PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036

 REKAPITULASI HASIL PENGUJIAN CAMPURAN ASPAL HRS - BASE

Paket Ko Kont ntrak rakto torr P Pel elak aksa san na Kon Konsult sultan an Super erv vis isii

: Pengadaan Jalan Kabupaten/Kota Kelas III Ruas Fatubenao - Debubot / K.31 : CV. CV. Su Sum mbe berr IInd ndah ah : CV CV. G Gu unatam atamaa Des Desai ain n

I. KOMP KOMPOSIS OSISII CAMP CAMPURAN URAN AGREGAT AGREGAT

1. Ko Kom mpo posi sisi si KOMPOSISI HOT - BIN

Jenis Material

Total Agregat (%)

Total Campuran (%)

Individu (kg)

Komulatif  (kg)

12 35 52 1 6.50 0.20

11.22 32.72 48.61 0.93 6.50 0.01

89.7 261.8 388.9 7.5 52.0 0.1

89.7 351.5 740.4 747.9 799.9 800.0

HOT - BIN I HOT - BIN II HOT - BIN III FILLER  ASPAL ADITIVE 2. Grad Gradasi asi Agre Agregat gat C Camp ampuran uran ASTM mm

Ukuran Ayakan Gradasi ( Cold Bin ) Gradasi ( Hot Bin )

Max Min

Spesifikasi

1'' 25 100.0 99.0 90-100

3/4" 19.0 100.0 100 100 100

1/2" 12.5 92.7 90.90 100 90

3/8" 9.5 76.6 84.18 90 65

#4 4.75 64.6 65.04 ~ ~

#8 2.36 50.0 47.29 55 35

# 30 0.60 29.2 22.54 35 15

# 50 0.30 15.9 16.95 ~ ~

# 200 0.075 9.4 6.89 9 2

II. HASI HASIL L PENG PENGUJIAN UJIAN MET METODE ODE MARSHALL MARSHALL No 1 Kadar Kadar Asp Aspal al E Efe fekt ktif  if 

2 3 4 5 6 7 8 9 10 11 12

URAIAN

Berat Berat Jenis Jenis Cam Campu puran ran Pad Padat at Peny Penyera erapan pan As Aspa pall Ro Rong ngga ga Dal Dalam am Camp Campuran uran (VI (VIM) M) Ro Rong ngga ga Dal Dalam am Agre Agregat gat (VMA) (VMA) Ro Rong ngga ga T Teris erisii A Aspal spal (VF (VFB) B) Stabi Stabilit litas as Mar Marsh shall all Keleleh lehan Hasil Hasil Bagi Bagi Stabilit Stabilitas as Marsh Marshall all Stabilitas ssetelah etelah p perend erendaman aman 24 Jam Adit itif  if  VIM p pada ada kepadatan kepadatan memb membal al (refusal)

Hasil Pengujian 6.50 2.290 0.58

Satuan % Ton/m³ %

Spesifikasi Min 5,5 Max. 1,7

4.30 17.80 76.40 1120.00 3.8 300.0 92.63 0.2 3.8

% % % Kg mm Kg/mm % % %

4,0 - 6,0 Min 17 Min 68 Min 600 Min 3 Min 250 Min 90 0,2 - 0,4 Min 3

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Semy N. Allung, A.Md

Benediktus T. ST

 Nip. 196512272006041007 196512272006041007

Direktur 

Material Engineer 

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain : Pengadaan Jalan Kabupaten/Kota Kelas III Ruas F Fatubenao atubenao - Debubot / K.31

Paket

ANALISA SARINGAN SNI 03 - 1968 - 1990 Material : HOT BIN I (BP 3/4") A

Tanggal : 08 April 2020

Ukuran saringan

Komulatif  

Inch

mm

Brt tertahan

% Tertahan

% Lolos

3/4

19.0

0

0

100

1/2

12.7

2579

75.85

24.15

3/8

9.8

3261

95.91

4.09

 No.4

4.75

3380

99.41

0.59

 No. 8

2.35

3390

99.71

0.29

 No. 30

0.6

3392

99.76

0.24

 No. 50

0.30

3393

99.79

0.21

 No. 200

0.075 Berat contoh =

Rata - rata

gram

3400

Material : HOT BIN I (BP 3/4") B Ukuran saringan

Komulatif  

Rata - rata

Inch

mm

Brt tertahan

% Tertahan

% Lolos

3/4

19.0

0

0

100

100

1/2

12.7

2693

75.73

24.27

24.21

3/8

9.8

3440

96.74

3.26

3.68 

 No.4

4.75

3538

99.49

0.51

0.55

 No. 8

2.35

3546

99.72

0.28

0.29

 No. 30  No. 50

0.60 0.30

3549 3551

99.80 99.86

0.20 0.14

0.22 0.17 

 No. 200

0.075 Berat contoh :

3556

gram

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pake aket

: Pen Pengadaa adaan n Jal alan an Kabu abupat ateen/Kota Kelas III Ru Ruaas Fatu atubenao - Debubot / K.31

ANALISA SARINGAN SNI 03 - 1968 - 1990 Material : HOT BIN II (BP 1/2") A

Tanggal : 08 April 2020

Ukuran saringan

Komulatif  

Inch

mm

Brt tertahan

% Tertahan

% Lolos

3/4

19.0

0

0

100

1/2

12.7

0

0

100

3/8

9.8

382

11.24

88.76

 No.4

4.75

1843

64.67

35.33

 No. 8

2.35

2525

88.60

11.40

 No. 30

0.6

2655

93.16

6.84

 No. 50

0.30

2666

93.54

6.46

 No. 200

0.075

2712

95.16

4.84

Berat contoh :

Rata - rata

gram

2850

Material : HOT BIN II (BP 1/2")B Ukuran saringan

Komulatif  

Rata - rata

Inch

mm

Brt tertahan

% Tertahan

% Lolos

3/4

19.0

0

0

100

100

1/2

12.7

0

0

100

100

3/8

9.8

365

13.12

86.88

87.82

 No.4

4.75

1861

66.89

33.11

34.22

 No. 8

2.35

2569

92.34

7.66

9.53

 No. 30

0.60

2709

97.38

2.62

4.73

 No. 50

0.30

2722

97.84

2.16

4.31

 No. 200

0.075

2772

99.64

0.36

2.60

Berat contoh :

2782

gram

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pake aket

: Pen Pengadaa adaan n Jal alan an Kabu abupat ateen/Kota Kelas III Ru Ruaas Fatu atubenao - Debubot / K.31

ANALISA SARINGAN SNI 03 - 1968 - 1990 Material : HOT BIN III (ABU BATU + PASIR) A

Tanggal : 08 April 2020

Ukuran saringan

Komulatif  

Inch

mm

3/4

19.0

1/2

12.7

3/8

Brt tertahan

% Tertahan

% Lolos

0

100

0

0

100

9.8

0

0

100

 No.4

4.75

0

0

100

 No. 8

2.35

578

17.23

82.77

 No. 30

0.6

2106

62.79

37.21

 No. 50

0.30

2443

72.84

27.16

 No. 200

0.075

3038

90.58

9.42

Berat contoh :

Rata - rata

gram

3354

Material : HOT BIN III (ABU BATU + PASIR) B Ukuran saringan

Komulatif  

Rata - rata

Inch

mm

Brt tertahan

% Tertahan

% Lolos

3/4

19.0

0

0

100

100

1/2

12.7

0

0

100

100

3/8

9.8

0

0

100

100

 No.4

4.75

0

0

100

100

 No. 8

2.35

521

17.68

82.32

82.54

 No. 30

0.60

1793

60.84

39.16

38.18 

 No. 50

0.30

2113

71.70

28.30

27.73

 No. 200

0.075

2656

90.13

9.87

9.65

Berat contoh :

2947

gram

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pake aket

: Pen Pengadaa adaan n Jal alan an Kabu abupat ateen/Kota Kelas III Ru Ruaas Fatu atubenao - Debubot / K.31 ANALISA SARINGAN SNI 03 - 1968 - 1990

Material : FILLER A

Tanggal : 08 April 2020

Ukuran saringan

Komulatif  

Inch

mm

3/4

19.0

100

1/2

12.7

100

3/8

9.8

100

 No.4

4.75

100

 No. 8

2.35

100

 No. 30

0.6

100

 No. 50

0.30

0

0.00

100.00

 No. 200

0.075

22

4.40

95.60

Berat contoh :

Brt tertahan

500

% Tertahan

Rata - rata

% Lolos

gram

Material : FILLER B Ukuran saringan

Komulatif   mm

3/4

19.0

100

100

1/2

12.7

100

100

3/8

9.8

100

100

 No.4

4.75

100

100

 No. 8

2.35

100

100

 No. 30  No. 50

0.60 0.30

0

0.00

100 100.00

100 100.00

 No. 200

0.075

21

3.61

96.39

96.00

Berat contoh :

Brt tertahan

582

% Tertahan

Rata - rata

Inch

% Lolos

gram

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pak Paket

: Pen Peng gad adaa aan n Ja Jalan lan Kab Kabup upat aten en/K /Kot otaa Kelas elas II IIII R Rua uass F Fat atub uben enao ao - De Debubo bubott / K.3 .31 1

Kom ompo pone nen n

: Hot Hot Bin II IIII ((A Abu Batu atu + Pa Pasi sir) r)

Tanggal

: 08 April 2020

PENGUJIAN BAHAN LOLOS SARINGAN NO. 200 SNI 03 - 4142 - 1996 

URAIAN

I

II

SATUAN

Berat Benda Uji Semula

(A)

3354

2947

Gram

Berat Benda Uji Setelah Dicuci

(B)

3095

2733

Gram

7. 72

7. 26

%

Bahan Lolos Saringan No. 200

A-B

x 100

Speck  

A

7.49

RATA - RATA

%

Max. 10 %

Disetujui Oleh ;

Diperiksa Oleh ;

Dibuat Oleh ;

Pengendali Mutu

Konsultan Supervisi

Kontraktor Pelaksana

Dinas Pekerjaan Umum Kab. Belu

CV. Gunatama Desain

CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech

Lab. Tech

   

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN P ERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Paket Paket

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Pe Pengad ngadaan aan Jal Jalan an Kab Kabupa upaten/ ten/Ko Kota ta Kelas Kelas III Ru Ruas as Fatub Fatubena enao o - Debub Debubot ot / K. K.31 31

10

Ukuran saringan

HOT BIN I

Inch

mm

100%

3/4

19.0

1/2

 

44

45

HOT BIN II

1

HOT BIN III

FILLER  

HASIL

SPECK  

1.00

100.00

100

100.00

1.00

90.90

90 - 100

52.00

100.00

1.00

84.18

65 - 90

100.00

52.00

100.00

1.00

65.04

-

82.54

42.92

100.00

1.00

47.29

35 - 55

1.66

38.18

19.86

100.00

1.00

22.54

15 - 35

4.31

1.51

27.73

14.42

100.00

1.00

16.95

-

2.60

0.91

9.65

5.02

96.00

0.96

6.89

2-9

12%

100%

35%

100%

52%

100%

1%

100.00

12.00

100.00

35.00

100.00

52.00

100.00

12.7

24.21

2.90

100.00

35.00

100.00

52.00

3/8

9.8

3.68

0.44

87.82

30.74

100.00

 No.4

4.75

0.55

 No. 8

2.35

0.29

0.07

34.22

11.98

0.03

9.53

3.34

 No. 30

0.6

0.22

0.03

4.73

 No. 50

0.30

0.17

0.02

 No. 200

0.075

0.00

0.00

GRAFIK GRAF IK GABUNGAN GABUNGAN HRS - BASE 100

90

80

70

60

   s    o     l    o 50     L       % 40

30

20

10

0

Ukuran saringan (mm)

 0   .  0   7    5  

 0   .  6    0  

        5         3   ,         2

 9   .  8    0  

1   2   . 7  

1    9   .  0    0  

Catatan :  KOMPOSISII TERPILIH   KOMPOSIS

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Semy N. Allung, A.Md

Benediktus T. ST

 Nip. 196512272006041007

Direktur 

Material Engineer 

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 2 1036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Paket Pak et

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Penga Pengadaan daan Jala Jalan nK Kabup abupate aten/K n/Kota ota Kel Kelas as III Ruas Fat Fatube ubenao nao - Debub Debubot ot / K.31 K.31

RANCANGAN CAMPURAN ASPAL URAIAN

 NILAI

SATUAN

Proporsi Fraksi Kasar

CA

52.71

%

Proporsi Fraksi Halus

FA

40.41

%

Proporsi Bahan Pengisi

FF

6.89

%

 Nilai Konstanta

K

1.60

%

Perkiraan Kadar Aspal

Pb

6.50

%

 Rumus Perkiraan Kadar Aspal (Pb)  Pb =0,035 (CA) + 0,045 (FA) + 0,18 ((FF) FF) + K

KOMPOSISI

KOMPONEN

KADAR ASPAL RENCANA (%)

a

Hot Bin I

AGREGAT 12%

5.5 11.34

6 11.28

6.5 11.22

7 11.16

7.5 11.10

 b

Hot Bin II

35%

33.08

32.90

32.73

32.55

32.38

c

Hot Bin III

52%

49.14

48.88

48.62

48.36

48.10

e

Filler

1%

0.95

0.94

0.94

0.93

0.93

Total Agregat Campuran (%)

100%

94.50

94.00

93.50

93.00

92.50

0.2

0.2

0.2

0.2

0.2

100.00

100.00

100.00

100.00

100.00

Kadar Bahan Pengelupasan (%) Total Campuran (%) Komposisi Campuran Kadar Aspal Rencana

Komposisi Agregat %

Berat Timbangan 5.5

6

6.5

7

7.5

a

Hot Bin I

12%

136.1

135.4

134.6

133.9

133.2

 b

Hot Bin II

35%

396.9

394.8

392.7

390.6

388.5

c

Hot Bin III

52%

589.7

586.6

583.4

580.3

577.2

e

Filler

1%

11.3

11.3

11.2

11.2

11.1

1134.0

1128.0

1122.0

1116.0

1110.0

Berat Aspal (gr)

66.0

72.0

78.0

84.0

90.0

Berat Bahan Anti Pengelupasan (gr)

0.13

0.14

0.16

0.17

0.18

Berat Rencana Total Campuran (gr)

1200.0

1200.0

1200.0

1200.0

1200.0

Berat Agregat Campuran (gr)

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksan Pelaksanaa CV. Sumber Indah

Alfridus Bauk

Semy N. Allung, A.Md

Benediktus T. ST

 Nip. 196512272006041007

Direktur 

Material Engineer 

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 210 36 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pak Paket

: Pengadaan Jalan Kabupaten/Kota Kelas III Ru Ruaas Fatubenao - Debubot / K.31

Komponen Tanggal

: HRS - BASE : 09 April 2020

BERAT JENIS DAN PENYERAPAN AGG. KASAR  SNI 03 - 1970 - - 1990

 Agregat Kasar

: Batu Pecah 3/4"

Sumber Material

 NOMOR CONTOH CONTOH

: Hot Bin I 

1

2

Rata - rata

Berat Contoh Kering Oven

A

Gram

2674

2573

Berat Contoh Kering Permukaan

B

Gram

2704

2602

Berat Contoh Dalam Air

C

Gram

1699

1636

Gr/cc

2.661

2.664

2.662

Gr/cc

2.691

2.694

2.692

Gr/cc

2.743

2.746

2.744

%

1.122

1.127

1.125

A B - C B B - C A

BERAT JENIS BULK  BERAT JENIS SSD BERAT JENIS APPARENT

A - C B - A  X 100%

PENYERAPAN AIR   Agregat Kasar

Sumber Material  : Hot Bin II 

: Batu Pecah 1/2"

 NOMOR CONTOH CONTOH

1

2

Rata - rata

Berat Contoh Kering Oven

A

Gram

1805

1764

Berat Contoh Kering Permukaan

B

Gram

1828

1786

Berat Contoh Dalam Air

C

Gram

1142

1117

Gr/cc

2.631

2.637

2.634

Gr/cc

2.665

2.670

2.667

Gr/cc

2.722

2.726

2.724

%

1.274

1.247

1.261

BERAT JENIS BULK  BERAT JENIS SSD BERAT JENIS APPARENT PENYERAPAN AIR 

A B - C B B - C A A - C B - A  X 100% A

CATATAN :

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 210 36 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pak Paket

: Pengadaan Jalan Kabupaten/Kota Kelas III Ru Ruaas Fatubenao - Debubot / K.31

Komponen Tanggal

: HRS - BASE : 09 April 2020

BERAT JENIS DAN PENYERAPAN AGG. HALUS SNI 03 - 1970 - - 1990  Agregat Halus

Sumber Material 

: Abu Batu + Pasir  NOMOR CONTOH

: Hot Bin III 

1

2

Rata - rata

Berat Benda Uji Kering Permukaan Jenuh

A

Gram

500

500

Berat Piknometer + Air

B

Gram

672

670

Berat Piknometer + Air + Benda Uji

C

Gram

983

981

Gram

485

484

Gr/cc

2.566

2.561

2.563

Gr/cc

2.646

2.646

2.646

Gr/cc

2.787

2.798

2.793

%

3.093

3.306

3.199

Berat Benda Uji Kering Oven

D D B +A - C A

BERAT JENIS BULK  BERAT JENIS SSD

B +A D- C B+D - C   X 100%

BERAT JENIS APPARENT PENYERAPAN  Agregat Halus

Sumber Material 

: Filler (Semen)  NOMOR CONTOH

: Pabrikan

1

2

Rata - rata

Berat Contoh Kering Oven

A

Gram

485

492

Berat Contoh Kering Permukaan

B

Gram

500

500

Berat Contoh Dalam Air 

C

Gram

346

314

Gr/cc

3.152

2.645

3.152

Gr/cc

3.249

2.688

3.249

Gr/cc

3.490

2.764

3.490

%

3.072

1.626

3.072

BERAT JENIS BULK  BERAT JENIS SSD BERAT JENIS APPARENT PENYERAPAN AIR 

A B - C B B - C A A - C B - A  X 100% A

CATATAN :

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech Tech

Lab. Tech

   

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Paket Pak et

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Pe Peng ngad adaa aan n Jala Jalan n Ka Kabup bupat aten en/Ko /Kota ta Ke Kela lass III III Ru Ruas as F Fat atube ubena nao o-D Deb ebubo ubott / K. K.31 31

ANALISA BERAT JENIS AGREGAT SNI 03 - 1970 - - 1990

PROPORSI

KOMPONEN

BERAT JENIS

(%)

BULK

SSD

APPARENT

a) HOT BIN I

12%

2.662

2.692

2.744

 b) HOT BIN BIN II

35%

2.634

2.667

2.724

c) HOT BIN III

52%

2.563

2.646

2.793

d) FILLER 

1%

3.152

3.249

3.490

Bulk 

SSD

Apparent

=

=

=

100 12 2.662

+

35 2.634

52 2.563

+

+

1 3.152

+

1 3.249

+

1 3.490

=

 2.634

100 12 2.692

+

35 2.667

52 2.646

+

100 12 2.744

+

 Berat Jenis Jenis Effekti Effektiff =

35 2.724

+

52 2.793

2.604

+

2.664

KET

= 2.604

= 2.664

= 2.768

2

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 1965122720060410 196512272006041007 07

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Paket Pak et

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Penga Pengadaa daan n Jalan Jalan Kab Kabupa upate ten/ n/Kot Kotaa Kel Kelas as III III Rua Ruass Fatu Fatuben benao ao - Debubo Debubott / K.31 K.31

BERAT JENIS GABUNGAN SNI 03 - 1970 - 1990

KOMPONEN

PROPORSI

BERAT JENIS BULK

BERAT JENIS BULK  

(%)

AGREGAT

GABUNGAN AGREGAT

a) HOT BIN I

12%

2. 662

4. 508

 b) HOT BIN II

35%

2.634

13.288

c) HOT BIN III

52%

2. 563

20.285

c) FILLER

1%

3. 152

0.317

100%

3 8 .3 9 8

2 .6 0 4

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pa Pake kett

: Pe Pen nga gada daan an Jala Jalan n Kabu Kabupa pate ten/ n/Ko Kota ta Ke Kela lass III Ruas Ruas Fa Fatu tube bena nao o - De Debu bubo bott / K. K.31 31

PENGUJIAN BERAT JENIS MAXIMUM CAMPURAN (Gmm) SNI 03 - 6893 - 2002

Tanggal : 14 April 2020

 NOMOR CONTOH

URAIAN

1

2

Rata-Rata

Berat Benda Uji Kering Oven

A

105 2

89 7

Berat Wadah + Benda Uji dlm Air Berat Wadah dlm Air

P Q

117 1 5 58

1 082 55 8

6 13

52 4

2.396

2. 405

Berat Benda Uji dlm air

C=

P-Q

A Berat Jenis (Gmm)

=

2.401

(A-C)

Disetujui Oleh ;

Diperiksa Oleh;

Dibuat Oleh;

Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Konsultan Supervisi CV. Gunatama Desain

Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA :

KONSULTAN SUPERVISI :

CV. Sumber Indah

CV. Gunatama Desain

Pak Paket et Kompon en Tanggal

:P Pen engad gadaan aan Jalan Jalan Kabupa Kabupate ten/ n/Ko Kota ta Kelas Kelas III Ruas Ruas F Fatu atuben benao ao - D Deb ebubo ubott / K. K.31 31 : HR RS S - BAS E : 13 A Ap pril 2 20 020

PERCOBAAN MARSHALL SNI 06 - 2489 - 1991

 Rendaman : 30 menit No

a

b

c

d

e

f

g

h

i

j

k

l

m

n

o

p

1 2

5.5 5.5

1188.0 1166.0

1189.0 1167.0

667.0 655.0

522.0 512.0

2.276 2.277  2.277

2.426 2.426 2.426

17.42 17.36 17.39

6.18 6.12 6.15

64.51 64.75 64.63

64.00 61.00 62.50

946.37 902.01 924.19

946.37 902.01 924.19

3.00 3.00 3.00

315.46 300.67 308.065

5.08 5.08 5.080

1 2

6.0 6.0

1177.0 1174.0

1178.0 1176.0

663.0 662.0

515.0 514.0

2.285 2.284

2.409 2.409

17.51 17.56

5.11 5.17

70.81 70.56

70.00 70.00

1035.10 1035.10

1035.10 1035.10

3.50 3.50

295.74 295.74

5.58 5.58

 2.285

2.409

17.54

5.14

70.69

70.00

1035.10

1035.10

3.50

295.74

5.58

1 2

6.5 6.5

1170.0 1171.0

1173.0 1172.0

662.0 662.0

511.0 510.0

2.290 2.296  2.293

2.391 2.391 2.391

17.80 17.57 17.68

4.26 3.99 4.12

76.07 77.29 76.68

80.00 78.00 79.00

1182.97 1153.39 1168.18

1182.97 1153.39 1168.18

4.00 3.80 3.90

295.74 303.52 299.63

6.08 6.08 6.08

1 2

7.0 7.0

1167.0 1179.0

1171.0 1181.0

660.0 665.0

511.0 516.0

2.284 2.285  2.284

2.375 2.375 2.375

18.45 18.41 18.43

3.83 3.78 3.80

79.25 79.46 79.35

70.00 72.00 71.00

1035.10 1064.67 1049.88

1035.10 1064.67 1049.88

3.40 3.60 3.50

304.44 295.74 300.09

6.59 6.59 6.59

1 2

7.5 7.5

1185.0 1157.0

1188.0 1159.0

668.0 652.0

520.0 507.0

2.279 2.282

2.358 2.358

19.06 18.95

3.36 3.22

82.37 82.98

64.00 63.00

946.37 931.59

946.37 968.85

3.20 3.00

295.74 322.95

7.09 7.09

 2.280

2.358

19.00

3.29

82.67

63.50

938.98

957.61

3.10

309.35

7.09

Gmm :

2.401

Bj. Agg. Eff =

2.634

Abps. Aspal =

0.444

Bj. Aspal =

1.029

P. ring =

14.79

Ka. Gmm :

6.50

Bj.agg. BULK =

2.604

Keterangan : a. K.Aspa l thdp c amp

f= B Brrt isi (b/e )

 b. Brt. Di udara (gr)

g = Brt isi max teoritis

h = % rongga thdp agre ga t ( 100 - (h*(100 - a)/bj.bulk) 100

c. Brt. SSD (gr) % a gre ga t

d. dlm air (gr)

Bj. Eff.Agregat

e. vol (cc )

% aspa l

+

m= S Stta bilitas (kg), l*kor eksi be nda uji

i = % rongga thdp campuran 100 - (100*(f/g)

n = Kelelehan (mm)

j = % rongga te risi aspal (100*(h - i))/i

o = Ha sil bagi Marsha ll (kg/mm), m/n

k = P emba ca an arloji stabilita s

Bj. Aspa l

p = Ka da r aspa l e ffektif (%)

l = Sta bilita s(k*konversi)

= a - (( Absp, a spal/100)*(100 - c ))

BJ. Bulk + Apparent

**Bj. Eff. Agregat =

*** Absorpsi aspal terhadap total agregat =

2

(BJ. Eff. Agr -

100 x

BJ. Bulk agr)

x BJ. Asp

(BJ. Eff. Agr x BJ. Bulk agr)

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

   

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN D AN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Pak Paket et Kom ompo pone nen n

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Penga Pengadaa daan n Jala Jalan n Kab Kabupa upaten ten/K /Kota ota Kelas Kelas II IIII Rua Ruass F Fatu atube benao nao - Deb Debubo ubott / K.31 K.31 :H HRS RS - BAS BASE E

GRAFIK PERCOBAAN MARSHALL TEST 6

7.2

#REF!

#REF!

7.2

6

7.2

2.140000

0

Kadar aspal >< VIM

7.2

0

0

Kadar aspal >< Kepadatan

8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00

2.220

5.5

6

6.5

7

7.5

5. 5

5.7

5.9

6.1

6. 3

6. 5

6.7

6.9

7.1

7. 3

7.5

Kadar aspal >< VFB

Kadar aspal >< VMA 90.00

20.00

85.00 19.00

80.00 75.00

18.00

70.00 17.00

65.00 60.00

16.00

55.00 15.00

50.00 5.5

6

6.5

7

7.5

5. 5

6

6. 5

Kadar aspal >< Stability

7

7.5

Kadar aspal >< MQ

1400.00

450.00

1200.00

#REF!

400.00

1000.00

350.00

800.00

300.00

600.00

250.00

400.00

200.00 150.00

200.00 5. 5

6

6. 5

7

5.5

7.5

6

6.5

7

7.5

7

7.5

Kadar aspal >< VIM PRD

Kadar aspal >< flow 5.00

7.00

4.50

6.00

4.00

5.00

3.50

4.00

3.00

3.00

2.50

2.00

2.00

1.00 5.5

6

6. 5

7

7.5

5.5

6

6.5

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa oleh; Konsultan Supervisi CV. Gunatama Desain

Diajukan oleh; Kontraktor Pelaksana; CV. Sumber Indah

Alfridus Bauk

Vinsensius Leki, ST

Elpy Da Costa

 Nip. 196512272006041007 196512272006041007

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Pa Pake kett Kom ompo pone nen n

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Pen Penga gada daan an Jala Jalan nK Kab abup upat aten en/K /Kot otaa Kela Kelass IIII II Ru Ruas as Fat atub uben enao ao - Deb Debub ubot ot / K K.3 .31 1 :H HR RS - B BA ASE

EVALUASI SIFAT - SIFAT CAMPURAN ASPAL KADAR ASPAL

SIFAT - SIFAT 5.5

Stabilitas Marshall Rongga Dalam Agregat (VMA)

6.0

6.5

7.0

7.5

Rongga Terisi Aspal (VFB) Rongga Dalam Campuran (VIM) Rongga dlm Campuran Membal (VIM PRD) Kelelehan (Flow) Marshall Quotient (MQ) 6.50

SIFAT - SIFAT

 No

NILAI

SATUAN

SPESIFIKASI

1

Kad adar ar Asp spal al Opti Optim mum

6.5 0

%

-

2

Kepadatan

2.2 90

T/m3

-

3

Ro Rong ngga ga dal dalam am A Agr greg egat at ((V VMA) MA)

17. 80

%

Min 17

4

Ro Rong ngga ga Teri Terisi si Aspal spal (V (VF FB)

76. 40

%

Min 68

5

Ro Rong ngga ga dala dalam m Ca Camp mpur uran an (V (VIM IM))

4.30

%

4-6

6

Ro Rong ngga ga dlm dlm Cam Campu pura ran n Me Memba mball (V (VIM IM PRD PRD))

3.80

%

Min 3

7

Stabi tabili littas Mar arsh shaall

1120 .00

Kg

Min 600

8

Marsh arshaall Quot uotient ient (MQ) (MQ)

300 .00

Kg/mm

Min 250

9

Kelelehan (Flow)

3.7 8

mm

Min 3

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa oleh; Konsultan Supervisi CV. Gunatama Desain

Dibuat oleh; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Semy N. Allung, A.Md

Benediktus T. ST

 Nip. 19651227200604 1007

Direktur 

Material Engineer 

   

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah Pak Pak et et Komponen Tanggal

KONSULTAN SUPERVISI : CV. Gunatama Desain

: Pe Pe n ng ga d daa aan n JJaa llaa n K aab b up up ate aten n /K /K o ota ta K eela lass IIIII Ru Ru as as F Faa tu tu b bee n naa o - De De b bu ub bo ot / K K.. 3 31 1 : HRS - BASE : 15 April 2020

PERCOBAAN TEST MARSHALL SISA SNI 06 - 2489 - 1991

 Rendaman 30 menit dengan suhu 60 °C No a b c 1 6.50 1180.0 1182.0 2 6.50 1169.0 1173.0 3 6.50 1189.0 1190.0

d 667.0 663.0 670.0

e 515.0 510.0 520.0

f 2.291 2.292 2.287

g 2.391 2.391 2.391

h 17.74 17.71 17.91

i 4.19 4.15 4.39

j 76.37 76.54 75.50

k 82 60 75

l 1212.54 887.23 1109.03 Rata - Rata

m 1212.54 887.23 1109.03 1069.60

n 3.40 2.80 3.20

o 356.63 316.87 346.57

p 6.08 6.08 6.08

 Rendaman 1 x 24 jam dengan suhu suhu 60°C  1 6.50 1174.0 1176.0 2 6.50 1180.0 1186.0

663.0 671.0

513.0 515.0

2.288 2.291

2.391 2.391

17.84 17.74

4.31 4.19

75.86 76.37

60 68

887.23 1005.52

887.23 1005.52

3.00 3.00

295.74 335.17

6.08 6.08

667.0

516.0

2.289

2.391

17.83

4.30

75.91

73

1079.46 Rata - Rata Stabilitas Marshall Sisa

1079.46 990.74 92.63

3.00

359.82

6.08

0.444

Bj. Aspal =

P. ring =

14.79

Ka. Gmm :

6.50

3

6.50

Gmm :

2.401

1181.0

1183.0

Bj Bulk Agg =

Bj. Agg. Eff =

2.604

2.634

Abps. Aspal =

1.029

Keterangan : a. K.Aspal thdp camp

f = Br Brt isi (b/e)

h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk)

 b. Brt. Di udara (gr)

g = Brt isi ma max x teoritis

i = % rongga thdp campuran 100 - (100*(f/g)

n = Kelelehan Kelelehan (m (mm) m)

j = % rongga terisi aspal (100*(h - i))/i

o = Hasil bagi Marshall (kg/mm), m/n

c. Brt. SSD (gr)

100

m= S Sttabilitas, (l*korksi bnda uji)

% agregat

d. dlm air (gr)

% aspal

+

Bj. Eff.Agregat

e. Volume (c - d)

k = Pembacaan arloji stabilitas

Bj. Aspal

p = Kadar aspal effektif (%)

l = Stabilitas(k*konversi)

= a - ((Absp, aspal/100)*(100 - c))

Bj. Bulk + Bj. Appare Apparent nt

**Bj. Eff. Agregat =

*** Absorpsi aspal terhadap total agregat =

2

(BJ. Eff. Agr -

100 x

BJ. Bulk agr)

x BJ. Asp

(BJ. Eff. Agr x BJ. Bulk agr)

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Dipe riksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

   

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumbe r Indah Paket Paket Kompone n Tanggal

KONSULTAN SUPERVISI : CV. Guna tama Desain

:P Pen enga gada daan an Ja Jalan lan Kabu Kabupa paten ten/K /Kot otaa Kelas Kelas III Ruas Ruas Fa Fatu tube bena nao o - Debu Debubo bott / K.31 K.31 : HRS - BASE : 15 April 2020

PERCOBAAN CAMPURAN ASPAL DENGAN KEPADATAN MUTLAK  SNI 06 - 2489 - 1991

No

a

b

c

d

e

f

g

h

i

 j

1

6

1193.0

1197.0

679.0

518.0

2.303

2.409

16.87

4.38

74.051

2

6.5

1199.0

1203.0

682.0

521.0

2.301

2.391

17.38

3.77

78.308

3

7

1196.0

1201.0

680.0

521.0

2.296

2.375

18.03

3.33

81.522

Gmm :

2.401

Bj. Agg. Eff :

2.634

Bj.agg. BULK :

2.604

Abps. Aspal

:

0.444

k

Bj. Aspal :

l

m

n

1.029

P. ring :

14.787

o

Ka . Pb :

Keterangan : a. K.Aspal thdp camp

f= B Brrt isi (b/e)

h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk)

 b. Brt. Di udara (gr)

g = Brt isi ma max x teoritis

i = % rongga thdp campuran campuran 100 - (100*(f/g) (100*(f/g)

n = Kelelehan Kelelehan (mm)

j = % rongga terisi aspal (100*(h - i))/i

o = Hasil bagi Marshall (kg/mm), m/n

100

c. Brt. SSD (gr) d. dlm air (gr) e. vol (cc)

% agregat Bj. Eff.Agregat **Bj. Eff. Agregat =

+

% aspal Bj. Aspal

m= S Sttabilitas (l*korksi bnda uji*0,45359)

k = Pembacaan arloji stabilitas

p = Kadar aspal effektif (%)

l = Stabilitas(k*konversi)

Bj. Bulk + Bj. Appare Apparent nt

= a - ((Absp, aspal/100)*(100 - c)) *** Absorpsi aspal terhadap total agregat =

2

100 x

(BJ. Eff. Agr -

BJ. Bulk agr)

x BJ. Asp

(BJ. Eff. Agr x BJ. Bulk agr)

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh ; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh ; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk  Nip. 196512272006041007 196512272006041007

Vinsensius Leki, ST

Elpy Da Costa

Lab. Tech

Lab. Tech

 

PEMERINTAH KABUPATEN BELU DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT BIDANG BINA MARGA DAN JASA KONSTRUKSI Jln. A. Yani No. 19 Telp (0389) 21136, 21036 KONTRAKTOR PELAKSANA : CV. Sumber Indah

KONSULTAN SUPERVISI : CV. Gunatama Desain

p

6.71

Paket : Pen Pengadaan gadaan JJalan alan Ka Kabupaten/ bupaten/Kota Kota Kelas II IIII Ruas F Fatubenao atubenao - Debubo Debubott / K.3 K.31 1

RANCANGAN CAMPURAN KERJA (JMF) MATERIAL : 1 Batu P Peecah 3/4" Ex. T Taalau 2 Batu P Peecah 1/2" Ex. T Taalau 3 Abu Batu Ex. Talau 4 Pasir Ex. Stock Pile 5 Filler / Semen Ex. K Ku upang 6 Aspal Ex. Pertamina  NO 1 2 3 5 6 7

KOMPONEN Hot Bin I Hot Bin II Hot Bin III Filler Kadar Aspal Aditive Anti Pengelupasan

SIFAT - SIFAT  NO

SIFAT - SIFAT

SATUAN SATUAN % % % % % %

PROPORSI 12 35 52 1 6.50 0.20

SPESIFI SPESIFIKASI KASI Max. 2 0,2 - 0,4

KETERANGAN Tdk disyaratkan Tdk disyaratkan Tdk disyaratkan Memenuhi Tdk disyaratkan Memenuhi

SATUAN SATUA N

HASIL

SPESIFI SPESIFIKASI KASI

KETERANGAN

1

Kadar Aspal Total

%

6.50

-

Tdk disyaratkan

2

Berat Jenis Camp. (GMM)

%

2.40

-

Tdk disyaratkan

3

Berat Jenis Aspal

%

1.029 1.

-

Tdk disyaratkan

4

Penyerapan Aspal Effektif 

%

0.58

Max 1.7

Memenuhi

T/m %

2.290

-

Tdk disyaratkan

5.92

Min 5,5

Memenuhi

3

5

Berat Jenis Camp. Padat (Gmb)

6

Kadar Aspal Efektif 

7

Stabilitas

Kg

1120.00

Min 600

Memenuhi

8

Kelelehan Marshall (FLOW)

%

3.78

Min 3

Memenuhi

9

Marshall Quotient (MQ)

%

300.00

Min 250

Memenuhi

10

Rongga dlm Campuran (VIM)

%

4.30

4-6

Memenuhi

11

Rongga dlm Agregat (VMA)

%

17.80

Min 17

Memenuhi

12 13

Rongga Terisi Aspal (VFB) Rongga Kepadatan Mutlak 

% %

76.40 3.80

Min 68 Min 3

Memenuhi Memenuhi

14

Stabilitas Marshall Sisa

%

92.63

Min 90

Memenuhi

Disetujui Oleh ; Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Diperiksa Oleh; Konsultan Supervisi CV. Gunatama Desain

Dibuat Oleh; Kontraktor Pelaksana CV. Sumber Indah

Alfridus Bauk

Semy N. Allung, A.Md

Benediktuss T. ST Benediktu

 Nip. 196512272006041007 196512272006041007

Direktur 

Material Engineer 

 

BERITA ACARA PERCOBAAN CAMPURAN (TRIAL MIX ) CAMPURAN ASPAL LATASTON LAPIS PONDASI HRS - BASE

Pela Pelaks ksan anaa Kegiat giatan an

: Di Dina nass Peke Pekerj rjaa aan n Um Umum um & Pe Peru rum mahan ahan Raky Rakyat at Kab. ab. Belu Belu

Pa Pak ket Kontr ontrak ak

: Pengad ngadaa aan n Ja Jallan Kab abup upaaten/ ten/K Kota ota Kelas III Ru Ruas as Fa Fatu tube ben nao - Debubo bubott / K.31

 Nomor Kontrak Kontrak

: 2/PPK-BM 2/PPK-BM/KONTRAK /KONTRAK/Jl. /Jl. Fatubena Fatubenao o - Debubot/II Debubot/III/2020 I/2020

Tanggal Kontrak

: 20 Maret 2020

Kontraktor Pelaksana

: CV. Sumber Indah

Konsultan Supervisi

: CV. Gunatama Desain

Pada hari ini Kamis tanggal Enam Enam Bel Belas Bulan April Tahun Dua Ribu Dua Puluh, bersa bersama ma-s -sam amaa kami kami Kont Kontra rakt ktor  or  Pe Pela laksa ksana, na, Ko Konsu nsulta ltan n Sup Super ervis visii dan Pe Penge ngenda ndali li Mut Mutu u Di Dinas nas Pe Peke kerja rjaan an Um Umum um Ka Kabupa bupate ten n Belu Belu te tela lah h meny menyel eles esai aikan kan Perco Percobaa baan n Cam Campu pura ran n (T (Tri rial al Mix) Mix) Lata Latast ston on Lapi apis Pond Pondas asii HR HRS S - Base Base un untu tuk k Pake Pakett Peke Pekerj rjaa aan n : Penga engada daan an Jala Jalan n Kabu Kabupa pate ten n / Kota Kota Kelas III - Ruas Fatubenao - Debubot / K.31  Tahun Anggaran 2020. Tata cara percobaan Laboratorium menggunakan : 1 SN SNII 0 033-19 1968 68-1 -199 990 0 : Meto Metode de Pe Peng nguj ujia ian n Te Tentan ntang gA Ana nali lisa sa Sari Saring ngan an Ag Aggr greega gatt H Hal alus us dan dan K Kas asar  ar  2

SN SNII 03-1 03-196 9699-19 1990 90

: Meto Metode de Pe Peng nguj ujia ian n Bera Beratt Jeni Jeniss dan dan Peny Penyeera rapa pan n Ag Aggr greega gatt Kas asar  ar 

3

SN SNII 03-1 03-197 9700-19 1990 90

: Meto Metode de Pe Peng nguj ujia ian n Bera Beratt Jeni Jeniss dan dan Peny Penyeera rapa pan n Ag Aggr greega gatt Halu Haluss

4

SNI 0303-41 4142 42--19 1996 96

: Metode P Peengujian Ba Bahan L Lo olos Sa Saringan N No o. 200 200

5 6

SN SNII 03-6 03-689 8933-20 2002 02 SN SNII 0606-24 2489 89-1 -199 991 1

: Metode tode Pe Pen nguj gujian B Beerat rat JJeenis nis M Maaxim ximun Cam ampu pura ran n (G (Gm mm) : Meto Metode de Pe Peng nguj ujia ian n Si Sifat fat - Si Sifa fatt Cam Campu pura ran nA Asp spal al Pana Panass De Dengan ngan Alat Alat Ma Mars rsha hall ll

Da Dari ri Pe Peng nguj ujia ian n kami kami,, dipe dipero role leh h hasi hasill seba sebaga gaim iman anaa terc tercan antu tum m dala dalam m La Lamp mpir iran an Re Reka kapi pila lasi si Ha Hasi sill Pe Peng nguj ujia ian n Ca Camp mpur uran an Aspa Aspall Lataston Lapis Pondasi HRS - BASE. Demikian berita acara ini kami buat untuk dipergunakan sebagaimana mestinya.

Atambua, 16 April 2020

Konsultan Supevisi CV. Gunatama Desain

Kontraktor Pelaksana CV. Sumber Indah

Semy N. Allung, A.Md

Benediktus T. ST

Direktur

Material Egineer

Pengendali Mutu Dinas Pekerjaan Umum Kab. Belu

Alfridus Bauk  Nip. 196512272006041007

 

 

HASIL PENGUJIAN MATERIAL SUMBER MATERIAL : HOT BIN

 