Consortium
PT. REKADAYA ELEKTRIKA
SHANDONG MACHINERY PT. JUHDI SAKTI ENG.
INSPECTION & TEST PLAN
ITP No.
: PLN-ITP-QC-001
Revision
: 3
Date
: March 16, 2012
Project No.
: 1804
PT. PERUSAHAAN LISTRIK NEGARA (Persero).
PLTU MALUKU UTARA (2 X 7 MW), TIDORE - MALUKU UTARA Contract No.
: 1804-B2-CT-058-R
Project Name
: PLTU Maluku Utara (2 x 7 MW), Tidore - Maluku Utara
Client
: PT. PLN UPK KIT SULMAPA II
Contractor
: Consortium of PT. Shandong Machinery I & E Group & PT. Rekadaya Elektrika
Description
: All Structural Steel Buildings
Design Code
: As Per Specification
Reference
: Bid Document Book I, II, IIIA, IIIB, IVA, IVB, AWS D1.1 & AISC
Inspection Authority
: To Be Advise
Distribution -
PT. PLN (Persero) UPK KIT SULMAPA II Project Team Leader of Construction Supervision Team QA/ QC Consultant JSE QA/ QC Engineer at H.O RE QA/ QC Engineer at site Shandong QA/ QC Department
Issue No
Rev
Submission Date
Isssue Purpose
Prepared by PT. JSE QA/ QC Engineer
Checked by PT. RE QA/ QC Manager
Reviewed by PT. PLN - JMK QA/ QC Engineer
Approved by PT. PLN UPK KIT SULMAPA II
Note - The schedule of inspection will refer to discussion between JSE, SRC and Manufacturer
Prepared by
QC Engineer Date:
PT. Juhdi Sakti Engineering Approved by
QA/ QC Manager Date:
PT. Rekadaya Elektrika Approved by
PT. PLN - JMK Checked by
PT. PLN UPK KIT SULMAPA II Accepted by
QA/ QC Engineer Date:
QA/ QC Engineer Date:
QA/ QC Engineer Date:
Consortium
PT. REKADAYA ELEKTRIKA
SHANDONG MACHINERY
PT. JUHDI SAKTI ENG.
INSPECTION & TEST PLAN
ITP No.
: PLN-ITP-QC-001
Revision
: 3
Date
: March 16, 2012
Project No.
: 1804
PT. PERUSAHAAN LISTRIK NEGARA (Persero).
PLTU MALUKU UTARA (2 X 7 MW), TIDORE - MALUKU UTARA Legend Classification Notification : Inspection request in writing and require a minimum of 24 hours notice of impending inspection/ test H W SW I P R
= Hold Point, no work sequence can proceed without inspection = Witness of inspection, Vendor may proceed if Owner not appearance at the pointed time Witness point shall be given by Notification, if manufacturer doesn't inform the Supervision party, the supervision party will have the right to require a witness again = Spot Witness, Inspection on the spot = Inspection = Prepared of Work or Report/ Documentation = Review of Report or Documentation
Abbreviations ITP AFC WPS
= Inspection & Test Plan = Approved For Construction = Welding Procedure Specification
PQR AWS P. O
= Procedure Qualification Record = American Welding Society = Purchasing Order
Notes 1) Ref. Inspection activities & Approval Section of Document. a. Where there is a Subcontractor element, the Subcontractor involved will sign the approval of the activity (NDE/ PWHT) b. Where there is no Subcontractor element, RE will sign approval of activity and present to the Client. c. This Inspection Test Plan at INSPECTION ACTIVITY COLUMN should be understood to all concerns person will be in charge of tank work. 2) Inspection Test Plan Status It is to be understood that the Inspection forms an integral parts of the control/ verification documentation is needed However, where no other documents are required or exit "The Inspection Test Plan" only will be understood to be the control/ verification document.
Consortium
ITP No Revision Date Project No.
PT. REKADAYA ELEKTRIKA
SHANDONG MACHINERY I & E GROUP
PT. JUHDI SAKTI ENG.
PT. PERUSAHAAN LISTRIK NEGARA (Persero).
INSPECTION & TEST PLAN ( ITP ) PLTU MALUKU UTARA (2 x 7 MW), TIDORE - MALUKU UTARA
: PLN-ITP-QC-001 :3 : March 16, 2012 : 1804
STEEL STRUCTURE INSPECTION ACTIVITIES NO 1
2
3
DESCRIPTION & ACTIVITIES CHECK LIST Pre Fabrication 1.1 Availability of ITP, indication of Hold, Review & Witness Point 1.2 Availability of Detailed Dwg. 1.3 Availability of WPS/ PQR 1.4 Welder Qualification 1.5 Material Identification 1.5.1 Quantity 1.5.2 Visual Inspection 1.5.3 Dimensional Check 1.5.4 Type of Material Foundation (Support) 2.1 Location, Elevation and Orientation 2.2 Pad/ Shim Plate 2.3 Centerline & Elevation For Column And Beam 2.4 Grouting In Anchor Pocket 2.5 Grouting On Surface Intallation 3.1 Field Weld Results (If Any) 3.2 Elevation, Centerline & Plumbness Check 3.3 Inspection For Highh Strength Bolting 3.4 Anchor Bolt Tightening 3.5 Attachment (platform, ladder, etc.) Install (If Any) 3.6 Final Visual Inspection
JSE
SRC
PLN - JMK
PLN UPK KIT SULMAPA II
Approved ITP AFC Dwg. Approved WPS Welder Certificate
P R P P
R P&R R W
R R R W
R R R W
AFC Dwg. AFC Dwg. & AWS D1.1 Project Spec. Mill Certificate
P. O Report & Shipping Doc. Project Spec. Mill Certificate & AFC Dwg. Project Spec. & AWS D1.1
R I I R
P SW SW R
R SW SW R
R SW SW R
AFC Dwg. AFC Dwg. AFC Dwg. AFC Dwg./ Project Spec. AFC Dwg./ Manufacturers
AFC Dwg. & Report AFC Dwg. AFC Dwg. & Report AFC Dwg./ Project Spec. & Report AFC Dwg./ Manufacturers & Report
P P P P P
W W W W W
W W W W W
W W W W W
Approved WPS & AWS D1.1 Project Spec., AWS D1.1 & AISC Project Spec. & AISC Project Spec. & AISC AFC Dwg. As-Built Dwg.
AWS D1.1. & Report Project Spec., AWS D1.1, AISC & Report Project Spec., AISC & Report Project Spec., AISC & Report AFC Dwg. & Report As-Built Dwg.
P P P P P P
SW W W W SW W
SW W W W SW W
SW W W W SW W
REFERENCE DOCUMENT
VERIFYING DOCUMENT
Technical Specification Design Code AWS D1.1 AWS D.1.1/ Eng. Spec.