ITP for Electrical Conduit Installation.revb

July 5, 2018 | Author: Ganga Daran | Category: Specification (Technical Standard), Industries, Technology, Engineering, Business
Share Embed Donate


Short Description

ITP...

Description

Dung Quat Economic Zone, Binh Thuan, Binh Son, Quang Ngai, Vietnam T +84 55 5618 900 F +84 553 618 950

B

20.Jan.2012

V.H.PHONG J.Y.JEONG

K.J.LIM

For Information Information

 A

07.Dec.2011

V.H.PHONG J.Y.JEONG

K.J.LIM

For Information Information

Rev.

Date

Drawn

Checked

Approved

Details of Revision

Owner :

AES-VCM MONG DUONG POWER COMPANY LIMITED

Owner's Engineer :

ITP for Electrical Conduit Installation

Doc. No.

T10206-QE01-P0ZEN__-040201

Rev. B

Contractor 

DOOSAN

2 of 3

AES-VCM

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

S

:



:

W

:

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan.

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by  AES-VCM Mong Duong.

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not.

Item Name

Oper. No.

KKS Description

Abbreviation : Note :

Doc. No.

T10206-QE01-P0ZEN__-040201

Rev. B

Contractor 

DOOSAN

Page 3

AES-VCM

ITP for Electrical conduit installation

Inspection & Test Activities Applicable Code & Subcontractor DOOSAN AES-VCM Standard Documentation A Sign A Sign A Sign

Inspection Process

Verification Document

Project Specification

H

W

R

Verify installed location

Construction Drawing

H

S

S

3.0

Steel conduit installation

Construction Drawing

H

W

W

Inspection Sheet

4.0

PVC installation for Duct Bank ( before pouring concrete)

Construction Drawing

H

W

W

Inspection Sheet

1.0

Material Approval

2.0

S: Surveillance

R: Report Review

W: Witness Inspection

H: Hold Inspection

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

page3

Quality Record

Remarks

View more...