JOB HAZARD ANALYSIS HOW TO USE THIS FORM : 1) Crew performing task reviews ALL generic JHA considerations. 2) Review previous JHA update(s) for useful information which will help this task. 3) Create new JHA update with generic form and ALL considerations for this task. 4) Carry out task as per plan. If any conditions change ---STOP & RE-ASSESS. 5) File JHA update for future reference. WORK ACTIVITY RIG UP WIRELINE EQUIPMENT Job Step
Description of Job Step
Potential Hazard/s
L
Installation/Facility Location Associated Work Permit Type Associated Work Permit Number Electrical Isolation Certificate Number Physical Isolation Certificate Number JHA Cross-Reference Number S
Control / Recovery Measures
R
§ 1
Preparation for PTW
§ To avoid clash of work at platform
2
3
6
§ §
2
Pre Job Meeting.
§ Other party not aware where you are working
2
2
4
§ Hand and foot crush during lifting the equipment due to sling break. Body caught between load
3
Lifting wireline equipment
§ § Finger §
pinched while repositioning the equipment Equipment dropped due to lifting equipment failure.
2
2
4
Applicant, Authorizing, Approval Signatories be familiar with the job. Competent Personnel to conduct the operation. Inform to all crew on location and description of works.
§ §
Inform to all crew on location
§
Physical inspection equipment. Valid inspection records
§ § § § § § §
Inform the hazards involved at place of work
of
PLATFORM WP-IA LIFTING
L
S
R
Result
1
1
1
Acceptable
1
1
1
Acceptable
1
1
1
Acceptable
lifting
Stay away from the weight Don’t stand between load Assign experience signal man Beware of hand and foot position Use tag line while handling lifting equipment. Clear communication between Signal man and Crane Operator.
JOB HAZARD ANALYSIS § § End of wire stabbed personnel if §
4
Rig up wireline equipment on the main deck.
§ § Hydraulic § §
§
wire parted. Bodily injury and equipment dropped due to lifting equipment failure. Tripping hazard. oil hose burst cause hydraulic splash to personnel and contaminate environment. Back injury due to wrong method of manual handling. Finger, hand and foot crush during handling equipment.
§ 2
2
4
§ § § § § §
5
Sign off permit
§
other party not aware of job status.
2
3
6
§ §
Physical inspection for lifting equipment. Make sure lifting equipment valid the inspection record. Double check the connection and hose Cut and test the wire prior to do job. Proper house keeping and make sure no oil spill. Use proper lifting gears and lifting technique. Get help from other personnel.
1
1
1
Acceptable
1
1
1
Acceptable
All under pressure hoses connection secure with safety pin. Follow the working safety procedure.
Secure all equipment Mention on the permit status of job.
JOB HAZARD ANALYSIS L - LIKELIHOOD CATEGORY
DEFINITION
CATEGORY
RESULT
R - RATING
S - SEVERITY DEFINITIONS
H
3
6
9
6-9
UNACCEPTABLE
LOW
1
Remote
LOW
1
No Injury
No Damage
No Pollution
M
2
4
6
3-4
TOLERABLE
MEDIU M
2
Possible
MEDIUM
2
First Aid Injury
Minor Damage
Minor Pollution
L
1
2
3
1-2
ACCEPTABLE
HIGH
3
Probable
HIGH
3
Lost Time Injury
Major Damage
Major Pollution
L
M
H
IS THERE A SAFER WAY TO COMPLETE THE JOB ?
JHA Number
ARE THERE ALTERNATIVES WITH LESS RISK ?
TASK SAFETY MANAGEMENT OUTLINE
LIKELIHOOD
Date this JHA created : Date JHA Last Revised :
WORK ACTIVITY EQUIPMENT Manufacturer Tag. No.
Type of Equipment
Precise Work Site
WIRELINE EQUIPMENT
Name
MAIN DECK AREA
WORK ACTIVITY PARTICIPANTS Discipline Position WIRELINE WIRELINE WIRELINE
Performed Job Before?
Name
W/L OPRT
WORK ACTIVITY RESPONSIBILITY WORK LEADER Name : Signature : Date : Time :
THIS JHA CREATED BY Discipline WIRELINE
JHA SUBMITTED BY RECEIVING AUTHORITY Name: Signature : Date : Time :
Position W/L OPRT
JHA ACCEPTED BY APPROVING AUTHORITY Name : Signature : Date : Time :