AES-VCM MONG DUONG POWER COMPANY LIMITED Owner's Engineer :
Contractor :
Project :
PC MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
Title :
T10206-QE01-POZEN__-040203 INSPECTION AND TEST PLAN FOR CABLE TRAYS INSTALLATION
Drawing No. :
T10206-QE01-P0ZEN-040203
Page 1
:
T10206
UAS :
QE01
Unit :
PO
KKS :
ZEN
Reg. No. 040203 Revision : Page-No :
A 1 of 4
ITP for Cable Tray Installation
Doc. No.
T10206-QE01-POZEN-040203
Rev. A
Contractor
DOOSAN
2 of 4
AES-VCM
This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S
:
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan.
R
:
Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by .
W
:
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not.
H
:
Hold Point / Downstream construction and other activities shall not proceed without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Page 2
Inspection & Test Plan for Cable Tray Installation
Item Name
Oper. No.
Check the condition of cable Supports, Racks, Trays and Trunking while receiving.
Note :
:
Rev. A
Contractor
DOOSAN
Page 3 of 4
A2
B1
Verification Document
Remarks (Allowable tolerance)
Packing List
R
R
R
Packing List
N/A
Check size and type of the Supports, Racks, Trays and Trunking with respect to the requisitions.
Material Technical Specification
R
R
R
Technical Specification, T10206-YR02-POZEN14403
N/A
Check the installation is according to the designed layout drawing & specification.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
expansion joints if any are specified are in place.
Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B3
No sharp edges cut to be permitted. Cutting edges of trays/trunkings are touch-up painted.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B4
Ensure the gap between parallel runs is quite enough to accommodate the layer of cables.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B5
Ensure there are no sharp 90 degrees bends are made.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B6
Ensure the cable trays numbered according to cable trays route layout on which KKS nos. are indicated and explained.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B7
Ensure the cable trays numbered according to cable trays route layout on which KKS nos. are indicated and explained.
Approved Cons truction Drawing T10206-YD04---
H
W
W
Refer to attached Checklist
N/A
B2
Abb revi atio n
T10206-QE01-POZEN-040203
Inspection & Test Activities Specific Applicable drawing number, Standard Code number, Subcontractor DOOSAN AES-VCM Specification A Sign A Sign A Sign
Inspection Process
A1 A.Material Receipt
B. Cable Tray Installation
Doc. No.
AES-VCM
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
Inspection Check List Project
:
Drawing No.
:
Specific Location
:
Cable Tray Installation Works
Ref. No. Date :
CHECK ITEM
No
Inspection elements
1
Check the condition of cable Supports, Racks, Trays and Trunking while receiving.
2
Check size and type of the Supports, Racks, Trays and Trunking with respect to the requisitions.
Verification & Approval Observed Result Yes No N/A / Remarks
Inspection Check List Project
:
Drawing No.
:
Specific Location
:
Cable Tray Installation Works
Ref. No. Date :
CHECK ITEM
Verification & Approval Observed Result Yes No N/A / Remarks
No
Inspection elements
1
Check the condition of cable Supports, Racks, Trays and Trunking while receiving.
2
Check size and type of the Supports, Racks, Trays and Trunking with respect to the requisitions.
3
Check the installation is according to the designed layout drawing & specification.
4
Check the leveling & alignment of tray & rack and expansion joints if any are specified are in place.
5
No sharp edges cut to be permitted. Cutting edges of trays/trunkings are touch-up painted.
6
Ensure the gap between parallel runs is quite enough to accommodate the layer of cables.
7
Ensure there are no sharp 90 degrees bends are made.
8
Ensure the cable trays numbered according to cable trays route layout on which KKS nos. are indicated and explained.
9
Check whether the exclusive earth continuity between the trays / trunking / racks where the joints are made.
10
Earth jumper cable with crimp type terminals to be fitted to all cable tray joints.
hecked by : (Subcontractor DOOSAN Electrical Dept.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.