need to be submitted today to CTJV