j53 s4hana1709 Bb Configguide en Us
Short Description
Descripción: s4hana1709...
Description
SAP S/4HANA August 2016 English
Profitability Analysis (J53) [local] Building Block Configuration Guide
SAP SE Dietmar-Hopp-Allee 16 69190 Walldorf Germany
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Copyright © 2016 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. Please see http://global.sap.com/corporate-en/legal/copyright/index.epx#trademark for additional trademark information and notices. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
© SAP SE
Page 2 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Icons Icon
Meaning Caution Example Note Recommendation Syntax
Typographic Conventions Type Style Description Example text Words or characters that appear on the screen. These include field names, screen titles, buttons as well as menu names, paths, and options. Cross-references to other documentation. Example text
Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT
Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text
Screen output. This style includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade, and database tools.
EXAMPLE TEXT Keys
on the keyboard, for example, function keys (such as F2) or the ENTER
key. Example text
Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
© SAP SE
Page 3 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Content Profitability Analysis ................................................................................................................... 5 1 2
3
4
Purpose .............................................................................................................................. 5 Preparation ......................................................................................................................... 5 2.1
Prerequisites ............................................................................................................ 5
2.2
Supported Deployments........................................................................................... 5
Configuration ...................................................................................................................... 5 3.1
Create Actual Assessments CCA to CO-PA ............................................................ 5
3.2
Activate Profitability Analysis ................................................................................... 7
Manual Build Steps .......................................................................................................... 98
Profitability Analysis ................................................................................................................... 5 1
Purpose .............................................................................................................................. 5
2
Preparation ......................................................................................................................... 5
3
4
2.1
Prerequisites ............................................................................................................ 5
2.2
Deployment Options................................................................................................. 5
2.3
Configuration ............................................................................................................ 5
Configuration ...................................................................................................................... 6 3.1
Create Actual Assessments CCA to CO-PA ............................................................ 6
3.2
Activate Profitability Analysis ................................................................................... 8
Manual Build Steps ............................................................................................................ 8
Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar Formatted: Default Paragraph Font, Check spelling and grammar
© SAP SE
Page 4 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Profitability Analysis 1 Purpose The purpose of this document is to describe the general configuration steps required to manually set up the configuration within the system landscape that has already been installed using the corresponding installation or configuration guides for installation. If you want to install SAP S/4HANA locally (on-premise) and if you do not want to configure manually and prefer an automated installation process using BC Sets and other tools, you can set up a best-practice client and activate the implementation content. For more information, see the Administration Guide for the Implementation of SAP S/4HANA, on premise edition which is linked in the content library (included in the documentation package).
2 Preparation 2.1 Prerequisites Before you start installing this scenario, you must install the prerequisite building blocks. For more information, see the Building Block Prerequisites Matrix.
2.2 Supported Deployments The configuration guide provides the implementation content for the different SAP S/4HANA products:
SAP S/4HANA Cloud – (CE) minimal scope and content
SAP S/4HANA – (OP) installed locally (on-premise), full scope and content coverage
Depending on the use case/deployment option/ S/4HANA product version, you need to implement the required scope/content starting with the Public cloud chapter and proceed with the next required sections.
For the full scope of the on premise scope & content – PC and OP are required
For the SAP S/4HANA Cloud scope & content – CE is required; OP is not required
3 Configuration 3.1 Create Actual Assessments CCA to CO-PA Procedure 1. Access the activity using one of the following navigation options: IMG Menu
Controlling Profitability Analysis Flows of Actual Values Transfer of Overhead Assess Cost Center Costs / Process Costs Define Structure of Cost Center Assessment / Process Cost Assessment
Transaction Code
KEU1
© SAP SE
Page 5 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
2. On the CO-PA Create Actual Assessment Cycle: Initial Screen view, make the following entries: Field Name Value Cycle
Comments
YA1710
Start Date 01.01. For example, if current year is 2015, enter 01.01.2014 3. Choose Execute. 4. On the CO-PA Create Actual Assessment Cycle: Header Data view, make the following entries: Field Name
Value
To
31.12.9999
Text
US-Actual Assessment CO-PA
CO-Area
A000 (or your CO Area)
TF basis
2 Account-based Profitability Analysis
5. Choose Attach segment. 6. On the CO-PA Create Actual Assessment Cycle: Segment view, make the following entries: Tab Segment Header: Field Name
Value
Segment Name
YA1710-1 Marketing
Assessment CElem
94222000
Sender values, Rule
Posted amounts
Sender values, Share in %
100
Receiving tracing factor, Rule
Fixed Percentage
Tab Senders/Receivers (if the product groups are not implemented, do this step later) Field Name
Value
Sender, Cost Center Group
1710160
Tab Receiver Tracing Factor Field Name
Value
Portion/percent
100
7. Save your entries. 8. Repeat steps 4 to 7 for the following values: Field
Value Segment 2
Value Segment 3
Segment Name
YA1710-02 Admin. Overhead
YA1710-03 Sales
Assessment CElem
94224000
94225000
© SAP SE
Page 6 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Sender values, Rule
Posted amounts
Posted amounts
Sender values, Share in %
100
100
Receiving tracing factor, Rule
Fixed percentages
Fixed percentages
Sender, Cost Center Group
1710110
1710170
Receiver
Company Code; for example, 1710
Company Code; for example, 1710
Receiver Tracing Factor, Receivers Portion/Percent
100
100
Field
Value Segment 4
Value Segment 5
Segment Name
YA1710-04 NonOperating Expense
YA1710-5 NonOperating Income
Assessment CElem
94226000
94227000
Sender values, Rule
Posted amounts
Posted amounts
Sender values, Share in %
100
100
Receiving tracing factor, Rule
Fixed percentages
Fixed percentages
Sender, Cost Center Group
1710180
1710180
Sender Cost Element Group
6200_CE
6100_CE
Receiver
Company Code; for example, 1710
Company Code; for example, 1710
Receiver Tracing Factor, Receivers Portion/Percent
100
100
Field
Value Segment 6
Value Segment 7
Segment Name
YA1710-6 Taxes
YA1710-7 Other Income and Expenses
Assessment CElem
94228000
94229000
Sender values, Rule
Posted amounts
Posted amounts
Sender values, Share in %
100
100
Receiving tracing factor, Rule
Fixed percentages
Fixed percentages
Sender, Cost Center / Cost Center Group
1710180
17101801
Sender Cost Element Group
6300_CE
10_CE
Receiver
Company Code; for example, 1710
Company Code; for example, 1710
Receiver Tracing Factor, Receivers Portion/Percent
100
100
3.2 Activate Profitability Analysis © SAP SE
Page 7 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
Procedure 1. Access the activity using one of the following navigation options: IMG Menu
Controlling Profitability Analysis Flows of Actual Values Activate Profitability Analysis
Transaction Code
KEKE
2. On the Change View “CO-PA: Active Flag for Profitability Analysis”: Overview screen, make the following entries: COAr Name A000
From FY
Op.Concern Active Status
Best Practices
A000
3
3. Save your entries. Formatted: Indent: Left: 0.25", No bullets or numbering
4 Manual Build Steps For the configuration activities described in this document , no manual build steps are required. Formatted: Normal
Some settings cannot automatically be transported between systems or clients. In these cases, you either transport the settings manually, if possible, or make the settings in the target system or client. The following table lists the configuration activities where automatic transport is not possible. Refer to the details and sequence in the sections above Configuration activity
Manual transport possible
Manual action in target system / client required
3.1 Create Actual Assessments CCA to COPA
Yes
No
Remarks
We recommend that you plan especially for doing these manual build steps and rehearse the sequence in advance, if possible well before cut over.
Manual Transport of COPA data Procedure Access the activity using one of the following navigation options: IMG Menu
Controlling Profitability Analysis Tools Production Startup Transport
Transaction Code
KE3I
© SAP SE
Page 8 of 10
SAP Best Practices
Profitability Analysis (J53): Configuration Guide (US)
On the SAP-EIS Transport Tool: Choose Transport Objects screen, choose Cycle, then choose Execute. On pop-up windonw Choose Request/Tasks, enter Customizing Request and Workbench Request, then choose Continue(Enter). On Select Objects screen, choose the lines of your COPA assessment cycles, then choose Execute. On pop-up window Choose Dependent Object Class, choose Cycles and Groups. then choose Continue(Enter). System window Display logs pops up. The selected assessment cycles are included into your transport requests.
Formatted: Font: Not Italic
3.
Formatted: Indent: Left: 0.25", No bullets or numbering
Manual Build Steps Some settings cannot automatically be transported between systems or clients. In these cases, you either transport the settings manually, if possible, or make the settings in the target system or client. The following table lists the configuration activities where automatic transport is not possible. Refer to the details and sequence in the sections above Configuration activity
Manual transport possible
Manual action in target system / client required
Create Actual Assessments CCA to COPA
Yes
No
Remarks
We recommend that you plan especially for doing these manual build steps and rehearse the sequence in advance, if possible well before cut over.
Manual Transport of Controlling Data OKE7 Procedure Access the activity using one of the following navigation options: Transaction Code
OKE7
On the Transport Controlling settings screen, select the objects per the Manual Rework table above and choose Include in Request. On the Prompt for Workbench Request dialog box, select the request and choose Continue (Enter). Settings are included into the transport requests.
© SAP SE
Page 9 of 10
SAP Best Practices
4 5
Profitability Analysis (J53): Configuration Guide (US)
Manual Build Steps For the configuration activities described in this document , no manual build steps are required
1.
© SAP SE
Page 10 of 10
View more...
Comments