ITP Mechanical Fabrication Piping and Structure
February 15, 2017 | Author: Adiguna Dhana | Category: N/A
Short Description
Download ITP Mechanical Fabrication Piping and Structure...
Description
MEC
CONSTRUCTION, ELECTRICAL, MECHANICAL
PROJECT TITLE
:
TURNAROUND
Prepared by,
Reviewed by,
AGUS SUTRISNO QA/QC TAR
IRWAN SIMANJUNTAK QA/QC Lead
MEC
CONSTRUCTION, ELECTRICAL, MECHANICAL
NO.
DESCRIPTION
NO.
DESCRIPTION
1.
DOCUMENT REVIEW
2.
MATERIAL RECEIVING
3.
WELDING
4.
INSPECTION
5.
HYDROSTATIC TEST
6.
PAINTING
7.
PACKAGING AND DELIVERY
8.
HOOK UP / INSTALLATION
9.
DOCUMENTATION
10.
ABREVIATION
INSPECTION AND TEST PLAN MECHANICAL FABRICATION PIPING AND STRUCTURE DOC NO: …/…/……/../……/….
NAROUND AND CONSTRUCTION PROJECT
y,
UNTAK d
Approved by,
Approved by,
MOHAMMAD ABDURRAFIQ TAR TEAM LEADER
ANGGIT SANTIA NSD TEAM LEADER
INSPECTION AND TEST PLAN MECHANICAL FABRICATION PIPING AND STRUCTURE DOC NO: …/…/……/../……/….
VIEW
EIVING
TEST
D DELIVERY
ALLATION
ON
Date Issue Revision Page
: ….-….-.. :0 : 1 of 18
ROJECT 2014
Approved by,
Approved By
RICHARD H. SINAGA QA/QC CERTIFICATION
M. SYAFEI LUBIS FAB TEAM LEADER
PAGE
Date Issue Revision
: ….-….-.. :0
Page
: 2 of 18
PAGE
3
of
18
3
of
18
4
of
18
6
of
18
7
of
18
8
of
18
9
of
18
10
of
18
15
of
18
17
of
18
CONSTRUCTION, ELECTRICAL, MECHANICAL
Client Project Location No 1
2
INSPECTION AND TEST PLAN …….. DOC NO: …/…/……/../……/….
: PHE ONWJ : ………… : Offshore North West Java Activity Document Review - WPS & PQR - Welder Certificate - Fabrication Procedure - Hydrostatic Procedure - Quality Assurance Manual (if any) - Purchasing Order - NDE Procedure - NDE Personnel Certificate - Painting Procedure - Mill Certificate - Inspection Report - AFC Drawing Material Receiving - Verification Material - Visual Material (take photoraphs)
Reference Document
Acceptance Norm
- ASME Section IX - ASME Section IX - ASME Section IX - ASME Section V / Spec ARII - ARII-GS-105 - Procedure Specification - ASME Section V - ASME Section V - PHEONWJ-F-PRC-007 - ASME Section II - ASME Section V
-
- Purchasing/Work Order
-
- Identification Material
- Mill Certificate
- Heat Number Transfer
-
-
Verified Document
- WPS & QPR All welding activities shall be comply with - Welder Certificate WPS/QPR approved by authorized parties/Migas - Manufacture Data Report
All of document shall be review by PHE ONWJ prior to used in project execution
All of document shall be refers to PHE ONWJ Spesification and International Code/Standard
- Quality Manual (if any) - Purchasing Order/Work Order NDE Procedure - NDE Personnel Certificate - Painting Procedure - Mill Certificate - Inspection & Test Report
: ….-….-.. : 0 : 3 of 18
Date Issue Revision Page Acceptance Crtiretia
- ASME Section IX - ASME Section IX - ASME Section IX - Spesification/Procedure - Specification/Pricedure/ISO - Purchasing Order - ASME Section IX - PHEONWJ-F-PRC-0007 - ASME Section II - ASME Section V - PHEONWJ-X-DSH-0001
Note
Inspection FAB/CAT/GRP
NDT TEAM
PHE QC
P P P P P P P P P P P
R R W/I W/I R R R R R R R
- Test Report, Inspection Report
- ASME Section II - PHEONWJ-S-SPE-0101
P
V/W
- Material to be identified one by one with accurately, againt with the mill certificate
- Mill Certifiate
- ASME Section II - PHEONWJ-M-SPE-0023 - PHEONWJ-M-SPE-0025
P
W/I
- Purchasing Order/Work Order
- Heat number shall be transfer from the originally plate sheet or piping to the cutet pieces plate sheet or piping (if any)
- Test Report & Inspection Report
- ASME Section II - PHEONWJ-M-SPE-0023 - PHEONWJ-M-SPE-0025
P
V/W
- Stamping Identification
- Drawing - Specification/Procedure - ASME Section II - ASTM, MSS 44/ 55
-
- Name Plate/Stamp Odentification - Manufacture Data Report - Inspection Report Heat Number Transfer
- ASTM, MSS 44, 45 - PHEONWJ-X-DSH-0001
P
V/W
- Dimensional
- ASTM - ASME B16.5 - ASME B16.47 A/B - API 5L - ASTM / MSS 44/ 45
- All material received will be dimensional as per PHE ONWJ specification and international standard code
- Report of Dimensional - Report Inspection - Mill Certificate - Purchasing Order/Work Order
- Procedure - ASTM/MSS SP 44/55 - ASME B16.5 - ASME B16.47 A/B - PHEONWJ-M-SPE-0023 - PHEONWJ-M-SPE-0025
P
V/W
- Material Handling
- ASTM - MSS 44/55 - Procedure/Specification
-
- Mill Certificate - Procedure/Specification
- Procedure/Specification
P
V/R
Material to be received in good condition c/w MTO and mill certificate and other documentation
Material to be identified one by one with accurately, againt with the mill certificate
Material to be handled and storage refer to warehouse manual handling procedure
H = Hold Point, W = Witness Point, R = Review, P = Perform/ Provide, M = Monitor, S = Spot, V = Verify, I = Inspection
QPS
MIGAS