This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S
:
R
:
W
:
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan.
Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by AES-VCM Mong Duong.
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not.
Item Name
Oper. No.
KKS Description
Abbreviation : Note :
Doc. No.
T10206-QE01-P0ZEN__-040201
Rev. B
Contractor
DOOSAN
Page 3
AES-VCM
ITP for Electrical conduit installation
Inspection & Test Activities Applicable Code & Subcontractor DOOSAN AES-VCM Standard Documentation A Sign A Sign A Sign
Inspection Process
Verification Document
Project Specification
H
W
R
Verify installed location
Construction Drawing
H
S
S
3.0
Steel conduit installation
Construction Drawing
H
W
W
Inspection Sheet
4.0
PVC installation for Duct Bank ( before pouring concrete)
Construction Drawing
H
W
W
Inspection Sheet
1.0
Material Approval
2.0
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.