ITP for Storage Tank
Short Description
Inspection and Test Plan for Storage Tank...
Description
Prepared By :
Tank No.
: T-30A1 Legend :
ITP NO.
INSPECTION AND TEST ITEMS
QUALITY CONTROL PLAN
Date :
17-Aug-11
INSPECTION AND TEST PLAN FOR STORAGE TANK
REV :
A
(ALUMINUM DOME ROOF / INTERNAL FLOATING COVER (FULL FACE CONTACT)) I = Inspection by visual, II = Inspection by Surveillance, III = Inspection by Measurement, IV = Inspection by Testing, P = Prepare, R = Review Record, A = Approve Record, W = Witness, ( ) = Spot,
ACCEPTANCE CRITERIA
APPLICABLE CODE/STANDARD
ITP METHOD
SAMPLE SIZE / FREQUENCY
ITP METHOD / BY 3rd-Party
Signature
Date
RECORD FORM No.
[ ] = Random, H = Hold Point
REMARKS
Shop Fabrication 1.0
Material
1.1 Incoming Inspection (a) Material Spec. and Grade (b) Yield and Tensile Strength (c) Chemical Composition (d) Plate Size & Physical Condition
1.2 Identification and Traceability
1.3 Storage and Handling : (a) Materials (b) Welding Consumables
2.0
WPS / PQR / WQT Certs
3.0
Pre-fabrication
3.1 Dimensional Inspection : Shell, Roof, Bottom , Annular Bottom, Roof Annular, Reinforcing Plate, etc. (a) Layout, Marking and Cutting (b) Edge Preparation (c) Curvature and Surface
Compliance with para.5 of project spec. No. DEP 34.51.01.31 GEN. and & EN 14015 - Check purchase requisition against D/O and order spec. - Compliance with the Code requirement. - Thk.tolerance specified thk., PO / code - No flattening, thining, flaw, and injurious defects on the surfaces and cut edges. - Check plate ID such as heat no., plate no., and thickness against Mill Certificate. - Timber piece req'd, never direct on ground and proper handle to avoid mechanical damage. - Shall be kept in a clean/dry area & proper handle to avoid physical damage and contamination. Compliance with ENTS-QWI-09(Issue no.04) and Sex.IX of the ASME Code and PO/ Spec. requirments Compliance with project spec. No. DEP 34.51.01.31 GEN.
-DEP 34.51.01.31-GEN. -EN 14015 : 2004 -EN 10029 : 1991
-Para 6.1.8 EN 14015 : 2004 & Table 1 EN 10029 : 1991
To be accomplished on each surveillance Visual
100% of incoming goods (below 5 pcs per one item)
I, II
[I]
-
Mill Cert. of Materials
Vernier Caliper or UTM Gauge Visual
6 points of each steel plate
I, III
(R)
-
QA-F06B
Throughout fabrication
-Para 15.4 EN 14015:2004 Visual
All pressure retaining parts
P
R
-
QA-T-33
-Para 15.3 EN 14015:2004 Visual
Throughout fabrication
II
R
-
None
II
[ II ]
-
As per TREL11402-WP-005
IV, P IV, P
R, A R
A
QA-W-00, QA-W-02
I, II, III, IV, P
[W]
-
QA-T-01, QA-T-02, QA-T-03 QA-T-20
TREL-11402-WP-005
-ENTS-QWI-09 -ASME SECTION IX
Visual
Before and after removal from manufacturer's package All applicable welding process(es) TOP approved NDE companies
-DEP 34.51.01.31-GEN -DEP 64.51.01.31-GEN.
- Dimension shall be within the following tolerance:- Max.allow. tolerance for difference in diagonal of shell plate : 3 mm. - Tolerance within ± 2 mm. in length. -Tolerance within ± 2 mm. in width. - O.D., width & length tolerance for reinforcing plate : ± 3 mm. - Tolerance within ± 2.5º in single bevel. - Plate thickness up to 12.5 mm.Max.16mm differences between design and the as built profile
-EN 14015 : 2004
-Final thickness of the plate shall not be less than 95% of the plate thickness
-Para 15.7 EN 14015:2004
Measuring Tape
-Para 15.5 EN 14015 : 2004 -Para 15.5 EN 14015 : 2004 -Para 15.5 EN 14015 : 2004
Full inspection
Template, Measuring Tape QA-T-05
-Para 7.4e(3) TREL11402-MP-001 Weld Gauge -Table 25 EN 14015 : 2004 Sweep Board 1 m long
Page 1 of 6
visit for which the activity is applicable
Prepared By :
Tank No.
: T-30A1 Legend :
ITP NO.
INSPECTION AND TEST ITEMS
3.2 Marking Inspection (a) Third Point Punch Marking (b) Pre-fabricated Material Identification (piece mark)
3.3 Manhole & Nozzle pre-assembly with Flange & Cover
3.4 Other Components(Internal pipe w/c supp't, sump, vortex breaker, spiral stair-way, roof handrail, roof walkway,roof way, water spray system, topangle, earth piece, cable conduit,support, settling level mark, gussets,name plate bracket, anchor chair,jacking up bracket, riser pipe,internals and other structural etc. 3.5 Heating coils-Shop welding if any 4.0
Shop Post Weld Heat Treatment (PWHT) (Shell with nozzles, t ≥ 25 MM or D > 300 MM)
QUALITY CONTROL PLAN
Date :
17-Aug-11
INSPECTION AND TEST PLAN FOR STORAGE TANK
REV :
A
(ALUMINUM DOME ROOF / INTERNAL FLOATING COVER (FULL FACE CONTACT)) I = Inspection by visual, II = Inspection by Surveillance, III = Inspection by Measurement, IV = Inspection by Testing, P = Prepare, R = Review Record, A = Approve Record, W = Witness, ( ) = Spot,
ACCEPTANCE CRITERIA - As per AFC. drawing and EN 14015 : 2004 (a) Shall be punched on the inside top edge in every 1/3 plate length. (b) Markings, such as number of tank, piece, die-stamping heat, and thickness. (ccourse, ) Low stress min.radius of 0.25mm. ,not suitable for plates less than 6mm.thick - Manhole tolerance: ID.min.600mm. - ±3 mm for O.D. of flange and neck. - +3 mm / -0 mm for flange Thk. - ±1º for inclination of flg. face to neck. Nozzle tolerance : - ±0.5º for inclination of flg. face to neck. - As per AFC drawing and EN 14015 : 2004
APPLICABLE CODE/STANDARD -Para 15.4 & 15.11 EN 14015 : 2004
ITP METHOD Visual
Shell plates section
Visual
All primary components
Square, Measuring Tape
After welding
Square, Weld Gauge, Measuring Tape
Full inspection
- Dimension check & Tolerance as per drawings - EN14015 : 2004 Measuring Tape - Visual & 100% RT Per approved drawing Visual - Para 18.10 EN 14015 : 2004 Visual a) No. of thermocouple & location Thermocouple b) Temperature / recorder
Full Inspection Full Inspection
-Para 7.4e(3) TREL11402-MP-001
c) Holding time d) Calibration / certification 5.0
Shop Examination of Welds (a) Visual Inspection of Weldment, final visual, dimension checks. (b) PT or MT - Temporary & Permanent attachment
6.0
Painting Inspection (External) ( Under Bottom, shell, roof and structure steel) (a) Surface Preparation (b) Primer Coat
SAMPLE SIZE / FREQUENCY
- As per AFC. drawing and EN 14015 : 2004 - Accordance with Table 32-Imperfection acceptance criteria - Shall accordance with Table 29, EN14015 : 2004 - Accordance with Table 32-Imperfection acceptance criteria
- As per para. 3 of project spec. no. DEP 30.48.00.31-GEN. & TOSS-48-001 - As per appendix 1 & 2 of project spec. no. DEP 30.48.00.31-GEN. and TOSS-48-001
ITP METHOD / BY
Signature
Date
RECORD FORM No.
I, II P
[I] R
3rd-Party -
III, P
[ III ], R
-
QA-T-04
I, II, III, IV, P (W), R
-
QA-G-01,QA-S-01
-
PWHT Chart
[ ] = Random, H = Hold Point
REMARKS
QA-T-33
I, III, P R I, II, III,
[W] R I, W, R
I, III, P
(W)
IV, P
(W), R, A
-
PT or MT report
I, III, P
[W]
-
QA-F-11B
Min. TC of 3 pcs Heating
View more...
Comments